This is a Scope of Work document for the State of Utah Division of Wildlife Resources (DWR) in conjunction with the Bureau of Land Management (BLM), detailing aerial seeding services for the Big Springs Fire recovery project in Tooele County, Utah. The project encompasses approximately 370 acres of BLM and State lands located on the west bench of the Stansbury Mountain Range at elevations between 4,100 and 6,500 feet. The contractor must provide aerial seeding services using a mix of grasses, forbs, and shrubs applied at a rate of approximately 14.75 lbs. per acre on 340 acres of BLM lands and 23.7 lbs. per acre on 30 acres of State lands. The aircraft must be equipped with GPS technology to establish flight lines ensuring 100% coverage and must be capable of handling approximately 6,947 lbs. of seed material. Seeding operations are scheduled to occur between December 12, 2025, and January 10, 2026, with work required to begin by 8:00 a.m. daily to minimize wind-related seed drift. The Government reserves the right to postpone operations if wind speeds exceed 10 miles per hour. The nearest airport is Tooele Valley Airport (TVY) located approximately 17 air miles southeast of the project site.
The Government will supply all pre-mixed seed in bulk totes at agreed-upon locations at each project site, with the contractor responsible for providing equipment and personnel for unloading and loading seed. This Request for Quotes is evaluated on objective criteria with lowest cost as the determining factor for award. Only one primary bid per vendor will be accepted, and any exceptions to specifications must be protested in writing to the Division of Purchasing prior to the closing date. The State reserves the right to solicit additional quotes via email, phone, or other methods permitted under the Utah Procurement Code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Vendor Prerequisites - Quotes Part 8 PS SP.pdf | ||
| 3-Big Springs Aerial Seeding ESR map.pdf | ||
| 7-Big Springs AerialSeeding.zip | ZIP file | |
| 5-Big Springs Fire Aerial Seeding SITLA.zip | ZIP file | |
| 6-Big Springs UTNWS Map.pdf | ||
| 4-Attachment A-PO Terms and Conditions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B- Scope of Work AM26-52 Big Springs Fire Aerial Seeding Project:
Big Springs Fire Aerial Seeding
Locations:
This project is located on Bureau of Land Management (BLM) and State lands, adjacent to Private lands on the west bench of the Stansbury Mountain Range in Tooele County, Utah. Elevations range from approximately 4,100 to 6,500 feet. A vicinity map is attached showing the site, as well as proposed aerial seeding treatment map.
Nearest Airport:
The nearest airport is Tooele Valley Airport (TVY), in Erda, UT, which is approximately 17 air miles to the southeast.
Acreage/ Rate:
Approximately 370 acres will be seeded. The mix, consisting of grasses, forbs and shrubs, will be applied at a rate of approximately 14.75 lbs. per acre on 340 acres of BLM lands with a similar mix at 23.7 lbs. per acre on 30 acres of State lands. The aircraft used must be capable of seeding at these rates.
GPS Technology:
The aircraft must be equipped with a global positioning system that is used to establish flight lines for 100% coverage.
Total Weight:
Approximately 6,947 lbs.
Seeding Dates:
December 12, 2025, to January 10, 2026. The Government will coordinate start date(s) for each project area.
Timing:
The contractor will be expected to begin seeding by 8:00 a.m. to avoid windy conditions and minimize seed drift. The Government reserves the right to postpone the seeding operation if wind speed exceeds 10 miles per hour.
DWR Assistance:
Seed will be furnished by the Government at an agreed upon location at each project site. Seed will be pre-mixed and supplied in bulk totes. The contractor will be responsible for providing necessary equipment and personnel to unload and load seed.
Questions should be submitted through Bonfire.