This Scope of Work document outlines a Class III Cultural Resources Inventory contract awarded by the State of Utah Division of Purchasing through the Wildlife Resources Institute, soliciting archaeological survey services for the Red Butte area administered by the BLM Salt Lake Field Office in Box Elder County. The project encompasses 5,030 acres of BLM land and requires an intensive inventory of cultural resources prior to proposed vegetation treatments designed to improve sagebrush habitat for greater sage-grouse. The contractor must complete fieldwork by June 30, 2027, submit draft deliverables by July 30, 2027, and deliver final deliverables by August 30, 2027. Principal Investigators, Field Directors, and Crew Chiefs must hold current BLM Cultural Resources Use Permits and PLPCO Principal Investigator Permits. The contractor is responsible for acquiring all necessary permits and permissions across all project lands. Deliverables consist solely of digital submissions following BLM Utah Fieldwork Guidelines and Utah State Historic Preservation Office standards, including the UtSHPO Cover Sheet and BLM Summary Report of Cultural Resource Inspection, with all records matching UtSHPO submission structure and BLM Utah Data Standards.

This contract utilizes a firm-fixed price, lump sum compensation model with no provision for cost modifications or change orders based on unexpected findings, requiring bidders to budget carefully given the expected low to moderate archaeological findings. The award will be determined through a cumulative assessment combining the Best Value score (300 points maximum) from the original RFP AS24-114 with a SOW Cost Point Award (700 points maximum) calculated based on individual bid submissions, with the lowest cost bid receiving full cost points and higher bids receiving proportional reductions. Payment follows a standard milestone schedule: 10 percent upon completion of the pre-field literature review, 50 percent upon fieldwork completion, 30 percent upon draft deliverable submission, and the final 10 percent upon acceptance of final deliverables and successful UtSHPO consultation. Bidders must be on the approved vendor list for archaeology, and all work is contracted through State of Utah Solicitation AS24-114 with Limited Purchasing Delegation #230. The project area includes only three previously documented sites, with the majority representing new survey coverage, and access is feasible via high-clearance four-wheel-drive vehicles, with UTV use potentially required for winter or adverse weather conditions.

View the file

Other files

File Type Posted
RedButteCRI_20261104.sbx —
RedButteCRI_20261104.cpg —
RedButteCRI_20261104.shx —
RedButteCRI_20261104.dbf DBF file
RedButteCRI_20261104.shp —
RedButteCRI_20261104.shp.xml XML file
RedButteCRI_20261104.sbn —
20261030_RedButteCRI.kmz KMZ file
1-Vendor Prerequisites - IFB Agency.pdf PDF
RedButteCRI_20261104.prj —
4-3. Att.-A-Agency-Terms-and-Conditions-GS (1).docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple Award for Archaeology Scope of Work Procurement Authority: State of Utah AS24-114 Project Title: Red Butte Cultural Resources Inventory (WRI #7667[4])

Project Title: Red Butte Cultural Resources Inventory

Cultural Resources Project Type: Intensive inventory

Project Description: The BLM is proposing to utilize a suite of vegetation treatments to improve and maintain suitable, functional sagebrush habitat for greater sage-grouse and other sagebrush-dependent species at a landscape level to ensure long-term viability and persistence of the Box Elder greater sage-grouse population. The treatments would manage juniper infilling and expansion, promote ecosystem resiliency, minimize invasive species, and reduce the risk of high-severity fire. Vegetation treatments would also enhance habitat for mule deer, elk, and other wildlife species.

These objectives will be met through heavy machinery treatment with bullhogs/masticators that have ground disturbing impacts.

Thus, the BLM-SLFO is soliciting a Class III Cultural Resources Inventory of the proposed mastication areas in order to make a good faith effort to identify and evaluate cultural resources prior to treatment as set forth in §36CFR800.4.

WRI Number: 7667(4)

Land Manager: The project is located on land entirely administered by the BLM-Salt Lake Field Office (SLFO).

Cultural Lead (Agency Archaeologists): Savanna Agardy, BLM/WFS Archaeologist, is the cultural lead and will be consulting with UtSHPO. Please also include DWR Archaeologist Arie Leeflang in correspondence. Arie will handle invoicing and contracting aspects of the project.

Permitting Requirements: PIs, Field Directors, and Crew Chiefs must hold a current BLM Cultural Resources Use Permit for the Great Basin and a Public Lands Policy Coordinating Office (PLPCO) Principal Investigator Permit to Conduct Archaeological Surveys. A fieldwork authorization must be obtained from the pertinent field office and other pertinent land managing agencies. Contractor is responsible for acquiring all necessary permits and permissions for all lands included in the project.

The identification, documentation, and NRHP evaluation of archaeological resources will be completed in accordance with the current BLM Utah Fieldwork Guidelines and Utah State Historic Preservation Office Cultural Resource Compliance Guidance.

Multiple Award for Archaeology Region: Northern

WRI Contracted Model: Firm-fixed price, lump sum. Given this compensation model, cost modifications or change orders based upon unexpected or excessive findings will not be approved. Please budget and bid carefully.

Acres: 5,030 acres (all BLM)

Period of Performance Expected Fieldwork Completion Date: 6/30/2027 Draft Deliverables Due Date: 7/30/2027 Final Deliverables Due Date: Final deliverables need to be provided by 8/30/2027

Fieldwork Preferences: Do not place physical datums and do not flag sites. Site boundaries, artifacts, and features must be GPS’d with submeter accuracy following BLM Utah Fieldwork Guidelines. Follow the 2008 UPAC Linear Sites guidance for the recordation of linear sites. Clearly justify the recordation of the linear as a site, per the UPAC guidance, as opposed to an isolated occurrence. Linear sites that are not justified as an archaeological site will be transitioned to an isolated occurrence if requested by the Agency Archaeologists.

https://wri.utah.gov/wri/project/title.html?id=7667

Utah Archaeological Site Forms will be completed for each newly recorded cultural resource site and each revisited previously documented site. Previously documented sites that are unable to be relocated will be documented using a Utah Archaeological Site Form Part A or the appropriate UtSHPO template form. Previously recorded cultural site forms that are recent (less than 10 years) do not need to be re-documented if they have adequate information, and the existing documentation meets UtSHPO and BLM standards.

Each cultural resource site within the project area shall be evaluated for inclusion in the National Register of Historic Places (NRHP), as set forth in 36 CFR 60. The Contractor shall make recommendations concerning site eligibility and include a written justification, both on the Utah Archaeological Site Form and in the project report. This justification shall specify the specific criteria under which eligible sites are found to qualify and a discussion of the seven aspects of integrity specified in 36 CFR 60. Final determinations of eligibility will be made by the BLM in consultation with the UtSHPO.

If areas of dense vegetation or steep slopes present an unsafe work environment, document the locations with GPS points or polygons and photographs. Such changes in archaeological survey intensity will be documented and shared with the Agency Archaeologists within 10 days of the close of the pertinent field session unless otherwise directed. These areas must be documented in the final report and will be coded as reconnaissance surveys or exempted rather than intensive surveys in the report.

Reporting Requirements: No paper reporting is required for this project. Standard BLM and UtSHPO digital deliverables are required for the Agency Archaeologists. This contract will: 1) Provide federal and state agencies with a cultural resource inventory for the specified project acreage and 2) Provide information on the distribution and character of cultural resources in this area to better assess their significance and preservation requirements, to determine the potential effects of the proposed undertaking on Historic Properties, and to provide protection of eligible resources from ground-disturbing activities.

Unless directed otherwise, the contractor will be required to gather existing information on known cultural resources and previous cultural resources surveys within the project area and within a 1/2-mile buffer around the project area. This will provide the contractor with a good understanding of the density and types of sites that may be found. Previous project information is available from the UtSHPO’s Sego database and if directed, from the pertinent BLM field office. Other background information should be gathered from General Land Office records, relevant NRHP historic contexts, PLPCO Access 360 web application, historical aerial images, historical maps, etc.

The final report will include the UtSHPO Cover Sheet (PDF page 1) and the BLM Summary Report of Cultural Resource Inspection, Form UT-8100-3 (PDF page 2+). All records and data files will match UtSHPO submission structure and requirements and BLM Utah Data Standards.

Upon completion of fieldwork, Agency Archaeologists may request the spatial data for transect lines, archaeological sites, as well as preliminary fieldwork results such as a list of sites, total Class II or exclusion acres (if applicable), and preliminary eligibility determinations before approving the fieldwork completion milestone invoice.

Previous Inventories and Previously Recorded Sites: Despite the large survey area acreage, only a small amount of the APE has been previously surveyed in 2010. Given the year surveyed, everything will be resurveyed to Class III standards in the APE. Only three previously documented sites are in the project area: 42BO1781 (historic refuse scatter), 42BO1782 (prehistoric artifact scatter), 42BO1251 (historic Keg Springs Road). Thus, the majority of the project area will be entirely new survey and new site data.

Findings Expectations: Based on data from previous surveys in the area, findings are expected to be low to moderate. However, keep in mind this is only an estimate. It is possible for findings to be higher than the low-moderate range.

Access: Access throughout the project areas is decent and accessible with a high clearance, 4x4 vehicle. A UTV may be required for travel efficiencies within the project area, especially during winter or poor weather conditions.

Payment Schedule: Invoicing for this project will follow the standard Multiple Award for Archaeology contract schedule: 10% invoiced upon completion of pre-field literature review; 50% upon completion of fieldwork; 30% upon delivery of draft deliverables;

final 10% upon full acceptance of final deliverables by the Agency Archaeologists and successful consultation with UtSHPO. Agency Archaeologists must approve milestone arrival.

Milestone arrivals require the submission of documentation:

● Pre-field literature review: submission of a brief Class I document that summarizes the initial literature review and background research effort. While this does not need to be polished, the document should provide evidence of a thorough literature review effort and should include a survey findings expectations paragraph.

● Fieldwork: Agency Archaeologists may request documentation of fieldwork and preliminary fieldwork results. This may include spatial data for fieldwork transect lines, preliminary archaeological site boundaries, and class II or other exclusion areas. Preliminary site lists and preliminary eligibility determinations may also be requested. Such submissions may be waived by the Agency Archaeologists during the project kickoff meeting.

● Draft deliverables: draft UtSHPO package following BLM and UtSHPO reporting and data standards requirements.

● Final deliverables: final UtSHPO package following BLM and UtSHPO reporting and data standards requirements.

Invoices must include your DWR contract number. Please contact the DWR Archaeologist if you do not know your contract number.

This number differs from the Billing PO number listed below.

Billing PO: 202655

Attached Files:

• 20261104_RedButteCRI_GIS – a GIS shapefile and KMZ file of the project area

How Projects will be Awarded

The individual SOW project award will be made based upon a cumulative assessment which will take place at each project release.

That assessment will combine the previously outlined Best Value score and a new “SOW Cost Point Award.”

The Best Value score was awarded in RFP AS24-114 and is not changeable. It is a portion of 300 points as assessed in the first three categories (Technical Criteria) of the RFP.

The “SOW Cost Point Award” is figured each time bids are received based upon an individual SOW. The bid responses may be for a “lump sum” bid that would cover all the costs associated with the entire project. Or the bid responses may ask for a “base rate” bid that would cover the basic aspects of an archaeological survey and a “per site” bid that would also ask for the costs to record an archaeological site. 700 cost points are possible. The lowest cost bid will receive the full 700 points. Each higher bid will receive points based upon its percentage higher than the lowest bid.

Cumulative Assessment is calculated by:

(AS24-114 Best Value score out of 300) + (“SOW Cost Point Award” out of 700)

The highest point tally will receive the project contract at their submitted bid rate.

This approach will assure the State of Utah and the WRI are able to include the point rankings associated with non-cost elements from the RFP, along with the cost ranking associated with each project SOW release (aka the “SOW Cost Point Award”).

All work is contracted and awarded through the State of Utah Division of State Purchasing & General Services Solicitation AS24-114 and Limited Purchasing Delegation #230

Any awarded work is at a fixed rate and is not open to modification except as allowed under State of Utah Division of State Purchasing & General Services rules.

C o o k C a n y o n

R e d K n o l l s

B i l l S h a w C a n y o n

P a s k e t t C a n y o n

G r o u s e C r e e k V a l l e y

C o o k C a n y o n

I n g h a m P e a k

G r o u s e C r e e k

M o u n t a i n s

I n g h a m C a n y o n

0 1 Miles No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual use or aggregate use with other data.

10/30/2026

Bureau of Land Management, Utah Salt Lake Field Office

491 North John Glenn Road Salt Lake City, UT 84116

Red Butte Cultural Resource Inventory

UtahN

Red Butte CRI: 5,030 acres

Bureau of Land Management (BLM)

Private

State of Utah

11N 16W

10N 17W 10N 16W

12N 17W

10N 19W 10N 18W

11N 17W11N 18W

12N 18W 12N 16W

11N 19W

12N 19W