2-Attachment B - Standard Contract.pdf
PDF 358 KB Posted
- Attached to
- RIDM LANDOLT Spacecraft Platform
- Solicitation number
- GMU-KS0903-26
- Issued by
- Virginia
About this file
Summary
This is a Standard Contract document from George Mason University in Virginia for the provision of spacecraft services in support of a NASA-funded astrophysics mission. The contract establishes terms and conditions for a single contractor to provide a flight-qualified spacecraft bus, payload integration and verification services, early hardware-in-the-loop testbed infrastructure, and integrated routine and orbital operations for a one-year astrophysics mission in Geostationary Earth Orbit (GEO) in support of the NASA Landolt Mission. The contract period extends from the effective date through September 30, 2029, with a federal award allowing for a one-year no-cost extension to September 30, 2030, and further extension possible through negotiation. Peter Plavchan (or designee) serves as the Contract Administrator with authority to enforce contract performance and determine work acceptability. The contractor may issue pre-approved Statements of Work (SOWs) to modify the scope of engagement, though George Mason retains the right to terminate individual SOWs for convenience without terminating the overall contract.
The specific pricing schedule will be negotiated and inserted into the contract; invoices must reference a George Mason Purchase Order number and will be paid Net 30 following receipt by the accounts payable department. The contract incorporates federal flowdowns and NASA requirements from Award No. 80NSSC24M0086, including provisions for patent rights, export controls, non-discrimination, and cross-waivers of liability for space operations. The contractor must maintain commercial general liability insurance of at least one million dollars per occurrence, workers compensation insurance as required by statute, commercial automobile liability insurance of at least one million dollars per occurrence, and an umbrella/excess policy of at least five million dollars. All contractor personnel accessing George Mason facilities must pass comprehensive background checks at the contractor's expense. The contract is governed by Virginia law and the Restructured Higher Education Financial and Administrative Operations Act, with disputes resolved through procedures outlined in the Commonwealth of Virginia Purchasing Manual for Institutions of Higher Education and Their Vendors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B – STANDARD CONTRACT
Note: Other documents may be incorporated into this document, either by way of attachment or by reference, but in all cases this contract document shall take precedence over all other documents and will govern the terms and conditions of the contract.
This Contract entered on this ____ day of , 2026 (Effective Date) by ________________ hereinafter called “Contractor” (located at ____________) and George Mason University hereinafter called “George Mason,” “University”.
I. WITNESSETH that the Contractor and George Mason, in consideration of the mutual covenants, promises and agreement herein contained, agree as follows:
II. SCOPE OF CONTRACT: The Contractor shall provide a flight-qualified spacecraft bus, payload integration and verification services, early hardware-in-the-loop testbed infrastructure, and integrated routine/orbital operations for a one-year astrophysics mission in Geostationary Earth Orbit (GEO) in support of the NASA Landolt Mission (a federal grant awarded to George Mason University’s College of Science). as set forth in the Contract documents.
During the term of this Contract, Contractor may issue Statements of Work (“SOW”) to modify the scope of the engagement or otherwise change the work to be performed under this Contract. All SOW’s must be on a form approved by George Mason prior to the start of this Contract. Any SOW that does not conform to the pre-approved SOW form shall be void even if approved by George Mason. Additionally, the SOW shall be limited to modifications to the scope of the engagement or other changes to the work to be performed under this Contract; any other terms contained in a SOW shall be void and have no effect even if approved by George Mason. Other than changes to the scope of the engagement or the work to be performed under this Contract, Contractor may not change, modify, add, supersede, or remove any term from this Contract through a SOW.
George Mason may, upon written notice, terminate any individual Statement of Work (“SOW”) issued under this Contract for convenience, without terminating the Contract as a whole. Termination of a SOW shall be effective immediately after receipt of written notice. Upon termination of a SOW, George Mason shall be liable only for payment of services actually performed and accepted up to the effective date of termination, reimbursable expenses incurred prior to the effective date of termination (if applicable and in accordance with the SOW), and any non-cancellable commitments expressly authorized in the SOW.
Termination of an SOW shall not affect the validity or enforceability of the Contract or any other SOWs then in effect.
III. PERIOD OF CONTRACT: From Effective Date of contract through the federal award period of performance end date, currently September 30th, 2029. The federal award has an allowed one-year no cost extension to September 30th, 2030 which George Mason University intends to exercise. The contract end date may be further extended as negotiated.
IV. PRICE SCHEDULE: The pricing specified in this section represents the complete list of charges from the Contractor. George Mason shall not be liable for any additional charges.
Negotiated price schedule will be inserted here.
V. CONTRACT ADMINISTRATION: Peter Plavchan (or delegate) shall serve as Contract Administrator for this Contract and shall use all powers under the Contract to enforce its faithful performance. The Contract Administrator shall determine the amount, quality and acceptability of work and shall decide all other questions in connection with the work. All direction and order from George Mason shall be transmitted through the Contract Administrator, however, the Contract Administrator shall have no authority to approve changes which shall alter the concept or scope or change the basis for compensation.
VI. METHOD OF PAYMENT: As selected from RFP Payment Term Options / Method of Payment. Contractor shall submit invoices directly to acctpay@gmu.edu and copy the Contract Administrator. Invoices must reference a George Mason Purchase Order number to be considered valid. Invoices will only be accepted if submitted after services rendered or goods received. All invoice will be paid Net 30 (or as selected in Payment Terms / Method of Payment), after receipt of invoice in the accounts payable email inbox.
VII. THE CONTRACT DOCUMENTS SHALL CONSIST OF (In order of precedence):
A. This signed form;
B. Uniform Guidance and Mandatory Federal Flowdowns (attached);
Purchasing Department 4400 University Drive, MS 3C1, Fairfax, VA 22030 Phone: 703.993.2580; http://fiscal.gmu.edu/purchasing/
C. Negotiation Response(s) dated XXXXX (attached);
D. RFP No. GMU-KS0904-26, in its entirety (attached);
E. Contractor’s proposal dated September 23, 2026 (attached);
F. Contractor’s Statement of Work template (attached).
VIII. GOVERNING RULES: This Contract is governed by the provisions of the Restructured Higher Education Financial and
Administrative Operations Act, Chapter 10 (§ 23.1-1000 et seq.) of Title 23.1 of the Code of Virginia, and the “Governing Rules” and the Purchasing Manual for Institutions of Higher Education and their Vendors. Documents may be viewed at:
https://vascupp.org.
IX. CONTRACT PARTICIPATION: It is the intent of this Contract to allow for cooperative procurement. Accordingly, any public body, public or private health or educational institutions, or affiliated corporations may access this Contract if authorized by the Contractor.
Participation in this Contract is strictly voluntary. If authorized by the Contractor, this Contract will be extended to the entities indicated above to purchase goods and services in accordance with contract terms. As a separate contractual relationship, the participating entity will place its own orders directly with the Contractor and shall fully and independently administer its use of the contract to include contractual disputes, invoicing and payments without direct administration from the University. No modification of this Contract or execution of a separate agreement is required to participate; however, the participating entity and the Contractor may modify the terms and conditions of the contract to accommodate specific governing laws, regulations, policies, and business goals required by the participating entity. Any such modification will apply solely between the participating entity and the Contractor.
The University may request the Contractor provide semi-annual usage reports for all entities accessing this Contract. The University shall not be held liable for any costs or damages incurred by any other participating entity as a result of any authorization by the Contractor to extend the Contract. It is understood and agreed that the University is not responsible for the acts or omissions of any entity and will not be considered in default of the contract no matter the circumstances.
Use of this Contract does not preclude any participating entity from using other contracts or competitive processes as needed.
X. STANDARD TERMS AND CONDITIONS:
A. APPLICABLE LAW AND CHOICE OF FORUM: This Contract shall be construed, governed, and interpreted pursuant to the laws of the Commonwealth of Virginia. All disputes arising under this Contract shall be brought before an appropriate court in the Commonwealth of Virginia.
B. ANTI-DISCRIMINATION: By entering into this Contract, Contractor certifies to the Commonwealth that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians with Disabilities Act, the Americans with Disabilities Act and §§ 9&10 of the Governing Rules. If Contractor is a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the Contract on the basis of the recipient's religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. (Governing Rules, § 36).
In every contract over $10,000 the provisions in 1. and 2. below apply:
1. During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.
b. The Contractor, in all solicitations or advertisements for employees placed by or on behalf of the
Contractor, will state that such Contractor is an equal opportunity employer.
c. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting these requirements.
2. The Contractor will include the provisions of 1. above in every subcontract or purchase order over $10,000, so that the provisions will be binding upon each subcontractor or Contractor.
C. ANTITRUST: By entering into this Contract, the Contractor conveys, sells, assigns, and transfers to the
Commonwealth of Virginia all rights, title and interest in and to all causes of action it may now have or hereafter acquire under the antitrust laws of the United States and the Commonwealth of Virginia, relating to the particular goods or services purchased or acquired by the Commonwealth of Virginia under this Contract.
D. ASSIGNMENT: Neither party will assign or otherwise transfer its rights or obligations under this Contract without both parties’ prior written consent. Any attempted assignment, transfer, or delegation without such consent is void.
E. AUDIT: The Contractor shall retain all books, records, and other documents relative to this Contract for five (5) years after final payment. George Mason, its authorized agents, and/or state auditors shall have full access to and the right to examine any of said materials during said period.
F. AVAILABILITY OF FUNDS: It is understood and agreed between the parties herein that George Mason shall be bound hereunder only to the extent of the funds available or which may hereafter become available for the purpose of this Contract.
G. AUTHORIZED SIGNATURES: The signatory for each Party certifies that he or she is an authorized agent to sign on behalf such Party.
H. BACKGROUND CHECKS: Prior to any of Contractors employees, agents, or subcontractors (collectively
"Personnel") performing services on any George Mason campus, Contractor shall, at its sole expense, obtain comprehensive background checks on all Personnel. Such background checks shall include, at minimum: a review of the Personnel's records to include social security number search, local and federal criminal records (any misdemeanor convictions and/or felony convictions), the Sex Offender Registry, and the SanctionsBase+ Search or equivalent. In addition, for sensitive financial work or when operating a motor vehicle in the performance of duties for George Mason, the background investigation shall include a credit report or motor vehicle check, respectively. Contractor warrants that all such Personnel have successfully passed these background checks and are qualified to perform the contracted services. Contractor shall maintain records of all background checks and make them available to George Mason upon request. George Mason reserves the right to deny access to its premises to any Personnel based on the results of these background checks or for any other reason at George Mason’s sole discretion. Contractor shall immediately remove any Personnel from George Mason’s premises upon George Mason’s request. Signature on this Contract confirms your compliance with this requirement.
I. CANCELLATION OF CONTRACT: George Mason reserves the right to cancel this Contract, in part or in whole, without penalty, for any reason, upon 60 days written notice to the Contractor. Upon written notice of cancellation from George Mason, George Mason shall be fully released from any further obligation under the Contract and Contractor agrees to directly refund all payments, for services not already performed, to George Mason, including any pre-paid deposits, within 14 days. Any contract cancellation notice shall not relieve the Contractor of the obligation to deliver and/or perform on all outstanding orders issued prior to the effective date of cancellation.
J. CHANGES TO THE CONTRACT: Changes can be made to this Contract in any of the following ways:
1. The parties may agree in writing to modify the scope of this Contract.
2. George Mason may order changes within the general scope of Contract at any time by written notice to Contractor. Changes within the scope of this Contract include, but are not limited to, things such as services to be performed, the method of packing or shipment, and the place of delivery or installation. Contractor shall comply with the notice upon receipt. Contractor shall be compensated for any additional costs incurred as the result of such order and shall give George Mason a credit for any savings. Said compensation shall be determined by one of the following methods:
a. By mutual agreement between the parties in writing; or
b. By agreeing upon a unit price or using a unit price set forth in the contract, if the work to be done can be expressed in units, and the contractor accounts for the number of units of work performed, subject to the George Mason’s right to audit Contractor’s records and/or to determine the correct number of units independently; or
c. By ordering Contractor to proceed with the work and keep a record of all costs incurred and savings realized. A markup for overhead and profit may be allowed if provided by the Contract. The same markup shall be used for determining a decrease in price as the result of savings realized. Contractor shall present George Mason with all vouchers and records of expenses incurred and savings realized.
George Mason shall have the right to audit the records of Contractor as it deems necessary to determine costs or savings. Any claim for an adjustment in price under this provision must be asserted by written notice to George Mason within thirty (30) days from the date of receipt of the written order from George Mason. If the Parties fail to agree on an amount of adjustment, the question of an increase or decrease in the contract price or time for performance shall be resolved in accordance with the procedures for resolving disputes provided by the Disputes Clause of this Contract or, if there is none, in accordance with the disputes provisions of the Commonwealth of Virginia Purchasing Manual for Institutions of Higher Education and Their Contractors. Neither the existence of a claim nor a dispute resolution process, litigation or any other provision of this Contract shall excuse the Contractor from promptly complying with the changes ordered by George Mason or with the performance of the contract generally.
K. CLAIMS: Contractual claims, whether for money or other relief, shall be submitted in writing no later than 60 days after final payment. However, written notice of the Contractor's intention to file a claim shall be given at the time of the occurrence or beginning of the work upon which the claim is based. Nothing herein shall preclude a contract from requiring submission of an invoice for final payment within a certain time after completion and acceptance of the work or acceptance of the goods. Pendency of claims shall not delay payment of amounts agreed due in the final payment.
1. The Contractor must submit written claim to:
Chief Procurement Officer George Mason University Purch1@gmu.edu
2. The Contractor must submit any unresolved claim in writing no later than 60 days after final payment to the Chief Procurement Officer.
3. Upon receiving the written claim, the Chief Procurement Officer will review the written materials relating to the claim and will mail their decision to the Contractor within 60 days after receipt of the claim.
4. The Contractor may appeal the Chief Procurement Officer’s decision in accordance with §55 of the
Governing Rules.
L. COMPLIANCE: All goods and services provided to George Mason shall be done so in accordance with any and all applicable local, state, federal, and international laws, regulations and/or requirements and any industry standards, including but not limited to: the Family Educational Rights and Privacy Act (FERPA), Health Insurance Portability and Accountability Act (HIPAA) and Health Information Technology for Economic and Clinical Health Act (HITECH), Government Data Collection and Dissemination Practices Act, Gramm-Leach-Bliley Financial Modernization Act (GLB), Payment Card Industry Data Security Standards (PCI-DSS), Americans with Disabilities Act (ADA), Virginia State Corporation Commission (SCC) registration, and Federal Export Administration Regulations. Any Contractor personnel visiting George Mason facilities will comply with all applicable George Mason policies regarding access to, use of, and conduct within such facilities. George Mason’s policies can be found at https://universitypolicy.gmu.edu/all-policies/ and any facility specific policies can be obtained from the facility manager.
M. CONFIDENTIALITY OF PERSONALLY IDENTIFIABLE INFORMATION: The Contractor shall ensure that personally identifiable information (“PII”) which is defined as any information that by itself or when combined with other information can be connected to a specific person and may include but is not limited to personal identifiers such as name, address, phone, date of birth, Social Security number, student or personal identification numbers, driver’s license numbers, state or federal identification numbers, biometric information, religious or political affiliation, non-directory information, and any other information protected by state or federal privacy laws, will be collected and held confidential and in accordance with this Contract, during and following the term of this Contract, and will not be divulged without the individual's and George Mason's written consent and only in accordance with federal law or the Code of Virginia.
N. CONFLICT OF INTEREST: Contractor represents to George Mason that its entering into this Contract with George
Mason and its performance through its agents, officers and employees does not and will not involve, contribute to nor create a conflict of interest prohibited by Virginia State and Local Government Conflict of Interests Act (Va. Code 2.2-3100 et seq), the Virginia Ethics in Public Contracting Act (§57 of the Governing Rules), the Virginia
Governmental Frauds Act (Va. Code 18.2 – 498.1 et seq) or any other applicable law or regulation.
O. CONTINUITY OF SERVICES:
1. The Contractor recognizes that the services under this Contract are vital to George Mason and must be continued without interruption and that, upon Contract expiration, a successor, either George Mason or another contractor, may continue them. The Contractor agrees:
a. To exercise its best efforts and cooperation to affect an orderly and efficient transition to a successor;
b. To make all George Mason owned facilities, equipment, and data available to any successor at an appropriate time prior to the expiration of the Contract to facilitate transition to successor; and
c. That the University Procurement Officer shall have final authority to resolve disputes related to the transition of the Contract from the Contractor to its successor.
2. The Contractor shall, upon written notice from the Procurement Officer, furnish phase-in/phase-out services for up to ninety (90) days after this Contract expires and shall negotiate in good faith a plan with the successor to execute the phase-in/phase-out services. This plan shall be subject to the Procurement Officer’s approval.
3. The Contractor shall be reimbursed for all reasonable, pre-approved phase-in/phase-out costs (i.e., costs incurred within the agreed period after Contract expiration that result from phase-in, phase-out operations).
All phase-in/phase-out work fees must be approved by the Procurement Officer in writing prior to commencement of said work.
P. DEBARMENT STATUS: As of the Effective Date, the Contractor certifies that it is not currently debarred by the
Commonwealth of Virginia from submitting bids or proposals on contracts for the type of services covered by this Contract, nor is the Contractor an agent of any person or entity that is currently so debarred.
Q. DEFAULT: In the case of failure to deliver goods or services in accordance with this Contract, George Mason, after due oral or written notice, may procure them from other sources and hold Contractor responsible for any resulting additional purchase and administrative costs. This remedy shall be in addition to any other remedies which George Mason may have.
R. DRUG-FREE WORKPLACE: Contractor has, and shall have in place during the performance of this Contract, a drug-free workplace policy (DFWP), which it provides in writing to all its employees, vendors, and subcontractors, and which specifically prohibits the following on company premises, during work-related activities, or while conducting company business: the sale, purchase, manufacture, dispensation, distribution possession, or use of any illegal drug under federal law (including marijuana). For purposes of this section, “drug-free workplace” covers all sites at which work is done by Contractor in connection with this Contract.
S. ENTIRE CONTRACT: This Contract constitutes the entire understanding of the Parties with respect to the subject matter herein and supersedes all prior oral or written contracts with respect to the subject matter herein. This Contract can be modified or amended only by a writing signed by all of the Parties.
T. EXPORT CONTROL:
1. Munitions Items: If the Contractor is providing any items, data or services under this order that are controlled by the Department of State, Directorate of Defense Trade Controls, International Traffic in Arms Regulations (“ITAR”), or any items, technology or software controlled under the “600 series” classifications of the Bureau of Industry and Security’s Commerce Control List (“CCL”) (collectively, “Munitions Items”), prior to delivery, Contractor must:
a. notify George Mason (by sending an email to export@gmu.edu), and
b. receive written authorization for shipment from George Mason’s Director of Export Controls.
The notification provided by the Contractor must include the name of the George Mason point of contact, identify and describe each ITAR or CCL-controlled commodity, provide the associated U.S. Munitions List (USML) category number(s) or Export Control Classification Number, and indicate whether or not the determination was reached as a result of a commodity jurisdiction determination, or self-classification process. The Contractor promises that if it fails to obtain the required written pre-authorization approval for shipment to George Mason of any Munitions Item, it will reimburse George Mason for any fines, legal costs and other fees imposed for any violation of export controls regarding the Munition Item that are reasonably related to the Contractor’s failure to provide notice or obtain George Mason’s written pre-authorization.
2. Dual-Use Items: If the Contractor is providing any dual-use items, technology or software under this order that are listed on the CCL in a series other than a “600 series”, Contractor must (i) include the Export Control Classification Number (ECCN) on the packing or other transmittal documentation traveling with the item(s) and, (ii) send a description of the item, its ECCN, and the name of the George Mason point of contact to:
export@gmu.edu.
U. FORCE MAJEURE: George Mason shall be excused from any and all liability for failure or delay in performance of any obligation under this Contract resulting from any cause not within the reasonable control of George Mason, which includes but is not limited to acts of God, fire, flood, explosion, earthquake, or other natural forces, war, civil unrest, accident, any strike or labor disturbance, travel restrictions, acts of government, disease, pandemic, or contagion, whether such cause is similar or dissimilar to any of the foregoing. Upon written notification from George Mason that such cause has occurred, Contractor agrees to directly refund all payments to George Mason, for services not yet performed, including any pre-paid deposits within 14 days.
V. FUTURE GOODS AND SERVICES: George Mason reserves the right to have Contractor provide additional goods and/or services that may be required by George Mason during the term of this Contract. Any such goods and/or services will be provided by the Contractor under the same pricing, terms and conditions of this Contract. Such additional goods and/or services may include other products, components, accessories, subsystems or related services that are newly introduced during the term of the Contract. Such newly introduced additional goods and/or services will be provided to George Mason at Favored Customer pricing, terms and conditions.
W. IMMIGRATION REFORM AND CONTROL ACT OF 1986: By entering into this Contract Contractor certifies that they do not and will not during the performance of this Contract employ illegal alien workers or otherwise violate the provisions of the federal Immigration Reform and Control Act of 1986.
X. INDEMNIFICATION: Contractor agrees to indemnify, defend and hold harmless George Mason, the Commonwealth of Virginia, its officers, agents, and employees from any claims, damages and actions of any kind or nature, whether at law or in equity, arising from or caused by the use of any materials, goods, or equipment of any kind or nature furnished by the Contractor/any services of any kind or nature furnished by the Contractor, provided that such liability is not attributable to the sole negligence of George Mason or to the failure of George Mason to use the materials, goods, or equipment in the manner already and permanently described by the Contractor on the materials, goods or equipment delivered. Contractor understands and acknowledges that George Mason has not agreed to provide any indemnification or save harmless agreements running to Contractor.
Y. INDEPENDENT CONTRACTOR: The Contractor is not an employee of George Mason,but is engaged as an independent contractor. Nothing in this Contract is intended to, nor shall it create or be deemed to create any partnership, joint venture, franchise, agency or other legal association between the parties. The parties are independent contractors, and any references to a relationship other than that of independent contractors shall be of no force or effect. The Contractor shall indemnify and hold harmless the Commonwealth of Virginia, George Mason, and its employees and agents, with respect to all withholding, Social Security, unemployment compensation and all other taxes or amounts of any kind relating to the Contractor’s performance of this Contract. Nothing in this Contract shall be construed as authority for the Contractor to make commitments which will bind George Mason or to otherwise act on behalf of George Mason, except as George Mason may expressly authorize in writing.
Z. INFORMATION TECHNOLOGY ACCESS ACT: Computer and network security is of paramount concern at
George Mason. George Mason wants to ensure that computer/network hardware and software does not compromise the security of its IT environment. Contractor agrees to use commercially reasonable measures in connection with any offering your company makes to avoid any known threat to the security of the IT environment at George Mason.
All e-learning and information technology developed, purchased, upgraded or renewed by or for the use of George Mason shall comply with all applicable University policies, Federal and State laws and regulations including but not limited to Section 508 of the Rehabilitation Act (29 U.S.C. 794d), the Information Technology Access Act, §§2.2- 3500 through 2.2-3504 of the Code of Virginia, as amended, and all other regulations promulgated under Title II of The Americans with Disabilities Act which are applicable to all benefits, services, programs, and activities provided by or on behalf of the University. The Contractor shall also comply with the Web Content Accessibility Guidelines (WCAG) 2.1 AA. For more information, please visit http://ati.gmu.edu, under Policies and Procedures.
AA. INSURANCE: The Contractor shall maintain all insurance necessary with respect to the services provided to George Mason. The Contractor further certifies that they will maintain the insurance coverage during the entire term of the Contract and that all insurance is to be placed with insurers with a current reasonable A.M. Best’s rating authorized to sell insurance in the Commonwealth of Virginia by the Virginia State Corporation Commission. The Commonwealth of Virginia and George Mason shall be named as an additional insured. By requiring such minimum insurance, George Mason shall not be deemed or construed to have assessed the risk that may be applicable to the
Contractor. The Contractor shall assess its own risks and, if it deems appropriate and/or prudent, maintain higher limits and/or broader coverage. The Contractor is not relieved of any liability or other obligations assumed or pursuant to this Contract by reason of its failure to obtain or maintain insurance in sufficient amounts, duration, or types.
1. Commercial General Liability Insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury or property damage, personal injury and advertising injury, products and completed operations coverage;
2. Workers Compensation Insurance in an amount not less than that prescribed by statutory limits; and, as applicable;
3. Commercial Automobile Liability Insurance applicable to bodily injury and property damage, covering owned, non-owned, leased, and hired vehicles in an amount not less than one million dollars ($1,000,000) per occurrence; and
4. An umbrella/excess policy in an amount not less than five million dollars ($5,000,000) to apply over and above Commercial General Liability, Employer’s Liability, and Commercial Automobile Liability Insurance.
BB. INTELLECTUAL PROPERTY: Contractor warrants and represents that it will not violate or infringe any intellectual property right or any other personal or proprietary right and shall indemnify and hold harmless George Mason against any claim of infringement of intellectual property rights which may arise under this Contract.
1. Unless expressly agreed to the contrary in writing, all goods, products, materials, documents, reports, writings, video images, photographs or papers of any nature including software or computer images prepared or provided by Contractor (or its subcontractors) for George Mason will not be disclosed to any other person or entity without the written permission of George Mason.
2. Work Made for Hire. Contractor warrants to George Mason that George Mason will own all rights, title and interest in any and all intellectual property rights created in the performance or otherwise arising from the Contract and will have full ownership and beneficial use thereof, free and clear of claims of any nature by any third party including, without limitation, copyright or patent infringement claims. Contractor agrees to assign and hereby assigns all rights, title, and interest in any and all intellectual property created in the performance or otherwise arising from the Contract, and will execute any future assignments or other documents needed for George Mason to document, register, or otherwise perfect such rights. Notwithstanding the foregoing, for research collaboration pursuant to subcontracts under sponsored research contracts administered by the University's Office of Sponsored Programs, intellectual property rights will be governed by the terms of the grant or contract to George Mason to the extent such grant or contract requires intellectual property terms to apply to subcontractors.
CC. NON-DISCRIMINATION: All parties to this Contract agree to not discriminate on the basis of race, color, religion, national origin, sex, pregnancy, childbirth or related medical conditions, age (except where sex or age is a bona fide occupational qualification, marital status or disability).
DD. NON-EXCLUSIVITY: Nothing herein is intended nor shall be construed as creating any exclusive arrangement with Contractor. This Contract will not restrict or prohibit George Mason from acquiring the same or similar goods and/or services from other entities or sources.
EE. NON-SOLICITATION / NON-COMPETE: George Mason University, as a state agency of the Commonwealth of
Virginia, shall not be subject to or bound by any non-solicitation or non-compete provisions. All University positions are publicly posted, and contractor employees may freely apply for, be considered for, and accept employment with the University without restriction. Any provision to the contrary shall be deemed null, void, and unenforceable.
FF. PAYMENT TO SUBCONTRACTORS: The Contractor shall take the following actions upon receiving payment from George Mason: (1) pay the subcontractor within seven days for the proportionate share of the total payment received from George Mason attributable to the work performed by the subcontractor under that Contract; or (2) notify George Mason and subcontractor within seven days, in writing, of its intention to withhold all or a part of the subcontractor's payment with the reason for non-payment. The Contractor shall collect the appropriate Tax Identification Number (Either SSN# or EIN#) based on the entity type of the subcontractor. The Contractor shall pay interest to subcontractors on all amounts owed by the Contractor that remain unpaid after seven days following receipt by the Contractor of payment from George Mason for work performed by the subcontractor under that contract, except for amounts withheld as allowed by prior notification. Unless otherwise provided under the terms of this Contract, interest shall accrue to subcontractors at the rate of one percent per month. The Contractor shall include in each of its subcontracts a provision requiring each subcontractor to include or otherwise be subject to the same payment and interest requirements with respect to each lower-tier subcontractor. A contractor's obligation to pay an interest charge to a subcontractor may not be construed to be an obligation of George Mason. A contract modification may not be made for the purpose of providing reimbursement for such interest charge. A cost reimbursement claim may not include any amount for reimbursement for such interest charge.
GG. PUBLICATION OF CONTRACT DOCUMENTS: It is a statutory requirement for George Mason to utilize eVA (electronic Virginia), the Commonwealth of Virginia’s agency-wide procurement online system. This Contract and related documents, including but not limited to purchase orders, invoices, proposals, scopes of work and pricing data are subject to publication and shall not be treated as confidential or require notification to any party prior to disclosure.
HH. PUBLICITY: Contractor shall not use, in its external advertising, marketing programs, or promotional efforts, any data, name, insignia, trademarks, pictures or other representation of the University or its employees except on the specific written authorization in advance by the University. The University must receive all requests for authorization in writing no later than ten (10) days in advance of the use date.
II. REMEDIES: If the Contractor breaches this Contract, in addition to any other rights or remedies, George Mason may terminate this Contract without prior notice.
JJ. RENEWAL OF CONTRACT: This Contract may be renewed or extended by George Mason for one-year, to match the federal award period, assuming the federal award is extended out until September 30, 2030 under the terms and conditions of this Contract. Price increases, if justified and allowable, may be negotiated only at the time of renewal.
Written notice of the University’s intention to renew shall be given approximately 90 days prior to the expiration date of each contract period.
KK. REPORTING OF CRIMES, ACCIDENTS, FIRES AND OTHER EMERGENCIES: Any George Mason Employee, including contracted service providers, who is not a staff member in Counseling and Psychological Services (CAPS) or a pastoral counselor, functioning within the scope of that recognition, is considered a “Campus Security Authority (CSA).” CSAs must promptly report all crimes and other emergencies occurring on or near property owned or controlled by George Mason to the Department of Police & Public Safety or local police and fire authorities by dialing 9-1-1. At the request of a victim or survivor, identifying information may be excluded from a report (e.g., names, initials, contact information, etc.). Please visit the following website for more information and training:
http://police.gmu.edu/clery-act-reporting/campus-security-authority-csa/.”
LL. RESPONSE TO LEGAL ORDERS, DEMANDS, OR REQUESTS FOR DATA: Except as otherwise expressly prohibited by law, Contractor will: i) immediately notify George Mason of any subpoenas, warrants, or other legal orders, demands or requests received by Contractor seeking University Data; ii) consult with George Mason regarding its response; iii) cooperate with George Mason’s reasonable requests in connection with efforts by George Mason to intervene and quash or modify the legal order, demand or request; and iv) upon George Mason’s request, provide George Mason with a copy of its response.
If George Mason receives a subpoena, warrant, or other legal order, demand (including request pursuant to the Virginia Freedom of Information Act) or request seeking University Data maintained by Contractor, George Mason will promptly provide a copy to Contractor. Contractor will promptly supply George Mason with copies of data required for George Mason to respond, and will cooperate with George Mason’s reasonable requests in connection with its response.
MM. SEVERABILITY: Should any portion of this Contract be declared invalid or unenforceable for any reason, such portion is deemed severable from the Contract and the remainder of this Contract shall remain fully valid and enforceable.
NN. SOVEREIGN IMMUNITY: Nothing in this Contract shall be deemed a waiver of the sovereign immunity of the Commonwealth of Virginia and of George Mason.
OO. SUBCONTRACTS: No portion of the work shall be subcontracted without prior written consent from George Mason.
In the event that the Contractor desires to subcontract some part of the work specified herein, the Contractor shall furnish George Mason the names, qualifications and experience of their proposed subcontractors. The Contractor shall, however, remain fully liable and responsible for the work to be done by its subcontractor(s) and shall assure compliance with all requirements of this Contract. This paragraph applies to, but is not limited to, subcontractor(s) who process University Data. https://www.sbsd.virginia.gov/
PP. TARIFF & DUTY FEES: In the event that any new tariffs, import duties, taxes, or other government-imposed fees or restrictions are enacted or increased after the Effective Date of this Contract, and such impositions materially impact the Contractor’s cost of goods, materials, or services required to fulfill its obligations under this Contract, the
Contractor may be entitled to an equitable adjustment in the contract price. The Contractor must provide written notice and reasonable documentation supporting the increase in costs due to such governmental actions. The documentation should demonstrate: (i) the unit price paid by Contractor as of the date of contract award or date of Purchase Order issuance (whichever comes earlier) for the good or raw material used to furnish the goods to the University under this Contract; (ii) the applicability of the tariff to the specific good or raw material being impacted; (iii) Contractor’s payment of the increased import duty or tariff (either directly or through an increase to the cost paid for the good or raw material); and (iv) the additional charges to the University reflect a simple pass-through expense with no markup.
The evidence submitted shall be sufficient in detail and content to allow the University to verify that the tariff is the cause of the price change. The University, in its sole judgement, will determine whether to accept and pay for such additional charges.
QQ. UNIVERSITY DATA: University Data includes all George Mason owned, controlled, or collected PII and any other information that is not intentionally made available by George Mason on public websites, including but not limited to business, administrative and financial data, intellectual property, and patient, student and personnel data. George Mason University shall not provide, and Contractor shall not be required to receive, access, use, collect, process, store, transmit, or maintain any University Data unless otherwise agreed to in writing by the parties. If the parties subsequently determine that Contractor's performance of the Services will require access to or handling of University Data subject to specific legal, regulatory, or security requirements, including Personally Identifiable Information ("PII") or Protected Health Information ("PHI"), the parties shall first execute any applicable data security, privacy, or compliance agreements, including a Data Security Agreement and, if applicable, a Business Associate Agreement.
Inadvertent provision by George Mason University or incidental receipt by Contractor of University Data shall not, by itself, constitute a breach of this Contract. Upon discovery of any such inadvertent provision or receipt, Contractor shall promptly notify George Mason University and cooperate in the return, deletion, protection, or other appropriate disposition of the data
RR. UNIVERSITY REVIEW/APPROVAL: All goods, services, products, design, etc. produced by the Contractor for or on behalf of George Mason are subject to George Mason’s review and approval.
SS. WAIVER: The failure of a party to enforce any provision in this Contract shall not be deemed to be a waiver of such right.
Contractor Name George Mason University
Signature Signature
Name: Name:
Title: Title:
Date: Date:
Uniform Guidance and Mandatory Federal Flow downs
This Contract incorporates by reference the following terms and conditions for all federal purchases:
1. Contracts for more than the simplified acquisition threshold currently set at $250,000, which is the inflation adjusted amount determined by the civilian agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate.
2. All contracts in excess of $10,000 must address termination for cause and for convenience by the non-federal entity including the manner by which it will be effected and the basis for settlement.
a. Termination for Convenience. Contract is terminated due to reasons known to the University, i.e., program changes, changes in state-of-the art equipment or technology, insufficient funding, etc. Termination is utilized when the contractor is not in violation of the contract terms and conditions.
b. Termination for Cause. Contract is terminated due to actions by the contractor, i.e., failure to perform, financial difficulty, slipped schedules, etc. In certain instances, termination settlement may include re-procurement costs to be paid by the contractor.
c. Termination due to Force Majeure. Mason shall be excused from any and all liability for failure or delay in performance of any obligation under this Contract resulting from any cause not within the reasonable control of Mason, which includes but is not limited to acts of God, fire, flood, explosion, earthquake, or other natural forces, war, civil unrest, accident, any strike or labor disturbance, travel restrictions, acts of government, disease, pandemic, or contagion, whether such cause is similar or dissimilar to any of the foregoing. Upon written notification from Mason that such cause has occurred, Contractor agrees to directly refund all payments to Mason, for services not yet performed, including any pre-paid deposits within 14 days.
3. Rights to Inventions Made Under a Contract or Agreement. Any discovery or invention that arises during the course of the contract shall be reported to the non-Federal entity. This clause should require the contractor to disclose promptly inventions to the contracting officer (within 2 months) after the inventor discloses it in writing to the contractor personnel responsible for patent matters. The awarding agency shall determine how rights in the invention/discovery shall be allocated consistent with “Government Patent Policy” and Title 37 C.F.R. § 401.
If the Federal award meets the definition of “funding agreement” under 37 C.F.R. §401.2 (a) and the recipient or sub recipient wishes to enter into a contract with a small business or firm or non-profit organization regarding the substitution of parties, assignments or performance of experimental, developmental, or research work under that ‘funding agreement,’ the recipient or sub recipient must comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.
University award terms and conditions contained in grant or cooperative agreement award documentation also may contain provisions regarding patents and intellectual property, specifically including requirements or special instructions, that may require that non-Federal entities include specific contract provisions (if applicable) in procurement contracts entered into under University grant or cooperative agreement awards.
4. Debarment and Suspension (Executive Orders 12549 and 12689). A contract award (see 2 CFR 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM) Exclusion lists, in accordance with OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and suspension. “SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other that Executive Order 12549.
5. Byrd-Anti-Lobbying Amendment (31 U.S.C. 1352). Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influenced an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant, or any other awarded covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.
6. See 2 C.F.R §200.322 Procurement of Recovered Materials. A non-Federal entity that is a state agency or agency of a political subdivision of a state must include a provision requiring contractors to comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. Per Section 6002, where the purchase price of the items exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000, these non- Federal entities and their contractors must procure only items, designated in guidelines of the EPA at 40 C.F.R. § 247, containing the highest percentage of recovered material practicable, consistent with maintaining a satisfactory level of competition. These non-Federal entities and their contractors must procure solid waste management services so that energy and resource recovery are maximized, and they must establish an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.
7. Clean Air and Water: Contractors (and sub recipients) exceeding $150,000.00 must contain a provision requiring the contractor (or sub recipients) to agree to comply with all requirements of the Clean Air Act (42 U.S.C. 7401 et seq.), and the Clean Water Act [Federal Water Pollution Control Act] as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal Awarding Agency and the Regional Office of the Environmental Protection Agency (EPA).
8. If Applicable, this contractor and subcontractor shall abide by the requirements of 41 CFR 60-
1.4(a),…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .