2-2026 Sidewalk Replacement Contract Special Provisions.docx
DOCX document 53 KB Posted
- Solicitation number
- 3013-1226
- Issued by
- Will County, Illinois
About this file
Summary of 2-2026 Sidewalk Replacement Contract Special Provisions
This document contains special provisions for a sidewalk replacement contract issued by the State of Illinois for the 2026 Sidewalk Replacement Program (East of Larkin), identified as project 3013-1226. The contract addresses sidewalk replacement services in a designated geographic area. The special provisions establish the specific terms, conditions, and requirements that govern contractor performance, including standards for materials, workmanship, safety protocols, and project management procedures. These provisions serve as supplementary requirements beyond standard contract language and are designed to ensure quality execution and compliance with local specifications and regulations applicable to the sidewalk replacement work.
The document establishes binding contractual requirements for contractors undertaking the sidewalk replacement project, including technical specifications, insurance requirements, bonding provisions, and compliance obligations specific to the Illinois project jurisdiction. Special provisions typically address construction sequencing, site restoration, traffic management, utility coordination, and quality assurance measures. Contractors must adhere to all outlined provisions throughout the contract term, with particular attention to any performance standards, inspection procedures, and remediation requirements specified for deficient work. The provisions may also include provisions for contract administration, payment procedures, and dispute resolution mechanisms to facilitate successful project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-East Contract List 9 09 26.pdf | ||
| 1-NOTICE TO PUBLIC BODIES AND CONTRACTORS.docx | DOCX document | |
| 5-Full Contract Document.pdf | ||
| 4-2026 Sidewalk Program-East of Larkin Ave.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF JOLIET
SIDEWALK IMPROVEMENTS
INDEX OF SPECIAL PROVISIONS
General Special Provisions Page Number
| Location of Project | 2 | ||||
| Control of Work and Prosecution of Progress | 2 | ||||
| Construction Debris | 3 | ||||
| Construction Restrictions | 3 | ||||
| Location of Existing Utilities | 3 | ||||
| Protection of Existing Drainage Facilities | 3 | ||||
| Cooperation with Other Contractors | 4 | ||||
| Traffic Control & Protection | 4 | ||||
| Material Inspection | 5 | ||||
| Incidental Work | 5 | ||||
| Notification of Property Owners | 5 | ||||
| Additional Insured | 6 | ||||
| Certified Payrolls | 6 | ||||
| Prevailing Wage Requirements | 6 | ||||
| Mobilization | 7 | ||||
| Clearing and Grubbing | 7 | ||||
| Sawcutting | 7 | ||||
| Pavement Removal | 7 | ||||
| Sign Pot Removal & Replacement | 7 | ||||
| Tree Root Pruning | 7 | ||||
| General Conditions and Insurance | 7 | ||||
| GPS Collection and Data Requirements | 8 |
Pay Item Special Provisions
| Topsoil Furnish and Place, Variable Depth | 11 | ||||
| Seeding | 11 | ||||
| Subbase Granular Material | 12 | ||||
| Portland Cement Concrete Driveway Pavement | 12 | ||||
| Portland Cement Concrete Sidewalk | 13 | ||||
| Detectable Warnings | 13 | ||||
| Manholes to be Reconstructed | 13 | ||||
| Bike Path Removal | 14 | ||||
| Cathedral Tile Removal and Replacement | 14 | ||||
| Tree Stump Removal | 14 | ||||
| Sanitary Manhole to be Adjusted | 15 | ||||
| Brick Paver Removal and Replacement | 15 | ||||
| B-Box to be Adjusted | 15 | ||||
| Valve Box to be Adjusted | 15 |
CITY OF JOLIET
SPECIAL PROVISIONS
General Special Provisions
The following Special Provisions supplement the “Standard Specifications for Road and Bridge Construction”, latest edition, the latest edition of the “Manual of Uniform Traffic Control Devices for Streets and Highways”, Standard Specifications for Water and Sewer Main Construction in Illinois, latest edition, the “Manual of Test Procedures for Materials” in effect on the date of invitation for bids, Public Works and Public Utility Standards and Guidelines latest editions. In addition, the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein, which apply to, and govern the construction of this Section will serve as reference. In case of conflict with any part, or parts, of said Specifications, these said Special Provisions shall take precedence and shall govern.
Location of Project
The project consists of various areas provided by the City and as described within this document, within the City of Joliet, Will/Kendall County, Illinois.
Control of Work and Prosecution of Progress
It is the intent of the City of Joliet that the project be constructed in an orderly and timely manner. The Contractor shall take special note of the provisions of Article 105.06, Article 108.01 Paragraph 2, and Article 108.02 of the Standard Specifications, which shall be adhered to.
It is the intent of the City of Joliet that the project be constructed in an orderly and timely manner. The Contractor shall respond to a City request within 48 hours and complete items provided within three (3) weeks of said request. If a response is not obtained by the City or construction does not begin within the three (3) weeks, the Contractor will forfeit the construction bond provided.
Once excavation of elements have occurred, replacement of each element shall occur no later than seven (7) days. Access removal to residential homes shall be no more than seven (7) days. If any access or structural element is not replaced within the seven (7) day time frame the contractor will be subject to liquated damages in accordance with Article 108.09, per calendar day, of the Standards Specifications.
All framed/excavated areas shall be backfilled and landscaped with seven (7) days of structural element being installed.
All quantities provided in the Schedule of Prices are estimated values to establish unit prices. The list provided and associated map if for reference only. The intent of the contract is to remove and replace sidewalk. The contract shall work directly with the City on schedules, limits, and final documentation.
Due to limited funding, the contractor shall not out pace the work and shall provide the route of work to be completed at least two weeks prior to any construction. Locations shown on the map in blue need to be prioritized. Any work completed that exceeds available funding shall be the responsibility of the contactor and such items that exceed the funding will be considered incidental this contact.
The successful bidder shall be responsible for meeting deadlines described here within, and as directed by the Engineer.
The contract shall be completed by June 4, 2027. After the completion date, an additional 20 working days will be allowed to complete punch list items. No extensions will be permitted in accordance with Article 108.08(b) of the “Standard Specifications for Road and Bridge Construction”, latest edition. Should the Contractor fail to complete the work, he will be held liable to the City of Joliet pursuant to amounts specified in Article 108.09 of the Standard Specifications.
Construction Debris
Add the following to the third paragraph of Article 202.03 of the Standard Specifications:
“The Contractor shall not conduct any generation, transportation, or recycling of construction or demolition debris, clean or general or uncontaminated soil generated during construction, remodeling, repair, and demolition of utilities structures, and roads that is not commingled with any waste, without the maintenance of documentation identifying the hauler, generator, place of origin of the debris or soil, the weight or volume of the debris or soil, and the location, owner, and operator of the facility where the debris or soil was transferred, disposed, recycled, or treated. This documentation must be maintained by the Contractor for 3 years.”
Construction Restrictions
All engines and engine driven equipment used in relation to this project shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive noise. Construction hours are as follows: Monday – Friday, 7:00 a.m. to 7:00 p.m., Saturdays 7:00 a.m. to 5:00 p.m., Sundays and holidays – no work allowed. Any requested variations to these hours shall be approved by the City in writing, prior to commencing any operations outside of these hours.
Location of Existing Utilities
Locations of all utilities shown on the Plans are approximate only, and are not necessarily complete. The Contractor shall make his own investigations as to the locations of all existing structures, cables, and pipe lines. Prior to construction, the Contractor shall contact utility companies to arrange for location of any utilities they may have in the various areas and to provide his schedule.
It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in their present or relocated positions and that no additional compensation will be allowed for any delays, inconvenience or damage. It is also suggested that the Contractor call the concerned utility companies for further information. Contractor shall bring to the attention of the Engineer any potential conflicts after receiving all necessary JULIE information. In areas where JULIE locates reveal potential conflicts with proposed storm sewer installation or roadway excavation, the Contractor shall field verify the depth of these utility crossings. In any such area, the Engineer will verify if potential adjustments to the proposed utility installations will be required.
Protection of Existing Drainage Facilities
During Construction, if the Contractor encounters or otherwise becomes aware of any sewer, underdrains or field drains within the right-of-way other than those shown on the plans, he/she shall so inform the Engineer. The Engineer shall direct the work necessary to maintain or to replace the facilities in service and to protect them from damage during construction if to be maintained. Existing facilities to be maintained that are damaged because of non-compliance with this provision shall be replaced at the Contractor’s own expense.
Cooperation with Other Contractors
The Contractor shall cooperate with other Contractors that are working on or near any portion of the project site. The Contractor shall schedule his construction to minimize conflicts in common work areas and to maintain continuity in construction and traffic management. The Contractor will be given the names of any other Contractors who will work on or near the project site. It is the Contractor’s responsibility to contact each Contractor and coordinate the sequence of work with them.
Traffic Control and Protection
Traffic control shall be in accordance with the applicable Sections of the Standard Specifications for Road and Bridge Construction, and the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways. In addition, these special provisions, and any special details and applicable portions of the Highway Standards contained herein and in the plans, will also serve as a reference for traffic control.
At the Preconstruction Conference, the Contractor shall furnish the name of the individual in his direct employ who is to be responsible for the installation and maintenance of the traffic control for this project. If the actual installation and maintenance are to be accomplished by a subcontractor, consent shall be requested of the Engineer at the time of the Preconstruction Conference in accordance with Article 108.01 of the Standard Specifications for Road and Bridge Construction. This shall not relieve the Contractor of the foregoing requirement for a responsible individual in his direct employ.
The Contractor shall ensure that all traffic control devices installed by him are maintained and operational 24 hours a day, including Saturdays, Sundays and holidays.
Advance notification to any affected adjoining residence or business shall be required prior to any temporary or short-term obstruction of access to the adjoining roadway. If notification of a temporary loss of access (date, time and duration) has not been made at least 24 hours, but not more than 48 hours prior to, the Contractor shall not be allowed to proceed with that particular work item.
The Contractor shall provide written notice to the City of Joliet and Engineer at least 72 hours in advance of beginning any work.
Special attention is called to Articles 104.04, 107.09 and 107.14 of the Standard Specifications for Road and Bridge Construction and the highway standards included in the plans.
Any and all roadway closures that last more than thirty (30) minutes shall have a Roadway Closure permit approved by the City prior to any closure by the Contractor. If a roadway is to be close for no more than thirty (30) minutes the Contractor shall notify all emergency departments within the City prior to any lane closure. Additionally, all business or residents shall be notified prior to the closure.
The roadway closure permit shall be submitted to the City for review a minimum of seven (7) business days prior to the anticipated closure. Any roadway closed without written approval by the City of Joliet shall result in liquated damages in the amount of $25,000 per calendar day and all work being performed shall stop, be restored, and roadway reopened at the Contractors own expense.
Traffic control and protection shall not be paid for separately and be considered incidental to the contract. This shall include all labor, materials, transportation, handling and incidental work necessary to furnish, install, maintain and remove all traffic control devices as indicated in the plans, as outlined above, and as approved by the Engineer.
Material Inspection
All Hot-Mix Asphalt and P.C. Concrete materials used on this project shall be tested and inspected in accordance with the Illinois Department of Transportation’s QC/QA requirements.
The Contractor shall provide QA testing to the City of Joliet Resident Engineer by 4:00 p.m., 48-hours in advance of construction for inspection of all Hot-Mix Asphalt and concrete materials used on this project.
The Contractor is to submit a QC plan for HMA and concrete materials to the QA Manager/City Engineer for approval prior to construction operations commencing. The QA Manager/City Engineer will approve this plan.
QC and QA reports for concrete will be retained by the City Engineering Department after review and approval by the QA Manager/City Engineer.
QC reports for bituminous mixtures will be transmitted directly by the Contractor daily during production to the QA Manager/City Engineer. The Engineering Department will review and retain the QA plant reports. The QA field reports can be submitted by the QA Manager/City Engineer to the Engineering Department.
All documents shall be submitted through the City of Joliet’s ProjectDox Portal for review and approval.
Incidental Work
All work shown on the Plans, described in the applicable specifications or in these Special Provisions and not covered by a pay item, will be considered as incidental to the Contract.
Notification of Property Owners
It shall be there responsibility of the contractor to notify the residents of the upcoming construction. The contractor shall notify the residents in multiple steps as provided below:
1. Flyers, door hangers, or message boards shall be provided a minimum of two (2) weeks prior to the start of construction to residents being affects by construction.
2. Advanced notification to any affected residence or business shall be required prior to any temporary or short-term obstruction of access to adjoining roadway. If notification of temporary loss of access (date, time, and duration) has not been made at least forty-eight (48) hours, but no more than seven (7) days prior to, the Contractor shall not be allowed to proceed with that particular work item.
a. Loss of access shall not exceed seven (7) days for any residence or business.
b. The morning of the work, the Contractor will again be required to notify the property owner verbally.
3. The notice given out by the Contractor should provide information regarding the anticipated date that full access or water will be restored.
4. Coordination between activities should allow for work to be done in a timely matter to permit access to the roadway.
Additional Insured
During the Contracting phase of this project, the Contractor shall Contact City of Joliet to determine the extent of the agencies that shall be named as additionally insured on this project. At a minimum, the following shall be named:
The City of Joliet, and Resident Engineering Firm, and all other agencies and representatives on-site under the direction of those entities shall be listed.
Certified Payroll Requirements Per Public Act 94-0515, Contractors and Subcontractors on public works projects must submit certified payroll records on a monthly basis to the Village, along with a statement affirming that such records are true and accurate, that the wages paid to each worker are not less than the required prevailing rate and that the Contractor is aware that filing records he or she knows to be false is a Class B misdemeanor.
The certified payroll records must include for every worker employed on the public works project the name, address, telephone number, social security number, job classification, hourly wages paid in each pay period, number of hours worked each day, and starting and ending time of work each day. These certified payroll records are considered public records and public bodies must make these records available to the public under the Freedom of Information Act, with the exception of the employee’s address, telephone number and social security number. Any Contractor who fails to submit a certified payroll or knowingly files a false certified payroll is guilty of a Class B misdemeanor.
Prevailing Wage Requirements In accordance with the Public Act 94-0515, the Contractor shall be responsible for the following requirements:
Maintain records for three (3) years of all laborers or workers employed on this project including their name, address, phone number, social security number, classification, hourly wages paid in each pay period, and the number of hours worked each day.
Submit these records to the village clerk in either hard copy or electronically.
Certify in writing these records are true and accurate; that the rate paid is not less than the Applicable Prevailing Wage.
These records shall be made available for inspection by the Illinois Department of Labor on two (2) business days notice.
The Contractor shall note that filing a false Certified Payroll is a class B misdemeanor.
This contract calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the “prevailing rate of wages” (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor’s website at: http://www.state.il.us/agency/idol/rates/rates.HTM. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties.
Mobilization
This Contract contains no provisions for Mobilization. Therefore, Section 671 of the Standard Specifications is deleted.
Clearing and Grubbing
Clearing and grubbing shall not be paid for separately and considered incidental to the contract as required by the Engineer.
Sawcutting
Sawcutting shall not be paid for separately but shall be included in the cost for removal items.
Pavement Removal
This work shall be in accordance with Section 440 of the Standards for Road and Bridge Construction in Illinois.
Pavement Removal shall not be paid for separately but shall be included in the cost for removal items and include all labor, materials, equipment and all necessary appurtenance to complete said work.
Sign Post Removal and Replacement
This work shall be in accordance with all application Section of the Standards for Road and Bridge Construction in Illinois.
All replacement material needed, if damaged or otherwise, shall be the responsibility of the contractor.
Sign Post Removal and Replacement shall not be paid for separately but shall be included in the cost for removal items and include all labor, materials, equipment and all necessary appurtenance to complete said work.
Tree Root Pruning
This work shall be performed in accordance with Sections 201 of the "Standard Specifications".
This work will not be paid separately and be included in the cost of the removal items and include any necessary excavation work, disposal of excess material, shaping, topsoil, and all other labor, equipment, and material necessary to complete this item.
General Conditions and Insurance
Please see the City of Joliet General Conditions Booklet Adopted October 15, 2020.
Section 2-448(c). Insurance; all construction and demolition contracts.
1) The successful bidder in all construction and demolition contracts shall submit, with other required contract documents, a certificate of insurance, issued by an insurance company licensed to do business in Illinois, indicating the bidder as the insured and naming the City of Joliet (and its officers and employees) as additional insured with right of notice of cancellation for the duration of the contract in at least the following amounts:
a) General Liability Insurance – One Million Dollars ($1,000,000) general liability insurance covering injuries, deaths and property damage.
b) Workers Compensation Insurance – amount required by Illinois law.
2) The successful bidder shall require the same amounts and coverages as in sub-section (1) from all subcontractors.
3) The amounts stated in sub-section (1)(a) shall be doubled for contracts exceeding Five Hundred Thousand Dollars ($500,000).
4) The minimum amount of insurance may be modified and other insurance-related terms and conditions may be required in specific contracts as the Mayor and City Council may deem appropriate
GPS Collection and Data Requirements The City of Joliet uses GIS (Geographical Information System) technologies to store, manage, and maintain geographic/spatially related data. Likewise, most of the civil engineering community has evolved to the point where the predominating design environment is computer aided design and drafting (CAD). It is the goal of the City to use GIS and CAD technologies to acquire as-built data for all infrastructure installed. It is the responsibility of the contractor to deliver complete and accurate GIS data prior to acceptance of any improvements. The standards below will guide integration of digital engineering CAD drawings into the GIS environment, while maintaining the integrity and positional accuracy of the data.
Blank attribute tables in geodatabase format will be provided by the City for storm, water, sanitary, electric, and dry utility systems. The fields are already formatted and are to be used for providing attribute information that corresponds to the infrastructure.
Requirements for Digital CAD and GIS As-Built Submittals:
· All data shall be in coordinate system: NAD_1983_StatePlane_Illinois_East_FIPS_1201 Feet.
· The scope of mapped infrastructure is to include water main, sanitary sewer, storm sewer, storm sewer outflows, electrical, streetlights, and all other appurtenances required by the City of Joliet.
· Do not rename any of the attribute tables.
· Do not alter the original formatting and structure of the attribute tables or replace them with similar tables.
· Use the correct table for each sewer line, structure type, or other feature.
· All required fields filled in with appropriate data. Additional information entered in the non-required fields is also helpful.
· Correct units and precision used for pipe diameter, pipe length, upstream elevation, etc.
· Correct code from the lookup tables used when required. The lookup tables can be found in in the metadata associated with the geodatabases. Whenever possible use the code that most accurately describes the item.
· Removed or abandoned features need to be denoted as such within the attribute table.
· All sanitary and storm sewer shall be drawn in the direction of flow.
· Collect GPS points of structures prior to burying.
General Notes:
· The lookup tables are not linked to the attribute tables, so they are used as a reference.
· Adhere to the requirements in any “type” column in the Attribute Table Requirements.
· This formatting must be adhered to for the attribute information to be used properly.
· Excel (.xls) files can be accepted for the attribute tables if the formatting is kept the same and none of the field names are changed or deleted, however the original geodatabase file format is preferred.
· If it is unclear which attribute tables should be used or how to code any of the required fields, please consult with the City prior to delivering your digital data submission.
· Data shall be submitted in full GIS geodatabase format or AutoCAD drawings with Civil 3D Models.
· Refer to external City documents regarding more detailed CAD and GIS standards and guidelines.
· All files are to be submitted at as-built stage (upon completion of construction).
GIS General Requirements The Contractor is to provide real-time utility and infrastructure asset data for delivery into the City of Joliet’s Geographic Information System (GIS) for all improvements and appurtenances. The Contractor is required to utilize GPS equipment to obtain selected project datapoints, assets, and real-time as-built utility information during construction.
Equipment Requirements Equipment requirements for data collection shall include GPS Rovers that meet the minimum accuracy and real-time GIS integration requirements. Equipment used to collect this data shall be properly calibrated and capable of meeting a minimum accuracy of 10 mm horizontally and 20 mm vertically (Trimble R2, DA2, or equal).
In addition to the GPS Rover, a dedicated smart phone or tablet with 5G cellular connectivity to be provided by the Contractor is needed for the GPS unit to communicate. The City will not provide technical support of operation of the GPS units. If support is needed, contractors can hire a GIS consultant approved by the City knowledgeable of the process.
The GPS equipment shall integrate and utilize the Esri ArcGIS Field Maps Application (downloadable from App Store and Google Play) with a City provided Project Map. The Contractor will provide real-time connectivity and data updates using a cellular data connection with the GPS unit. GPS units must be able to deliver real time, cellular networked data to an ESRI ArcGIS Online portal established by the City. The Contractor will have access to collected data and can utilize this GIS information to assist them throughout the project. The Contractor will use a City provided ESRI license.
Setup and Collection Requirements Contractor shall obtain survey data during or immediately after installation of the utility. For open trench and exposed water main or sewer utilities, data points shall be obtained at intervals of 50 feet and at directional changes with a minimum of 2 points. Utilities that are bored (trenchless) will be surveyed at the exposed pit locations at both ends and along the boring route with depths manually inputted every 10 feet from the above ground locating devices. For water, sanitary, and storm services, data points shall be obtained at intervals of 10 feet and at directional changes with a minimum of 2 points.
Data collection with the GPS device shall be completed by the Contractor on a real-time basis as the project is being constructed. The Contractor shall verify that data is being collected in real-time in the provided GIS portal (simple website link) on a regular basis, no less than two times per day.
Contractor shall have a surveyor establish GPS control points, and the contractor shall check in daily (beginning of day) to verify and maintain calibration of the device.
At least 95% of collected data must meet GPS accuracy requirements. Data not meeting this standard will be required to be exposed and surveyed again until this standard is met.
Data Collection Features The following features are required to be collected by the Contractor during construction for the purpose of delivering GIS Digital As-Builts:
1. Water main, services, fittings, valves, hydrants, corporation stops, curb stops, structures, b-boxes, and related features (horizontal, vertical elevation, top of pipe, sizes, model data)
2. Sanitary sewer, services, manholes, cleanouts, and related features (horizontal, vertical elevation, top of pipe, sizes, model data)
3. Exposed Sanitary Services (horizontal, vertical elevation, sizes, regardless of type)
4. Storm sewer services, manholes, sump, and related features (horizontal, vertical elevation, top of pipe, sizes, model data)
5. Electric lines including but not limited to streetlights, handholes, connection points, and all appurtenances (horizontal, vertical elevation, sizes, regardless of type)
6. Dry utility exposed during construction (horizontal, vertical elevation, sizes, regardless of type)
7. Connections to existing utilities
8. Any other proposed or modified underground utility work or related feature
9. All City owned facilities shall be provided in GIS and As-builts
Final GPS survey code and data input requirements will be provided at project start-up.
Submittals Digital Data Collection will be conducted in real-time during construction and visible within the ArcGIS Online portal. No final GIS package delivery will be required of the contractor (final as-built survey is still required).
The City will finalize data collection by completing final utility connected linework for the purpose of delivering GIS feature classes or shapefiles compatible with ESRI. Utility lines connected shall include all identified attributes. If needed, the Contractor will assist the City and clarify final pipe data and connections within GIS.
Data Acceptance At time of project completion, the City will verify that all data has been collected satisfactorily. Failure to do so will be grounds for not accepting the project or releasing retainage until the data is satisfactory. If, at any time, the Contractor fails to perform this work, the City reserves the right to utilize an outside provider and charge the work to the project owner prior to releasing the retainage/contract bond and/or accepting the project.
Drawing Requirements All drawings prepared for the City of Joliet Public Utilities Department will include the general notes found in Appendix D – General Notes and the Standard Details as Provided in Appendix B of this Design Manual All drawings shall be in compliance with the design criteria as outlined in this manual and formatted for 24” x 36” full-size production. Drawings will be submitted via digital (PDF) in the City of Joliet ProjectDox System.
All projects shall require the submittal of As-Built drawings. As-built drawings shall be red-line updated monthly during construction and will be subject to review by City inspectors. Drawings submitted upon project completion shall show the as-built location of all utilities and utility structures and be provided in AutoCAD and PDF format.
This work shall not be paid for separately but be considered include in the cost of the contract and include all materials, labor, and equipment needed to complete the GPS data capture.
Pay Item Special Provisions
Topsoil Furnish and Place, Variable Depth
This work shall consist of furnishing and placing topsoil at the locations and to the thickness specified on the plans or as directed by the Engineer in accordance with Section 211 of the “Standard Specification”.
Topsoil maintenance shall include the removal, spraying or cutting of weeds over 6” high. This maintenance shall be performed a minimum of once (1) a month. In addition, prior to restoration, all topsoil areas shall be clean of all weeds and debris. This maintenance shall be considered incidental to this item.
The topsoil shall be placed such that a minimum depth of four (4”) inches shall be achieved prior to seeding activities. Any additional material required beyond a depth specified shall be reclaimed from any excavated, suitable material located onsite. No compensation will be provided for the placement of this material, unless agreed to by the Engineer. Backfill of this kind shall be considered incidental to this Contract. If sufficient depth to place the topsoil is not available, the Contractor will be required to excavate the additional depth to place the required thickness, this shall be considered incidental to this pay item.
Furnishing, placing and maintaining topsoil will be paid for at the contract unit price per square yard for TOPSOIL FURNISH AND PLACE, VARIABLE DEPTH which shall include all labor, material, equipment, excavation, and all other appurtenances to install the topsoil as specified within the plans.
Seeding
This work shall be performed in accordance with Sections 250 and 251 of the "Standard Specifications".
The Contractor shall be responsible for maintaining all restored areas until such a time as the City accepts these areas. This acceptance will be granted after the Contractor has both fulfilled the minimum required maintenance items and has established a stand of grass (where required) which meets the acceptance standards set forth in these Special Provisions.
Acceptance of seeded areas will be determined by inspection by the City and Engineer. In order for an area to be accepted, it shall conform the following:
a) Grass shall display a reasonably uniform distribution of grass plants
b) Grass shall display vigorous growth and be green and healthy in appearance.
Vegetation shall be established to a minimum of 70% of the area, any areas smaller than 70% growth will not be accepted. Bare spots must be re-seeded in accordance with seeding and maintenance specifications.
In addition, watering shall be completed by the contactor as requested by the engineer and the watering shall be considered incidental to this item.
This work will be paid for at the contract unit price per acre for SEEDING, of the class specified and including any necessary excavation work, disposal of excess material, shaping, topsoil, seed, repair, and all other labor, equipment, and material necessary to complete this item.
Subbase Granular Material
This work shall be performed in accordance with Section 311 of the Standard Specifications with the exception that the first layer be constructed immediately following the roadway excavation. The Contractor shall place the first layer of base course before the end of each work day so that the limits of the excavation are accessible to vehicular traffic. The first layer of base course shall be a minimum thickness of four (4”) inches and the width shall extend to the limits of the roadway as shown in the plans. Aggregate ramps shall be constructed at the limits of the excavation at the end of each work day to allow vehicular access to the roadway. All material used in providing access shall be utilized in the final base course and shall be considered incidental to this item.
Upon completion of the first layer of base course and after the installation of the curb and gutter, a proof roll shall be performed to locate any unsuitable sub-grade material that will require removal. This proof roll shall be accomplished in the presence of the engineer and shall be done with a loaded semi-truck.
Upon completion of the final lift of base course and prior to the placement of the hot mix asphalt pavement, the contractor shall perform another proof roll.
Aggregate used for base course will be measured for payment in square yards of the type and thickness specified.
This work will be paid for at the contract unit price per square yard for AGGREGATE BASE COURSE, of the type and thickness specified and shall include all labor, materials, equipment, and all other appurtenances required to install the aggregate base course. The saw cutting of asphalt will be not paid for separately and be included in all the removal items.
Portland Cement Concrete Driveway Pavement
This work shall be in accordance with Section 423 of the Standard Specifications and includes furnishing all materials, equipment and labor necessary to install P.C.C. Driveway Pavement.
Driveway thickness shall be as specified within the plans and be reinforced by 6" x 6" #10 welded wire fabric. All driveways shall be placed on a four inch (6") thick sub-base of stone.
Expansion material shall be put at both ends of the approach.
This work will be paid for at the contract unit price per square yard for PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, of the thickness specified, and shall include all labor, material, equipment, and all other appurtenances in order to complete the installation.
Portland Cement Concrete Sidewalk
This work includes furnishing all material, equipment and labor necessary to install sidewalk in accordance with Section 424 of the "Standard Specifications." All sidewalks except driveway sidewalks shall be five inches (5") thick. All residential driveway sidewalks shall match the adjacent apron thickness, or as specified, and shall be reinforced with 6" x 6" #10 welded wire fabric. All sidewalks shall be placed on a four inch (4") thick aggregate sub-base.
Under no circumstance shall the Contractor stamp their name, phone number, or any other information in newly constructed concrete work.
Where curb ramps are specified in the plans, this work will not be paid separately and shall be considered incidental to the construction of the associated sidewalk items.
The work will be paid for at the contract unit price per square foot for PORTLAND CEMENT CONCRETE SIDEWALK, of the thickness specified and shall include all labor materials, equipment, and all other appurtenance to install the sidewalk.
Detectable Warnings
Detectable warning panels shall be reusable cast iron plat truncated domes with contrasting color (natural patina unfinished).
Payment for the Detectable Warnings shall be paid for at the contract unit price per square foot for DETECTABLE WARNINGS.
Manholes to be Reconstructed
This work shall consist of the reconstruction of existing manholes as specified in Section 602, 603 and 604 of the “Standard Specifications”.
Reconstruction of sanitary sewer structures must include the installation of an external chimney seal, conforming to ASTM C923. Acceptable external chimney seals include Infi-Shield Uni-Band or an approved equivalent. Cost of chimney seal will not be measured separately for payment.
This work shall be paid for at the contract unit price per each for MANHOLES TO BE RECONSTRUCTED and shall include all materials, labor, equipment, disposal, and appurtenances necessary to complete the work as detailed in the plans and specified herein.
Bike Path Removal
This work shall include all labor, material, and equipment necessary to remove the existing HMA bike path pavement, including aggregate base courses and stabilized subbases and shall be performed according to Section 440 of the Standard Specifications and as specified herein.
A full depth, perpendicular, straight-line joint shall be sawn at the ends and all edges of portions to be removed. Any damage done to the existing bike path or appurtenances to remain in place shall be repaired or removed and replaced as directed by the Engineer.
Materials resulting from the removal of existing pavement and appurtenances as specified herein shall be disposed of according to Article 202.03 of the Standard Specifications.
This work will be measured in place and paid for at the contract unit price per square yard for BIKE PATH REMOVAL, which shall include all labor, material, disposal and equipment required to complete the work as detailed in the plans and specified herein.
Cathedral Tile Removal and Replacement
This work shall be in accordance with Section 424 of the "Standard Specifications" and shall include all labor, equipment, storage, and appurtenances to remove and replace “Cathedral Tiles” as directed by the engineer.
The contractor shall be responsible for any damage and/or loss/theft of tile. Sawcutting of existing concrete and protection shall be included in this line item.
Once removed the tiles shall be poured/placed into the new concrete sidewalk as directed by the Engineer.
A removal and replacement plan shall be provided by the contractor to the Engineer in writing for approval prior to any work being completed.
The work will be paid for at the contract unit price per square foot for CATHEDRAL TILE REMOVAL AND REPLACEMENT, and shall include all labor materials, equipment, replacement tiles (as required) and all other appurtenance to reinstall the “Cathedral Tiles.”
Tree Stump Removal
This work shall be performed in accordance with Sections 201 of the "Standard Specifications".
This work shall include removing stumps and all associated roots to properly grade the parkway and as directed by the Engineer. Root pruning and/or removal shall be included in this line items.
This work shall be paid for at the contract unit price of each for TREE STUMP REOVAL and included in the cost of the removal items and include any necessary excavation work, disposal of excess material, shaping, topsoil, and all other labor, equipment, and material necessary to complete this item.
Sanitary Manhole To Be Adjusted
This work shall consist of adjusting frames and lids in accordance with the City of Joliet Utilities Standards. The adjustment of all sanitary sewer manholes shall also be performed in accordance with the latest provisions and requirements of the Public Utility Standards and the following.
The manhole castings and adjusting rings required to raise the frame to the finished grade shall be set in BUTYL rope or approved equal.
A chimney seal approved by Public Utilities shall be installed on all manholes to be adjusted.
This work shall be measured and paid for at the contract unit price per each for SANITARY MANHOLE TO BE ADJUSTED. This price shall include excavation around each structure, complete the adjustment, the chimney seal and adjustment rings as specified, backfill, and all material, equipment, labor, and all appurtenances required to complete the manhole adjustment in accordance with City of Joliet Public Utilities Standards.
Brick Paver Removal and Replacement
This work shall be in accordance with all applicable Standard Specifications for Road and Bridge construction and City of Joliet Public Works Standards.
This work shall include the removal and replacement of brick pavers as directed by the engineer. Care shall be taken while removing all brick pavers and all damage or negligence shall be the responsibility of the contractor to replace such pavers.
Additional pavers needed shall be supplied by the contractor and be approved by the engineer prior to installation.
This work shall be measured and paid for at the contract unit price per square yard for BRICK PAVER REMOVAL AND REPLACEMENT and shall include excavation, bedding, subbase, equipment, labor, and all appurtenances required to complete the replacement of pavers as directed by the engineer.
B-Box to be Adjusted
This work shall consist of the adjustment of existing b-boxes as specified in Section 602 of the “Standard Specifications” in conjunction with all Public Utilities standards and specifications.
This work shall be paid for at the contract unit price per each for B-BOX TO BE ADJUSTED and shall include all materials, labor, equipment, disposal, trench backfill, and appurtenances necessary to complete the work as detailed in the plans and specified herein.
Valve Box to be Adjusted
This work shall consist of the adjustment of existing valve boxes as specified in Section 602 of the “Standard Specifications” in conjunction with all Public Utilities standards and specifications.
This work shall be paid for at the contract unit price per each for VALVE BOX TO BE ADJUSTED and shall include all materials, labor, equipment, disposal, trench backfill, and appurtenances necessary to complete the work as detailed in the plans and specified herein.