This is a Specifications document (Exhibit J.5) for a roof replacement project at the Wallace Pack Unit of the Texas Department of Criminal Justice (TDCJ) Institutional Division in Navasota, Texas. The project scope includes replacement of approximately 144,800 square feet of existing metal roof systems with new metal roof systems, installation of a new metal roof retrofit system with sub-purlins over existing roofing for approximately 38,500 square feet, replacement of damaged purlins and wall girts, installation of a rooftop-mounted walkway system connecting multiple buildings, replacement of metal wall panels, and repair or replacement of all vents, stacks, flashings, and associated sealants. Work also encompasses mechanical equipment replacement including new rooftop mechanical equipment, control wiring, thermostats, roof curbs, conduit and wiring replacement, and certified air balance testing. The project is designated MWR No. 02618010 with an Issued-For-Proposal date of September 24, 2025. The specifications document comprises 388 pages organized into multiple divisions covering general requirements, site construction, concrete, carpentry, thermal and moisture protection (roofing systems), metal panels, flashing, roof accessories, joint sealants, painting, mechanical systems, plumbing, electrical systems, and fire alarm systems.

The project requires compliance with TDCJ occupancy standards, meaning operations will continue during construction with minimal service interruptions. Contractor quality control requirements are extensive, including a dedicated Quality Control Manager with minimum qualifications, daily quality control reports, three-point inspection protocols, and deficiency tracking systems. Testing and inspection services must be provided by qualified independent laboratories meeting American Council of Independent Laboratories standards and preferably A2LA accredited. The contractor must provide temporary utilities, sanitation facilities for projects exceeding 30 days duration, and field office accommodations for projects exceeding 120 days. Submittals are required including product data, shop drawings, samples, mock-ups, and requests for information with specific formatting and documentation requirements. No pricing information, set-asides, incumbent data, or contract award dates are specified in this technical specifications document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Texas Department of Criminal Justice Institutional Division

TDCJ Wallace Pack Unit Grimes County

Navasota, TX

MWR No. 02618010 September 24, 2025

Issued For Proposal

SPECIFICATIONS

REPLACE ROOF - MULTIPLE BLDGS.

09/24/2025 09/24/2025

09/24/2025

Exhibit J.5

696-FD-27-P002 1 of 388

Amtech Solutions TABLE OF CONTENTS Wallace Pack Unit Section 00 00 00 - Page 1 of 3 Replace Roof – Multiple Bldgs. MWR #02618010

Texas Department of Criminal Justice

Wallace Pack Unit Replace Roof – Multiple Bldgs.

MWR #02618010

TABLE OF CONTENTS

DIVISION 00 BID DOCUMENTS NO. OF PAGES

00 00 00 TABLE OF CONTENTS 3

00 01 50 LIST OF DRAWING SHEETS 1

DIVISION 01 GENERAL NO. OF PAGES

01 00 00 SCOPE OF WORK v.20230221 2 01 10 00 SUMMARY v.20230214 3 01 25 00 SUBSTITUTION PROCEDURES v.20160201 2 01 33 00 SUBMITTALS v.20230328 9 01 42 00 REFERENCES v.20210422 4 01 45 16.13 CONTRACTOR QUALITY CONTROL v.20240610 9 01 45 23 TESTING AND INSPECTION SERVICES v.20200701 13 01 50 00 TEMPORARY FACILITIES AND CONTROLS v.20190701 9 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL v.20240129 4 01 64 00 OWNER-FURNISHED PRODUCTS v.20170501 NOT USED 01 70 00 EXECUTION REQUIREMENTS v.20240920 9 01 73 29 CUTTING AND PATCHING v.20180201 4 01 73 30 PAVING REPAIR AND RESURFACING v.20200701 4 01 77 00 CLOSEOUT PROCEDURES v.20200301 4 01 78 23 OPERATION AND MAINTENANCE DATA v.20230328 4 01 78 36 WARRANTIES v.20230707 3 01 78 39 PROJECT RECORD DOCUMENTS v.20210113 4 01 90 00 FACILITY DEMOLITION v.20220105 6

DIVISION 02 SITE CONSTRUCTION

02 41 19 SELECTIVE DEMOLITION v.20250227 8

DIVISION 03 CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE v.20211018 11

DIVISION 04 MASONRY NOT USED

DIVISION 05 METALS NO. OF PAGES

05 31 00 STEEL DECKING v.20191001 5 05 51 10 FIXED METAL LADDERS v.20240920 4

09/24/2025 09/24/2025

09/24/2025

696-FD-27-P002 2 of 388

Wallace Pack Unit Section 00 00 00 - Page 2 of 3 Replace Roof – Multiple Bldgs. MWR #02618010

TABLE OF CONTENTS

LIST OF SPECIFICATION DIVISIONS AND SECTIONS

DIVISION 06 CARPENTRY NO. OF PAGES

06 10 00 ROUGH CARPENTRY v.20201101 7

DIVISION 07 THERMAL AND MOISTURE PROTECTION NO. OF PAGES

07 01 50.19 ROOF REPLACEMENT PREPARATION v.20250213 6 07 21 00 THERMAL INSULATION v.20250214 7 07 41 13 METAL ROOF PANELS v.20250218 16 07 42 13 METAL WALL PANELS v.20250225 8 07 62 00 SHEET METAL FLASHING AND TRIM v.20241002 14

07 62 10 ES-1 7

07 72 00 ROOF ACCESSORIES v.20250224 20 07 92 00 JOINT SEALANTS v.20201101 12

DIVISION 08 DOORS & WINDOWS NOT USED

DIVISION 09 FINISHES NO. OF PAGES

09 90 00 PAINTING FOR COMMON METAL SURFACES v.20180301 4 09 91 13 EXTERIOR PAINTING v.20200701 5

DIVISION 10 SPECIALTIES NOT USED

DIVISION 11 EQUIPMENT NOT USED

DIVISION 12 FURNISHINGS NOT USED

DIVISION 13 SPECIAL WORK NO. OF PAGES

13 34 19 RETROFIT STEEL SUB-PURLINS v.20250226 5

DIVISION 14 CONVEYING SYSTEMS NOT USED

DIVISION 15 MECHANICAL/PLUMBING NOT USED

DIVISION 16 ELECTRICAL NOT USED

DIVISION 17 LIGHTING NOT USED

DIVISION 21 FIRE SUPPRESSION NOT USED

DIVISION 22 PLUMBING NO. OF PAGES

22 05 00 COMMON WORK RESULTS FOR PLUMBING v.20240906 12

DIVISION 23 MECHANICAL NO. OF PAGES

23 05 01 COMMON WORK RESULTS FOR MECHANICAL v.20240906 13

23 05 13 COMMON MOTOR REQUIREMENTS

FOR HVAC EQUIPMENT v.20190601 3

23 05 53 IDENTIFICATION FOR HVAC

PIPING AND EQUIPMENT v.20200601 6

09/24/2025 09/24/2025

TENTS

NO.

NO.

20160201 09/24/2025

696-FD-27-P002 3 of 388

Wallace Pack Unit Section 00 00 00 - Page 3 of 3 Replace Roof – Multiple Bldgs. MWR #02618010

TABLE OF CONTENTS

LIST OF SPECIFICATION DIVISIONS AND SECTIONS

DIVISION 23 MECHANICAL NO. OF PAGES

23 05 93 TESTING, ADJUSTING, AND BALANCING

FOR HVAC v.20190601 2 23 07 13 HVAC DUCT INSULATION v.20190301 7 23 07 19 HVAC PIPING INSULATION v.20240404 19 23 33 00 DUCT ACCESSORIES v.20210201 7 23 34 23 HVAC POWER VENTILATORS v.20230221 6

DIVISION 25 INTEGRATED AUTOMATION NOT USED

DIVISION 26 ELECTRICAL NO. OF PAGES

26 00 00 BASIC ELECTRICAL METHODS v.20240906 7 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL v.20250228 6

26 05 19 LOW VOLTAGE ELECTRICAL

CONDUCTORS AND CABLES v.20210727 4

26 05 23 CONTROL-VOLTAGE ELECTRICAL POWER

CABLES v.20250228 12

26 05 26 GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS v.20210602 12

26 05 29 HANGERS AND SUPPORTS FOR

ELECTRICAL SYSTEMS v.20170601 2

26 05 33 RACEWAYS AND BOXES FOR

ELECTRICAL SYSTEMS v.20230207 11 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS v.20210602 4 26 27 26 WIRING DEVICES v.20200301 3

DIVISION 27 COMMUNICATIONS NOT USED

DIVISION 28 ELECTRONIC SAFETY AND SECURITY NO. OF PAGES

28 00 00 BASIC METHODS ELECTRONIC SYSTEMS v.20210210 6 28 31 10 FIRE ALARM SYSTEMS v.20190701 9

DIVISION 31 EARTHWORK NOT USED

DIVISION 32 EXTERIOR IMPROVEMENTS NOT USED

DIVISION 33 UTILITIES NOT USED

END OF TABLE OF CONTENTS

09/24/2025 09/24/2025

TENTS

NO.

NO.

20160201 09/24/2025

696-FD-27-P002 4 of 388

Amtech Solutions LIST OF DRAWINGS Wallace Pack Unit Section 00 01 50– Page 1 of 1 Replace Roof – Multiple Bldgs. MWR# 02618010

SECTION 00 01 50 - LIST OF DRAWINGS

WALLACE PACK UNIT

REPLACE ROOF – MULTIPLE BLDGS.

CS COVER SHEET

OSP OVERALL SITE PLAN

C1 EXISTING ELEVATION PLAN

C2 PROPOSED ELEVATION PLAN

S1.0 STRUCTURAL REPAIR PLAN

S2.0 STRUCTURAL REPAIR PLAN

S2.1 STRUCTURAL REPAIR PLAN

S2.2 STRUCTURAL FRAMING REPAIR DETAILS

S3.0 STRUCTURAL REPAIR PLAN

RD1 ROOF PLAN WING C, HALL C, WIND D, AND HALL D – DEMOLITION

RD2 ROOF PLAN WING A, HALL A, WING B, AND HALL B – DEMOLITION

RD3 ROOF PLAN G, HALL G, G2, H, AND HALL H – DEMOLITION

RD4 ROOF PLAN GYM, J, HALL J, AND J2 – DEMOLITION

RD5 ROOF PLANWING E-E14 – DEMOLITION

R1 ROOF PLAN WING C, HALL C, WIND D, AND HALL D – CONSTRUCTION

R2 ROOF PLAN WING A, HALL A, WING B, AND HALL B – CONSTRUCTION

R3 ROOF PLAN G, HALL G, G2, H, AND HALL H – CONSTRUCTION

R4 ROOF PLAN GYM, J, HALL J, AND J2 – CONSTRUCTION

R5 ROOF PLANWING E-E14 – CONSTRUCTION

WD1 ELEVATIONS – DEMOLITION

W1 ELEVATIONS – CONSTRUCTION

D1 ROOF DETAILS

D2 ROOF DETAILS

D3 ROOF DETAILS

D4 ROOF DETAILS

D5 WALL DETAILS

MPD-1 MECHANICAL AND PLUMBING DEMO PLAN

MPD-2 MECHANICAL AND PLUMBING DEMO PLAN

MPD-3 MECHANICAL AND PLUMBING DEMO PLAN

MPD-4 MECHANICAL AND PLUMBING DEMO PLAN

MPD-5 MECHANICAL AND PLUMBING DEMO PLAN

MP-1 MECHANICAL AND PLUMBING PLAN

MP-2 MECHANICAL AND PLUMBING PLAN

MP-3 MECHANICAL AND PLUMBING PLAN

MP-4 MECHANICAL AND PLUMBING PLAN

MP-5 MECHANICAL AND PLUMBING PLAN

MP-6 MECHANICAL DETAILS

ED-1 ELECTRICAL DEMOLITION PLAN

ED-2 ELECTRICAL DEMOLITION PLAN

ED-3 ELECTRICAL DEMOLITION PLAN

ED-4 ELECTRICAL DEMOLITION PLAN

ED-5 ELECTRICAL DEMOLITION PLAN

E-1 ELECTRICAL PLAN

E-2 ELECTRICAL PLAN

E-3 ELECTRICAL PLAN

E-4 ELECTRICAL PLAN

E-5 ELECTRICAL PLAN

END OF LIST OF DRAWINGS

696-FD-27-P002 5 of 388

Amtech Solutions SCOPE OF WORK v.20230221 Wallace Pack Unit Section 01 00 00 - Page 1 of 2 Replace Roof – Multiple Bldgs. MWR #02618010

SECTION 01 00 00 – SCOPE OF WORK v.20230221

[Standard TDCJ Specification]

PART 1 – GENERAL

1.1 PROJECT DESCRIPTION (SCOPE OF WORK)

A. Provide a complete, new roofing system and all required appurtenances on

1. Replacement of existing metal roof system for Multiple Buildings with a new metal roof system, which contains approximately 144,800 S.F. of roof area.

