This is an Addendum No. 1 document dated August 26, 2026, issued by Fallowfield Township in Washington County, Pennsylvania, for the Elementary Park Improvements Project (Contract No. 2026-01, LS 24-07). The project involves ADA accessibility improvements at Elementary Park, including removal and replacement of bituminous concrete pavement adjacent to the Township Pavilion, installation of new paving and pavement markings, construction of a new concrete ramp and sidewalk connecting to the playground's ADA-accessible entrance, installation of handrails on both sides of the ramp and timber steps, installation of a 4-inch HDPE perforated underdrain in the pavilion area, and landscaping improvements. A pre-bid meeting was held on August 18, 2026, at 10:00 a.m. at the Fallowfield Township Municipal Building with attendance not mandatory. Sealed electronic bids are due by 3:00 p.m. prevailing time on Wednesday, September 2, 2026, via PennBid, with public opening and reading of bids at 6:00 p.m. that same day at the Township Supervisors meeting. The contract completion date is 90 consecutive calendar days from the Notice to Proceed, with liquidated damages set at $500.00 per calendar day for delays.
Addendum No. 1 makes significant clarifications and modifications to the original project scope. The three-foot wooden fence around the playground that was shown on the original drawings does not exist and its relocation has been removed from the project scope. The project scope is amended to include procurement and installation of a new ADA parking sign with post and post foundation. Additionally, the contractor must install a six-inch HDPE storm drain with connections to three existing roof downspouts on the north side of the pavilion. Bid packages must include a certified check or bid bond equal to 10 percent of the bid amount, a PA Public Works Employment Verification Form, and the Pennsylvania Nondiscrimination/Sexual Harassment Clause. The proposal form contains 12 line items including mobilization/demobilization, site preparation and demolition, erosion and sedimentation control, underdrain and storm sewer installation, subbase and asphalt paving, pavement marking, timber stairs, concrete walkway installation, ramp handrails, and landscaping with ADA parking sign installation. State wage rates are required, and insurance requirements are specified in the Supplemental General Conditions section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fallowfield Township Addendum No. 1 Elementary Park Improvements Project
Carroll Township 1 of 2 Addendum No. 1 Valley Avenue Park Phase 2 Project
ADDENDUM NO. 1/August 26, 2026/to the Contract Documents for the ELEMENTARY PARK IMPROVEMENTS PROJECT for Fallowfield Township, Washington County, Pennsylvania, dated July 2026.
Engineer’s Project No. AG085753.012
This Addendum is part of the above noted Contract Documents dated July 2026 and in conformity with the requirements of the INFORMATION TO BIDDERS must be acknowledged on the first page of the PROPOSAL when submitted with the Bid.
I. GENERAL
A. The sign-in sheet for the pre-bid meeting that was held on August 18, 2026 is attached to this addendum. Attendance was not mandatory.
B. The agenda for pre-bid meeting is attached to this addendum for reference only.
II. CLARIFICATIONS
A. The 3-foot high wooden fence around the playground has been removed. Therefore, the relocation of this wooden fence is removed from the scope of the project.
B. The project scope is amended to include the procurement and installation of a new ADA parking sign, post and post foundation.
III. SPECIFICATION ADDENDA
A. Specification Section PROPOSAL:
1. The PROPOSAL (Pages C-1 through C-3) is hereby replaced in its entirety with the attached Pages C-1 through C-3. Pages C-4 through C-9 of the PROPOSAL are unchanged.
B. Specification Section SUMMARY OF WORK:
1. Paragraph 1A.1 Scope of Project shall be replaced in its entirety with the following:
1A.1.1 This project includes the removal of existing bituminous concrete pavement adjacent to the Township Pavilion and the installation of new bituminous concrete paving and pavement markings, as shown on the drawings, to meet ADA requirements. Work also includes creating a new concrete ramp and sidewalk to connect to the playground’s ADA-accessible entrance and installing new handrails on both sides of the ramp in timber steps to improve access between the pavilion and playground. Additional work include the installation of a 4-inch HDPE perforated underdrain in the pavilion area, installation of a new 6-inch HDPE storm drain that is to be connected to the three existing downspouts on the north side of the pavilion, landscaping improvements and the procurement and installation of a new ADA parking sign, including sign post and sign post foundation, as indicated on the drawings.
Fallowfield Township Addendum No. 1 Elementary Park Improvements Project
Carroll Township 2 of 2 Addendum No. 1 Valley Avenue Park Phase 2 Project
IV. DRAWING ADDENDA
C. Drawing C-3: The following items noted in red on Drawing C-3 are hereby incorporated into the Contract via this addendum. A copy of the revised Drawing C- 3 is attached to this addendum.
1. The 3-foot Wooden Fence shown on the drawings does not exist.
2. Contractor shall install 6-inch storm sewer and provide connections to the three existing roof downspouts along the northern side of the park pavilion, as shown on the drawings.
3. Contractor shall procure a new ADA Parking sign and install, along with sign post and sign post foundation, per the Typical Accessible Parking Sign Detail, a copy of which is attached to this addendum.
END OF ADDENDUM NO. 1
PRE-BID CONFERENCE
ELEMENTARY PARK IMPROVEMENTS PROJECT
For
FALLOWFIELD TOWNSHIP
WASHINGTON COUNTY, PENNSYLVANIA
Pre-Bid Meeting Tuesday, August 18, 2026 10:00 a.m.
Fallowfield Township Municipal Building 9 Memorial Drive, Charleroi, PA 15022
Agenda
1. Introduction
A. Project Description:
1) The Project consists of:
Without intending to limit or restrict extent of work required under this Contract, Work to be performed comprises the following:
• The removal of existing bituminous concrete pavement adjacent to the
Township Pavilion and the installation of new bituminous concrete paving and pavement markings, as shown on the drawings, to meet ADA requirements.
• Installation of a new concrete ramp and sidewalk to connect to the playground’s ADA-accessible entrance.
• Installation of new handrails on both sides of the new concrete ramp and timber steps to improve access between the pavilion and the playground.
• Installation of a new 4-inch HDPE perforated underdrain in the pavilion area.
• Landscaping improvements.
• Relocation of the existing wooden fence.
• Procurement and installation of a new ADA parking sign.
2) Scope includes all work necessary for a complete project.
3) Project Location:
a. Fallowfield Township’s Elementary Park
b. 2 Florence Dr #98, Charleroi, PA 15022
2. Bidding Procedures
A. Bidding Schedule
1) Bid Date: Wednesday, September 2, 2026
2) Bid Time: Submitted by 3:00 p.m. prevailing time, on PennBid
3) Bid documents are available at no cost via the PennBid Platform.
4) All questions must be submitted via PennBid.
5) Bids will be publicly opened and read aloud at the continued Fallowfield
Township Supervisors meeting at 6:00 pm on Wednesday, September 2, 2026 at the Fallowfield Township Municipal Building. Results will be displayed on PennBid the following day.
B. Items Required in Bid Package
1) Proposal (Bid Form) – Pages C-1 to C-9.
2) Certified Check or Bid Bond in the amount equal to 10% of the bid.
3) PA Public Works Employment Verification Form
4) Pennsylvania Nondiscrimination / Sexual Harassment Clause
5) The Proposal (Bid Form) shall not be separated from the complete set of bid documents, which shall be submitted in its entirety with the Proposal completely filled in.
C. Qualifications of Bidders – The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work. See Information For Bidders (Pages B-1 to B-8).
D. Access to Project Location – Contact Fallowfield Township at (724) 483-8700.
3. Review of Selected Items in Contract Documents
A. Project Schedule
1) Completion Date – 90 days from Notice to Proceed – See Contract (Pages F-1 to
F-2).
B. Liquidated Damages
1) Specified as $500.00 per calendar day as stipulated under the Contract (Pages F-1 to F-2).
C. Special Conditions
1) Supplemental General Conditions (Pages E-1 to E-8).
2) Insurance Requirements – See Certificate of Insurance provided at the end of the
Supplemental General Conditions Section.
3) State Wage Rates are required.
4. General Questions
5. Site Visit
AutoCAD SHX Text
3000 PSI CONCRETE FOOTING
AutoCAD SHX Text
THIS SIGN TYPICAL AT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PARKING SPACE
AutoCAD SHX Text
EACH ACCESSIBLE
AutoCAD SHX Text
TYPICAL ACCESSIBLE PARKING SIGN
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text
LAWN
AutoCAD SHX Text
SEE PAVING SECTION
AutoCAD SHX Text
PLATED NUTS, BOLTS AND
AutoCAD SHX Text
WITH 5/8" DIA. CADMIUM
AutoCAD SHX Text
0.100 ALUMINUM WITH
AutoCAD SHX Text
NOTE: PANELS ARE TO BE
AutoCAD SHX Text
COPY. BOLT TO STEEL TUBE
AutoCAD SHX Text
RAISED OR SILKSCREEN
AutoCAD SHX Text
WHERE APPLICABLE
AutoCAD SHX Text
STEEL POLE
AutoCAD SHX Text
3" GALVANIZED
AutoCAD SHX Text 6'-6"
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text
ACCESSIBLE
AutoCAD SHX Text
VAN
AutoCAD SHX Text 6"
AutoCAD SHX Text
WASHERS.
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text
RESERVED
AutoCAD SHX Text
PARKING
FALLOWFIELD TOWNSHIP C-1 PROPOSAL
PROPOSAL
TO FALLOWFIELD TOWNSHIP
9 MEMORIAL DRIVE
CHARLEROI, PA 15022
1. The undersigned, having familiarized themselves/himself with the local conditions affecting the cost of the work and with all components of the Contract Documents, as enumerated in the Supplemental General Conditions section of the Specifications, hereby proposes to furnish all labor, materials both expendable and permanent, necessary tools and equipment, utilities, transportation, and all services necessary to perform and complete all of the work required for the construction of
CONTRACT NO. 2026-1 (LS 24-07)
ELEMENTARY PARK IMPROVEMENTS
all in accordance with the Drawings and Specifications as prepared by Hatch Associates Consultants, Inc., including Addenda Nos.
__________________________________ for the following lump sum and/or unit price(s):
FALLOWFIELD TOWNSHIP C-2 PROPOSAL
FALLOWFIELD TOWNSHIP
CONTRACT NO. 2026-01 (LS 24-07)
ELEMENTARY PARK IMPROVEMENTS
PROPOSAL PAGES
ITEM
NO.
ESTIMATED
QUANTITY
DESCRIPTION UNIT PRICE TOTAL PRICE
1. 1 L.S. Mobilization/Demobilization $_________
2. 1 L.S. Site Preparation and Demo $_________
3. 1 L.S. Erosion and Sedimentation $_________
4. 120 L.F.
Installation of 4-inch HDPE Perforated Underdrain including backfill, geotechnical measures, bedding and pipe end treatments
5. 120 L.F.
Installation of 6-inch HDPE Storm Sewer, including backfill, geotechnical measures, bedding and pipe end treatments and connection to three (3) existing Pavilion downspouts
6. 38 Tons Minimum 4-inches of Compacted Type 2A Subbase $______ $_________
7. 40 Tons
3.5-Inches of Asphalt Paving (2” of 19.5 mm binder mix and 1.5” wearing course)
8. 1 L.S. Pavement Marking/Line Striping $_________
9. 1 L.S. Installation of Timber Stairs $_________
10. 450 S.F. Installation of Concrete Walkway $______ $_________
11. 1 L.S.
Installation of Ramp Handrail (both sides of the Ramp)
12. 1 L.S.
Landscaping and new ADA Parking Sign, including post and foundation as outlined on the construction drawings
TOTAL PRICE BID FOR CONTRACT NO. 2026-01
(SUM OF ITEMS NOS. 1 THROUGH 12) $_______________
FALLOWFIELD TOWNSHIP C-3 PROPOSAL
Note: The Owner may add or delete quantities from any of the Bid Items comprising this Contract as conditions dictate. The Contract prices will be adjusted, up or down accordingly, by multiplying the quantity added or deleted by the unit price contained in the Proposal and adding or subtracting the product to or from the Contract Price, as the case may be.
2. Accompanying this Proposal is a (Certified Check/Bid Bond) in the amount of ________________ Dollars ($____________) payable to Fallowfield Township, which it is agreed, shall be retained as liquidated damages by the Owner, if the undersigned fails to execute the Contract and furnish bonds as specified within ten (10) calendar days after notification to do so.
3. To complete the work under Contract No. 2026-01 will require ninety (90) consecutive calendar days from the date of written Notice to Proceed.
4. In submitting this bid it is understood that the right is reserved by the Owner to reject any or all bids and to waive any informalities in the bidding.
5. It is agreed that this bid may not be withdrawn for a period of ninety (90) calendar days from the opening.
Date:
ATTEST: FIRM NAME: _______________________________
BY: _______________________________
TITLE: _______________________________
Corporate Secretary
Official Address:
__________________________________ SEAL
+1245.95
+BR1246
+TR1249
+TS1246
+BS1249
SPOT ELEVATION
BOTTOM OF RAMP
TOP OF RAMP
TOP OF STAIR
BOTTOM OF STAIR
1246 CONTOUR
LIMIT OF WORK
EXISTING CONTOUR
GRADE BREAK
6" PERFORATED HDPE
UNDERDRAIN
LEGEND
LEGEND
CONCRETE WALK
BITUMINOUS CONCRETE
4" WHITE PAVEMENT MARKINGS
CRUSHED STONE TRENCH
RAMP HANDRALIS
LIMIT OF WORK
GRAVEL
CONTROL JOINT
EXPANSION JOINT
X X
XXXXXXXX
OHE
OHE
OHE
OHE
OHE
OHE
OHE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
3' WOODEN FENCE
3' WOODEN FENCE
SIGN:
RESERVED PARKING
1' PLASTIC
BO
R D
ER
1' PLASTIC BORDER
3' W O
O D
EN
FEN
C E
GRASS
GRAVEL
1 STORYBUILDINGBLOCK
PAVILION
MULCH
PLAYGROUND
PLASTIC SLIDES
ASPHALT
7' PLASTIC FENCE
20.00
5.50
7.
RAMP HANDRAILS -
BOTH SIDES
3&4 C-4
CONCRETE WALK2
C-4
TIMBER STAIRS5
C-4
CONCRETE WALK
(WIDEN EXISTING WALK TO 5' WIDTH)
PROPOSED RAMP
4" WHITE PAVEMENT
MARKINGS, TYP.
BITUMINOUS
CONCRETE
C-4
.0
5.
RELOCATE EXISTING WOOD
FENCE TO MEET PERIMETER
FENCING
X X
LIMIT OF WORK
RELOCATE ADA PARKING
SIGN
CRUSHED STONE EDGE
1.
5.00
CRUSHED STONE TRENCH6
C-45.00
(SU
R
FAC
E)
46.14 5.00
28.00
.0
R6.00
10.50
24.81
ALIGN NEW
JOINTS WITH
EXISTING JOINTS
5.
34.75
3 EQ. FLAGS
3 EQ. FLAGS
C-4
X X
XXXXXXXX
OHE
OHE
OHE
OHE
OHE
OHE
OHE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
3' WOODEN FENCE
3' WOODEN FENCE
1' PLASTIC
BO
R D
ER
1' PLASTIC BORDER
3' W O
O D
EN
FEN
C E
1 STORYBUILDINGBLOCK
STORM GRATE TOP ELEV: 1245.62
SS MHRIM ELEV:FILLED WITH DEBRIS
SS MHRIM ELEV:FILLED WITH DEBRIS
1246.2
1245.95
1245.95
1245.75
BR1246
1247.5
TR1249
BS1246
TS1249
MEG
MEG
MEG
MEG
X
X
ABUT EX.
CONCRETE
OUTLET BEYOND
STRUCTURE
4" DIA. PERFORATED HDPE
UNDERDRAIN (SEE NOTE 10)
$$WATERMARKD$$
SIGNATURE
REGISTERED PROFESSIONAL
NAME
ENG REG NUMBER
REVISION DATE
ORIGINAL DATE
SIGNATURE
HATCH DRAWING NUMBER:
NR
ROLE NAME DATE
LEAD DISC. ENG.
ENG. MANAGER
PROJ. MANAGER
NRDRAFTSPERSON
DESIGNER
CHECKER
DESIGN COORD.
RESP. ENG.
SCALE REVDWG. No.DATECHK'DBYDESCRIPTION
REVISIONS
No.DRAWING No.
REFERENCE DRAWINGS
DRAWING TITLE
OR AS NOTED
THIS DRAWING WAS PREPARED FOR THE EXCLUSIVE USE OF [ CLIENT ] ("CLIENT") AND IS ISSUED PURSUANT TO [ THE RELEVANT AGREEMENT ] BETWEEN CLIENT AND [ HATCH LTD. ] ("HATCH"). UNLESS OTHERWISE AGREED IN WRITING WITH CLIENT OR SPECIFIED ON THIS DRAWING, (A) HATCH DOES NOT ACCEPT AND DISCLAIMS ANY AND ALL LIABILITY OR RESPONSIBILITY ARISING FROM ANY USE OF OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY OR ANY MODIFICATION OR MISUSE OF THIS DRAWING BY CLIENT, AND (B) THIS DRAWING IS CONFIDENTIAL AND ALL INTELLECTUAL PROPERTY RIGHTS
EMBODIED OR REFERENCED IN THIS DRAWING REMAIN THE PROPERTY OF HATCH.
ELEMENTARY PARK
FALLOWFIELD TOWNSHIP
WASHINGTON COUNTY, PA
FALLOWFIELD TOWNSHIP
A
GRADING AND DRAINAGE PLAN &
LAYOUT AND MATERIALS PLAN
C. CAMPOS
C. LAMPARK
1/26 1/26
1/26
AS NOTED C-3
C. CAMPOS
A. KEEL
SCALE:
LAYOUT AND MATERIALS PLAN
1"=10'-0"1
SCALE:
GRADING AND DRAINAGE PLAN
1"=10'-0"2
LAYOUT AND MATERIALS NOTES:
1. ALL LAYOUT LINES, OFFSETS OR REFERENCES TO LOCATING OBJECTS ARE
EITHER PARALLEL OR PERPENDICULAR UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR SHALL CONFIRM EXISTING PATHWAY LIMITS AND ALIGNMENTS
WITH THE CONSTRUCTION DOCUMENTS AND NOTIFY THE OWNERS
REPRESENTATIVE OF ANY DISCREPANCIES BETWEEN THE TWO.
3. ALL PROPOSED PATHWAYS AND SITE IMPROVEMENTS SHALL BE LAID OUT AND
STAKED FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION BY THE OWNER;S
REPRESENTATIVE. ANY REQUIRED FIELD ADJUSTMENTS SHALL BE UNDERTAKEN
AT NO ADDITIONAL COST TO THE OWNER.
4. CONTRACTOR SHALL SET, PROTECT, AND REPLACE ALL REFERENCE MARKINGS
AND STAKING AS NECESSARY OR AS REQUIRED BY THE OWNER'S
REPRESENTATIVE.
GRADING AND DRAINAGE NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING GRADES IN THE FIELD AND
SHALL REPORT ANY DISCREPANCIES BETWEEN THE EXISTING AND PROPOSED
CONDITION TO THE OWNER'S REPRESENTATIVE.
2. ALL PROPOSED PAVEMENTS SHALL SMOOTHLY MEET THE LINE, GRADE AND
EDGES OF EXISTING ADJACENT PAVEMENT SURFACES AS WELL THE TOP OF
RAMPS AND BACK OF CURBS.
3. WHERE NEW EARTHWORK MEETS EXISTING EARTHWORK, CONTRACTOR SHALL
BLEND THE GRADES SMOOTHLY, PROVIDING VERTICAL CURVES OR ROUNDS AT
ALL TOP AND BOTTOM OF SLOPES, AND ELIMINATE ROUGH SPOTS AND ABRUPT
GRADE CHANGES.
4. CONTRACTOR SHALL ENSURE ALL AREAS PROPERLY PITCH TO DRAIN, WITH NO
SURFACE WATER PONDING OR PUDDLING.
5. ALL NEW WALKWAY / ACCESS PATH GRADING MUST CONFORM TO CURRENT
AMERICANS WITH DISABILITIES ACT (ADA) REGULATIONS: WALKWAYS SHALL
MAINTAIN A CROSS PITCH OF NOT MORE THAN ONE AND A HALF (1.5%) PERCENT
AND THE RUNNING SLOPE (PARALLEL TO THE DIRECTION OF TRAVEL) BETWEEN
1% MIN. AND 4.5% MAX. ANY DISCREPANCIES NOT ALLOWING THIS TO OCCUR
SHALL BE REPORTED TO THE OWNERS REPRESENTATIVE PRIOR TO CONTINUING
WORK.
6. ALL UTILITY GRATES, COVERS OR OTHER SURFACE ELEMENTS INTENDED TO BE
EXPOSED AT GRADE SHALL BE FLUSH WITH THE ADJACENT FINISHED GRADE
AND ADJUSTED TO PROVIDE A SMOOTH TRANSITION AT ALL EDGES.
7. EXCAVATION REQUIRED WITHIN PROXIMITY OF KNOWN EXISTING UTILITY LINES
SHALL BE DONE BY HAND. CONTRACTOR SHALL REPAIR ANY DAMAGE TO
EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION
OPERATIONS AT NO COST TO THE OWNER.
8. THE CONTRACTOR IS CAUTIONED THE LOCATION AND/OR ELEVATION OF
EXISTING UTILITIES AND STRUCTURES, AS SHOWN ON THESE PLANS.
THIS INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.
THE CONTRACTOR, PRIOR TO THE START OF CONSTRUCTION, SHALL VERIFY THE
LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES IN THE FIELD.
THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY COMPANY, AND
ANY GOVERNING PERMITTING AUTHORITY, AT LEAST 72 HOURS PRIOR TO ANY
EXCAVATION WORK TO REQUEST THE EXACT FIELD LOCATION OF UTILITIES AND
THE OWNER'S REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING, OF ANY
UTILITIES INTERFERING WITH THE PROPOSED CONSTRUCTION AND
APPROPRIATE REMEDIAL ACTIONS TAKEN BEFORE PROCEEDING WITH THE
WORK. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE
ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS
SHOWN ON THE PLAN.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING AND MAINTAINING
ALL CONTROL POINTS AND BENCH MARKS NECESSARY FOR THE WORK.
10. INSTALL 4" HDPE PERFORATED UNDERDRAIN IN FILTER "SOCK" WITHIN CRUSHED
STONE TRENCH. SET UNDERDRAIN ELEVATION TO MAINTAIN POSITIVE SLOPE TO
OUTLET POINT. REFER TO PLAN FOR APPROXIMATE UNDERDRAIN OUTLET
LOCATION, FINAL LOCATION SHALL BE REVIEW FOR APPROVAL BY THE OWNER'S
REPRESENTATIVE PRIOR TO INSTALLATION.
11. ALL PAVEMENT MARKINGS SHALL BE 4" WIDE WHITE THERMOPLASTIC.
NORTHSCALE: 1" =
20'5' 10'0
10'-0"
NORTHSCALE: 1" =
20'5' 10'0
10'-0"
1/26 rdengler Line rdengler Line rdengler Callout Contractor shall install 6-inch HDPE Storm Drain rdengler Ellipse rdengler Ellipse rdengler Ellipse rdengler Line rdengler Line rdengler Line rdengler Callout Contractor shall connect existing roof downspouts (3) to new 6-inch HDPE storm drain with 4-inch piping rdengler Arrow rdengler Arrow rdengler Line rdengler Line rdengler Callout Contractor shall procure and install new ADA Parking Sign, sign post and post foundation. See Detail provided with Addendum #1 rdengler Line rdengler Line rdengler Line rdengler Line rdengler Callout The relocation of the existing wooden fence has been removed from the Contract rdengler Text Box NOTATIONS IN RED ARE CHANGES TO THE DRAWING AS DESCRIBED IN ADDENDUM #1 DATED AUGUST 26, 2026 rdengler Line rdengler Line rdengler Line rdengler Line rdengler Line rdengler Line rdengler Line rdengler Line rdengler Callout
3' WOODEN FENCE DOES NOT EXIST
rdengler Arrow rdengler Arrow
Engineer’s Project No. AG085753.012
File details come from the government source that posted it. Updated .