Thoreau High School Construction Project Manual Summary

This is a comprehensive project manual for Thoreau High School construction in Gallup, New Mexico, prepared for the Gallup-McKinley County Schools district. The document contains detailed specifications across multiple divisions covering mechanical systems (HVAC, plumbing, fire suppression), electrical systems, and specialty installations. The project includes a rooftop air handling unit, ground-loop heat pump system, fire suppression wet-pipe sprinkler system, facility management system controls, dedicated outdoor air units, kitchen exhaust systems, and extensive electrical distribution and lighting infrastructure. Key mechanical components include variable frequency drive-equipped pumps, heat pump units rated for ground-source operation at 7,200 feet elevation, sophisticated building automation controls with BACnet protocol integration, and comprehensive testing and commissioning requirements. The specifications mandate compliance with 2021 editions of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, and International Fire Code as adopted by New Mexico, along with NFPA standards and local authority having jurisdiction requirements.

The project manual emphasizes quality assurance through factory-authorized service representatives, comprehensive field testing, performance verification, and detailed commissioning procedures. All contractors and subcontractors must provide equipment submittals within 30 days of contract award, coordinate with other trades through documented coordination meetings, and maintain record drawings throughout construction. The specifications require premium efficiency motors meeting EISA standards, proper seismic restraint design, vibration isolation for rotating equipment, and extensive commissioning support including operator training. Contractors must provide one-year parts and labor warranties on equipment from date of beneficial use, with extended warranties specified for certain components such as five-year coverage on heat pump compressors and 15-year coverage on gas furnace heat exchangers. The document includes detailed submittal procedures, shop drawing requirements, coordination drawing standards, and field quality control protocols with mandatory testing for grounding systems, piping pressure tests, duct leakage, and integrated systems performance verification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual

Volume 2

Thoreau High School PSFA Project Number – P23-002

Gallup, New Mexico

Gallup-McKinley County Schools

October, 2025

Megan Text Box January 2026

COMMON WORK REQUIREMENTS

FOR FIRE SUPPRESSION 21 0500 - 1

SECTION 21 0500 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION

GENERAL

SCOPE OF WORK

See General Conditions and Supplemental General Conditions.

The requirements listed under General Conditions and Supplemental General Conditions and the General Requirements are applicable to this section and all subsequent sections of Division

21 and form a part of the contract.

Division 22 for Plumbing Systems.

Division 23 for Heating, Ventilating and Air Conditioning (HVAC) Systems.

Division 26 for Electrical Systems.

Division 28 for Fire Alarm Systems.

Division 33 for requirements of site utility systems, including sanitary sewer, storm sewer, domestic water distribution system, fire main water distribution system.

All electrical work, regardless of voltage which is provided under Division 21 shall comply with the requirements of the National Electric Code (NEC) and Division 26.

FIRE SUPPRESSION DIVISION INDEX

Section 21 0500 Common Work Requirements for Fire Suppression

Section 21 0503 Trenching and Backfilling for Fire Suppression

Section 21 0504 Pipe and Pipe Fittings for Fire Suppression

Section 21 0505 Piping Specialties for Fire Suppression

Section 21 0523 Valves for Fire Suppression

Section 21 0548 Vibration and Seismic Control for Fire Suppression

Section 21 0549 Fire Suppression and Electrical Installation Coordination

Section 21 1313 Fire Protection System, Automatic Wet-Pipe Sprinkler

CODES AND PERMITS

The fire suppression shall be performed in strict accordance with the applicable provisions of the International Building Code, 2021 Edition; the Uniform Plumbing Code, 2021 Edition; the

Uniform Mechanical Code, 2021 Edition and the International Fire Code, 2021 Edition as adopted and interpreted by the State of New Mexico, and the National Fire Protection

Association (NFPA Regulations), current adopted edition, regarding fire protection, heating and ventilating and air conditioning systems and electrical systems. All materials and labor necessary to comply with rules, regulations and ordinances shall be provided. Where the drawings and/or specifications indicate materials or construction in excess of code

FOR FIRE SUPPRESSION 21 0500 - 2

requirements, the drawings and/or specifications shall govern. The Contractor shall hold and save the Architect free and harmless from liability of any nature or kind arising from his failure to comply with codes and ordinances.

Permits necessary for performance of the work shall be secured and paid for by the Contractor.

All utility connections, extensions, and tap fees shall be paid for by the Contractor, unless otherwise specified herein.

The following lists some applicable codes and standards that shall be followed.

Applicable county and state mechanical, electrical, gas, plumbing, health and sanitary codes, laws and ordinances

National Electrical Manufacturer's Association Standards

National Electrical Code

Underwriters Laboratories, Inc. Standards

American National Standards Institute

American Society for Testing Materials Standards

Standards and requirements of local utility companies

National Fire Protection Association Standards

American Society of Mechanical Engineers Boiler and Pressure Vessel Codes

Occupational Safety and Health Act

The American Society of Sanitary Engineering

RECORD DRAWINGS

See Division 1, for requirements associated with Project Record Drawings.

The Contractor shall be responsible to maintain a complete and accurate set of marked up reproducible sepias showing information on the installed location and arrangement of all mechanical work, and in particular, where changes were made during construction. The

Contractor shall be responsible for keeping record drawings accurate and up-to-date throughout the construction period. Record drawings may be reviewed and checked by the Architect during the construction and in conjunction with review and approval of monthly pay requests.

The Contractor shall include copies of all addenda, RFI's, bulletins, and change orders neatly taped or attached to record drawing set.

After installation and acceptance of direct buried underground piping and service lines in trenches, the Contractor shall take 'as-built' measurements, including all depths, prior to commencement of backfilling operations. It will not be sufficient to check off line locations.

Definite measurements shall be taken for each service line. The location of buried piping and trench service lines shall be shown on the drawings and dimensioned from fixed points.

QUALIFICATIONS

All mechanics shall be skilled in their respective trade.

All welders shall be certified in accordance with the ASME Boiler Test Code, Section IX, latest issue.

FOR FIRE SUPPRESSION 21 0500 - 3

QUALIFICATION PROCEDURES

The storage, handling, and transportation of all refrigerants, oils, lubricants, etc. shall be accomplished in strict compliance with all State, local, and Federal Regulations including all requirements set forth by the Environmental Protection Agency (EPA) for the safe handling of regulated refrigerants and materials. The Contractor shall utilize qualified and/or certified personnel and equipment as prescribed by these requirements.

HAZARDOUS CONDITIONS

Protruding metal (bolts, steel angles, etc.) potentially hazardous to maintenance and operation personnel, shall be cut back and/or protected to reduce the risk of injury.

HAZARD SIGNS

Equipment rooms, fan plenums, and similar areas containing moving or rotating parts, or other potentially hazardous environments shall include signs on all doors entering such spaces that shall read similar to the following: "Hazardous Area - Authorized Personnel Only."

Confined Spaces: Areas designated by OSHA Standard 1910.146 as a confined space shall be marked with a sign that reads "Confined Space - Entry by authorized personnel only, by permit."

"Confined Space" means a space that:

Is large enough and so configured that an employee can bodily enter and perform assigned work; and

Has limited or restricted means for entry or exit (for example, tanks, vessels, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry); and

Is not designed for continuous employee occupancy.

The Contractor shall survey the final premises to determine where any such potentially hazardous areas exist. If the Contractor feels that hazards exist which cannot be suitably provided for through the above typical methods, he shall forward in writing his concerns, and request for a decision concerning the referenced hazard, prior to the final inspection of the facilities.

SUBMITTALS

The Contractor shall submit submittal brochures of all equipment, fixtures and materials to be furnished under Division 21, including but not limited to the following:

Piping materials, valves, equipment and installation methods, vibration isolation devices, pipe penetration installation methods and products for fire rated assemblies, and all equipment listed on equipment schedules, and in related construction documents.

Materials, certification, shop drawings, and other information as specified in the individual Division 21 Specification Sections within this Specification.

FOR FIRE SUPPRESSION 21 0500 - 4

Unauthorized Substitutions: If substitute materials, equipment or systems are installed without prior review or are installed in a manner which is not in conformance with the requirement of this Specification and for which the Contractor has not received a written review, removal of all the unauthorized materials and installation of those indicated or specified shall be provided at no change in contract amount.

All equipment shall be installed in accordance with the manufacturer's recommendations.

Provide all accessories and components for optimum operation as recommended by the manufacturer.

Expense: All costs for the preparation, correction, delivery, and return of the submittals shall be borne by the Contractor.

Submittals and one resubmittal will be reviewed by the Architect/Engineer. If the Contractor fails to provide the required data with his second submittal, he will be charged for the third and subsequent reviews.

See Division 1 for additional submission requirements.

The Contractor shall submit a maximum of seven (7) copies of submittal brochures for review.

Brochures shall be submitted within thirty (30) days after contract award. One (1) copy of all submittals will be retained by the Engineer. One (1) copy of all submittal data will be retained by the Engineer and one (1) copy will be provided to the Owner's Representative. The remaining copies will be returned to the Architect. Additional sets of submittals, if required by the Contractor, shall be reproduced by the Contractor from the reviewed and marked sets returned to the Contractor.

Complete data must be furnished showing performance, quality and dimensions. No equipment or materials shall be purchased prior to receiving written notification that submittals have been reviewed and marked either "NO EXCEPTIONS TAKEN" or "EXCEPTIONS AS NOTED."

Submittals returned marked "EXCEPTIONS AS NOTED" do not require resubmittal provided that the Contractor agrees to comply with all exceptions noted in the submittal, and so states in a letter.

Review of Submittals: Submittals will be reviewed with reasonable promptness, but only for conformance with the design concept of the Project and for conformance with the information indicated on the Drawings and stated in the Specifications. Review of a separate item as such will not indicate review of the assembly in which the item functions. Review of submittals shall not relieve the Contractor of responsibility for any deviation from the requirements of the

Contract Documents, nor for errors or omissions in the submittals; or for the accuracy of dimensions and quantities, the adequacy of connections, and the proper and acceptable fitting, execution, functioning and completion of the work. Review shall not relieve the Contractor of responsibility for the equipment fitting within the allotted space shown on the drawings with all clearances required for equipment operation, service and maintenance including minimum clearances required by applicable codes, manufacturer's installation instructions and as necessary for proper clearance in front of all electrical panels as defined by the National Electric

Code (NEC). Any relocation of mechanical and/or electrical equipment, materials and systems required to comply with minimum clearances shall be provided by the Contractor without additional cost under the Contract.

FOR FIRE SUPPRESSION 21 0500 - 5

Shop drawings will be returned unchecked unless the following information is included: cover sheet shall be provided for each submittal of equipment, products and material proposed for use on the project. A common cover sheet for similar equipment (example: all air handling units or all fire protection products) is acceptable. The cover sheet shall list equipment by symbol number; reference all pertinent data in the Specifications or on the drawings; provide size and characteristics of the equipment, name of the project and a space large enough to accept a review stamp. The data submitted shall reflect the actual equipment performance under the specified conditions and shall not be a copy of the scheduled data on the drawings. Cover sheet shall clearly identify any deviations from the specifications for submitted equipment, products, and materials.

Use of substitutions reviewed and checked by the Engineer does not relieve the Contractor from compliance with the Contract Documents. Contractor shall bear all extra expense resulting from the use of any substitutions where substitutions affect adjoining or related work required in this Division or other Divisions of this Specification.

If Contractor substitutes equipment for that drawn to scale on the drawings, he shall prepare a

1/4" = 1'-0" installation drawing for each equipment room where a substitution is made, using dimensions of substituted equipment, and including piping, and electrical equipment requirements, to verify that equipment will fit space with adequate clearances for maintenance.

This 1/4" = 1'-0" fabrication drawing shall be submitted for review with the shop drawing submittals of the substitution. Failure to comply with this requirement will result in the shop drawings being returned unchecked.

COORDINATION DRAWINGS

The Contractor shall, in advance of the work, prepare coordination drawings for:

Mechanical equipment rooms.

Piping and piping chases.

Complete fire suppression system piping and sprinkler head layout.

Layout of all fire suppression equipment.

Show the location of piping openings through the building floors, walls and roofs coordinated with Architectural and Structural, as well as the location and elevations of building fire suppression equipment and systems and piping, coordinated with plumbing, HVAC and electrical systems. Coordination drawings, including plans, elevations and sections, as appropriate, shall clearly show the manner in which the fire suppression systems fit into the available space and coordinates with HVAC and plumbing equipment, ductwork, piping, and electrical equipment, including conduits, light fixtures, motor control centers, transformers, panels, variable frequency drives, etc. Drawings shall demonstrate required code clearances for mechanical and electrical equipments, control panels, etc., and proper operation, maintenance and replacement of fire suppression devices and equipment. Coordination drawings shall be of appropriate scale to satisfy the previously stated purposes, but not smaller than 1/8 inch scale for floor plans and 1/4 scale of equipment rooms and chase areas. Drawings may be composite or may be separate but fully coordinated drawings of the same scale. Every subcontractor must sign-off on coordination drawings prepared by each craft. Failure to sign-off will indicate that subcontractor is proceeding at his own risk. Any cost required to relocate systems to comply with required clearance and equipment installation requirements shall be provided by the

Contractor without additional cost under the contract.

FOR FIRE SUPPRESSION 21 0500 - 6

Seven (7) complete sets of coordination drawings shall be submitted prior to the scheduled start of the work in the area illustrated by the drawings, for the purpose of showing the Contractor's planned method of installation. The objectives of such drawings are to promote carefully planned work sequence and proper coordination, in order to assure the expeditious solutions of problems, and the installation of lines and equipment as contemplated by the contract documents while avoiding or minimizing additional costs to the Contractor and to the Owner.

In the event the Contractor, in coordinating the various installations and in planning the method of installation, finds a conflict in location or elevation of any of the mechanical systems, with the structural items or with other construction items, such conflicts shall immediately be documented and submitted for clarification. In doing so, the Contractor shall explain the proposed method of solving the problem, or shall request instructions as to how to proceed if adjustments beyond those of usual trades coordination are necessary.

Installation of fire suppression work shall not proceed prior to the submission and completion of the review of the coordination drawings, and any conflicts which are disclosed by the coordination drawings. It is the responsibility of the Contractor to submit the required drawings in a timely manner consistent with the requirements for completing the work covered by this contract within the prescribed contract time.

USE OF CADD FILES

Under certain conditions, the Contractor will be permitted the use of the Engineer's CADD files for documentation of as-builts, submittals, or coordination drawings.

The Engineer shall be compensated for the time necessary to format the CADD files delivery to the Contractor. Such work will include removal of title blocks, professional for seals, calculations, proprietary information, etc.

The Contractor shall complete the enclosed License, Indemnity and Warranty Agreement, complete with contractor's name, address, and Contractor's Representative signature prior to request for CADD file usage.

PRIOR APPROVAL

Equipment manufacturers and service providers are listed within the specifications for the work specified in this division. For the items listed below, the specified manufacturers and providers are the only ones presently approved, and may be the only ones allowed:

Plumbing Fixtures and Trim

Water Treatment Equipment

Manufacturers and service providers who are not listed in these specs, and who offer equivalent or superior products or services, are invited to submit for approval prior to bid (prior approval).

Submit two copies. Requests for prior approval must:

Include the substitution request form at the end of this spec section.

Include technical data sufficient for the Engineer to generally assess appropriateness for this project.

FOR FIRE SUPPRESSION 21 0500 - 7

Be submitted minimum ten days prior to the bid date in effect at the time of submission.

Comply with any additional requirements per specification Division 1.

Any additional prior approved alternate manufacturers and service providers will be published in an addendum prior to bid. Prior approval indicates that based on the information submitted it appears to the Engineer that the alternate might be capable of meeting the specifications and the design intent, and might be appropriate for the project. But prior approval does not guarantee this. Prior approved products and service providers must still go through the submittal process after award, and must still comply with the design intent and all specification requirements.

Please do not request prior approval for products and service providers that are not listed above.

Instead, for those items alternate manufacturers and alternate service providers may be submitted after bid in accordance with the submittal process, provided they meet or exceed the specifications and the indicated design intent.

GUARANTEE-WARRANTY

See Division 1 for warranties.

The following guarantee is a part of the specifications and shall be binding on the Contractor:

"The Contractor guarantees that this installation is free from mechanical defects. He agrees to replace or repair any part of the installation which may fail within a period of one year after date established below, provided that such failure is due to defects in the materials or workmanship or to failure to follow the specifications and drawings.

Warranty of the Contractor-furnished equipment or systems shall begin on the date the system or equipment is placed in operation for beneficial use of the Owner or occupancy by the Owner, whichever occurs first; such date will be determined in writing, by means of issuing a 'Certificate of Substantial Completion', AIA Form G704," or equivalent.

The extent of guarantees or warranties by Equipment and/or Materials Manufacturers shall not diminish the requirements of the Contractor's guarantee-warranty to the Owner.

All items of fire suppression equipment be provided with a full one (1) year parts and labor warranty, from the date of acceptance by the Owner.

Fire pumps including controllers and transfer switches.

PRODUCTS

QUALITY OF MATERIALS

All equipment and materials shall be new, and shall be the standard product of manufacturers regularly engaged in the production of fire suppression equipment and shall be the manufacturer's latest design. Specific equipment, shown in schedules on drawings and specified herein, is to set forth a standard of quality and operation.

Hazardous or Environmentally Damaging Materials: Products shall not contain asbestos, mercury, PCBs, or other materials harmful to people or the environment.

FOR FIRE SUPPRESSION 21 0500 - 8

ALTITUDE RATINGS

Unless otherwise noted, all specified equipment capacities are for an altitude of 7,200 feet above sea level and adjustments to manufacturer's ratings must be made accordingly.

ELECTRICAL SERVICES – MOTORS

Each motor, unless otherwise specified of 3/4 HP and greater, shall be designed for operation with 3 phase, 60 Hz, 480 volt electrical service. Unless otherwise specified, motors of 1/2 hp and less shall be designed for operation with single phase, 60 Hz, 120 volt electrical service.

Motors shall be 1750 RPM, squirrel cage, normal starting torque and normal starting current, in accordance with NEMA standards unless otherwise specified.

NEMA EFFICIENCY

Motor Horsepower Efficiency, Minimum

5 90.2

7-1/2 91.0

10 91.7

15 92.4

20 93.0

25 92.4

30 93.0

40 93.6

50 93.6

60 93.6

75 95.0

All T-frame, ODP motors 5 HP and above shall be premium efficiency motors with a minimum power factor of 0.85 on 1800 RPM motors and a minimum efficiency rating in accordance with

IEEE Standard 112, Test Method 'B' as scheduled below. In addition, all motors used in conjunction with variable frequency drives shall be premium efficiency.

Motors, including premium efficiency motors shall be manufactured by General Electric

Baldor, Louis Allis (Spartan), Marathon, Reliance Electric, Westinghouse, or equivalent having equal efficiencies.

Special motors as may be necessary by the application and as specified herein and on the drawings include C-FACE, totally enclosed fan cooled (TEFC), explosion-proof, etc., shall be provided as required and shall be furnished manufacturer's premium efficiency rating for 5 HP and larger.

Each motor shall be of the horsepower as specified and suitable for use at an altitude of 6,500 feet. All motors shall have grease lubricated sealed ball bearings. Motors larger than 1 HP shall have a standard grease fitting "Zerk" and a separate grease relief tapping. Motors shall be factory lubricated. Motors shall be commercially dynamically balanced and tested at the factory before shipment and shall be selected for quiet operation. The Contractor shall line up motors and drives and place motors and equipment on foundations ready for operation.

FOR FIRE SUPPRESSION 21 0500 - 9

Unless indicated otherwise, motors shall be NEMA design B with a service factor of 1.15 with

40oC rise and total temperature rise of 65oC ambient and when powered from the system voltage feeding the motor. TEFC motors shall have a service factor of 1.00 with total temperature rise of 65oC in the above conditions. Motors located in areas exceeding 40oC in the ambient shall be factory rated for the ambient temperature of the motor environment. Single phase motors shall generally be NEMA Type N split phase induction motors with built-in thermal protectors.

Unless otherwise specified for a particular application use electric motors with the following requirements.

Single-phase Motors: Capacitor-start type for hard starting applications. Motors for centrifugal fans and pumps may be split phase or permanent split capacitor (PSC).

Polyphase Motors: NEMA Design B, Squirrel cage, induction type. Each two speed motor shall have two separate windings.

Rating: Continuous duty at 100% capacity in an ambient temperature of 40oC.

If the Division 21 Contractor proposes to furnish motors varying in horsepower and/or characteristics from those specified, he shall first submit his request for the change and shall then coordinate the change with Division 26, Electrical and shall pay all additional charges in connection with the change.

ELECTRICAL WIRING AND CONTROL EQUIPMENT

All wiring and conduit shall be furnished and installed as scheduled in Section 21 0549, Fire

Suppression and Electrical Installation Coordination, unless otherwise noted or directed.

The Contractor shall coordinate completely with all trades and Sub-Contractors as required to ensure that all necessary components of control work are included and fully understood. No additional cost shall accrue to the Owner as a result of lack of such coordination.

The fire suppression piping system may be bonded to the electrical ground bus at the electrical service equipment, but shall not under any circumstances be used as the main grounding electrode for the electrical service.

PAINTING

All finish painting of fire suppression systems and equipment will be under "Painting," unless equipment is hereinafter specified to be provided with factory applied finish coats.

All equipment shall be provided with factory applied prime finish, unless otherwise specified.

Touch-Up: If the factory finish on any equipment is damaged in shipment or during construction of the building, the equipment shall be refinished.

COUPLING GUARDS

All flexibly connected pumps shall be provided with protective steel coupling guards.

IDENTIFICATION OF VALVES

FOR FIRE SUPPRESSION 21 0500 - 10

Each valve shall be provided with a stamped metal tag secured to the valve. Tag shall indicate the valve number, the service and function of each valve. The Contractor shall furnish two sets of prints of drawings showing floor plan for each floor with all valves accurately located and labeled. Submitted drawings shall be neat and easily readable. In addition, the Contractor shall provide a valve chart, typed neatly on 8-1/2" x 11" sheets, listing the number, size, location, function, normal operating position, on each valve installed under Division 21. Tags shall be stamped brass 1-1/2" diameter, and secured to valves by heavy copper figure eight hooks, braided stainless steel wire anchor, or other approved means.

Division 21 valve tags shall be coordinated with Division 22 and Division 23 valve tags for coordinated format between each division.

PIPING SYSTEM IDENTIFICATION

Means of Identification: All piping shall be identified by each of the means described below.

The Contractor shall provide shop drawing submittal data for proposed labeling system materials and manufacturer's recommended installation procedures.

Piping Systems shall be identified by means of an identifying legend on color coded background appropriately worded to indicate the "service" name of the pipe as shown on the drawings. Color coded banding shall also be provided. Additionally, an arrow shall be included to indicate the direction of flow through the pipe.

Locations of Piping System Identification: The identifying legends and directional arrows described in the paragraphs preceding shall be located at the following points on each piping system:

Adjacent to each valve in piping system.

At every point of entry and exit where piping passes through a wall.

On each pipe riser and junction.

At a maximum interval of 20 feet on pipe lines exposed and concealed above accessible ceilings.

Adjacent to all special fittings (regulating valves, etc.) in piping systems.

At every access door.

Piping identification shall meet the standards of the Federal Occupational Safety Health Act

(OSHA) which refers to the ANSI Standard A13.1. The following standardized color code scheme shall be used:

Yellow - Hazardous Materials

Green - Liquid Materials of Inherently Low Hazard

Blue - Gaseous Materials of Inherently Low Hazard

Red - Fire Protection Materials

The size of letter and length of color field shall conform to the ANSI standard and shall be as follows:

Outside Diameter of Length of Size of

Pipe or Covering Color Field Letters

FOR FIRE SUPPRESSION 21 0500 - 11

------ to 1-1/4" 8" 1/2"

1-1/2" to 2" 8" 3/4"

2-1/2" to 6" 12" 1-1/4"

8" to 10" 24" 2-1/2"

Over 10" 32" 3-1/2"

All pipe labels exposed within mechanical equipment spaces shall be semi-rigid plastic identification markers. Each label shall have appropriately color-coded background with printed legend. Directional flow arrows shall be included on label. Labels shall "snap-on" around pipe without the requirement for adhesive or bonding of piping sizes 3/4" through 5".

Labels for piping 6" and larger shall be furnished with spring attachment at each end of label.

Labels shall be "SETMARK" Type SNA, 3/4" through 5" size and Type STR, 6" and larger, as manufactured by Seton Name Plate Corporation, Brady, or equivalent.

All pipe labels except pipe labels located exposed within the mechanical equipment spaces shall be vinyl material with permanent adhesive for application to clear dry pipe and/or insulation jacketing. Each label shall have appropriate color-coded background with printed legend.

Direction arrows shall be placed next to label to indicate flow direction. Color and size of arrows shall correspond to that of label. Pressure sensitive pipe tape matching the background color of the label shall be placed over each end of the label and completely around the pipe.

Attach pipe markers to lower quarter of the pipe on horizontal runs and on the centerline of vertical piping where view is not obstructed. Flow indicator arrow shall point away from pipe marker.

Provide the following labels, with ANSI/OSHA color for all piping systems as shown on the drawings and as listed below:

Letter Background

Service/Legend Color Color

Fire Protection Water White Red

Fire Auto Sprinkler White Red

Fire Dry Standpipe White Red

Fire Wet Standpipe White Red

Fire Combination Standpipe White Red

IDENTIFICATION OF CONTROL SYSTEM DEVICES

All automatic controls, control panels, pressure electric, electric pressure switches, relays and starters shall be clearly tagged and identified.

UNDERGROUND PIPING SYSTEM IDENTIFICATION

Bury a continuous, preprinted, bright colored, plastic ribbon cable marker with each underground pipe regardless of whether encased. Locate directly over buried pipe, 6" to 8" below finished grade. Marker tape used in conjunction with buried plastic piping systems shall be special detector type. Marker tape used in conjunction with buried plastic piping systems shall be special detection type.

FOR FIRE SUPPRESSION 21 0500 - 12

ACCESS DOORS

Provide all access doors required for access to valves, controls, or other items for which access is required for either operation or servicing. All costs incurred through failure to perform this function as the proper sequence of this work shall be borne by the Contractor. The type of access door shall be as required by the room finish schedule. Acoustical tile access doors shall be equal to Krueger Style B, Style A for acoustical plaster, Style C-CE for sidewall drywall or plaster construction.

Access doors shall be not less than 24" x 24" in size except that larger panels shall be furnished where required, and panels in tile or other similar patterned ceilings shall have dimensions corresponding to the tile or pattern module.

Where access doors are installed in walls required to have a specific fire rating, the access door installed shall be a fire rated access door with UL label, as manufactured by Milcor or equivalent. Access door in 1-hour construction shall be Class C and access doors in 2-hour construction shall be Class B.

EXECUTION

COOPERATION WITH OTHER TRADES

The Contractor shall refer to other parts of these specifications covering the work of other trades which must be carried on in conjunction with the mechanical work so that the construction operations can proceed without harm to the Owner from interference, delay, or absence of coordination. The Contractor shall be responsible for the size and accuracy of all openings.

DRAWINGS

The complete design for the project fire suppression system including drawings, hydraulic calculations, piping sizing and arrangement, head layouts, equipment selection, etc., shall be the responsibility of Division 21 Contractor. Preparation of the fire suppression system design shall be in accordance with all Division 21 specification requirements, NFPA requirements and

Authorities Having Jurisdiction.

Should any doubt or question arise in respect to the true meaning of the drawings or specifications, the question shall be submitted in writing.

Installation of all fire suppression equipment and piping systems shall be arranged to provide all clearances required for equipment operation, service, and maintenance, including minimum clearances required by applicable codes, manufacturer's installation instructions and as necessary for proper clearance in front of all electrical panels as defined by the National Electric

Code (NEC). Piping systems shall not be routed through or above electrical equipment room or electrical equipment space designed within mechanical equipment rooms.

The Contractor's attention is directed to the unique architectural design features and consideration associated with this facility which will require significantly greater levels of coordination and cooperation for the work furnished and installed under Division 21 with the

FOR FIRE SUPPRESSION 21 0500 - 13

associated architectural, structural, and electrical work than is normally necessary for a more typical facility.

The installation of all concealed fire suppression systems shall be carefully arranged to fit within the available space without interference with adjacent mechanical, plumbing, structural and electrical systems. The Contractor shall make all necessary provisions for penetrations of piping, including sleeves and blockouts in structural systems. The exact location of all exposed fire suppression systems, including access doors; sprinkler piping exposed within finished areas;

and other equipment and devices as applicable, shall be coordinated with the Architect, who shall have final authority for the acceptance of the work as it specifically relates to the architectural aesthetic design requirements for the facility.

FIELD MEASUREMENTS

The Contractor shall verify the dimensions and conditions governing his work at the building.

No extra compensation shall be claimed or allowed on account of differences between actual dimensions, including dimensions of equipment, fixtures and materials furnished, and those indicated on the drawings. Contractor shall examine adjoining work, on which his work is dependent for perfect efficiency, and shall report any work which must be corrected.

Coordination of all fire suppression work within the building will be the direct responsibility of the Contractor. Review of submittal data in accordance with paragraph "Submittals" shall in no manner relieve the Contractor of responsibility for the proper installation of the fire suppression work within the available space. Installation of equipment and systems within the building space shall be carefully coordinated by the Division 21 Contractor with all building trades.

Each contractor shall so harmonize his work with that of the several other trades that it may be installed in the most direct and workmanlike manner without hindering or handicapping the other trades. Piping interferences shall be handled by giving precedence to pipe lines which require a stated grade for proper operation. Sewer lines shall take precedence over water lines in determination of elevations. In all cases, lines requiring a stated grade for their proper operation shall have precedence over electrical conduit and ductwork. Installation of fire suppression, plumbing and HVAC systems within the ceiling cavity shall be in the following order of priority: plumbing waste lines; roof drains; supply, return, outside air, makeup, and exhaust ductwork; steam and condensate piping; fire sprinkler mains; fire sprinkler branch piping and sprinkler runouts; heating hot water and chilled water piping; domestic hot and cold water; control piping, wiring and conduit; miscellaneous special piping systems.

EQUIPMENT SUPPORT

Contractor shall provide support for equipment to the building structure. Contractor shall furnish all necessary structures, inserts, sleeves, and hanging devices for installation of mechanical and plumbing equipment, ductwork and piping, etc. Contractor shall completely coordinate installation of such devices with all trades and Sub-Contractors. Contractor must further verify that the devices and supports are adequate as intended and do not overload the building's structural components in any way.

FOR FIRE SUPPRESSION 21 0500 - 14

SEISMIC SUPPORTS

The Contractor shall be responsible for all anchors and connections for the mechanical work to the building structure to prevent damage of equipment and systems due to earthquakes. The complete fire protection systems shall be supported as required to resist stresses produced by lateral forces as required by NFPA No. 13. Where fire suppression equipment and piping is connected to the building structure, exact method and means of attachment to the structural system shall be approved by the Architect.

See Section 21 0548 for additional requirements for seismic supporting of fire suppression equipment and systems.

PROTECTION OF MATERIALS AND EQUIPMENT

The Contractor shall be responsible for the protection of all work, materials and equipment furnished and installed under this section of the specifications, whether incorporated in the building or not.

All items of fire suppression equipment and materials, including piping, valves and fittings, etc., shall be protected from damage and contamination. Equipment and materials shall not be stored outside and exposed to weather and ambient conditions without appropriate protection measures and without the approval of the Architect. Equipment shall be delivered to the jobsite and maintained while on the jobsite with all openings, controls and control panels covered with heavy duty polyethylene wrap or other proper means. Equipment and materials where stored within the building shall be protected at all times from construction damage and contamination from dust, dirt, debris, and especially during fireproofing, painting and gyp board sanding and finishing. Unprotected equipment and piping will require special field cleaning by the

Contractor prior to acceptance by the Architect.

The Contractor shall provide protection for all work where necessary and shall be responsible for all damage done to property, equipment and materials. Storage of materials within the building shall be approved by the Architect prior to such storage.

Pipe openings shall be closed with caps or plugs, or covered to prevent lodgment of dirt or trash during the course of installation. At the completion of the work, fire suppression equipment and materials shall be cleaned thoroughly and delivered in a condition satisfactory to the Architect.

TRENCHING AND BACKFILLING

All excavation, trenching and backfilling required for the fire suppression installation shall be provided by this Contractor.

MANUFACTURER'S INSTRUCTIONS

All equipment shall be installed in strict accordance with recommendations of the manufacturer.

If such recommendations conflict with plans and specifications, the Contractor shall report such conflicts to the Architect who shall make such compromises as he deems necessary and desirable.

FOR FIRE SUPPRESSION 21 0500 - 15

CONCRETE BASES AND HOUSEKEEPING PADS

Concrete bases and housekeeping pads shall be installed under all pieces of fire suppression equipment unless specifically deleted by the specifications or drawings.

Contractor shall be responsible for the accurate dimensions of all pads and bases and shall furnish and install all vibration isolators, anchor bolts, etc.

Contractor shall provide concrete housekeeping pad foundations for all floor mounted equipment installed under this section unless otherwise shown on the drawings. All concrete bases and housekeeping pads shall conform to the requirements specified under Division 3, Concrete, portions of these specifications. Pad foundations shall be 4" high minimum, unless otherwise indicated on the drawings. Chamfer edges shall be 1". Faces shall be free of voids and rubbed smooth with carborundum block after stripping forms. Tops shall be level. Provide dowel rods in floor for lateral stability and anchorage.

Equipment anchor bolts shall be set in a galvanized pipe or sheet metal sleeves 1" larger than bolt diameter. Anchor bolts shall be high strength steel J shape. Anchor bolt design shall be arranged and paid for by the Contractor.

Machinery bases, bed plates, sole plates, or vibration isolation units shall be carefully aligned, shimmed, leveled, then grouted in place with commercial non-shrink grout. When a flexible coupling is employed as a part of the drive train, the coupling shall be aligned before the machinery base is grouted.

ALIGNMENT OF FLEXIBLE COUPLINGS

Flexible couplings between motors and driven equipment shall be aligned by the qualified service technician after the equipment is installed and ready for operation. Proper aligning shall be provided within manufacturer's maximum alignment tolerance at equipment operating conditions and temperature. Alignment shall follow unit manufacturer's written procedures using approved dial indication methods for parallel and angular alignment. The Contractor shall provide written certification that each device has been so aligned.

LUBRICATION

The Contractor shall provide all oil for the operation of all equipment until acceptance. The

Contractor shall be held responsible for all damage to bearings while the equipment is being operated by him up to the date of acceptance of the equipment. The Contractor shall protect all bearings and shafts during installation and shall thoroughly grease the steel shafts to prevent corrosion. Bearings for items of fire suppression equipment shall be marked at each bearing location as to whether the bearing is a sealed type or relubricable type unit.

TESTS

Tests shall be conducted in the presence of the designated and authorized Owner's

Representative. The Contractor shall notify the Architect a minimum of one week in advance of scheduled tests. Requirements for testing are specified under the sections covering the various

FOR FIRE SUPPRESSION 21 0500 - 16

systems. The Contractor shall furnish all necessary equipment, materials, and labor to perform the required tests.

INSTALLATION CHECK

An experienced, competent, and authorized representative of the equipment listed below shall visit the site of the work and inspect, check, adjust if necessary, and approve the equipment installation. In each case, the equipment supplier's representative shall be present when the equipment is placed in operation. The equipment supplier's representative shall revisit the job site as often as necessary until all trouble is corrected and the equipment installation and operation is approved and accepted.

Each equipment supplier's representative shall furnish a written report certifying that the equipment (1) has been properly installed and lubricated; (2) is in accurate alignment; (3) is free from any undue stress imposed by connecting piping or anchor bolts; and, (4) has been operated under full load conditions and that it has operated satisfactorily.

OPERATION AND MAINTENANCE INSTRUCTIONS

The Contractor shall furnish complete operating and maintenance instructions covering all units of fire suppression equipment herein specified together with parts lists. Equipment spare parts shall include all components requiring service, including motors, bearings, shafts, etc. Furnish four (4) copies of all the literature; each shall be suitably bound in loose leaf book form.

See Division 1 for additional requirements concerning manuals, manual distribution, and maintenance materials.

Operating and maintenance manuals as required herein shall be submitted for review and distribution to the Owner not less than two (2) weeks prior to the date scheduled for the

Contractor to provide Operating and Maintenance Instructions to the Owner as specified herein.

Upon completion of all work and all tests, the Contractor shall instruct the Owner or his representative fully in the operations, adjustment and maintenance of all equipment furnished.

Contractor shall provide at least two weeks notice in advance of this period, with a written schedule of each training session, the subject of the session, the Contractors' representatives who plan to attend the session, and the time for each session.

Equipment startup and operational test shall be conducted by the Contractor with the assistance of the representatives from the fire pump manufacturers and fire pump controller manufacturer.

Test shall be conducted in the presence of the designated and authorized Owner's

Representative.

CERTIFICATIONS

Before receiving final payment, the Contractor shall certify in writing that all equipment furnished and all work done is in compliance with the contract documents and all applicable codes. Submit certifications and acceptance certificates, including proof of delivery of O&M

FOR FIRE SUPPRESSION 21 0500 - 17

manuals, spare parts required, and equipment warranties which shall be bound with O&M manuals.

CONSTRUCTION PHASING AND SCHEDULE

All work furnished and installed under Division 21 of this Specification shall be provided in accordance with the project schedule and phase and schedule requirements as described on the

Architectural Drawings and Specifications.

OPERATION PRIOR TO ACCEPTANCE

Operation of equipment and systems installed by the Division 21 Contractor for the benefit of the Owner prior to substantial completion will be allowed providing a written agreement between the Owner and the Contractor has established warranty and other responsibilities to the satisfaction of both parties.

Operation of equipment and systems installed by the Division 21 Contractor, for the benefit of the Contractor, except for the purposes of testing and balancing will not be permitted without a written agreement between the Owner and the Contractor establishing warranty and other responsibilities.

SITE VISITS AND OBSERVATION OF CONSTRUCTION

The design professional shall make periodic visits to the project site at various stages of construction in order to observe the progress and quality of various aspects of the Contractor's work, in order to determine in general if such work is proceeding in accordance with the

Contract Documents. This observation, however, shall in no way release the Contractor from his complete responsibility to supervise, direct, and control all construction work and activities.

The design team has no authority over, or a responsibility to means, methods, techniques, sequences, or procedures of construction provided by the Contractor or for safety precautions and programs, or for failure by the Contractor to comply with all law, regulations, and codes.

END OF SECTION 21 0500

FOR FIRE SUPPRESSION 21 0500 - 18

DIVISION 21 SUBSTITUTION REQUEST FORM (SRF)

TO: BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

PROJECT:

We hereby submit for your consideration the following product instead of the specified item for the above project:

Section: Page: Paragraph/Line: Specified Item:

Proposed Substitution:

Attach complete product description, drawings, photographs, performance and test data, and other information necessary for evaluation. Identify specific Model Numbers, finishes, options, etc.

1. Will changes be required to building design in order to properly install proposed substitutions?

YES ☐ NO ☐

If YES, explain:

2. Will the undersigned pay for changes to the building design, including engineering and drawing costs, caused by requested substitutions? YES ☐ NO ☐

3. List differences between proposed substitutions and specified item.

Specified Item Proposed Substitution

4. Does substitution affect Drawing dimensions? YES ☐ NO ☐

5. What affect does substitution have on other trades?

6. Does the manufacturer's warranty for proposed substitution differ from that specified?

YES ☐ NO ☐

7. Will substitution affect progress schedule? YES ☐ NO ☐

8. Will maintenance and service parts be locally available for substitution? YES ☐ NO ☐

9. Does proposed product contain asbestos in any form? YES ☐ NO ☐

SUBMITTED BY: Firm: Date:

Address:

Signature: Telephone:

For Engineer's Use Only

Accepted Not Accepted: Received too Late:

By: Date:

Remarks:

FOR FIRE SUPPRESSION 21 0500 - 19

LICENSE AGREEMENT FOR CADD DATABASE OR BIM MODEL

PROJECT: _____________________________________________

LICENSE GRANT: Contractor is granted use of the CADD Database or BIM Model (Database/Model) for the indicated project for the specific purpose of preparing submittal documents for this Project. No other use of the Database/Model is granted. Title to the Database/Model is not transferred to the

Contractor. The Database/Model may be of value to the Contractor in preparing submittals, but use of the model does not relieve the contractor of the requirement to verify measurements in the field.

COPYING RESTRICTIONS: Contractor may copy the Database/Model in whole or in part, but only for backup and archival purposes or for use by the Contractor's Subcontractors. Contractor agrees to ensure that any entities that receive the Database/Model from Contractor, either in whole or in part, comply with the terms and conditions of this agreement. Contractor shall safeguard the Database/Model from falling into the hands of parties other than Subcontractors with a legitimate need for it.

WARRANTY: Bridgers & Paxton (B&P) offers this Database/Model without warranty and specifically without express or implied warranty of fitness. If Contractor chooses to use the Database/Model, then he does so at his own risk and without any liability or risk to B&P.

INDEMNITY: Contractor shall to the fullest extent permitted by law, defend, indemnify and hold harmless the Owner, Architect, B&P, their employees and agents from all claims, damages, losses, and attorney fees arising out of or resulting from the use of the Database/Model.

ACKNOWLEDGMENT: Contractor acknowledges that (s)he has read this Agreement, understands it, and agrees to be bound by its terms and conditions.

CONTRACTOR'S REPRESENTATIVE

Signature: Company Name:

Name: Address 1:

Title: Address 2:

Date:

TRENCHING AND BACKFILLING

FOR FIRE SUPPRESSION 21 0503 - 1

SECTION 21 0503 - TRENCHING AND BACKFILLING FOR FIRE SUPPRESSION

GENERAL

REQUIREMENTS

Conform with applicable provisions of the General Conditions, Supplemental General

Conditions and the General…