2. Installation of a new metal roof retrofit system with sub-purlins over the existing metal roof system for one building which contains approximately 38,500 S. F. of roof area.

3. Install a new roof system consisting of a new metal roof panel system as specified and shown on the drawings.

4. Replacement of damaged purlins and wall girts with new purlins and wall girts at various locations.

5. Replacement of damaged purlin and wall girt secondary bracing with new purlin and girt secondary bracing, including any temporary shoring needed during installation of new purlin and girt secondary bracing at various locations.

6. Installation of a new rooftop mounted walkway system to connect multiple buildings.

B. Work includes, but is not limited to the demolition and removal of:

1. Any existing insulation board and roofing.

2. All exterior soffit & wall joint sealants, including joints at all control/expansion joints to assure a moisture and weather-tight building envelope.

3. Existing caulking on the existing exterior walls.

4. Replacement of existing metal wall panels with new metal wall panel system for Multiple

Buildings.

C. Raising all roof top appurtenances where the bottom of the equipment and the tops of all roof curbs provide a minimum 8” clearance height above the top of the nearest roof surface.

D. Install new equipment curbs/supports as required.

E. Structural repair of damaged purlins and wall girts, including repair of damaged secondary bracing.

F. Install new supports/carriers for all rooftop conduits.

G. Install new supports/carriers for all rooftop pipes and drains.

H. Repair or replace all vents, stacks, areas of flashing, and associated sealants.

I. Installation of defined walkways and service pads as shown on the drawings.

J. Remove and reinstall all existing razor wire as required to install new roof and complete all other work.

K. Install new metal rooftop mounted walkway system with access ladders.

L. Remove and replace caulking and backer rod at all joints in areas shown on drawings.

M. Installation of appropriate sheet metal vent covers over existing PVC schedule 40 vent pipes.

N. Replace all existing metal edged trim and install new treated wood nailers at the perimeter of new roofs where additional roof insulation is required.

O. Repair of all damaged finishes at or near flashings, at parapets, or other locations where damage has occurred.

P. Ensure communication of contractor responsibility for relocation of all roof top, wall and parapet mounted equipment along with associated utilities and all other appurtenances.

Q. Installation of new rooftop equipment screen.

Part II -Mechanical Equipment Replacement

A. Replace existing mechanical equipment as shown on the mechanical drawings.

696-FD-27-P002 6 of 388

Amtech Solutions SCOPE OF WORK v.20230221 Wallace Pack Unit Section 01 00 00 - Page 2 of 2 Replace Roof – Multiple Bldgs. MWR #02618010

B. Provide and install new roof top mechanical equipment as shown on drawings. To include new control wiring and thermostats.

C. Provide a temporary means of heating and/or cooling for the duration of this project. Including both the roof replacement and the mechanical portion of the work.

D. Provide new roof curbs as required.

E. Replace all conduit, wiring, junction boxes serving the roof top mounted equipment.

F. Install new remote disconnects at pieces of electrically powered equipment.

G. Provide appropriate condensate drainage as required.

H. Upon completed installation of new mechanical equipment, perform a certified air balance to assure proper operation of controls and duct system.

1.2 PROVISIONS FOR PROJECT SUPPORT

A. Provide and install temporary extensions and connections to utilities as required for construction operations. See Section 01 50 00 for requirements and utilities available from Texas Department of Criminal Justice (TDCJ).

1. For a construction duration greater than 30 days, temporary Sanitation Facilities are required to be provided and installed as part of Project Scope of Work. For a construction duration 30 days or less, use of TDCJ’s Sanitation Facilities will be permitted.

a. Provided Sanitation Facilities shall comply with Section 01 50 00.

B. For a construction duration greater than 120 days, a Field Office is required to be provided as part of Project Scope of Work. For a construction duration of 120 days or less, a Field Office is not required to be provided as part of Project Scope of Work, but may be provided for contractor’s convenience.

1. Provided Field Office shall comply with Section 01 50 00.

2. Provide and install temporary extensions and connections to utilities as required for

Field Office, if applicable.

C. Irrespective of the provision of a Field Office:

1. Provide one (1) cell phone with voicemail and “smart phone” service that includes web-based e-mail application OR one (1) cell phone with voicemail and one (1) desktop computer, laptop computer, electronic notebook, electronic tablet or similar device with web-based e-mail application. See Section 01 50 00 for additional requirements.

2. Provide Other Office Equipment as described in Section 01 50 00, 2.2.A.5.

END OF SECTION

696-FD-27-P002 7 of 388

Amtech Solutions SUMMARY v.20230214 Wallace Pack Unit Section 01 10 00 - Page 1 of 3 Replace Roof – Multiple Bldgs. MWR #02618010

SECTION 01 10 00 – SUMMARY v.20230214

PART 1 – GENERAL

1.1 SECTION INCLUDES

A. Definitions

B. Interrelation of Specifications

C. Work sequence

D. TDCJ occupancy (Texas Department of Criminal Justice occupancy)

1.2 DEFINITIONS

The listed terms may, or may not, appear in this Specification Section or other Specification Sections included in this solicitation. If a term listed below appears in this Specification Section or other Specification Sections included in this solicitation, the term shall be interpreted according to the meaning identified.

A. Architect – shall be interpreted to intend either Architect or Engineer (A/E).

B. Authority Having Jurisdiction (AHJ) – An organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure.

C. Certifying Authority – the Design Professional who has, or will, provide professional seal and signature for required plans and/or specifications.

D. Closeout/Close-Out – final activities as may be identified to demonstrate compliance with Construction Documents requirements and/or to transfer of operation, maintenance, and/or control to TDCJ.

E. Construction Documents – shall be interpreted to intend the IFC Drawings and/or Specifications including all Approved alterations.

F. Design Professional (DP) – shall be interpreted to intend A/E or other certifying entity acceptable to applicable AHJ.

G. Engineer – shall be interpreted to intend either Architect or Engineer (A/E).

H. Engineer of Record (EOR) – shall be interpreted to intend Certifying Authority.

I. Exposed – any area less than 16’ above finished floor (A.F.F.), or grade, or less than 10’ from any platform that can be climbed, in any area that can be traversed while standing.

1. Unless otherwise identified in writing, interpret areas such as basements, offices, equipment rooms, pipe chases, and other such areas as ‘Exposed’, to include areas with lay-in type ceilings.

J. IFC – Issued-For-Construction (IFC)

696-FD-27-P002 8 of 388

Wallace Pack Unit Section 01 10 00 - Page 2 of 3 Replace Roof – Multiple Bldgs. MWR #02618010

K. Owner’s Representative – see Project Administrator.

L. Project Administrator (PA) – TDCJ resource responsible for project management activities on behalf of Owner.

1. Where references of ‘Owner’, ‘Owner’s Representative’, ‘TDCJ’, ‘TDCJ’s’ representative’, etc. appear in relation to coordination activities, construction related required submittals, and/or obtaining approvals, these references shall be interpreted to intend the PA.

a. Where instructions identify a submission to the A/E, the submission shall be to the PA who will forward to A/E.

2. If requirements indicate that an approval, etc. is to be obtained, or provided, by the PA, it shall be interpreted to intend the PA will obtain and/or provide subject approval, etc. from the appropriate entity, which may or may not be the PA.

M. Tamper-resistant – elements resistant to loosening and/or disconnection with common tools. E.g. torx head screws.

N. Quality Assurance Inspector (QA) – TDCJ resource responsible for quality assurance activities such as inspections, etc. as may be required by Construction Documents or otherwise determined by Owner.

1.3 INTERRELATION OF SPECIFICATIONS

A. This specification document is comprised of standard TDCJ specifications applicable to the subject project. Appearance of an item or an element in these specifications shall not be interpreted to indicate that item or element is specifically required for the subject project. If an item or element is specifically identified as required or required in order to provide the proper execution and completion for the subject project, these specifications are required to be met.

1.4 WORK SEQUENCE

A. Construct Work in stages or phases with each to be substantially complete before beginning next to accommodate TDCJ occupancy requirements during the construction.

1. For interior work, to the extent possible, all work including demolition, installation, repair, restoration, functional testing, etc. shall be completed in one area before beginning work in another area.

2. At no time will construction and/or installation personnel be permitted to work in areas where direct contact with offenders is possible, such as through a window opening.

1.5 TDCJ OCCUPANCY

A. TDCJ will occupy the site and premises during entire period of construction for the conduct of normal operations.

1. TDCJ will occupy site and/or existing building(s) during entire construction period.

a. Day-to-day operations will continue during the construction period.

2. Coordinate offender relocation and schedule shut-downs of equipment and utilities, as needed/applicable, for construction progress.

696-FD-27-P002 9 of 388

Wallace Pack Unit Section 01 10 00 - Page 3 of 3 Replace Roof – Multiple Bldgs. MWR #02618010

a. All interruptions to TDCJ operations shall be minimized to the fullest extent possible.

1) All services shall remain operational at all times in areas outside the work area.

2) Provide temporary services for planned outages of permanent services in work areas for periods in excess of 4 hours (consecutive or cumulative) in any 24 hour period unless otherwise approved in writing.

3) Correct inadvertent interruption of TDCJ operations due to construction activities immediately.

PART 2 – PRODUCTS

2.1 GENERAL

A. Brand or manufacturer’s references are descriptive only, and indicate type and quality to be provided. All references to brand or manufacturer names shall be interpreted to include the language “or A/E approved equal”. Any brand or manufacturer meeting specifications will be considered, irrespective of the language “or A/E approved equal” appearing in conjunction with the brand or manufacturer name.

B. All provided products shall be free of Lead Based Paint and Asbestos Containing Material.

PART 3 – EXECUTION

3.1 GENERAL

A. The intent of Construction Documents is to require all items necessary for the proper execution and completion of the work. The Construction Documents by their intent are a complete and usable work product expected to be provided. To meet this requirement, provide construction in place to include that which is indicated in the Construction Documents and that which may be reasonably expected to be required to make the work complete in all respects and consistent with established and accepted construction practices.

1. Compliance with requirements of these Construction Documents includes all tools, connections, applications, inspections by AHJ, consumable products, meters, gages, dispensing means and mechanisms, and miscellaneous items required for storage, installation, operation, maintenance, and/or removal for all temporary and/or permanent elements and services provided until such is removed or accepted by TDCJ at Beneficial Occupancy as required by project objectives.

a. Compliance includes provision in a manner and condition acceptable to TDCJ.

2. A complete set of Construction Documents shall be provided. Perform complete scope of work regardless of where in the Construction Documents a requirement, or related requirement, appears.

696-FD-27-P002 10 of 388

Amtech Solutions SUBSTITUTION PROCEDURES v.20160201 Wallace Pack Unit Section 01 25 00 – Page 1 of 2 Replace Roof – Multiple Bldgs. MWR# 02618010

SECTION 01 25 00 – SUBSTITUTION PROCEDURES v.20160201

[Standard TDCJ Specification]

PART 1 - GENERAL

1.1 SUMMARY

A. Requirements for Substitution Requests.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Unless a Substitution has been approved and published in a written Addendum, the material, product, equipment, or service to be used and/or provided are those specified.

However, during the course of work, a Substitution may be approved if a specified or previously approved material, equipment, product and/or service is determined to be unavailable due to strikes, lockouts, bankruptcy, discontinuance of production, documented shortages or similar occurrences.

2.2 PRODUCT REQUIREMENTS

A. All Substitution requests under this Section require prior approval by TDCJ.

B. All Substitution requests under this Section require review and approval by A/E.

2.3 THRU 2.5

A. Not applicable.

PART 3 - PRODUCTS

3.1 PERFORMANCE QUALIFICATIONS

A. Not applicable.

3.2 PREPARATION

A. Review and coordinate all aspects of each item for conformance in all respects with specifications and requirements.

B. Prepare documentation that the requested substitution is equal or superior to the specified material, product, or equipment and shall consist of applicable information which would aid the A/E in making an informed decision. Include side by side product comparisons, technical data, laboratory test results, product drawings, etc.

1. If use of the proposed material, product, or equipment would result in changes to the design of other elements, the Substitution Request shall describe fully the changes required to the drawings or specifications.

3.3 EXECUTION REQUIREMENTS

A. Do not substitute material, product, equipment or service unless Substitution has been specifically approved in writing.

696-FD-27-P002 11 of 388

Amtech Solutions SUBSTITUTION PROCEDURES v.20160201 Wallace Pack Unit Section 01 25 00 – Page 2 of 2 Replace Roof – Multiple Bldgs. MWR# 02618010

B. No material, equipment, product or service is “equal” to such specified until a Substitution Request has been approved.

C. Any cost differences resulting from modifications to the drawings and/or specifications and the cost of making the changes, including charges for required design time by A/E, is the responsibility of Contractor/Vendor.

3.4 QUALITY CONTROL

A. Maintain copies of Approved Substitution Request(s) as Record Submittals.

3.5 COMMISSIONING

A. Not applicable.

3.6 EXECUTION SUBMITTALS

A. Substitution Request with attached required documentation.

3.7 Thru 3.8:

A. No additional requirements.

END OF SECTION

696-FD-27-P002 12 of 388

Amtech Solutions SUBMITTALS v.20230328 Wallace Pack Unit Section 01 33 00 – Page 1 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

SECTION 01 33 00 – SUBMITTALS v.20230328

PART 1 - GENERAL

1.1 SUMMARY

A. Requirements for Submittal of Product Data, Shop Drawings, Samples, Mock-Ups, Requests for Information and other work-related submittals, other than Substitution Requests.

B. Definitions:

1. Action Submittals – written and graphic information and physical samples that require responsive action.

2. Closeout Submittals – project completion related information that may or may not require review and approval.

3. Informational Submittals – written and graphic information and physical samples that may or may not require responsive action.

4. Product Data – illustrations, standard schedules, performance charts, instructions, manufacturer’s certificates, brochures, diagrams, test data and other information furnished to illustrate material, product, equipment or system for some portion of the Work.

5. Shop Drawings – drawings, diagrams, schedules and other data specially prepared for the Work to illustrate some portion of the Work.

6. Samples – physical examples which illustrate materials, equipment or workmanship to establish standards for the Work and/or to demonstrate compliance with the established standard of the Work.

7. Quality Control submittals – information and/or items required to demonstrate conformance with standards or other requirements of the Construction Documents which may or may not require review and approval.

8. Request For Information (RFI) – requests for additional information, interpretation, clarification of, or to identify conflicts with, the Construction Documents.

PART 2 - PRODUCTS, EQUIPMENT, MATERIALS AND/OR REQUIRED FIELD SERVICES

2.1 GENERAL REQUIREMENTS:

A. Submittal Schedule:

1. Required information in tabular format. Required information includes:

a. Specification number and title.

b. Submittal category (action or informational).

c. Name of supplier.

d. Description of the Work covered.

2. Demonstrate number of days for review and processing of Submittals and Resubmittals, and in such sequence and duration as to cause no delay in the Work.

a. Additional time for coordination with subsequent Submittals/

Resubmittals as required.

696-FD-27-P002 13 of 388

Wallace Pack Unit Section 01 33 00 – Page 2 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

b. Product Data before or concurrent with Samples/Mock-Ups and/or Shop Drawings.

c. Single submittal for each element of construction and type of product or equipment with all required information.

3. Coordination:

a. Fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

b. Different types of submittals for related parts of the Work when processing will not be delayed because of need to review submittals concurrently for coordination.

c. Logical groupings to facilitate interrelation of Products and Systems:

1) Simultaneous submittal of associated items of operating systems which require correlation for efficient function and installation.

2) Coordinated with other related submittals.

3) Samples/Mock-Ups that contain multiple, related components such as accessories together as one submittal package.

B. Contractor’s Approval Stamp: A uniform stamp with a statement certifying that submittal has been reviewed, checked and approved for compliance with the Construction Documents and provide a place for Contractor’s signature.

C. Transmittal Form: Contractor’s letterhead and title block on a pre-printed form or a permanently affixed label with applicable letterhead.

1. Label or title block:

a. Project name

b. Date

c. Submittal number with applicable resubmittal/revision identifier.

d. Name and address of A/E (Texas Department of Criminal Justice, for Construction Documents prepared by TDCJ personnel)

e. Name and address of Contractor if information is not contained in pre-printed letterhead, title block or label.

f. Name and address of Sub-contractor, if applicable.

g. Name and address of supplier, if applicable.

h. Name of manufacturer, if applicable.

i. Name of preparer of Submittal.

j. A 6” x 8” space for Contractor’s review and approval markings and action taken by A/E.

D. Prepared written statement:

1. Number and title of applicable Specification Section.

2. Drawing number and detail references, as applicable.

3. Type of element.

4. Locations(s) where product is to be installed, as applicable.

a. Reference sheet number, detail, and/or specification number.

b. Number and name of room or space.

c. Location within room or space.

5. Other necessary identification:

a. Clear indication of specific part number, etc. where product specification sheets contain multiple part numbers.

b. Applicable available options clearly marked.

696-FD-27-P002 14 of 388

Wallace Pack Unit Section 01 33 00 – Page 3 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

c. Complete with respect to quantities, dimensions, specific performance, materials, and similar data.

6. All information relating to means and methods of construction, fabrication, assembly, installation, or erection redacted or otherwise deleted unless such is specifically identified in applicable Specification Section as required.

E. Binders: Where individual Specification Sections require submittals in a Binder:

1. Commercial quality, sized for 8-1/2 in. x 11 in. documents, with cleanable covers equipped with clear view covers for insertion of a custom printed Cover Sheet and Spine insert.

2. Unless other is approved in writing, separate binders for each identified category.

3. Appropriately deep for amount of documents, not to exceed 3”.

a. Additional binders as required for documents not accommodated by 3” binder(s).

1) Labeling on coversheet shall include identification of “No. 1 of x”, etc., where x is the total number of binders for that category.

4. Cover Sheet elements:

a. Project Name.

b. Date.

c. Name and location of project.

d. Name of A/E firm (Texas Department of Criminal Justice if design was not provided by a separately engaged A/E firm).

e. Submittal label as identified in specification.

f. Where dividers are specified: Tabbed fly-leaf with typed labels.

5. Spine insert elements:

a. Submittal label as identified in specification.

b. Project Name.

6. Table of Contents: Neatly typed, using Table of Contents of Project Manual as format.

7. Fold larger sheets to fit into binders.

2.2 WORK PRODUCT REQUIREMENTS

A. Action Submittals:

1. Product Data:

a. Prepared written statement.

b. Include the following information, as applicable:

1) Manufacturer’s written recommendations.

2) Manufacturer’s product specifications.

3) Manufacturer’s installation instructions.

4) Standard color charts.

5) Manufacturer’s catalog cuts.

6) Wiring diagrams showing factory-installed wiring.

7) Printed performance curves.

8) Operational range diagrams

9) Mill reports

10) Standard product operation and maintenance manuals.

11) Compliance with specified referenced standards.

12) Testing by recognized testing agency.

13) Application of testing agency labels and seals.

696-FD-27-P002 15 of 388

Wallace Pack Unit Section 01 33 00 – Page 4 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

14) Notation of coordination requirements.

15) Indication mark on each Submittal showing which products and options are applicable.

2. Shop Drawings:

a. Prepared written statement.

b. Project-specific information, drawn accurately to scale, not based on reproductions of the Construction Documents or standard printed data.

1) Electronic copies of CAD Drawings of the Construction

Drawings will not be provided for use in preparing Shop Drawings.

c. Fully illustrated requirements of the Construction Documents.

Include the following information, as applicable:

1) Field dimensions.

2) Identification of products.

3) Fabrication and installation drawings.

4) Roughing-in and setting diagrams.

5) Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

6) Shopwork manufacturing instructions.

7) Templates and patterns.

8) Schedules.

9) Design calculations.

10) Compliance with specified standards.

11) Notation of coordination requirements.

12) Notation of dimensions established by field measurement.

13) Relationship to adjoining construction clearly indicated.

14) Seal and signature of professional engineer if specified.

15) Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

d. Sheet Size: Except for templates, patterns, and similar full-size drawings, at least 8-1/2 by 11 inches but no larger than 24 by 36 inches.

3. Samples and Mock-Ups:

a. Prepared written statement.

b. Manufacturer’s charts consisting of units or sections of units showing the full range of colors, textures, patterns, and other similar characteristics available.

c. Complete, full-size Mock-Ups, at Project site, unless other is indicated in applicable Specification Section or approved in writing, prepared from same material to be used for the Work, cured and/or finished in manner specified, and physically identical with material or product proposed for use.

B. Close-out Submittals:

1. Per requirements of individual Specification Sections.

C. Information Submittals:

1. Compatibility Test Report(s): Prepared report(s) written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

696-FD-27-P002 16 of 388

Wallace Pack Unit Section 01 33 00 – Page 5 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

2. Coordination Drawing(s): Per requirements in individual Specification Sections. To scale, showing connections, clearances, tolerances, interface requirements, etc.

3. Design Data: Prepared written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include diagrams if applicable. Provide name and version of software, if any, used for calculations.

4. Field Inspection Report(s): Written report(s) required by Construction Documents for recording inspection(s) and/or observation(s). Include the following:

a. Date of Field Inspection.

b. Type and Scope of Inspection.

c. Name of person who performed inspection, qualifications and contact information.

d. Attendees, if applicable.

e. Weather conditions and/or conditions of project area to be inspected.

f. Description of the Work to be inspected.

g. Reference to Specification and/or Drawing where requirement for

Inspection is identified.

h. Description of elements found to be in compliance with Construction

Documents.

i. Deficiencies noted to include condition of substrates; unacceptable installation tolerances; and/or any other item(s) that conflicts with requirements of Construction Documents.

j. Identification of specification or other requirement that conflicts with the detrimental condition, unacceptable tolerance(s), etc.

k. Corrective actions taken.

l. Corrective actions recommended.

5. Field Test Report(s): Written report(s) provided by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Construction Documents. Information included in Field Test Report(s) shall be the same as for Field Inspection Report(s).

6. Installer Certificate(s): Prepared written statement(s) on manufacturer’s letterhead certifying that Installer complies with requirements in the Construction Documents and, where required, is authorized by manufacturer for this specific Project.

7. Material Certificate(s): Prepared report(s) written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting test results of material for compliance with requirements in the Construction Documents.

8. Preconstruction Test Report(s): Prepared report(s) written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Construction Documents.

9. Product Test Report(s): Prepared written report(s) indicating current product produced by manufacturer complies with requirements in the Construction Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

696-FD-27-P002 17 of 388

Wallace Pack Unit Section 01 33 00 – Page 6 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

10. Product Certificate(s): Prepared written statement(s) on manufacturer’s letterhead certifying that product complies with requirements in the Construction Documents.

11. Report(s):

a. Cover page with the following information:

1) Project name.

2) Date of report.

3) Type of report.

4) Name, contact information, qualifications of preparer.

5) Specification Section specifying report.

b. Footer includes page numbers.

12. Research/Evaluation Report(s): Prepared written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include:

a. Name of evaluation organization.

b. Date of evaluation.

c. Time period when report is in effect.

d. Product and manufacturers’ names.

e. Description of product.

f. Test procedures and results.

g. Limitations of use.

13. Manufacturer Certificate(s): Prepared written statement(s) on manufacturer’s letterhead certifying that manufacturer meets or exceeds requirements in the Construction Documents. Include evidence of manufacturing experience where required.

14. Manufacturer’s Instruction(s): Prepared written or published information that documents manufacturer’s recommendations, guidelines, and procedures for installing, operating, and maintaining product or equipment.

a. Include the following, as applicable:

1) Name of product.

2) Name, address, and telephone number of manufacturer.

3) Preparation of adjoining elements.

4) Required tolerances.

5) Sequence of installation or erection.

6) Required adjustments.

7) Recommendations for cleaning and protection.

b. Specifically identify requirements for special post commissioning maintenance activities required to maintain warranties that are outside of typical Periodic Maintenance requirements.

15. Manufacturer’s Field Report(s): Prepared written information documenting factory-authorized (manufacturer) service representative’s tests and inspections. Include the following, as applicable:

a. Name of product.

b. Name, address, and telephone number of factory-authorized service representative making report.

c. Statement of observed field conditions, conditions of surfaces and installation and quality of workmanship.

d. Statement on condition of adjoining elements and acceptability for installation of product.

e. Statement that products at project site comply with manufacturer’s requirements.

f. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

696-FD-27-P002 18 of 388

Wallace Pack Unit Section 01 33 00 – Page 7 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

g. Results of operational and other tests and a statement of whether observed performance complies with requirements.

h. Statement whether conditions, products, and installation will affect warranty.

i. Other required items indicated in individual Specification Sections.

16. Material Safety Data Sheet(s) (MSDS): document(s) that contain information on the potential health effects of exposure to chemicals, or other potentially dangerous substances, and on safe working procedures when handling chemical products.

17. Qualification Data: Prepared written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects, engineers and owners, and other information specified.

18. Welding Certificate(s): Prepared written certification dated less than one calendar year previous that welding procedures and personnel comply with requirements in the Construction Documents. Include record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on American Welding Society forms. Include name of firms and personnel certified.

D. Request For Information:

1. Name of project.

2. RFI number.

3. RFI description.

4. Date.

5. Detailed identification and description of problem encountered, information required, item for which interpretation or clarification is required, conflicting requirements, such as Manufacturer’s Instructions conflict with instructions in Construction Documents, etc. Include applicable specification and/or drawing numbers.

6. Recommended resolution to include sizes, ratings, sketches, etc. in compliance with applicable specifications and requirements.

7. Hard-Copy RFIs: Each page of attachments with the RFI number and sequential page number.

8. Software-Generated RFIs: Substantially the same content as Hard-Copy RFIs and Attachments, provided as electronic files in Adobe Acrobat PDF format numbered as for Hard-Copy submission.

9. Supplementary Drawings: Include dimensions, thicknesses, structural grid references, details of affected or adjoining material, assemblies, attachments, products, components, equipment, etc needed to evaluate subject RFI and render an informed response.

2.3 REQUIRED FIELD SERVICES

A. Not applicable.

2.4 PRODUCT, EQUIPMENT, MATERIAL AND/OR FIELD SERVICES WARRANTY

REQUIREMENTS

A. As required per individual Specification Sections.

2.5 PRODUCT, EQUIPMENT, MATERIAL AND/OR FIELD SERVICES SUBMITTALS

A. Elements as required per individual Specification Sections.

696-FD-27-P002 19 of 388

Wallace Pack Unit Section 01 33 00 – Page 8 of 9

PART 3 - EXECUTION

3.1 INSTALLER AND/OR PERFORMANCE QUALIFICATIONS

A. Per requirements of individual Specification Sections.

3.2 PREPARATION

A. All submittals, other than RFIs, attached to a completed Transmittal Form.

B. Information specially prepared for submittal because standard printed data are not suitable for use, prepare as for Shop Drawings.

C. No more than 3 sets of Samples/Mock-Ups shall be required.

D. Partial or incomplete Submittals shall be returned, without review, for resubmission.

E. Prepare and maintain a tabular Log for each type of Submittal(s) (including RFIs) organized by submittal type and submittal number. Include in Log:

1. Project name.

2. Submittal number with applicable resubmittals/revision identifier including submittals that were dropped or otherwise cancelled.

a. Submittal number: Specification Section number followed by decimal point and a sequential number (e.g. 15 08 10.01).

1) Remain consistent throughout submittal type.

b. Resubmittal/revision identifier: Alphabetic suffix after another decimal point added to Submittal number (e.g. 15 08 10.01.A)

3. Description.

4. Date of submittal.

5. Date response was received.

6. Identification of related Minor Change in the Work, Field Order, Proposal

Request, etc. as applicable.

F. Immediately upon discovery of the need for information, interpretation, clarification, or direction, submit a Request for Information.

1. Coordinate and submit RFIs in a prompt manner so as to avoid delays in work.

2. Allow 72 hours for response.

3. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for interpretation of A/E’s action on submittals or substitutions.

d. Requests for coordination information already indicated in the

Construction Documents.

e. Incomplete RFIs.

f. RFIs with numerous or significant errors.

3.3 EXECUTION REQUIREMENTS

A. General:

696-FD-27-P002 20 of 388

Wallace Pack Unit Section 01 33 00 – Page 9 of 9 Replace Roof – Multiple Bldgs. MWR# 02618010

1. Time for review shall commence upon receipt of Submittal.

2. Retain responses for reference for Quality Control and Quality Assurance activities and coordination with other elements.

B. Submittals for Quality Control will be reviewed for compliance with the construction documents only. The review may not constitute a detailed review of adequacy of submitted design calculations. The appropriateness and accuracy of calculations is the responsibility of the Contractor (and Contractor’s professional engineer when such calculations are required to be professionally sealed).

3.4 QUALITY CONTROL

A. As required by individual Specification Sections.

3.5 COMMISSIONING

A. As required by individual Specification Sections.

3.6 EXECUTION SUBMITTALS

A. Every seven (7) calendar days, provide submittal logs.

3.7 INSTALLATION AND/OR WORKMANSHIP WARRANTY REQUIREMENTS

A. As required by individual Specification Sections.

3.8 CLOSE-OUT

A. As required by individual Specification Sections.

696-FD-27-P002 21 of 388

TDCJ Facilities Engineering References v.20210422 Wallace Pack Unit Section 01 42 00 - Page 1 Of 4 Replace Roof – Multiple Bldgs. MWR #02618010

SECTION 01 42 00 – REFERENCES V.20210422

[Standard TDCJ Specification]

PART 1 - GENERAL

1.1 STANDARDS

A. Applicability: For Products specified by reference to an association or trade standard, comply with requirements and recommendations stated in that standard, except when requirements are modified by the Construction Documents, or applicable codes establish stricter standards.

B. Publication Dates:

1. Except as otherwise indicated, where compliance with a reference standard is required, comply with standard in effect as of date of issue of Construction Documents, except when a specific date is specified.

2. Copies of Standards: Where copies of standards are needed for proper performance of Work, obtain such copies directly from publication source.

1.2 SCHEDULE OF ABBREVIATIONS

A. Abbreviations and Names: Following is a partial list of Architecture, Engineering, and Construction (AEC) industry standards organizations, codes, publications, practices, procedures, materials, and other accepted practice acronyms. References to these acronyms are listed in applicable specification sections using abbreviations contained below.

AA Aluminum Association AABC Associated Air Balance Council

AAMA American Architectural Manufacturer's Association AASHTO American Association of State Highway and Transportation Officials ABMA American Boilers Manufacturer's Association

ACI American Concrete Institute ACIL American Council of Independent Laboratories ACM Asbestos Containing Materials ACRM Asbestos Containing Roofing Materials

ADC Air Diffusion Council A/E Architect/Engineer AGA American Gas Association

AHRI Air Conditioning, Heating and Refrigeration Institute AIA American Institute of Architects

AISC American Institute of Steel Construction AISI American Iron and Steel Institute ALSC American Lumber Standards Committee AMI Auburn Manufacturing, Inc.

AMCA Air Movement and Control Association ANSI American National Standards Institute APA American Plywood Association ASCE American Society of Civil Engineers

ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers ASJ All Service Jacket ASME American Society of Mechanical Engineers

696-FD-27-P002 22 of 388

Wallace Pack Unit Section 01 42 00 - Page 2 Of 4 Replace Roof – Multiple Bldgs. MWR #02618010

ASNT American Society of Nondestructive Testing ASPE American Society of Plumbing Engineers ASTM American Society of Testing and Materials ASTM-MT ASTM – Mechanical Tubing ATSI Alliance for Telecommunications Industry Solutions

AWI Architectural Woodwork Institute AWPA American Wood-Preservers' Association AWPB American Wood-Preservers Bureau AWWA American Water Works Association AWS American Welding Society BAC Building Automation Control BACnet BAC network

BHMA Builders' Hardware Manufacturers Association BS British Standard cETL ETL (see below) – certified for use in Canada CDA Copper Development Association Inc.

CENELEC European Committee for Electrotechnical Standardization CFM or cfm Cubic Feet per Minute CFR Code of Federal Regulations

CISPI Cast Iron Soil Pipe Institute CGA Compressed Gas Association

CPSC Consumer Product Safety Commission CRRC Cool Roof Rating Council CRSI Concrete Reinforcing Steel Institute CS Commercial Standard of NBS (U.S. Dept. of Commerce) DB or dB Decibel DIV Division DOC Department of Commerce DSCC Defense Supply Center Columbus ELL-Jacs Trade Mark of a manufactured elbow cover EMC Electromagnetic Capability

EN A product family standard for industrial, scientific, and medical (ISM) equipment and electro-discharge machining (EDM) and arc welding equipment

ENV Electromagnetic Capability Standard developed by CENELEC EMT Electrical Metallic Tubing (conduit) EPA Environmental Protection Agency EPS Expanded Polystyrene EPDM Ethylene Propylene Diene Monomer

ETL Edison Testing Laboratories - certified for use in the U.S.

FACP Fire Alarm Control Panel FCC Federal Communications Commission

FCI Fluid Controls Institute FGMA Flat Glass Marketing Association FM Factory Mutual (Insurance Company Rating) FMG FM Global (Name of Factory Mutual Insurance Company Global) FS Federal Specification (General Services Admin) FSC Forestry Stewardship Council GANA Glass Association of North America

GSM Global System for Mobile (Communications) HI Hydraulic Institute HMAC Hot Mix Asphaltic Concrete HVAC Heating, Ventilating and Air Conditioning

IAPMO International Association of Plumbing and Mechanical Officials

696-FD-27-P002 23 of 388

Wallace Pack Unit Section 01 42 00 - Page 3 Of 4 Replace Roof – Multiple Bldgs. MWR #02618010

IBC International Building Code (International Code Council) IC Integrated Circuit ICBO International Conference of Building Officials

ICC International Code Council ICC-ES ICC-Evaluation Service ICRI International Concrete Repair Institute IEBC International Existing Building Code IEC International Electrotechnical Commission

IECC International Energy Conservation Code IEEE Institute of Electrical and Electronic Engineers Inc

IDF Intermediate Distribution Frame(s) IN or in Inch INC Incorporated IP Internet Protocol IP/GSM Internet Protocol / Global System for Mobile (Communications) ISO International Standardization Organization

IT Information Technology LB or lb Pound LBF or lbf Pound-Force LCD Liquid Crystal Display LLC Limited Liability Company LTD Limited MDP Main Distribution Panel MBMA Metal Building Manufacturers Association MFMA Maple Flooring Manufacturers Association Inc

MIL Military Standardization Documents (U.S. Dept. of Defense) MPI Master Painter’s Institute MSS Manufacturers Standardization Society MSS-SP MSS-Standard Practice NAAMM National Association of Architectural Metal Manufacturers NACE National Association of Corrosion Engineers NCMA National Concrete Masonry Association

NEC National Electrical Code (by NFPA) NECA National Electrical Contractors Association

NEMA National Electrical Manufacturers Association NETA National Electrical Testing Association

NESC National Electrical Safety Code NER National Evaluation Report

NFPA National Fire Protection Association NFRC National Fenestration Rating Council

NICET National Institute for Certification in Engineering Technologies NO Number NRCA National Roofing Contractors Association NRTL Nationally Recognized Testing Laboratory NSF National Sanitation Federation OSB Oriented Strand Board OSHA Occupational Safety and Health Administration PA Project Administrator PLC Programmable Logic Controller PCI Pre-stressed Concrete Institute

PDI Plumbing and Drainage Institute PROM Programmable Read Only Memory PS Product Standard PSF or psf Pound per Square Foot

696-FD-27-P002 24 of 388

Wallace Pack Unit Section 01 42 00 - Page 4 Of 4 Replace Roof –…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .