This is a Project Manual for the Cheney Transformer Replacement project prepared for the City of Wichita, Kansas, under Project No. 227043-002, dated February 2024. The manual contains electrical specifications and construction requirements for the complete installation of electrical systems related to transformer replacement work. The document establishes comprehensive technical requirements across multiple divisions, including medium voltage cables (above 600 volts), low-voltage electrical power conductors and cables, grounding and bonding systems, raceways and boxes, and related electrical infrastructure. The specifications reference industry standards including the National Electrical Code (NEC), National Fire Protection Association (NFPA) standards, UL listings, NEMA standards, and IEEE requirements. The project requires compliance with all applicable federal, state, and local codes and regulations, with the City of Wichita and the Engineer maintaining authority to approve deviations and modifications. The document does not specify quantities of materials, response dates, bid opening dates, or contract award dates, as it functions as the technical specification document rather than the bid solicitation notice.

The Project Manual establishes detailed requirements for materials, equipment, installation practices, testing, and quality assurance to be performed by the electrical contractor and related trades. All electrical materials and equipment must be new, of best quality, and free from defects, with manufacturers required to have produced specified items for at least three years and demonstrated satisfactory operation in three similar installations. The specifications require submission of shop drawings, catalog data, certified test reports, and operating instructions for approval prior to delivery to the jobsite. The contractor must provide a one-year guarantee on all work, materials, and equipment following substantial completion and is responsible for all temporary and permanent electrical service connections, compliance with utility company requirements, and coordination with other trades. The document includes detailed testing requirements, as-built drawing requirements, and comprehensive operational and maintenance documentation to be delivered to the Owner upon project completion.

View the file

Other files

File Type Posted
1-260295 Bid Table.pdf PDF
4-PLANS (Half Scale) 448-2026-029868.pdf PDF
3-BP 448-2026-029868.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

City of Wichita

Cheney Transformer Replacement

PROJECT NO. 227043-002

FEBRUARY 2024

PREPARED BY

PROFESSIONAL ENGINEERING CONSULTANTS, PA

303 South Topeka, Wichita, Kansas 67202

316-262-2691 / www.pec1.com http://www.pec1.com/

ELECTRICAL INDEX

i

Division 26 - Electrical

260500 Common Work Results for Electrical

260513 Cables, Medium Voltage (Above 600 Volts)

260519 Low Voltage Electrical Power Conductors and Cables

260526 Grounding and Bonding for Electrical Systems

260533 Raceway and Boxes for Electrical Systems

260543 Underground Electrical Construction

260573 Electrical System Protective Device Study

262413 Switchboards

262810 Overcurrent Protective Devices

262816 Enclosed Switches and Circuit Breakers

264313 Surge Protective Devices for Low-Voltage Electrical Power Circuits

Reference Drawings

-Standby Power Generator Electrical Drawings for Distribution Equipment

Wichita, Kansas

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-1

SECTION 260500 –COMMON WORK RESULTS FOR ELECTRICAL

PART 1 - GENERAL

1.1 GENERAL CONDITIONS:

A. The General Conditions, Supplementary General Conditions, General Requirements, and

Special Conditions shall be and are hereby made a part of this Section of the specifications.

B. In case of conflicts between the electrical drawings and Division 26 of these specifications, the more stringent requirements shall govern. In all cases, notify the Engineer for direction.

C. The requirements of COMMON WORK RESULTS FOR ELECTRICAL establish minimum requirements, apply to, and are hereby made a part of all sections of Division 26, 27, and 28 of this specification.

D. The Contractor shall be responsible for excavation of all earth, soil, and rock conditions at the site. Review the elevations and soil boring logs and include all associated costs.

1.2 DESCRIPTION:

A. The electrical work shall include all labor, materials, tools, transportation, equipment, services and facilities, required for the complete, proper and substantial installation of all electrical work shown on the plans, and/or outlined in these specifications. The installation shall include all materials, appliances, and apparatus not specifically mentioned herein or noted on the drawings but which are necessary to make a complete working installation of all electrical systems.

B. All of the electrical related work required for this project (unless specified otherwise) is a part of the Electrical Contract price but is not necessarily specified under this division of the specifications or shown on the electrical drawings. Therefore, all divisions of the specifications and all drawings shall be consulted.

C. The plan drawings are schematic only and are not intended to show the exact routing of raceway systems unless dimensions are noted on the drawings. Final routing will be governed by field conditions (structural members, mechanical equipment, ductwork, underground piping, duct banks, etc.) and shall be determined by the Contractor and approved by the Architect. Any changes in routing shall not change the design of the raceway system.

D. The plan drawings showing device and equipment locations are schematic only and are not intended to show exact locations unless dimensions are noted on the drawings. The

Contractor shall review all contract drawings that may affect the location of devices and equipment to avoid possible interference and permit full coordination of all work. The right to make any reasonable change in location within 6'-0", is reserved by the Architect up until the time of rough-in at no extra cost.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-2

E. Furnish and install electrical wiring, systems, equipment and accessories in accordance with the specifications and drawings. Capacities and ratings of transformers, cable, switchgear, panelboards, motor control, and other items, arrangement for specified items in general are shown on drawings.

F. Electrical service entrance equipment (arrangements for temporary and permanent connections to the power company's system) shall conform to the power company's requirements. Coordinate fuses, circuit breakers and relays with the power company's system, and obtain power company approval. Provide all required temporary building power and lighting. Remove when finished. Installation of temporary power and lighting shall comply with N.E.C. and OSHA requirements.

G. Ampacities specified or shown on the drawings are based on copper conductors, with the conduit and raceways accordingly sized.

1.3 MINIMUM REQUIREMENTS:

A. Codes Rules and Regulations: Execute all work under ADA, the latest rules and regulations of the National Electrical Code (NEC), the National Fire Protection Association, and with all laws, regulations and ordinances of the County, State, City, and the Utility Company.

B. Codes shall govern in case of any direct conflict between codes, plans and specifications;

except when plans and specifications require higher standards than those required by code.

Variance from the plan and specifications made to comply with code must be approved by the Architect. If approved they shall be made with no increased cost to the Owner.

1.4 STANDARDS:

A. All material and equipment shall be listed, labeled or certified by UL LLC, where such standards have been established. Equipment and material which are not covered by UL

Standards will be accepted provided equipment and material is listed, labeled, certified or otherwise determined to meet safety requirements of a nationally recognized testing laboratory. Equipment of a class which no nationally recognized testing laboratory accepts, certifies, lists, labels, or determines to be safe, will be considered if inspected or tested in accordance with national industrial standards, such as NEMA, or ANSI. Evidence of compliance shall include certified test reports and definitive shop drawings.

B. Definitions:

1. Certified: Equipment is "certified" if:

a. Equipment has been tested and found by a nationally recognized testing laboratory to meet nationally recognized standards, or to be safe for use in a specified manner.

b. Production is periodically inspected by a nationally recognized testing laboratory.

c. It bears a label, tag, or other record of certification.

2. Nationally recognized testing laboratory: A testing laboratory which is approved, in accordance with OSHA regulations, by the Secretary of Labor.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-3

1.5 QUALIFICATIONS (PRODUCTS AND SERVICES):

A. Manufacturers Qualifications: The manufacturer shall regularly and presently produce, as one of the manufacturer's principal products, the equipment and material specified for this project, and shall have manufactured the item for at least three years.

B. Product Qualification:

1. Manufacturer's product shall have been in satisfactory operation, on three installations of similar size and type as this project, for approximately three years.

2. The Engineer reserves the right to require the Contractor to submit a list of installations where the products have been in operation before approval.

C. Service Qualifications: There shall be a permanent service organization maintained or trained by the manufacturer which will respond within two hours of receipt of notification that service is needed. Submit name and address of service organization.

1.6 MANUFACTURED PRODUCTS:

A. Materials and equipment furnished shall be new, of best quality and design, free from defects, of current production by manufacturers regularly engaged in the manufacture of such items, for which replacement parts should be available. All items used on this project shall be free of asbestos, PCB, and mercury material.

B. When more than one unit of the same class of equipment is required, such units shall be the product of a single manufacturer.

C. Equipment Assemblies and Components:

1. Components of an assembled unit need not be products of the same manufacturer unless indicated otherwise.

2. Manufacturers of equipment assemblies, which include components made by others, shall be completely responsible for the final assembled unit.

3. Components shall be compatible with each other and with the total assembly for the intended service.

4. Constituent parts which are similar shall be the product of a single manufacturer.

D. Factory and Field wiring shall be identified on the equipment being furnished and on all wiring diagrams.

E. When Factory Testing is Specified:

1. The Engineer shall have the option of witnessing factory tests. The Contractor shall notify the Engineer a minimum of 15 working days prior to the manufacturer making the factory tests.

2. Four copies of certified test reports containing all test data shall be furnished to the

Engineer prior to final inspection and not more than 90 days after completion of the tests.

3. When equipment fails to meet factory test and reinspection is required, the

Contractor shall be liable for all additional expenses, including expenses of the

Engineer.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-4

1.7 EQUIPMENT PROTECTION:

A. Equipment and material shall be protected during shipment and storage against physical damage, dirt, moisture, cold and rain.

B. During installation, equipment, controls, controllers, circuit protective devices, and other like items, shall be protected against entry of foreign matter and be vacuum cleaned both inside and outside before testing, operating and painting.

C. Damaged equipment shall be, as determined by the Engineer, placed in satisfactory operating condition or be returned to the source of supply for repair or replacement.

D. Painted surfaces shall be protected with factory installed removable heavy Kraft paper, sheet vinyl or equal.

E. Damaged paint on equipment and materials shall be restored to the original quality of paint and workmanship as used by the manufacturer so repaired area is not obvious.

1.8 GENERAL WORK REQUIREMENTS:

A. Arrange, phase and perform work to assure electrical service both temporary and permanent for buildings at all times.

B. Coordinate location of equipment and conduit with other trades to minimize interferences.

C. Examination of Site:

1. Visit the site, inspect the existing conditions and check the drawings and specifications so as to be fully informed of the requirements for completion of the work.

2. Lack of such information shall not justify an extra to the contract price.

D. Permits:

1. Obtain and pay for all licenses and permits, fees, inspection and certificates required for the execution of this work.

2. Pay fees and charges for connection to outside services and use of property.

3. Deliver permits and certificates to the Architect to be transmitted to the Owner.

E. Services:

1. This Contractor shall pay for all expenses, deposits, reimbursements, etc., required by the local rules and codes for the service to the buildings, complete and ready for use. See plot plan.

2. Consult Power Company for their requirements and for coordinating with their installation. Contractor shall provide any work thus required beyond that indicated by the drawings and specifications. He shall bear all expense involved for the complete installation of the electrical service (both temporary and permanent) to the building ready for operation, including utility service charges, except as specifically excluded on the plans.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-5

3. This Contractor shall consult all local departments to verify requirements and bid installation of service in accordance with local codes and Utility company rules and regulations.

4. This Contractor shall bear all expense involved for the complete telephone and internet service conduit installation and pull wire ready for cable installation.

Verify complete installation with the local telephone company and internet service provider and bid installation to comply with their requirements.

F. Responsibility:

1. This Contractor will be held responsible for any and all damage to any part of the building or to the work of other contractors, as may be caused through this contractor’s operation.

2. Any mutilation of building finishes or equipment initiated by electrical construction shall be properly corrected by the respective finishing contractor and paid for by the Electrical Contractor.

3. The operation of the temporary power and the permanent electrical system shall be the responsibility of this Contractor until acceptance of the building by the

Owner.

G. Work to be done by Contractor:

1. Build in all openings, sleeves, chases, etc., for conduit and equipment as established, furnished and set by this Contractor. The General Contractor shall seal or grout all openings after this Contractor has installed the conduits.

2. Build in bolts, brackets, hangers etc., for work established, furnished and set by this Contractor.

3. All concrete work required for equipment furnished and set by this Contractor including clean up pads under electrical gear, fixture bases, transformer bases, etc.

4. Painting: All painting of electrical equipment installed in finished areas shall be done by the General Contractor. Painting will not be required on receptacles, switches, circuit breakers etc. All fixtures and exterior poles specified to be factory-primed shall be painted by General Contractor. Paint all wiremold, exposed conduit and equipment, etc., to match final wall colors.

5. Provide fireproofing above fixtures located in fire rated ceilings per U.L.

requirements.

6. Pay all utility costs for operation of electrical system during construction until acceptance of building by the Owner.

H. Work done by the Mechanical Contractor:

1. The Mechanical Contractor shall furnish wiring diagrams and temperature control drawings of all equipment furnished to the Electrical Contractor. (Catalog information is unacceptable, provide point to point drawings.)

2. The Mechanical Contractor shall furnish and install all control equipment requiring connections to air, water, steam, etc., such as pneumatic electric relays, remote bulb temperature controls, solenoid valves, aquastats and pressure controls.

3. The Mechanical Contractor shall reimburse the Electrical Contractor for any changes in system design i.e.; control or equipment which affects the Electrical

Contractor. Also refer to equipment connections, controls and instrumentation in

260500.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-6

I. Workmanship and Coordination:

1. Make installation substantially as shown on the plans.

2. Make alterations in location of apparatus or conduit as may be required to conform to building construction without extra charge.

3. Mechanical equipment service clearances and electrical apparatus service clearances as specified in their respective manufacturer's product data shall be maintained free from conduit.

4. Cooperate with other trades in their installation of work.

5. Complete the installation in a workmanlike manner, completely connected and ready to give proper and continuous service.

6. Use only experienced licensed electricians.

J. Cutting and Patching:

1. Notify the General Contractor in ample time, of the location of all chases, sleeves, and other openings required in connection with the work of this contract.

2. Cutting and patching made necessary because of failure to comply with the above shall be done by the General Contractor at the expense of the Electrical Contractor.

3. When it is necessary for the Electrical Contractor to cut building materials, it shall be done in a neat and workmanlike manner meeting with the approval of the

Architect.

4. Holes through concrete shall be carefully drilled with a "Concrete Termite" drill.

A Star Drill or Air Hammer will not be permitted. Structural members shall not be cut without approval from the Architect.

5. Any penetrations thru the roof shall be made with "Stoneman" 900 Series flashing connections as manufactured by Elmdor/Stoneman, City of Industry, California, or as approved by the Architect.

6. Any penetrations made in exterior or basement foundation walls shall be sealed with Thunderline "Link-Seal" connections, as manufactured by Thunderline

Corporation, Wayne, Michigan.

K. Manufacturer’s Instructions:

1. Apply, install, connect, erect, use, clean, and condition articles, materials and equipment as directed by the manufacturer.

L. Provide separate support for all devices mounted in or to lay-in ceiling tile. Ceiling tile shall not be used to support any device.

1.9 EQUIPMENT INSTALLATION AND REQUIREMENTS:

A. Equipment location shall be as close as practical to locations shown on the drawings.

B. Working spaces shall not be less than specified in the National Electrical Code for all voltages specified.

C. Inaccessible Equipment:

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-7

1. Where the Engineer determines that the Contractor has installed equipment without proper clearances or not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled as directed at no additional cost to the Owner.

a. Install access panels as approved by the Architect to provide access to all equipment, J-boxes and outlets located in non-accessible spaces. Panels shall be flush locking type with a fire rating equal to the ceiling system.

2. "Conveniently accessible" is defined as being capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as motors, pumps, belt guards, transformers, piping, and ductwork. Outlet and box covers shall be removable by using regular length (8") screw drivers.

D. Distribution Equipment:

1. All items of Electrical Distribution Equipment

(switchboards - panelboards - disconnects) shall be of one manufacturer, unless specifically noted on the drawings, in the specifications, or approved by the

Engineer. Intermixing of distribution equipment by different manufacturers will not be permitted.

2. Provide a Type 1 surge protective device for lightning protection on each service entrance for each building. The surge protective device shall meet the requirements of UL 1449. Refer to drawings for voltage and phasing of service. Arrester shall be located within the main switch, panel or switchboard enclosure and connected with 12” maximum leads. Surge protective devices shall have an enclosure suitable for indoor or outdoor mounting and shall utilize metal oxide varistors that are individually fused.

3. Equipment layouts on the drawings are based on one manufacturer. Verify all actual equipment sizes with equipment manufacturer prior to bidding.

4. If layout changes are required due to differing electrical manufacturer’s equipment size, they must be submitted to and approved by the Engineer. National Electric

Code working clearances must be maintained at all times. Extra remuneration will not be allowed for layout changes that differ from those shown.

5. Provide and install all steel supports as required for mounting of electrical equipment.

6. Anchor all free-standing electrical equipment including switchboards, switchgear, substations, motor control centers, paralleling gear, transfer switches, transformers, etc. to the floor with plated, 1/2" diameter minimum, anchor bolts or as recommended by the manufacturer.

1.10 EQUIPMENT CONNECTIONS, CONTROLS AND INSTRUMENTATION:

A. General: The following applies to all electrical power and control connections for all equipment requiring electrical installation work provided by others.

B. Electrical Contractor shall install and connect the following items for equipment requiring electrical power that is either furnished or specified by other Contractors and/or the Owner.

Where these required items are not furnished with the equipment being connected, it shall be the Electrical Contractors responsibility to provide the necessary items including conduit, boxes and wiring.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-8

1. Thermal Overload Devices.

2. Overcurrent Devices.

3. Short Circuit Protective Devices.

4. Voltage Transformation Equipment.

5. Control Devices (Local and Remote).

6. Equipment Mounting Structures.

7. Additional Miscellaneous Devices.

C. In general, all major equipment will be specified to be factory prewired with only service and interconnecting wiring required at the site by the electrical contractor; however, the

Electrical Contractor shall check all divisions of the specification to verify if the equipment is specified factory prewired and if not, then it shall be the responsibility of the Electrical

Contractor to provide the complete wiring of the equipment in accordance with wiring diagrams provided by other contractors and/or Owner to the Electrical Contractor. All interconnecting of equipment shall be by the Electrical Contractor.

D. All line and low voltage wiring and connections required to control the equipment are a part of this section. All wiring shall be in conduit. All conduit, wiring, and terminations shall be provided by the Electrical Contractor.

E. The Electrical Contractor shall provide 120-volt control power supply; #12 Ga. CU.

THHN/THWN in 1/2"C. minimum at all points required by controls, instrumentation and sprinkler risers. Circuit as shown on the plans or to the nearest 120-volt panel if no circuiting is indicated. Use spare 20 Amp. breakers. Each control panel shall be on a separate circuit unless otherwise indicated. If the controlled equipment is fed from the emergency system, then the control power supply must feed from the emergency system.

F. The Contractor shall become familiar with the equipment to be furnished by the other

Contractors and/or the Owner in connection with this work and include provisions for such connections and work in the Contractor's price. Extra remuneration will not be allowed for such work.

G. Connections to all equipment have been designed from units as specified on the drawings or in the specifications. In the event equipment or control differs on approved shop drawings it shall be the responsibility of the Supplying Contractor to coordinate electrical connections to the units and reimburse Electrical Contractor for any changes in system design. These changes shall not involve additional cost to the Owner.

H. Review all plans and specifications to verify all equipment connections that are required by mechanical and/or other contractors. Although the electrical drawings will show equipment connection requirements, it is the Electrical Contractor's responsibility to connect all equipment furnished by other Contractor's at no extra cost to the Owner, even if this equipment connection is not shown on the electrical drawings. Coordinate all required connections not shown on the electrical drawings with the Engineer.

1.11 NAMEPLATES:

A. General: The following items shall be equipped with nameplates:

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-9

1. Disconnect switches (fused or nonfused), transformers, switchgear and switchboards (including branch circuit breakers/switches), panelboards, separately mounted circuit breakers, starters, contactors, relays, junction boxes and pull boxes.

B. Inscription: Nameplates shall adequately describe the function or use of the particular equipment involved. Nameplates for panelboards and switchboards shall include the panel designation, voltage, and phase, A.I.C. rating of the supply (see schedules, one-line diagram, and color coding). For example, "Panel A" 120/208 V, 3-Phase, 4-Wire, 10,000

A.I.C. or “50,000 AIC with 22 KA Breakers, Series with class ‘J’ Fuses”:

1. Phase A – Black.

2. Phase B – Red.

3. Phase C – Blue.

4. Neutral – White.

5. Ground – Green.

C. The name used for a machine nameplate shall be the same as the one used on the machine's motor starter, disconnect and P.B. station nameplates. Nameplates for fused switches and panels shall also indicate fuse type and size.

1. In addition to the instructions listed above:

a. All panelboards and transfer switches fed from the emergency system shall be labeled “Emergency System”.

b. All panelboards and transfer switches fed from the standby system shall be labeled “Standby System”.

D. Construction:

1. Nameplates shall be as follows:

a. Normal power - laminated phenolic plastic white front and back with black core.

1. Lettering shall be engraved through front layer to form 1/4" characters. Nameplates shall be securely fastened to the equipment to be identified, with No. 4 Phillips, round head, cadmium plated, steel self tapping screws or nickel plated brass bolts.

Motor nameplate may be nonferrous metal not less than 0.03 inches thick, die stamped. In lieu of separate plastic nameplates, engraving directly on device plates is acceptable. Letters engraved thus, shall be filled with contrasting enamel. All nameplates and their installation are part of this work. Free hand lettering or dymo label marker will not be acceptable.

1.12 MATERIALS OF APPROVED EQUAL:

A. Where items of equipment and/or materials are specifically identified herein by a manufacturer's name, model or catalog number, and only such specific items may be used in the base bid, except as hereinafter provided.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-10

B. Unless requests for changes in base bid specifications are received, approved and noted by written addendum prior to the opening of bids, the successful contractor will be held to furnish specified items.

C. After contract is awarded, changes in specifications shall be made only as defined under

"Substitution of Equipment".

1.13 SUBSTITUTION OF EQUIPMENT:

A. After execution of the contract, substitution of equipment of makes other than those specifically named in the contract documents, may be approved by the Engineer, only if the equipment named in the specifications cannot be delivered to the job in time to complete the work in proper sequence and due to conditions beyond control of the

Contractor. Provide documentary proof in writing from the manufacturer that the specified equipment will not be available in time. If the Contractor is responsible for the delay, the substitution will not be approved.

B. Requests for substitutions must be accompanied by documentary proof of equality or difference in price and delivery, if any, in form of certified quotations from suppliers of both specified and proposed equipment.

1.14 SUBMITTALS: IN ACCORDANCE WITH SECTION SAMPLES AND SHOP DRAWINGS,

FURNISH THE FOLLOWING:

A. The Engineer's approval shall be obtained for all equipment and material before delivery to the job site. Delivery, storage or installation of equipment or material which has not had prior approval will not be permitted at the job site.

B. All submittals shall include adequate descriptive literature, catalog cuts, shop drawings and other data necessary for the Engineer to ascertain that the proposed equipment and materials comply with specification requirements. Catalog cuts submitted for approval shall be legible and clearly identify equipment being submitted.

C. Submittals shall be complete and submitted together for each section. Individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assemble as a whole. Partial submittals will not be considered for approval.

1. Mark the submittals, "SUBMITTED UNDER SECTION ". Mark out all statements on sheets that do not apply otherwise. The Engineer may select options and equipment not originally specified. All options that are not marked out will be assumed that the Contractor will furnish the same.

2. Submittals shall be marked to show specification reference including the section and paragraph numbers.

3. Submit each section separately.

4. Mark catalog cuts to indicate equipment, capacities, finishes, sizes, etc. Each individual item shall have its own sheet provided for approval. (Example: Separate sheets for each panelboard.)

D. The submittals shall include the following:

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-11

1. Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, pictures, nameplate data and test reports as required.

2. Elementary and interconnection wiring diagrams for communication and signal systems, control system and equipment assemblies. All terminal points and wiring shall be identified on wiring diagrams.

3. Parts list which shall include those replacement parts recommended by the equipment manufacturer, quantity of parts, current price and availability of each part.

4. Quantities of materials will not be verified by the Architect or Engineer. Approval stamp on shop drawings does not constitute approval of quantities listed on shop drawings.

5. Shop drawings:

a. All shop drawings shall be checked and signed by this contractor and general contractor prior to submittal to the Architect/Engineer.

b. Shop drawings submitted without Contractor’s signatures or approval and verification will not be approved.

c. Shop drawings shall be submitted on wire, cables, devices, disconnects, transformers, switchboards, conduit, raceway systems, low-voltage systems, etc.

6. Each sheet shall be either 8 1/2" x 11"; 8 1/2" x 13"; or 11" x 17" bond with a 5" x

3" clear area for engineer’s stamp. (This area shall not be used by this contractor or the general contractor’s stamp.) Larger drawings shall be able to be blue printed.

7. Submittals for low-voltage systems (fire alarm, security, PA, controls, sound, clock, nurses’ call, intercom, etc.) shall include complete riser diagrams showing all conductors and conduit sizes.

E. Engineer’s acceptance of Compliance Submittals will not relieve the Contractor from his responsibility for any deviations from the requirements of the contract documents, unless

Contractor has in writing called Engineer's attention to such deviation at the time of submission and the Engineer has given written approval to the specific deviation; nor shall any acceptance by Engineer relieve Contractor from responsibility for errors or omissions in Compliance Submittals.

F. Quantity of Submittals: See the general specification sections.

1.15 ELECTRICAL WORK COMPLETION:

A. Before requesting final inspection the following work must be completed.

B. Operating Instructions:

1. The Contractor shall submit along with the shop drawings of the equipment, three

(3) copies of operating instructions for all items. Instructions shall be prepared by the manufacturer of the equipment.

2. After the operating instructions have been approved by the Engineer, the

Contractor shall include the three (3) copies in maintenance instructions brochures.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-12

3. The Contractor shall also obtain all manufacturers’ instructions, manuals, and one complete set of drawings and turn these over to the Architect at the completion of the project.

4. The Contractor shall keep in a safe place; all keys and special wrenches furnished with equipment under this contract and shall give same to the Architect at the completion of the project.

5. The Contractor shall prepare a complete brochure, in triplicate, covering all systems and equipment furnished and installed under his contract. Brochures shall be submitted to the Architect-Engineer for approval and delivery to the Owner.

The cost of this brochure shall be included in the contract cost. Brochures shall contain the following:

a. Certified equipment drawings and/or catalog data clearly marked for equipment furnished as required for approval submission under detailed section of the specifications.

b. Complete operating and maintenance instructions for each item of equipment.

c. Complete part list for each equipment item.

d. Any special emergency operating instructions or a list of service organizations (including addresses and telephone numbers) capable of rendering emergency service to the various parts of the system.

6. Brochures shall be bound in hard backed three ring binders with an index, sub dividers and reinforced sheets.

a. Project name and address.

b. Section of work covered by brochure, i.e., "Electrical Work".

c. Name and address of Architect.

d. Name and address of Engineer.

e. Name and address of Contractor.

f. Telephone number of Contractor, including night or emergency number.

7. In addition to these written instructions, each respective Contractor shall fully and carefully instruct the Owner, or Owner’s selected representatives, as to the proper operation, care and maintenance of each system and its equipment.

1.16 TESTING AND ADJUSTMENT:

A. Record loads on each phase of all panelboards, distribution panels, switchboards, transformers and submit final readings to the Architect for records. This Contractor shall adjust equipment, instruments, gages, meters etc., as required to test and adjust these systems.

B. Check, test, and adjust the mechanisms of all electrical equipment and adjustable parts of lighting fixtures as required for optimum performance.

C. Perform tests for insulation resistance in accordance with the requirements of the National

Electrical Code and insure that all circuits are free from short circuits.

D. Keep a calibrated voltmeter and ammeter available at all times and provides service for test readings when and as required, up until the project is accepted by the Owner.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-13

E. Electrical Testing and Verification: Refer to the following specification sections (as applicable) for required tests and verifications:

1. 260513 – Cables, Medium Voltage (Above 600 Volts).

2. 260519 – Low Voltage Electrical Power Conductors and Cables.

3. 260526 – Grounding and Bonding for Electrical Systems.

4. 260527 – Isolation and Equal Potential Grounding.

5. 261200 – Transformers, Liquid Filled Substation.

6. 261201 – Transformers, Padmounted.

7. 262200 – Low Voltage Transformers.

8. 262413 – Switchboards.

9. 262416 – Panelboards.

10. 262726 – Wiring Devices.

1.17 AS-BUILT DRAWINGS:

A. Show on black or blue line prints in red ink all changes from original plans made during the installation. Return two (2) sets of red marked drawings, specifications and addenda, as set forth in the General Conditions, to the Architect upon completion of the project.

1.18 FINAL INSPECTION:

A. Final inspection will be made upon written request from the General contractor after the project is completed; in accordance with the Supplementary General Conditions.

B. Furnish a workman familiar with this project to accompany the Engineer on final inspection and have available ladders, drop cords, and other equipment as required to gain access to any portion of this system.

C. This Contractor and his principal subcontractors shall be represented at the inspection by a person of authority responsible to demonstrate to the engineer that his work conforms to the intent of the plans and specifications.

D. Extra inspections made necessary by the Electrical Contractor's failure to comply with the conditions as set forth above shall be charged to the Contractor for the Inspector's time both on the job and spent in travel between the office and the project site.

1.19 GUARANTEE:

A. Guarantee all work, material and equipment for a period of one year after date of substantial completion.

B. During the one year guarantee period the Electrical Contractor shall be responsible for any defects which develop in the electrical systems. Upon notification of a defect by the

General Contractor the Electrical Contractor shall make immediate effort to correct it and shall notify the Architect when this work is completed. This guarantee does not include ordinary lamp failure.

C. Repairs and/or replacements shall be made with no cost to Owner.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-14

D. Provide as part of the work of this contract, in addition to the first year's guarantee on equipment and materials, the following routine maintenance and inspection. (The one year time period will not start until each item is completed in accordance with plans and specifications and accepted by the Owner). Correct and adjust all emergency systems, controls, fire alarm, transformer, etc. This service to be provided throughout the guarantee period.

1.20 SINGULAR NUMBER:

A. Where any device or part of equipment is referred to in these specifications in the singular number (such as "the switch"), such reference shall be deemed to apply to as many such devices as are required to complete the installation as shown on the drawings.

1.21 LOW-VOLTAGE SYSTEMS:

A. Power wiring for low-voltage systems shall be furnished and installed by the contractor as shown on the drawings and as required by the equipment manufacturer.

B. Low voltage outlets shall be installed as shown on the drawings and shall be as specified for voice outlets, hereinbefore, or as otherwise shown or required by the application or by the equipment manufacturer.

C. Systems shall be completely installed in separate conduit systems. All cable for these systems shall be in conduit and shall not be combined with any other system cable.

Conduits systems shall be furnished and installed by the Electrical Contractor.

D. Conduit for low-voltage systems shall be limited to the following and shall be furnished and installed by the Electrical Contractor.

1. Conduit in walls, from outlets to accessible ceilings, terminated with open end bushing above ceiling.

2. Conduits between floors, terminated with open end bushings.

3. Conduits across fire and/or smoke walls, terminated with open end bushings, and sealed with approved fire rated material.

4. Other conduits as shown on drawings.

E. Conduits shall be sized as required by the number and type of conductors applied and/or as noted on plans (minimum 1") and shall be not smaller than sizes recommended by the equipment manufacturer. All conduits shall be labeled to identify which system it is to be used for i.e.: Fire Alarm, Nurse Call, Code Blue, P.A. etc.

F. When ceiling voids are used as air return plenums, only U.L. Listed plenum cable shall be used or cables shall be completely routed in conduit.

G. All low voltage wiring installed in ceiling voids shall be bundled, neatly routed, suspended above the grid system or located in cable tray and labeled with appropriate tags as to service.

227043-002

COMMON WORK RESULTS FOR ELECTRICAL 260500-15

H. Low voltage wire and cable shall be specifically designed to function with equipment supplied. Cable shall be color coded for ease of installation and service, twisted, shielded, and grounded for control of voice circuits and covered with wear-resistant moisture proof protective insulation. Wire shall bear manufacturer's trademark either embossed or printed on cable.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 260500

227043-002

CABLES, MEDIUM VOLTAGE (Above 600 Volts) 260513-1

SECTION 260513 - CABLES, MEDIUM VOLTAGE (ABOVE 600 VOLTS)

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section includes the furnishing, installation and connection of the medium voltage cables.

B. Samples:

1. When requested by the Engineer, furnish a 12-inch length of each type and size of wire and cable along with the tag from the coils or reels from which the samples were taken. The sample shall contain the manufacturer’s markings.

C. Standards:

1. The cable shall meet or exceed the latest editions of the following industry specifications:

a. REA Spec U-1 dated 12/87.

b. AEIC CS-8 2007 (Assoc. of Edison Illuminating Co.).

c. ICEA S-93-639 (Insulated Cable Engineers Assoc.).

d. ASTM B-231, B-233, and B-609.

D. Certifications:

1. Factory test reports:

a. Prior to installation of the cables, deliver four copies of the manufacturers certified IPCEA standard factory test reports for representative cables to the Engineer.

b. Certified test reports shall include the following:

1) AC and DC voltage withstand test results per AEIC CS-8.

2) Partial discharge (or corona) test results showing no discharge higher than 5 picocoulombs at three times the operating voltage of the cable. If any reel chart shows discharge higher than 5 picocoulombs, reel shall be rejected.

2. Field test reports: After testing, submit four certified copies of each of the graphs, specified under field testing, to the Engineer. Adequate information shall be included identifying the cable locations, types, voltage rating and sizes.

3. Splices and terminations:

a. After the splices and terminations have been installed and tested, deliver four copies of a certificate by the Contractor to the Engineer which includes the following:

227043-002

CABLES, MEDIUM VOLTAGE (Above 600 Volts) 260513-2

1) A statement that the materials, detailed drawings and printed instructions used was those contained in the kits approved for this contract.

2) A statement that each splice and each termination was completely installed without any overnight interruption.

3) A statement that field made splices and terminations conform to the following requirements:

a) Pencil the cable insulation precisely.

b) Connector installations:

(1) Use tools which are designed for the connectors being installed.

(2) Round and smooth the installed connectors to minimize localized voltage stressing of the insulating materials.

c) Remove contaminants from all surfaces within the splices and terminations before installing the insulating materials.

d) Solder block throughout stranded grounding wires which will penetrate the splicing and terminating materials.

e) Use mirrors to observe the installation of materials on the back sides of the splices and terminations.

f) Eliminate air voids throughout the splices and terminations.

g) Stretch each layer of tape properly during installation.

4) List all of the materials purchased and installed for the splices and terminations for this contract including the material descriptions, manufacturer's names, catalog numbers and total quantities.

E. Installer Approval:

1. Employees who install the splices and terminations shall have not less than three years of experience splicing and terminating cables which are equal to those being spliced and terminated, including experience with the materials in the kits.

Furnish satisfactory proof of such experience for each employee who splices or terminates the cables.

F. Warranty:

1. The manufacturer shall provide a written warranty guaranteeing the cable for 40 years against dielectric failure or poor workmanship.

227043-002

CABLES, MEDIUM VOLTAGE (Above 600 Volts) 260513-3

PART 2 - PRODUCTS

2.1 MATERIAL, MEDIUM VOLTAGE CABLE:

A. Medium voltage cable shall be in accordance with the NEC, IPCEA and UL.

Manufacturers shall be: Southwire, Kerite or Okonite.

B. Conductor:

1. Shall be single conductor compact stranded copper.

2. Cable shall be rated for 5kV.

C. Conductor Screen:

1. Extruded semi-conducting ethylene propylene rubber (EPR), meeting or exceeding the requirements of ICEA S-93-639, and AEIC CS-8. The conductor screen shall be free of any voids, contaminants, or protrusions and shall be firmly bonded to the insulation yet free stripping from the conductor.

D. Insulation: Insulation level shall be 133%, extruded ethylene propylene rubber (EPR) meeting or exceeding the requirements of ICEA S-93-639 and AEIC CS-8. The EPR shall not contain any polyethylene in the compound formula. The EPR insulation must have a field experience record of over 15 years.

E. Insulation Screen:

1. Extruded semi-conducting ethylene propylene rubber (EPR) meeting or exceeding the requirements of AEIC CS-8 and ICEA S-93-639. The semi-conducting screen must have a strip tension between 6 and 24 lbs. per square inch consistently throughout each length of cable.

2. The conductor screen, insulation, and insulation screen shall be applied via the triple tandem extrusion method to avoid any voids and contaminants between insulation and semiconductor.

F. Shielding: Shall be a 5 mil copper tape shield with a 12.5% overlap.

G. Jacket:

1. Black PVC. The jacket shall be extruded directly over copper tape shield. The minimum average thickness of the jacket shall be 80 mils.

H. Cable temperature ratings for continuous operation, emergency overload operation and short circuit operation shall be not less than the ICEA Standard for the respective cable.

I. Manufacturer's name and other pertinent information shall be marked or molded clearly on the overall outside surface of the jackets, or incorporated on marker tapes within the cables at reasonable intervals.

2.2 MATERIAL, SPLICES AND TERMINATIONS:

A. The materials shall be compatible with the conductors, insulation's and protective jackets on the cables and wires.

227043-002

CABLES, MEDIUM VOLTAGE (Above 600 Volts) 260513-4

B. The splices shall insulate and protect the conductors not less than the insulation and protective jackets on the cables and wires which protect the conductors. In locations where moisture might be present, the splices shall be watertight. In manholes and handholes the splices shall be submersible.

C. Splicing and Terminating Fittings:

1. Shall be heavy duty, pressure type fittings, which will assure satisfactory performance of the connections under conditions of temperature cycling and magnetic forces from available short circuit currents.

2. The fittings shall be suitable designed and the proper size for the cables and wires being spliced and terminated. Terminations to bus shall be with two-hole lugs.

3. Where the engineer determines that unsatisfactory fittings have been installed, remove the unsatisfactory installations and install approved fittings at no additional cost to the Owner.

D. Splicing and Terminating Kits:

1. General:

a. Shall be assembled by the manufacturer or supplier of the materials and shall be packaged for individual splices and terminations or for groups of splices and terminations.

b. Shall consist of materials designed for the cables being spliced and terminated and shall be suitable for the prevailing environmental conditions.

c. Shall include detailed drawings and printed instructions for each type of splice and termination being installed, as prepared by the manufacturers of the materials in the kits.

d. Detail drawings, and printed instructions shall indicate the cable type, voltage rating, manufacturer's name and catalog numbers for the materials indicated.

e. Voltage ratings for the splices and terminations shall be not less than the voltage ratings for the cables on which they are being installed.

f. Shall include shielding and stress cone materials.

2. Taped splices and terminations:

a. Insulating and semi-conducting rubber tapes shall withstand 200 percent elongation without cracking, rupturing or reducing their electrical and self-bonding characteristics by more than 5 percent.

3. Epoxy resin kits shall be as follows:

a. Compatible with the cable insulation's and jackets and make the splices watertight and submersible.

b. Thermosetting and generate its own heat so that external fire or heat will not be required.

c. Set solid and cure in approximately 60 minutes in 70-degree F ambient temperature.

227043-002

CABLES, MEDIUM VOLTAGE (Above 600 Volts) 260513-5

d. Not deteriorate when subjected to oil, water, gases, salt water, sewage and fungus.

e. Furnished in pre-measured quantities, sized for each splice and each termination, with two resin components in an easy mixing plastic bag which will permit mixing the resin without entrapping air or contaminants. Other methods of packaging and mixing the epoxy resin components will be considered for approval provided they include adequate safeguards to assure precise proportioning of the resin components and to prevent entrapping air and contaminants.

f. Use snap-together, longitudinally-split, interlocking seam, transplant mold bodies or taped frameworks, injection fittings and injection gun or pouring equipment. Completely fill voids within the splices and terminations.

E. Premolded Rubber Splices and Terminations:

1. Splices and terminations shall be in accordance with IEEE 48, 386, 404 and 592.

2. Premolded rubber devices shall have a minimum of 0.125-inch semi-conductive shield material covering the entire housing. Test each rubber part prior to shipment from the factory.

3. Grounding of metallic shields shall be accomplished by a solderless connector enclosed in a watertight rubber housing covering the entire assembly. The grounding device and splice or terminator shall be of same manufacturer to ensure electrical integrity of the shielded parts.

4. The premolded parts shall be suitable for indoor, outdoor, submersible, or direct-burial applications.

2.3 MATERIAL, FIREPROOFING TAPE:

A. The tape shall consist of a flexible, conformable fabric of organic composition coated one side with flame-retardant elastomer.

B. The tape shall be self-extinguishing and shall not support combustion. It shall be arcproof and fireproof.

C. The tape shall not deteriorate when subjected to water, gases, salt water, sewage, or fungus. It shall be resistant to sunlight and ultraviolet light.

D. The finished application shall withstand a 1000 ampere arc for not less than 30 seconds.

E. Securing tape: Shall be glass cloth electrical tape not less than 7 mils thick, and 3/4-inch wide.

2.4 CABLE FAULT INDICATORS:

A. Provide/install cable fault indicators, flag type as manufactured by Cooper or approved equal on all terminations for loop feed systems.

227043-002

CABLES, MEDIUM VOLTAGE (Above 600 Volts) 260513-6

2.5 CABLE PULLING LUBRICANT:

A. The cable pulling lubricant shall be compatible with all cable jackets. The lubricant shall be UL (or CSA) listed. The lubricant shall contain no waxes, greases, silicones, or polyalkylene glycol oils or waxes.

B. A 200-gram sample of the lubricant, when placed in an one-foot, split metal conduit and fully dried for 24 hours at 105 degrees C, shall not spread a flame more than three inches beyond a point of ignition at a continued heat flux of 40 kW/m2. Total time of test shall be one-half hour.

C. Approved Lubricant is:

1. Polywater J from American Polywater Corporation.

2. Quick Slip from Buchanan.

3. CCR Wire Pulling Lube from CRC.

4. Poly-X from American Colloid.

PART 3 - EXECUTION

3.1 INSTALLATION, MEDIUM VOLTAGE CABLE:

A. Installation shall be in accordance with the NEC,…