2-2660045 Johnstown Safety Building Specs PART 1.pdf
PDF 7 MB Posted
- Solicitation number
- Not on record
- Issued by
- Carbon County, Pennsylvania
About this file
This is a project manual and bidding document package for the Public Safety Building Elevator Addition and Alterations project issued by the City of Johnstown, Pennsylvania. The project, located at 401 Washington Street in Johnstown, involves construction of an elevator building addition with associated site work, interior and exterior improvements, and mechanical, electrical, and plumbing system replacement. The work will be awarded under four separate prime contracts: General Construction, Mechanical Construction, Electrical Construction, and Plumbing Construction. A mandatory pre-bid conference with site tour is scheduled for Tuesday, June 16, 2026, at 10:00 AM at the Public Safety Building Fourth Floor. All requests for information must be submitted through the PennBid website no later than 5:00 p.m. on Tuesday, June 23, 2026. Sealed bids must be received by July 6, 2026, at 1:00 PM via the PennBid website and will be opened and posted online. The anticipated construction start date is August 3, 2026, with a substantial completion date of July 31, 2027. Contract award is expected within sixty calendar days of bid opening.
Bidders must submit a bid bond in the amount of ten percent of the total bid amount and, upon award, furnish performance and payment bonds each in the amount of one hundred percent of the contract sum. The cost of all bonds must be included in the bid pricing. Liquidated damages are set at $1,000 per calendar day for delays beyond the substantial completion date. The project is subject to federal Davis Bacon Wage requirements, the Build America Buy America Act, the Pennsylvania Office of the Budget Domestic Steel Products Procurement Act, and RACP funding requirements. Bidders must submit a completed AIA Document A305 Contractor's Qualification Statement, current financial statements, evidence of good standing with Pennsylvania, a Non-Collusion Affidavit, and Debarment Certifications with their bids. The City of Johnstown reserves the right to reject any or all bids, waive informalities, and award based on best value determination, with contractor reputation, qualification statements, and subcontractor quality as evaluation factors beyond price alone.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public Safety Building Elevator Addition and Alterations
401 Washington Street Johnstown, PA 15901
PROJECT MANUAL
OWNER
City of Johnstown 401 Main Street
Johnstown, PA 15901
ARCHITECT
UpStreet Architects, Inc.
911 Menoher Blvd.
Johnstown, PA 15905
(814) 539-0224
CIVIL, STRUCTURAL, & MEP CONSULTANT
CJL Engineering 232 Horner Street
Johnstown, PA 15902
(814) 536-1651
Date Issued: 06/08/26
Public Safety Building Table of Contents Elevator Addition and Alterations 1
TABLE OF CONTENTS
A. COVER PAGE
B. ADDENDA (NONE AT THIS TIME)
C. TABLE OF CONTENTS
D. BID DOCUMENTS
1. BIDDER INFORMATION
a. Bidder Information
b. Advertisement for Bids
c. AIA Document A701 – 2018, Instructions to Bidders
d. Amendment to Instructions to Bidders
e. Conditions for Bidding from Electronic Media
2. BID PACKET
a. Bid Forms (available online at PennBid)
b. Bid Bond
c. Contractor’s Qualification Statement
d. Certification Regarding Debarment
1.) Debarment Certification for Primary Covered Transactions
2.) Debarment Certificate for Lower Tier Covered Transactions
e. Non-Collusion Affidavit
f. Anti-Lobbying Certificate
E. CONTRACT DOCUMENTS
1. AIA Document A101 – 2017, Standard Form of Agreement Between Owner And Contractor
a. Modifications to be incorporated in the Contract
2. AIA Document A201-2017, General Conditions Of The Contract For Construction
3. Supplementary General Conditions
4. AIA Document A312 – 2010, Payment Bond
5. AIA Document A312 – 2010, Performance Bond
6. Hold Harmless (Indemnity) Agreement
7. Public Works Employment Verification Form
F. COMPLIANCE FORMS
1. Federal Davis Bacon Wage Rate Determination
2. St-2 Steel Origin Certification Non-Identifiable, Non-Structural Steel
3. St-3 75% U.S. Manufacture Certification
4. St-4 Not Domestically Manufactured – Prime Contractor
Elevator Addition and Alterations 2
5. Build America Buy America Act Requirements
G. STUDIES AND REPORTS
1. Geotechnical Investigation Report
2. Phase I Environmental Site Assessment (ESA): Executive Summary and Test Results only
H. TECHNICAL SPECIFICATIONS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00-01-15 - List of Drawing Sheets
00-31-00 - Available Project Information
00-40-00 - Procurement Forms and Supplements
00-50-00 - Contracting Forms and Supplements 00-61-00 - Construction Bonds
00-73-16 - Insurance Requirements 00-73-43 - Wage Rate Requirements
DIVISION 01 -- GENERAL REQUIREMENTS
01-10-00 - Summary
01-20-00 - Price and Payment Procedures
01-23-00 - Alternates
01-25-00 - Substitution Procedures
Substitution Request Forms – During Construction
01-30-00 - Administrative Requirements
01-35-53 - Security Procedures
01-40-00 - Quality Requirements
01-41-00 - Regulatory Requirements
01-45-33 - Code-Required Special Inspections and Procedures
01-50-00 - Temporary Facilities and Controls
01-51-00 - Temporary Utilities
01-58-13 - Temporary Project Signage
01-60-00 - Product Requirements
01-70-00 - Execution and Closeout Requirements
01-74-19 - Construction Waste Management and Disposal
01-76-10 - Temporary Protective Coverings
01-78-00 - Closeout Submittals
DIVISION 02 -- EXISTING CONDITIONS
02-41-01 - Selective Demolition
02-82-00 - Removal of Asbestos Containing Materials
02-82-23 - Removal of Hazardous Building Components
Elevator Addition and Alterations 3
DIVISION 03 -- CONCRETE
03-01-00 - Pumped Concrete Overlay Patch
03-20-00 - Concrete Reinforcing
03-30-00 - Cast-In-Place Concrete
03-40-00 - Precast Concrete
03-73-00 - Troweled Concrete Patch
03-93-10 - Embedded Galvanic Anodes
03-94-00 - Bonding Agent and Reinforcement Protection
DIVISION 04 -- MASONRY
04-03-00 - Conservation Treatment for Period Masonry
04-05-11 - Masonry Mortaring and Grouting
04-20-00 - Unit Masonry
04-26-13 - Masonry Veneer
04-43-13 - Stone Masonry Veneer
04-72-00 - Cast Stone Masonry
DIVISION 05 -- METALS
05-12-00 - Structural Steel Framing
05-31-00 - Steel Decking
05-40-00 - Cold-Formed Metal Framing
05-50-00 - Metal Fabrications
05-51-33 - Metal Ladders
05-73-00 - Ornamental Aluminum Railing
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06-10-00 - Rough Carpentry
06-20-00 - Finish Carpentry
06-41-00 - Architectural Wood Casework
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07-13-00 - Sheet Waterproofing
07-21-00 - Thermal Insulation
07-21-19 - Foamed-In-Place Insulation
07-54-19 - Polyvinyl-Chloride Roofing - Duro-Last
07-62-00 - Sheet Metal Flashing and Trim
07-71-00 - Roof Specialties
07-72-00 - Roof Accessories
07-81-00 - Applied Fire Protection
07-84-00 - Firestopping
07-91-00 - Preformed Joint Seals
Elevator Addition and Alterations 4
07-92-00 - Joint Sealants
DIVISION 08 -- OPENINGS
08-06-71 - Door Hardware Schedule
08-11-13 - Hollow Metal Doors and Frames
08-14-16 - Flush Wood Doors
08-33-44 - Overhead Coiling Fire Curtains
08-36-13 - Sectional Doors
08-43-13 - Aluminum-Framed Storefronts
08-44-13 - Glazed Aluminum Curtain Walls
08-51-13 - Aluminum Windows
08-56-53 - Security Windows
08-71-00 - Door Hardware
08-80-00 - Glazing
DIVISION 09 -- FINISHES
09-21-16 - Gypsum Board Assemblies
09-22-16 - Non-Structural Metal Framing
09-30-00 - Tiling
09-51-00 - Acoustical Ceilings
09-65-00 - Resilient Flooring
09-68-13 - Tile Carpeting
09-84-30 - Sound-Absorbing Wall and Ceiling Units
09-91-13 - Exterior Painting
09-91-23 - Interior Painting
09-93-00 - Staining and Transparent Finishing
09-97-23 - Concrete and Masonry Coatings
DIVISION 10 -- SPECIALTIES
10-14-00 - Signage
10-21-13.19 - Plastic Toilet Compartments
10-26-41 - Ballistics Resistant Panels
10-28-00 - Toilet, Bath, and Laundry Accessories
10-44-00 - Fire Protection Specialties
10-51-13 - Metal Lockers
10-56-13 - Metal Storage Shelving
10-56-17 - Wall Mounted Standards and Shelving
10-57-23 - Closet and Utility Shelving
10-73-16.13 - Metal Canopies
DIVISION 11 -- EQUIPMENT
11-19-00 - Detention Equipment
Elevator Addition and Alterations 5
DIVISION 12 -- FURNISHINGS
12-24-00 - Window Shades - MechoShade Systems
12-31-00 - Manufactured Metal Casework
12-36-00 - Countertops
DIVISION 14 -- CONVEYING EQUIPMENT
14-21-00 - Electric Traction Elevators
DIVISION 22 -- PLUMBING
22-04-99 - Plumbing Scope
22-05-00 - Basic Plumbing Materials and Methods
22-05-10 - Plumbing Restoration and Retrofit
22-05-23 - Domestic Water Valves
22-05-29 - Plumbing Hangers and Supports
22-05-53 - Plumbing Identification
22-07-00 - Plumbing Insulation
22-11-16 - Domestic Water Piping
22-11-24 - Natural Gas Piping
22-13-16 - Sanitary Waste and Vent Piping
22-14-13 - Storm Drainage Piping
22-14-20 - Wet-Pipe Fire Protection System
22-14-29 - Plumbing Pumps
22-33-00 - Domestic Water Heating Equipment
22-40-00 - Plumbing Fixtures
DIVISION 23 -- HVAC
23-05-05 - HVAC Scope
23-05-10 - Basic HVAC Material and Methods
23-05-11 - Restoration and Retrofit - HVAC
23-05-19 - Piping Specialties - HVAC
23-05-23 - HVAC Valves - HVAC
23-05-29 - Hangers and Supports - HVAC
23-05-48 - Sounds and Vibration Control - HVAC
23-05-53 - Equipment and Piping Identification - HVAC
23-05-93 - Testing and Balancing of Systems
23-07-00 - HVAC Insulation
23-07-50 - Pipe Heat Trace
23-08-00 - Commissioning of HVAC Systems
23-09-00 - Instrumentation and Control for HVAC
23-09-93 - Sequences of Operation for HVAC Controls
Elevator Addition and Alterations 6
23-09-96 - Variable Frequency Drives
23-21-13 - HVAC Piping
23-21-23 - HVAC Pumps and Accessories
23-25-10 - Closed Loop Water Treatment
23-25-30 - Glycol Piping Treatment
23-31-13 - Ductwork
23-33-00 - Sheetmetal Accessories
23-34-23 - Exhaust Fans
23-34-24 - Roof Mounted Equipment Accessories
23-37-13 - Air Outlets and Inlets
23-52-00 - Boiler Gas Vents
23-52-16 - Water-Tube Condensing Boilers
23-57-01 - Plate and Frame Heat Exchangers
23-65-04 - Closed Circuit Adiabatic Cooler
23-73-12 - Blower Coil Unit
23-81-27 - Ductless Split-Type Air Conditioning Systems
23-81-46 - Packaged Water-Source Heat Pumps
23-82-14 - Electric Heating Units
23-82-39 - Terminal Heating Units
23-82-41 - Remote Condensing Units for Blower Coil Unit
DIVISION 26 -- Electrical 26-05-00 - Common Work Results for Electrical
26-05-00.10 - Abbreviations and Definitions
26-05-00.15 - Work Included
26-05-00.17 - Reviews and Acceptances
26-05-00.19 - Maintenances Manuals
26-05-00.22 - Equipment Wiring
26-05-08 - Testing, Acceptances, and Certifications
26-05-12 - Electrical Alternates
26-05-19 - Low Voltage Electrical Power Conductors and Cables
26-05-26 - Grounding and Bonding for Electrical Systems
26-05-29 - Hangers and Supports for Electrical Systems
26-05-33 - Raceways and Boxes for Electrical Systems
26-05-53 - Identification for Electrical Systems
26-09-43 - Distributed Digital Lighting Control System
26-24-16 - Panelboards
26-27-26 - Wiring Devices
Elevator Addition and Alterations 7
26-28-13 - Fuses
26-28-16 - Enclosed Switches and Circuit Breakers
26-43-13 - Surge Protective Devices
26-52-00 - Solid State Lighting
26-78-17 - Elevator Control Switch
DIVISION 27 -- Communications 27-05-00 - Communications Documentation
27-11-16 - Communications Cabinets Racks Frames and Enclosures
27-11-19 - Communications Patch Panels
27-11-23 - Communications Cable Management and Ladder Rack
27-11-26 - Communications Grounding and Bonding
27-13-23 - Communications Optical Fiber Backbone Cabling
27-13-24 - Communications Optical Fiber Splicing and Terminations
27-13-25 - Communications Optical Fiber Cabling Testing, Identification, and Administration
27-15-00 - Communications Horizontal Cabling
27-15-13 - Communications Copper Horizontal Cabling
27-15-14 - Communications Copper Horizontal Cabling Cable Plant Life Cycle Activities
27-15-43 - Communications Faceplates and Connectors
27-16-19 - Communications Path Cords, Station Cords, and Cross Connect Wire
27-41-00 - Local Sound / AV Systems
DIVISION 28 -- Electronic Safety and Security 28-23-00 - Video Surveillance System
28-31-10 - Door Access Control & Security Raceway System
28-31-11 - Fire Alarm Systems
DIVISION 31 -- Earthwork 31-10-00 - Site Clearing
31-20-00 - Earthwork
31-25-00 - Erosion and Sediment Control
31-40-00 - Temporary Shoring and Underpinning
31-62-50 - Helical Piles
DIVISION 32 -- Exterior Improvements 32-12-00 - Bituminous Paving
32-17-23 - Pavement Markings
32-17-26 - Tactile Warning Surfacing
32-91-19 - Finish Grading
32-91-20 - Landscape Grading
32-93-00 - Tree, Shrubbery and Groundcover Planting
Elevator Addition and Alterations 8
DIVISION 33 -- Utilities 33-10-00 - Water Utilities
33-40-00 - Storm Drainage
END OF TABLE OF CONTENTS
Elevator Addition and Alterations Bid Documents
D. BID DOCUMENTS
Elevator Addition and Alterations Bidder Information
D.1. BIDDER INFORMATION
a. This information shall instruct and aid the Bidder in preparing his/her Bid:
b. Advertisement for Bids
c. AIA Document A701 – 2018, Instructions to Bidders
d. Amendment to Instructions to Bidders
e. Conditions for Bidding from Electronic Media
Advertisement for Bids
ADVERTISEMENT FOR BIDS
Sealed bids will be received for the Public Safety Building Elevator Addition and Alterations Project, until July 6, 2026 at 1:00 PM at which time they shall be opened online and posted via PennBid.
Bids will be accepted via the PennBid website (www.pennbid.net). Bids must be received by the date and time above.
It is the intent of the City of Johnstown that the Work will be awarded under separate prime contracts, consisting of General, Mechanical, Electrical and Plumbing Construction Contracts.
A mandatory Pre-bid Conference will be held Tuesday June 16, 2026 at 10:00 AM at the Public Safety Building Fourth Floor for the project with a site tour to follow.
All questions must be submitted through the PennBid website (www.pennbid.com). No questions will be received or responded to by phone or email. All questions must be submitted on or before Tuesday June 23, 2026.
An electronic copy of the Bid Documents may be obtained at no cost from the PennBid website (www.pennbid.net).
The work generally consists of an elevator building addition with associated site work, alternates for additional interior and exterior improvements, and mechanical, electrical and plumbing replacement.
This is a federal Davis Bacon Wage project and current rates are included in the Project Manual.
A Bid Bond is required in the amount of ten percent (10%) of the proposed Contract Sum.
Payment and Performance Bonds are required of the successful Bidder, each in the amount of one hundred percent (100%) of the Contract Sum.
The project is subject to the Build America Buy America Act (BABA) and RACP funding requirements.
The project is subject to the Pennsylvania Office of the Budget Domestic Steel Products Procurement Act.
The City of Johnstown reserves the right to accept or reject any or all Bids, or any part of a Bid, and to waive informalities, and to award the Bid in the best interest of the City of Johnstown.
END OF ADVERTISEMENT FOR BIDS
http://www.pennbid.net/
Document A701® – 2018 Instructions to Bidders
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
FEDERAL, STATE, AND LOCAL
LAWS MAY IMPOSE
REQUIREMENTS ON PUBLIC
PROCUREMENT CONTRACTS.
CONSULT LOCAL AUTHORITIES
OR AN ATTORNEY TO VERIFY
REQUIREMENTS APPLICABLE TO
THIS PROCUREMENT BEFORE
COMPLETING THIS FORM.
It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.
for the following Project:
(Name, location, and detailed description)
THE OWNER:
(Name, legal status, address, and other information)
THE ARCHITECT:
(Name, legal status, address, and other information)
TABLE OF ARTICLES
1 DEFINITIONS
2 BIDDER’S REPRESENTATIONS
3 BIDDING DOCUMENTS
4 BIDDING PROCEDURES
5 CONSIDERATION OF BIDS
6 POST-BID INFORMATION
7 PERFORMANCE BOND AND PAYMENT BOND
8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
Johnstown Public Safety Building Elevator Addition and Alterations 410 Washington Street Johnstown, PA 15901
City of Johnstown 401 Main Street Johnstown, PA 15901
UpStreet Architects, Inc.
922 Menoher Blvd.
Johnstown, PA 15905
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
ARTICLE 1 DEFINITIONS
§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.
§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.
§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.
§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.
§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.
§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.
§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.
ARTICLE 2 BIDDER’S REPRESENTATIONS
§ 2.1 By submitting a Bid, the Bidder represents that:
.1 the Bidder has read and understands the Bidding Documents;
.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;
.3 the Bid complies with the Bidding Documents;
.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;
.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and
.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.
ARTICLE 3 BIDDING DOCUMENTS
§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.
§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.
§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.
§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.
§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.
§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)
§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.
§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.
§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.
§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.
§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.
§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.
§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)
§ 3.4.2 Addenda will be available where Bidding Documents are on file.
§ 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.
ARTICLE 4 BIDDING PROCEDURES
§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.
§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.
§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.
§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.
§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form.
§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.
§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.
§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.
§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:
(Insert the form and amount of bid security.)
§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning days after the opening of Bids, withdraw its Bid and request the return of its bid security.
§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:
(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)
§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof.
§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.
§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.
§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.
§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.
§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:
(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)
ARTICLE 5 CONSIDERATION OF BIDS
§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.
§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.
§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 6 POST-BID INFORMATION
§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.
§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.
§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:
.1 a designation of the Work to be performed with the Bidder’s own forces;
.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and
.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.
§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.
§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.
ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND
§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.
§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.
(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)
§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.
§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.
§ 7.2.3 The bonds shall be dated on or after the date of the Contract.
§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.
ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.
.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.
.4 Building Information Modeling Exhibit, if completed:
.5 Drawings
Number Title Date
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 10:38:59 ET on 02/05/2025 under Order No.4104251321 which expires on 03/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1984129835)
.6 Specifications
Section Title Date Pages
.7 Addenda:
Number Date Pages
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017.)
[ ] The Sustainability Plan:
Title Date Pages
[ ] Supplementary and other Conditions of the Contract:
Document Title Date Pages
.9 Other documents listed below:
(List here any additional documents that are intended to form part of the Proposed Contract Documents.)
Elevator Addition and Alterations Amendment to Instructions to Bidders
AMENDMENT TO INSTRUCTIONS TO BIDDERS
FORM OF INSTRUCTIONS TO BIDDERS:
SEE AIA A701 - 2018, INSTRUCTIONS TO BIDDERS BEFORE THIS DOCUMENT.
THE INSTRUCTIONS IN THIS DOCUMENT AMEND OR SUPPLEMENT THE INSTRUCTIONS TO
BIDDERS AND OTHER PROVISIONS OF THE BIDDING AND CONTRACT DOCUMENTS.
3.1 ARTICLE 2, BIDDER'S REPRESENTATIONS
A. Add the following subparagraphs to 2.1.4:
1. 2.1.4.1 A Pre-Bid Conference and site inspection will be held Tuesday June 16, 2026 at 10:00 AM at the Public Safety Building Fourth Floor, to answer questions and verify work. Attendance by Owner, Architect, Engineer, Contractors, Subcontractors and Vendors. Attendance is mandatory to submit a Bid.
a. 2.1.4.1.1 Agenda:
1) Attendance Sheet
2) Discrepancies (00 74 00 - Special Conditions)
3) RFIs
4) Alternates
5) Unit Prices
6) Substitutions
7) Addenda
8) Bid Submission Packets
9) Bid Results will be available on PennBid.
10) Contractor Questions
B. Add the following subparagraphs to 2.1:
1. 2.1.7 The Bidder fully understands and intends to meet the requirements of referenced documents such as codes, standards, and manufacturer's recommendations that apply to the work.
2. 2.1.8 The Bidder, by execution of the Contract, shall in no way be relieved of any obligation under it due to his failure to receive or examine any form or legal instrument or to visit the site and acquaint himself with the conditions there existing and the Architect will be justified in rejecting any claim based on facts regarding which he should have been on notice as a result thereof.
C. Add the following paragraph to Article 2:
1. 2.2 This Bid has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this Bid, with any other Bidder or with any competitor. The Bidder shall execute, and attach thereto, an affidavit substantially in the form herein provided, to the effect that he has not entered into a collusive agreement with any other person, firm, or corporation in regard to any Bid submitted.
3.2 ARTICLE 3, BIDDING DOCUMENTS
A. Section 3.1 Distribution:
1. Add the following to 3.1.1:
a. Bidders shall obtain Bidding Documents in electronic format (pdf) via the electronic distribution service PennBid. Paper copy Bidding Documents are available upon request; contact the Architect's office for pricing and availability.
2. Delete subparagraph 3.1.2. There will be no refund for returned Bidding Documents.
B. Section 3.2 Modification or Interpretation of Bidding Documents:
1. Add the following subparagraph to 3.2.2:
a. 3.2.2.1 All Requests for Information (RFI) during the bidding period are to be submitted in writing through PennBid no later than 5:00 p.m. local prevailing time on Tuesday, June 23, 2026. RFI's received after this time and date will be returned unanswered. RFI's will not be accepted from Subcontractors or Suppliers;
RFI's must be submitted through the electronic document service PennBid. No oral interpretations will be made to any Bidder as to the meaning of the Bidding Documents or any part thereof. See Section 01 30 00 - Administrative Requirements for additional information.
C. Section 3.3 Substitutions:
1. Delete this Section. Substitutions will NOT be considered during Bidding.
D. Section 3.4 Addenda:
1. Add the following subparagraph to 3.4.3:
a. 3.4.3.1 Addenda will be issued no later than Tuesday, June 30, 2026.
2. Add the following subparagraph to 3.4.4:
a. 3.4.4.1 All Addenda issued shall become part of the Contract and all Bidders shall be bound by such Addenda, whether or not received by the Bidders.
3.3 ARTICLE 4, BIDDING PROCEDURES
A. Section 4.1 Preparation of Bids:
1. Delete 4.1.4 in it's entirety and replace with the following:
a. All bids must be regular in every respect and no interlineations, excisions or special conditions must be made or included in the Bid Form by the Bidder.
2. Add the following sentence to the beginning of paragraph 4.1.5:
a. No alternative Bids will be considered unless specifically requested.
3. Add the following paragraphs:
a. 4.1.9 The “Base Bid Task” and “Alternate” price for each of the several items in the proposal for each Bidder shall include it’s prorated share of overhead and profit so that the sum of the products obtained by adding the Base Bid and the Alternate Prices represent the Total Bid.
1) 4.1.9.1 Any bid not conforming to this may be rejected as informal.
2) 4.1.9.2 Special attention to Bidders is called to this provision should conditions make it necessary to reject or accept Alternate Prices.
B. Section 4.2 Bid Security:
1. 4.2.1 Bid Security is required on the amount of Ten Percent (10%) of the Bid amount.
C. Section 4.3 Submission of Bids:
1. Add the following subparagraph to 4.3.1:
a. 4.3.1.1 Bidders shall submit their Bid electronically on the electronic document service PennBid.
2. Add the following subparagraph to 4.3.2:
a. 4.3.2.1 Each Bidder is required to read, complete, and submit supplement forms for the Bid to be considered bona-fide. Failure to submit these forms will result in disqualification of the Bid.
D. Section 4.4 Modification or Withdrawal of Bid:
1. Add the words "or authorized postponement thereof" after "receipt of Bids" on the first line of paragraph 4.4.1.
2. Add the following subparagraph to 4.4.3:
a. 4.4.3.1 Withdrawal of erroneous Bids after Bid Opening but before Award based on bid mistakes shall be permitted by the written determination of the Architect when the Bidder requests relief and presents credible evidence that the reason for the lower Bid price was a clerical mistake as opposed to a judgment mistake and was actually due to an unintentional arithmetical error or an unintentional omission of a substantial quantity of work, labor, material or services made directly in the compilation of the Bid. The request for relief and the supporting evidence must be received by the Architect within five working days after the Bid Opening. The Architect shall not permit a withdrawal of a Bid if the withdrawal of the Bid would result in the awarding of the contract on another Bid of the same Bidder, its partner or a corporation or business venture owned by or in which the Bidder has a substantial interest. No Bidder who is permitted to withdraw a Bid shall supply any material or labor to or perform any subcontract or other work agreement for any person to whom a contract or subcontract is awarded in the performance of the contract for which the withdrawn Bid was submitted without the written approval of the Architect.
3. Add paragraph 4.4.4:
a. 4.4.4 A Bid may not be modified, withdrawn or canceled by the Bidder within sixty
(60) calendar days following the time and date designated for the receipt of Bids, and each Bidder so agrees in submitting a Bid. Any Bid received after the time and date designated for the receipt of Bids shall not be considered.
3.4 ARTICLE 5, CONSIDERATION OF BIDS
A. Section 5.3 Acceptance of Bid (Award):
1. Add the following subparagraphs to 5.3.1:
a. 5.3.1.1 The Contract shall be awarded within no more than sixty (60) calendar days of the Bid Opening by written notice to the lowest responsible Bidder or all Bids shall be rejected. Extensions of the date for the Award may be made by mutual written consent of the contracting officer and the lowest responsible Bidder.
b. 5.3.1.2 It is the intent of the Owner to award a contract to the lowest responsible Bidder, however, the Owner reserves the right to award the Contract to whomever they feel provides the "Best Value" with price being the primary consideration but not the only determining factor. Contractor's reputation, A305 Contractor's Qualification Statement, and the quality and locality of Subcontractors will be taken into consideration.
2. Add the following paragraph to 5.3:
a. 5.3.3 The Owner reserves the right to negotiate contract / construction costs, after receipt of the Bids, with the lowest, qualified, bidding Contractor.
3.5 ARTICLE 6, POST-BID INFORMATION
A. Section 6.1 Contractor's Qualification Statement:
1. Delete 6.1 in it's entirety and replace with the following:
a. Submit a fully completed AIA Document A305, Contractor's Qualification Statement, as part of the supplement forms to be submitted with the Bid Form.
B. Section 6.3 Submittals:
1. Add the following subparagraphs to 6.3.1:
a. 6.3.1.4 Schedule of Values as defined in AIA Document A201-2007, Section 9.2 Schedule of Values.
b. 6.3.1.5 Proposed Subcontractor Listing.
2. Add the following subparagraphs to 6.3.2:
a. 6.3.2.1 Approval of the Contractor will be made upon receipt of:
1) AIA Document A305, Contractor’s Qualification Statement. Only projects with a scope of work similar to the proposed work need be listed. Provide a contact person and contact information for each project listed.
2) Registered name and tax identification number of the Contractor or Supplier.
3) Name and tax identification number of each principal having a five percent (5%) or greater ownership interest in the Contractor or Supplier.
4) Most recent financial statements of the Contractor.
5) Evidence of good standing (no current tax liability to the Commonwealth).
6) Other documentation that may be required from time to time.
b. 6.3.2.2 Approval of the Subcontractors: The Bidder is specifically advised that any person, firm or other party to whom it is proposed to award a subcontract under this Contract must be acceptable to the Owner.
1) The Contractor shall not award any work to any subcontractor until each has completed and submitted a Non-Collusion Affidavit.
2) Should any subcontractor be found ineligible after award of a contract, its contract shall be terminated.
3) The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to require…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .