2-260298 Bid Table.pdf
PDF 143 KB Posted
- Solicitation number
- 260298
- Issued by
- Sedgwick County, Kansas
About this file
This is a bid table for the City of Wichita, Kansas, Public Works & Utilities Department soliciting construction services for the Wichita Valley Center Flood Control Project Levee "J" Toe Drain Installation. The project encompasses site clearing, site restoration, and traffic control, along with measured quantity bid items including toe drain top soil excavation and stockpiling (659 cubic yards), toe drain trench excavation (7,424 cubic yards), toe drain replacement pipe with filter sock in 6-inch diameter perforated HDPE (6,363 linear feet), toe drain replacement risers in 6-inch diameter non-perforated HDPE (420 linear feet), riser caps and outlet appurtenances (42 each), precast concrete manholes at 48-inch diameter (33 each), corrugated metal pipe at 6-inch diameter (18 each), filter media stone meeting ASTM C33 specification (5,920 cubic yards), earthfill backfill with existing material (10,994 cubic yards), one rope gate, and multiple erosion control measures including silt barrier (1,485 linear feet), ditch check protection (16 each), stabilized entrances (6 each), and erosion control blanket SC150 or equivalent (8,484 square yards). Bids are due electronically by December 11, 2026, at 10:00 a.m. via the City of Wichita procurement portal or by email to Val Falo at VFalo@wichita.gov.
This bid table is for information purposes only and is not the official bid form. Prospective bidders should submit quoted delivered prices for all equipment, materials, and services listed. Contact information is provided for Val Falo at the City of Wichita Public Works & Utilities Department, 455 N Main, 12th Floor, Wichita, KS 67202, (316) 268-4414, or VFalo@wichita.gov. No specific pricing terms, set-asides, incumbent information, funding sources, or contract term details are specified in this bid table document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-BP 458-2025-085069.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
260298 Bid Table PW_Engineering
Wichita Valley Center Flood Control Project
Levee "J" Toe Drain Installation Responses are due before:
CONTACT INFORMATION
Contact: Val Falo Email: VFalo@wichita.gov Phone: (316) 268-4414 Fax (316) 268-4656 Address: 455 N Main, 12th Floor, Wichita, KS 67202
PLEASE QUOTE DELIVERED PRICES ON THE EQUIPMENT, MATERIAL, OR SERVICES LISTED BELOW
NOTE: THIS IS NOT A BID FORM - FOR INFORMATION PURPOSES ONLY
Line # Bid Item Description QTY UOM
LUMP SUM BID ITEMS
1 Site Clearing (NOTE 1) 1 LS 2 Site Restoration (NOTE 9) 1 LS 3 Traffic Control 1 LS
MEASURED QUANTITY BID ITEMS
4 Toe Drain Top Soil Excavation and Stockpiling (NOTE 4) 659 CY 5 Toe Drain Trench Excavation (NOTE 5) 7,424 CY 6 Toe Drain Replacement Pipe with Filter Sock (6" diameter perforated HDPE) (NOTE 6) 6,363 LF 7 Toe Drain Replacement Risers (6" diameter non-perforated HDPE) 420 LF 8 Toe Drain Replacement Riser Cap and Outlet Appurtenances (NOTE 7) 42 EA 9 Toe Drain Precast Concrete Manhole (48" dia.) 33 EA 10 Toe Drain Pipe CMP 6" (NOTES 6 AND 8) 18 EA 11 Toe Drain Replacement Filter Media (Stone meeting ASTM C33 specification for concrete aggregate) 5,920 CY 12 Toe Drain Earthfill (backfill with existing material) 10,994 CY 13 Rope Gate 1 EA 14 Erosion Control BMP (Silt Barrier) 1,485 LF 15 Erosion Control BMP (Ditch Check Protection) 16 EA 16 Erosion Control BMP (Stabilized Entrance) 6 EA 17 Erosion Control Blanket (SC150 or equivalent) (NOTE 15) 8,484 SY
12/11/2026 10:00:00 AM
RETURN TO:
Submit Electronically via https://wichita.gov/ procurementportal mailto:VFalo@wichita.gov https://wichita.gov/procurementportal https://wichita.gov/procurementportal