This is an Invitation for Bids (IFB) document issued by the Plains Township Board of Commissioners in Pennsylvania for the replacement of the roof at the Plains Township Municipal Building located at 126 N. Main Street in Plains, Pennsylvania. The project encompasses the complete replacement of the existing roof and all associated incidental work. Sealed bids must be submitted online through the PennBid Program no later than 12:00 pm local time on October 6, 2026. Bids will be publicly opened at the offices of Verdantas located at 613 Baltimore Drive, Suite 300, Wilkes-Barre, PA 18702-7903, and will be evaluated at the regularly scheduled Plains Township Board of Commissioners meeting on Thursday, October 8, 2026, at 7:00 pm at the Plains Township Fire Department Fox Hill Station, 50 Second Street, Plains, PA 18705. All bidding documents are available at no cost through the PennBid platform at https://pennbid.bonfirehub.com. This project is awarded as a single prime contract on a lump sum and unit price basis with alternate bids as specified in the bid form. No pre-bid conference has been scheduled as of the document date, though any changes will be communicated via addendum through the PennBid Program.
Bid security equal to 10 percent of the bidder's maximum bid price must accompany each submission, along with all required forms, statements, affidavits, and certifications as listed in Article 7 of the bid form. All workers on the project must be paid in accordance with Pennsylvania Prevailing Wage Act 442 minimum wage requirements throughout the contract duration. The Plains Township Board of Commissioners does not discriminate in contracting based on race, color, national origin, sex, religion, age, disability, or familial status.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-2026.09.22 Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALL BEFORE YOU DIG!!
PENNSYLVANIA LAW REQUIRES
3 WORKING DAY NOTICE FOR
CONSTRUCTION PHASE AND 10
WORKING DAY IN DESIGN STAGE
STOP CALL!!
PENNSYLVANIA ONE CALL SYSTEM
1-800-242-1776
PLAINS TOWNSHIP
MUNICIPAL BUILDING
ROOF REPLACEMENT
126 NORTH MAIN STREET
PLAINS, PA, 18705
LOCATION MAP
GOOGLE MAPS
PROJECT
LOCATION
PR
O
JE
C
T N
O R
TH
LIST OF DRAWINGS
SHEET
NUMBER SHEET NAME
GENERAL
CS COVERSHEET
ARCHITECTURAL
AG001 LEGENDS, NOTES AND ABBREVIATIOINS
AG002 SPECIFICATIONS & CODE REVIEW
AD101 ROOF DEMOLITION PLAN
AC101 ROOF NEW WORK PLAN
SHEET
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
DATE
PR
O
JE
C
T N
O
SCALE
D
ES
IG
N
ED
B
Y:
PR
EL
IM
IN
A R
Y N
O T
FO
R
C
O N
ST
R
U C
TI
O
N
PROJECT STATUS
TH
IS
D
RA
W
IN
G
RE
PR
ES
EN
TS
A D
ES
IG
N
IN
TE
NT
A
ND
C
ON
CE
PT
O
NL
Y.
T
HI
S
DO
CU
ME
NT
A
ND
A
LL
A
SS
OC
IA
TE
D
DO
CU
ME
NT
S
AR
E
PR
EP
AR
ED
F
OR
A
S
PE
CI
FI
C
SI
TE
A
ND
E
VE
NT
, A
ND
IN
CO
RP
OR
AT
E
CA
LC
UL
AT
IO
NS
A
ND
M
EA
SU
RE
ME
NT
S
AV
AI
LA
BL
E
FR
OM
T
IM
E
OF
D
RA
FT
IN
G.
U
SE
O
F
TH
IS
D
ES
IG
N
IS
G
RA
NT
ED
T O
TH
E
CL
IE
NT
F
OR
T
HE
S
PE
CI
FI
ED
A
ND
N
AM
ED
E
VE
NT
O
NL
Y.
2 3 4 5 6 7 8
B
C
D
E
F
A
AS NOTED
ST
AT
E:
PL
A
IN
S
TO
W
N
SH
IP
PL
A
IN
S~
LU
ZE
R
N E~
PA
CS
C O
VE
R
SH
EE
T C
LK
M R
S
M R
S
BA
LT
IM
O
R E
D R
IV
E, S U
IT
E
W
IL
KE
S-
BA
R
R E, P A
TE
L.
-8
-1
ISSUED FOR BID
09/21/2026
M U
N
IC
IP
A
L B
LD
G
R O
O F
R
EP
LA
C
EM
EN
T
1.
N o.
R
EV
IS
IO
N D
AT
E
C H
K' D
IS
SU
ED
B Y
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISH FLOOR
ALUM. ALUMINUM
ARCH ARCHITECT / ARCHITECTURAL
ASPH ASPHALT
BD BOARD
BLDG. BUILDING
BLK BLOCK(ING)
BM BEAM
BRG BEARING
BRK BRICK
BS BOTTOM OF SLAB
BTM BOTTOM
CJ CONTROL JOINT
CLO. CLOSET
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
D / DRN DRAIN
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DN DOWN
DP DAMPROOF(ING)
DR DOOR
DS DOWNSPOUT
DW DISHWASER
DWG DRAWING
EA EACH
EJ EXPANSION JOINT
EIFS EXTERIOR INSUL. FINISH SYSTEM
ELECT. ELECTRICAL
ELEV ELEVATION
ENCL ENCLOSURE
EQ EQUAL
EQUIP EQUIPMENT
EXIST. EXISTING
EX EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL FLOOR
FLUOR FLUORESCENT
FOS FACE OF STUDS
FR(G) FRAME(ING)
FT FEET OR FOOT
FUR FURRING
FVC FIRE VALVE CABINET
GA GAGE OR GAUGE
GALV GALVANIZE(D)
GC GENERAL CONTRACTOR
GL GLASS
GM GALVANIZED METAL
GR GRADE
GWB GYPSUM WALL BOARD
GYP. BD. GYPSUM BOARD
HC HOLLOW CORE
"H" HANDICAPPED ACCESSIBLE
HDW HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
HT HEIGHT
HTR HEATER
ID INSIDE DIAMETER
INFO INFORMATION
INSUL INSULATION OR INSULATED
INT INTERIOR
JT JOINT
KO KNOCKOUT
LAM LAMINATE
LAV LAVATORY
LP LOW POINT
MFGR MANUFACTURER
MANUF MANUFACTURER
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MTL METAL
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NO NUMBERS
NTS NOT TO SCALE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PL. LAM PLASTIC LAMINATE
PTN PARTITION
PL PROPERTY LINE
PLUM PLUMBING
PLYWD PLYWOOD
PNL PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PTD PAINTED
PTS POINTS
R RADIUS
REF REFRIGERATOR
REINF REINFORCE(ING)
REQ'D REQUIRED
REV REVISE / REVISION
RM ROOM
RSTRM RESTROOM
SAN SANITARY
SECT SECTION
SCHED SCHEDULE(D)
SF SQUARE FOOT (FEET)
SIM SIMILAR
SPLSH BLK SPLASH BLOCK
SPEC SPECIFICATION
STL STEEL
STRUCT STRUCTURAL / STRUCTURE
SUSP SUSPEND / SUSPENDED
TEMP TEMPERED
TH THRESHOLD
THK THICK / THICKNESS
THRU THROUGH
TOS TOP OF SLAB
TYP TYPICAL
UL UNDERWRITERS LABORATORY
VCT VINYL COMPOSITION TILE
VEST VESTIBULE
VIF VERIFY IN FIELD
W/ WITH
WD WOOD
& AND
@ AT
' FEET
" INCHES
ABBREVIATIONS GENERAL NOTES
A
AA
XX
x
FIN.
1ST. FL.
E L E V A T I O N
SCALE : 1/4" = 1'-0"
D E T A I L
SCALE : 1/4" = 1'-0"
S E C T I O N
SCALE : 1/4" = 1'-0"
A100
X
AXXX
X
AXXX
X
AXXX
DRAWING NAME
AND TAG
SECTION TAGS
ELEVATION TAGS
BUILDING
ELEVATION TAG
COLUMN
CENTERLINE TAG
DOOR TAG
WINDOW TAG
ROOM NAME /
NUMBER TAG
PARTITION TAG
SXSHELF TAG
NORTH ARROW
REVISION TAG
ANNOTATIONS
AXXX
DETAIL TAG
REVISION CLOUD
XXXXXXXXXXXXXXXXXXXXXXXXXX
TEXT APPEARANCE
NOTING ELEMENTS
EP WH
ELECTRICAL PANEL
OR WALL HEATER
NOTE TAG
DEMOLITION
LOW
HIGHELEVATION CHANGE
MATCH LINE
REF: DWG
MATCH LINE
REF: DWG
.00
.00
CONSTRUCTION
MATCH LINE TAG
SPOT
ELEVATION TAG NEW EXISTING
WXX
XXXXX
220D
X-XXX
X
X X
X
FLOOR PLAN
SCALE : 1/4" = 1'-0"
X
AXXX
DRAWING LEGEND
1.
a.
b.
c.
d.
e.
f.
2.
3.
4.
5.
A.
B.
C.
D.
a.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
CODES:
CODES:
PENNSYLVANIA STATE CODE:
THIS PROJECT IS DESIGNED TO BE IN COMPLIANCE WITH THE GOVERNING EDITIONS OF THE
PENNSYLVANIA DEPARTMENT OF LABOR AND INDUSTRY UNIFORM CONSTRUCTION CODE,
INCLUDING THE FOLLOWING APPLICABLE CODES:
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL MECHANICAL CODE.
2021 INTERNATIONAL FIRE CODE.
2019 NFPA-13 FOR INSTALLATION OF SPRINKLER SYSTEMS.
2021 INTERNATIONAL PLUMBING CODE.
2020 NATIONAL ELECTRIC CODE
CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CONDITIONS, LAWS, RULES, REGULATIONS
AND ORDINANCES OF FEDERAL, STATE, COUNTY, OR AUTHORITIES RELATING THERE-TO. NO
WORK SHALL BEGIN AT THE SITE UNTIL APPLICABLE APPROVALS AND REQUIRED PERMITS HAVE
BEEN OBTAINED BY THE CONTRACTOR(S) COVERING SUCH WORK. SUBCONTRACTORS ARE TO
VERIFY AND ASSURE PROPER CODE COMPLIANCE FOR ALL ASPECTS OF CONSTRUCTION WITHIN
THEIR RESPECTIVE TRADES. PERMITS ARE TO BE PART OF WORK.
SUBCONTRACTORS SHALL VERIFY AND ASSURE PROPER CODE COMPLIANCE FOR ALL ASPECTS
OF CONSTRUCTION WITHIN THEIR RESPECTIVE TRADES. OBTAINING PERMITS SHALL BE PART OF
THEIR RESPONSIBILITY
THE SCOPE OF THE PROJECT INCLUDES ALL WORK SHOWN OR INFERRED ON THE DRAWINGS AND
SPECIFICATIONS TO BE PERFORMED BY THE PRIME CONTRACTOR(S) AND THEIR QUALIFIED
SUBCONTRACTORS.
CONTRACTOR DESIGNATIONS:
GENERAL CONTRACTOR - G.C.
MECHANICAL CONTRACTOR - M.C.
PLUMBING CONTRACTOR - P.C.
ELECTRICAL CONTRACTOR - E.C.
ALL CONTRACTORS WILL:
SAFEGUARD THE OWNER'S PROPERTY AND THE ADJACENT PROPERTIES DURING
CONSTRUCTION. CONTRACTORS SHALL REPLACE ANY AND ALL MATERIALS TO THEIR
ORIGINAL CONDITIONS AT THE CONTRACTOR'S EXPENSE.
VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOBSITE BEFORE COMMENCEMENT
OF WORK; REPORT ALL ERRORS AND OMISSIONS OR DISCREPANCIES TO THE
ARCHITECT / ENGINEER IN WRITING PRIOR TO THE START OF WORK. IN ALL CASES
WHERE CONFLICTS MAY OCCUR THE ARCHITECT SHALL BE NOTIFIED AND WILL
INTERPRET THE INTENT OF THE CONTRACT DOCUMENTS.
INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL CONDITIONS AND DIMENSIONS OF
THE PROJECT AND SHALL NOTIFY THE ARCHITECT / ENGINEER OF ANY CONDITION
REQUIRING MODIFICATIONS OR CHANGES BEFORE PROCEEDING WITH THE WORK. DO
NOT SCALE DRAWINGS.
PROTECT AND STORE ALL FIXTURES, HARDWARE, ETC., AS WELL AS EQUIPMENT
SPECIFIED HEREIN FOR THE DURATION OF THE JOB.
COORDINATE WITH LOCAL UTILITIES FOR WATER, DRAINAGE, GAS, ELECTRICAL
SERVICES, ETC., FOR APPLICABLE CONNECTIONS AS MAY BE REQUIRED.
BE RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS WITH PROPER AUTHORITIES
DURING CONSTRUCTION AND NOTIFYING THE ARCHITECT / ENGINEER AND OWNER OF
ALL INSPECTIONS. THE G.C. IS RESPONSIBLE FOR SCHEDULING FINAL INSPECTION SO
THAT OWNER MAY RECEIVE AN "OCCUPANCY PERMIT".
INTERIOR DIMENSIONS ARE TAKEN TO FACE OF GYPSUM BOARD, MASONRY OR COLUMN CENTER
LINES UNLESS OTHERWISE NOTED.
ALL CONTRACTORS WILL BE REQUIRED TO OBTAIN AND EXAMINE A FULL SET OF DRAWINGS AND WILL HAVE VISITED THE JOB SITE. THEY SHALL BE FAMILIAR WITH AND BE SATISFIED TO THE
CONDITIONS UNDER WHICH THEY WILL BE OBLIGED TO OPERATE AND PERFORM PRIOR TO
SUBMITTING A BID FOR THEIR TRADE FOR SPECIFIC CONSTRUCTION.
THE G.C. SHALL BE RESPONSIBLE FOR COORDINATING THE CONSTRUCTION WITH ALL
CONTRACTORS.
THE G.C. SHALL PREPARE, IN CONJUNCTION WITH THE OTHER CONTRACTORS A CONSTRUCTION
SCHEDULE INCLUDING EACH TRADE ENGAGED FOR THE DURATION OF THE WORK AND DISTRIBUTE
A COPY TO OWNER AND ARCHITECT / ENGINEER.
ALL CONTRACTORS SHALL SUBMIT SHOP DRAWINGS TO THE ARCHITECT / ENGINEER FOR
APPROVAL AS NOTED IN THE SPECIFICATIONS. MANUFACTURER'S NAMES AND MODEL NUMBERS
ARE USED TO PROVIDE AN INDICATION OF QUALITY, STYLE AND SIZE DESIRED. OTHER
MANUFACTURER'S MODELS, QUALITY STYLE AND SIZES MAY BE SUBMITTED BUT SHALL OTHER
MANUFACTURER'S MODELS, QUALITY STYLE AND SIZES MAY BE SUBMITTED BUT SHALL PROCESS.
EXISTING MATERIALS SCHEDULED FOR REUSE SHALL BE STORED BY CONTRACTOR AS REQUIRED.
EXISTING MATERIALS SCHEDULED FOR TURNOVER TO THE OWNER SHALL BE REMOVED BY THE
CONTRACTOR; MOVED BY THE CONTRACTOR TO OWNER'S DESIGNATED AREA WITHIN THE
BUILDING.
MATERIALS DAMAGED OR OTHERWISE DEEMED UNUSABLE BY ARCHITECT, ENGINEER OR OWNER
SHALL BE DISPOSED OF BY CONTRACTOR IN A LEGAL AND SAFE MANNER.
INTERRUPTION OF ELECTRIC, WATER, SANITARY, GAS OR HEATING SERVICE, PHONE, CATV OR MECHANICAL EQUIPMENT TO THE BUILDING SHALL NOT BE PERMITTED WITHOUT ONE WEEK PRIOR
WRITTEN NOTICE TO THE OWNER.
SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S SHOP DRAWING APPROVAL STAMP INDICATING
THAT ALL DIMENSIONS AND ASSEMBLY OF COMPONENTS HAVE BEEN CROSS-CHECKED W/ EACH
RESPECTIVE TRADE FOR COMPLIANCE WITH THE PROJECT REQUIREMENTS. THE ARCHITECT /
ENGINEER WILL NOT PROCESS SHOP DRAWINGS WITHOUT THE CONTRACTOR'S STAMP.
THE G.C. SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS THAT ARE LOCATED SUCH THAT
CONSTRUCTION PERSONNEL SHALL HAVE A MAXIMUM TRAVEL DISTANCE OF 75 FEET TO
OBTAIN AN EXTINGUISHER AND SHALL PROVIDE A MINIMUM OF 2 PER FLOOR INCLUDING
BASEMENT. FIRE EXTINGUISHERS SHALL BE MINIMUM 10 LBS AND BE CAPABLE OF EXTINGUISHING
CLASSES A, B, C AND D TYPE FIRES.
SPECIAL CARE IS TO BE TAKEN TO INSURE THAT RATED PARTITIONS AND OTHER ASSEMBLIES
POSITIVELY SEALED AT ALL CONDUITS, DUCTWORK, PIPING OR ANY OTHER PENETRATIONS. EACH
CONTRACTOR SHALL BE RESPONSIBLE FOR SEALING THEIR PENETRATIONS TO MEET THE FIRE
RATED ASSEMBLY REQUIREMENTS.
EACH CONTRACTOR IS RESPONSIBLE FOR CUTTING AND PATCHING THEIR OWN PENETRATIONS.
MATERIALS USED FOR PATCHING SHALL THE SAME AS THE ADJACENT MATERIALS AND SHALL BE
APPROVED BY THE ARCHITECT / ENGINEER.
THE CONTRACTOR SHALL PROVIDE MATERIAL SAFETY DATA SHEETS (M.S.D.S.) FOR ALL
CHEMICALS USED AT THE SITE FOR THE REVIEW OF THE CLIENT. THIS DOCUMENTATION MUST BE
KEPT ON SITE AND READILY ACCESSIBLE AT ALL TIME DURING THE PROJECT.
THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR DEVIATIONS FROM
CONTRACT DOCUMENTS REQUIREMENTS BY THE ARCHITECT'S APPROVAL OF SHOP DRAWINGS
OR OTHER SUBMITTALS UNLESS THE CONTRACTOR HAS SPECIFICALLY INFORMED THE ARCHITECT IN WRITING OF SUCH DEVIATION AT THE TIME OF THE SUBMITTAL AND SUCH DEVIATION HAS BEEN
APPROVED IN WRITING. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR
ERRORS OR OMISSIONS IN SUCH SUBMITTALS BY THE ARCHITECT'S APPROVAL THEREOF.
THE CONTRACTOR SHALL DIRECT SPECIFIC ATTENTION IN WRITING ON SHOP DRAWINGS AND
SIMILAR SUBMITTALS TO REVISIONS OTHER THAN THOSE REQUESTED BY THE ARCHITECT ON
PREVIOUS SUBMITTALS. IN THE ABSENCE OF THE CONTRACTOR'S WRITTEN NOTICE, THE
ARCHITECT'S APPROVAL OF A RESUBMISSION SHALL NOT APPLY TO SUCH REVISIONS.
AC# AD#
PROJECT NORTH
SHEET
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
DATE
PR
O
JE
C
T N
O
SCALE
D
ES
IG
N
ED
B
Y:
PR
EL
IM
IN
A R
Y N
O T
N
ST
R
U C
TI
O
N
PROJECT STATUS
TH
IS
D
RA
W
IN
G
RE
PR
ES
EN
TS
A D
ES
IG
N
IN
TE
NT
A
ND
C
ON
CE
PT
O
NL
Y.
T
HI
S
DO
CU
ME
NT
A
ND
A
LL
A
SS
OC
IA
TE
D
DO
CU
ME
NT
S
AR
E
PR
EP
AR
ED
F
OR
A
S
PE
CI
FI
C
SI
TE
A
ND
E
VE
NT
, A
ND
IN
CO
RP
OR
AT
E
CA
LC
UL
AT
IO
NS
A
ND
M
EA
SU
RE
ME
NT
S
AV
AI
LA
BL
E
FR
OM
T
IM
E
OF
D
RA
FT
IN
G.
U
SE
O
F
TH
IS
D
ES
IG
N
IS
G
RA
NT
ED
T O
TH
E
CL
IE
NT
F
OR
T
HE
S
PE
CI
FI
ED
A
ND
N
AM
ED
E
VE
NT
O
NL
Y.
2 3 4 5 6 7 8
B
C
D
E
F
A
AS NOTED
ST
AT
E:
PL
A
IN
S
TO
W
N
SH
IP
PL
A
IN
S~
LU
ZE
R
N E~
PA
AG001
LE
G
EN
D
S, N
O
TE
S A
N D
A B
B R
EV
IA
TI
O
IN
S
C
LK
M R
S
M R
S
(N
AM
E_ O
N _S
TA
M
P)
XX
(R
A, PE
BA
LT
IM
O
R E
D R
IV
E, S U
IT
E
W
IL
KE
S-
BA
R
R E, P A
TE
L.
-8
-1
ISSUED FOR BID
09/21/2026
M U
N
IC
IP
A
L B
LD
G
R O
O F
R
EP
LA
C
EM
EN
T
1.
SHEET
NUMBER SHEET NAME 09
/21 /20
IS
SU
ED
F
OR
B
ID
GENERAL
CS COVERSHEET X
ARCHITECTURAL
AG001 LEGENDS, NOTES AND ABBREVIATIOINS X
AG002 SPECIFICATIONS & CODE REVIEW X
AD101 ROOF DEMOLITION PLAN X
AC101 ROOF NEW WORK PLAN X
ARCHITECTURAL DRAWINGS
LIST & ISSUANCE LOG
N o.
R
EV
IS
IO
N D
AT
E
C H
K' D
IS
SU
ED
SECTION 01 30 00 - ADMINISTRATION REQUIREMENTS
REFER TO PROJECT MANUAL FOR DIVISION 00 AND 01.
DIVISION #1 - GENERAL REQUIREMENTS
SPECIFICATIONS
1.
A.
B.
a.
b.
c.
d.
2.
A.
B.
3.
A.
4.
A.
B.
C.
SECTION 07 90 00 - JOINT PROTECTION
HIGH PERFORMANCE: GENERAL PURPOSE EXTERIOR ( NON-TRAFFIC ) SEALANT: ASTM C-920,
GRADE NS, CLASS 25, USES M, G AND A; SINGLE OR MULTI-COMPONENT.
COLOR: STANDARD COLORS MATCHING FINISHED SURFACES. COLOR SELECTED BY ARCHITECT.
APPLICATION: USED FOR:
CONTROL, EXPANSION AND SOFT JOINTS IN MASONRY.
JOINTS BETWEEN CONCRETE AND OTHER MATERIALS
JOINTS BETWEEN METAL FRAMES AND OTHER MATERIAL.
OTHER EXTERIOR NON-TRAFFIC JOINTS FOR WHICH NO OTHER SEALANTS ARE INDICATED.
EXTERIOR FOAM EXPANSION JOINT SEALER: PRE-COMPRESSED FOAM SEALER; POLYURETHANE
WITH WATER-REPELLENT, PRODUCTS RECOMMENDED BY MANUFACTURER FOR TRAFFIC BEARING
USE.
COLOR: STANDARD COLORS MATCHING FINISHED SURFACES. COLOR SELECTED BY ARCHITECT.
APPLICATION: USE FOR EXTERIOR WALL EXPANSION JOINTS.
EXTERIOR METAL LAP JOINT SEALANT: BUTYL OR POLYISOBUTYENE, NON-DRYING, NON-SKINNING, NON-CURRING:
APPLICATIONS: USE FOR CONCEALED SEALANT BEAD IN SHEET METAL WORK AND CONCEALED
SEALANT BEAD IN SIDING OVERLAPS.
SEALANT FOR CONTINUOUS WATER IMMERSION: POLYSULFIDE OR POLYURETHANE; ASTM C-920,
GRADE NS, CLASS 25, USES M AND A; APPROVED BY MANUFACTURER FOR CONTINUOUS WATER
IMMERSION; SINGLE OR MULTI-COMPONENT:
APPLICATIONS: USE FOR JOINTS IN FOUNTAIN POOL, AQUARIUM JOINTS.
COLOR: SELECTED BY ARCHITECT FROM MANUFACTURER'S STANDARD COLORS.
INTERIOR SEALANT AND SEALANT PRIMERS: MAXIMUM VOLATILE ORGANIC COMPOUND
CONTENT IN ACCORDANCE WITH SCAQMD RULL 1168.
1.
A.
B.
C.
2.
A.
3.
A.
B.
C.
SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM
SHEET MATERIALS:
PRE-FINISHED ALUMINUM: ASTM B209 (ASTM B209, 0.040 INCH THICK; PLAIN FINISH SHOP PRE-
COATED WITH FLUOROPOLYMER COATING.
POLYVINYLIDENE FLUORIDE (PVDF) COATING: SUPERIOR PERFORMING ORGANIC POWDER
COATING, AAMA 2605; PRETREATED METAL WITH TWO-COAT SYSTEM INCLUDING PRIMER AND
COLOR COAT WITH AT LEAST 70 PERCENT PVDF COATING.
COLOR AS SELECTED BY ARCHITECT FROM FULL RANGE OF COLORS.
FASCIA:
ALUMINUM, 0.40 GAUGE FASCIA, SECUREDGE 200 OR EQUAL. COLOR BY ARCHITECT FROM
MANUFACTURER'S FULL RANGE.
FABRICATION AND FINISH:
FORM SECTIONS TRUE TO SHAPE, ACCURATE IN SIZE, SQUARE, AND FREE FROM DISTORTION
OR DEFECTS, IN LONGEST POSSIBLE LENGTHS
FORM MATERIAL WITH FLAT LOCK SEAMS, EXCEPT WHERE OTHERWISE INDICATED; AT MOVING
JOINTS, USE SEALED LAPPED, BAYONET-TYPE OR INTERLOCKING HOOKED SEAMS.
PROVIDE ACCESSORIES AND SEALANTS AS REQUIRED
DIVISION #6 - WOOD, PLASTICS AND COMPOSITES:
2.
A.
B.
3.
A.
a.
b.
SECTION 06 10 00 - ROUGH CARPENTRY (CONTINUED)
SHEATHING MATERIALS:
WOOD STRUCTURAL PANEL ROOF SHEATHING: APA-EWA; STRUCTURAL I, C-D PLYWOOD, SPAN
RATING 48/24, APA RATED, EXPOSURE DURABILITY EXTERIOR; UN-SANDED.
WOOD STRUCTURAL PANEL WALL SHEATHING: APA-EWA; STRUCTURAL I, C-D PLYWOOD, SPAN
RATING 48/24, APA RATED EXPOSURE DURABILITY EXTERIOR; UN-SANDED.
ACCESSORIES:
FASTENERS: ASTM A153 / A153M, HOT DIPPED GALVANIZED, ASTM B695, MECHANICALLY
GALVANIZED STEEL FOR HIGH HUMIDITY AND PRESERVATIVE-TREATED WOOD LOCATIONS:
NAILS AND STAPLES: ASTM F1667.
ANCHORS: TOGGLE BOLT TYPE FOR ANCHORAGE TO HOLLOW MASONRY. EXPANSION SHIELD
AND LAG BOLT TYPE FOR ANCHORAGE TO SOLID MASONRY OR CONCRETE BOLT OR
BALLISTIC FASTENER FOR ANCHORAGES TO STEEL.
DIVISION #7 - THERMAL AND MOISTURE
PROTECTION:
1.
A.
B.
C.
D.
a.
b.
c.
d.
E.
F.
G.
2.
A.
B.
C.
D.
E.
3.
SECTION 07 53 03 - ELASTOMERIC MEMBRANE ROOFING - FULLY ADHERED EPDM
SINGLE PLY ROOFING ASSEMBLY: CARLISLE SYNTEC SYSTEMS, SURE-SEAL FULLY ADHERED EPDM
ROOFING SYSTEM OR APPROVED EQUAL:
60 MIL NON-REINFORCED, BLACK EPDM MEMBRANE, MAXIMUM WIDTH AND LENGTH.
ADHESIVE: AS RECOMMENDED BY MANUFACTURER.
VAPOR BARRIER; VAP AIR SEAL MD OR EQUAL
INSULATION: ASTM C1289 , TYPE II, CLASS 2 GRADE 2 POLYISOCYANURATE INSULATION WITH (CGF) COATED GLASS FACERS. BASIS OF DESIGN: SECURE SHIELD OR EQUAL. MIN R-30 AVG ON
ROOF. 2 LAYERS OF 2.5" WITH 1" MINIMUM TAPERED INSULATION.
THERMAL RESISTANCE: LTTR = R-5.7 PER ONE INCH.
COMPRESSIVE STRENGTH: MINIMUM 20 PSI.
WATER ABSORPTION: ASTM C209, <1% BY VOLUME
TAPERED INSULATION: 1/4 INCH PER 1 FOOT.
1/2" SECURE SHIELD HD COVER BOARD, OR EQUAL
PROVIDE WALK PADS TO ACCESS ROOFTOP UNITS FOR SERVICE.
WARRANTY: FURNISH 20 YEAR NO-DOLLAR LIMIT WATERTIGHT WARRANTY AND 80 MPH PEAK
GUST WIND SPEED ROOF SYSTEM. MANUFACTURER'S WARRANTY SHALL INCLUDE COVERAGE
OF MATERIALS, INSTALLATION AND DAMAGE TO BUILDING RESULTING FROM FAILURE TO RESIST
PENETRATION OF MOISTURE.
ROOF EDGING: CARLISLE SYN TEC SYSTEMS SECURE EDGE 200 FASCIA, NON-PENETRATING OR
APPROVED EQUAL:
2 PIECE, 0.040 ALUMINUM.
FINISH: KYNAR 500 WITH 2 YEAR STANDARD WARRANTY
COLOR: SELECTED BY ARCHITECT FROM MANUFACTURER'S FULL RANGE.
RE-2 BLOW-OFF RESISTANCE: 150 LBS. PER SQ. FT.
LENGTH: 12 FEET.
PREPARATION AND INSTALLATION: AS PER MANUFACTURER'S INSTRUCTIONS.
DIVISION #6 - WOOD, PLASTICS AND COMPOSITES:
1.
A.
B.
SECTION 06 10 00 - ROUGH CARPENTRY
LUMBER MATERIALS:
LUMBER GRADING RULES: NELMA, AND STATE AND LOCAL CODES. ALL LUMBER SHALL BE
STAMPED WITH THE GRADE MARK OF AN APPROVED TESTING AGENCY.
MISCELLANEOUS BLOCKING: SPRUCE PINE FIR ( SPF ) NO. W2 OR BETTER OR HEM-FIR NO. 2 OR
BETTER; 19 PERCENT MAXIMUM MOISTURE CONTENT.
2021 I.E.B.C. CODE REVIEW
TABLE C301.1 - CLIMATE ZONES, MOISTURE REGIMES AND WARM-HUMID
DESIGNATIONS
STATE PENNSYLVANIA
COUNTY LUZERNE
CLIMATE ZONE AND MOISTURE DESIGNATION 5A
TABLE C402.1.3 - OPAQUE THERMAL ENVELOPE INSULATION COMPONENT
MINIMUM REQUIREMENTS - R-VALUE METHOD
ROOFS
INSULATION ENTIRELY ABOVE ROOF DECK R-30 ci
GENERAL EXISTING BUILDING DATA
BUILDING AREA
ROOF AREA 5,040 S.F.
NOTE: THE OCCUPANCY CLASSIFICATIONS FOR THE SPACES WITHIN THIS
BUILDING SHALL REMAIN THE SAME AS CURRENTLY UTILIZED. THIS PROJECT
DOES NOT INCLUDE RELOCATION, ADDITION OR CHANGE OF OCCUPANCY,
ONLY REPAIRS AND ALTERATIONS/UPGRADES.
CHAPTER 1 - SCOPE AND APPLICATION
SECTION 101 - GENERAL
101.4 APPLICABILITY
THIS CODE SHALL APPLY TO THE REPAIR, ALTERATION, CHANGE OF
OCCUPANCY, ADDITION AND RELOCATION OF EXISTING BUILDINGS.
101.4.2 BUILDINGS PREVIOUSLY OCCUPIED
THE LEGAL OCCUPANCY OF ANY EXISTING BUILDING SHALL BE PERMITTED TO
CONTINUE WITHOUT CHANGE EXCEPT AS SPECIFICALLY REQUIRED BY THIS
CODE.
NOTE: THIS PROJECT CONSISTS SOLELY OF REPLACEMENT OF THE EXISTING
ROOFING SYSTEM AND ROOF INSULATION. NO ADDITION, RELOCATION, CHANGE
OF OCCUPANCY, OR EXPANSION OF THE BUILDING AREA IS PROPOSED.
101.5 SAFEGUARDS DURING CONSTRUCTION
CONSTRUCTION WORK COVERED BY THIS CODE, INCLUDING ANY RELATED
DEMOLITION ACTIVITIES, SHALL COMPLY WITH CHAPTER 15.
CHAPTER 3 - PROVISIONS FOR ALL COMPLIANCE METHODS
SECTION 301 - ADMINISTRATION
301.3.2 WORK AREA COMPLIANCE METHOD
ALTERATIONS COMPLYING WITH THE APPLICABLE REQUIREMENTS OF
CHAPTERS 6 THROUGH 12 SHALL BE CONSIDERED IN COMPLIANCE WITH THE
PROVISIONS OF THIS CODE.
302.5 NEW AND REPLACEMENT MATERIALS
MATERIALS INSTALLED AS PART OF THIS PROJECT SHALL COMPLY WITH THE
REQUIREMENTS APPLICABLE TO NEW CONSTRUCTION. LIKE MATERIALS SHALL
BE PERMITTED WHERE UNSAFE CONDITIONS ARE NOT CREATED.
[BS] 302.5.1 NEW STRUCTURAL MEMBERS AND CONNECTIONS
NEW STRUCTURAL MEMBERS AND CONNECTIONS, WHERE PROVIDED, SHALL
COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE
FOR NEW CONSTRUCTION.
CHAPTER 6 - CLASSIFICATION OF WORK
SECTION 601 - GENERAL
601.1 SCOPE
THE WORK PERFORMED ON THIS EXISTING BUILDING SHALL BE CLASSIFIED IN
ACCORDANCE WITH THIS CHAPTER.
601.2 WORK AREA
THE WORK AREA SHALL BE IDENTIFIED ON THE CONSTRUCTION DOCUMENTS
AND CONSISTS OF THE EXISTING ROOF AREAS SCHEDULED FOR REPLACEMENT.
SECTION 602 - ALTERATION LEVEL 1
602.1 GENERAL
THE PROPOSED ROOF REPLACEMENT IS CLASSIFIED AS A LEVEL 1 ALTERATION
CONSISTING OF THE REMOVAL AND REPLACEMENT OF EXISTING ROOFING
MATERIALS AND INSULATION WITH NEW MATERIALS SERVING THE SAME
PURPOSE.
CHAPTER 7 - ALTERATIONS - LEVEL 1
SECTION 701 - GENERAL
701.2 CONFORMANCE
AN EXISTING BUILDING OR PORTION THEREOF SHALL NOT BE ALTERED SUCH
THAT THE BUILDING BECOMES LESS SAFE THAN ITS EXISTING CONDITION.
SECTION 705 - REROOFING
705.1 GENERAL
REROOFING WORK SHALL COMPLY WITH THE APPLICABLE REQUIREMENTS OF
THE INTERNATIONAL BUILDING CODE AND CHAPTER 15 GOVERNING ROOF
ASSEMBLIES AND ROOFTOP STRUCTURES.
SECTION 706 - STRUCTURAL
706.2 ADDITION OR REPLACEMENT OF ROOFING
WHERE REROOFING RESULTS IN AN INCREASE IN DESIGN DEAD LOAD, LIVE
LOAD, OR SNOW LOAD, AFFECTED STRUCTURAL ELEMENTS SHALL BE
EVALUATED AND STRENGTHENED AS REQUIRED TO SUPPORT APPLICABLE
DESIGN LOADS.
NOTE: REPLACEMENT ROOF INSULATION AND ROOFING MATERIALS ARE NOT
ANTICIPATED TO INCREASE DESIGN ROOF LOADS BEYOND THE CAPACITY OF
THE EXISTING STRUCTURE.
CHAPTER 15 - ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
SECTION 1503 - WEATHER PROTECTION
1503.1 GENERAL
ROOF DECKS SHALL BE COVERED WITH APPROVED ROOF COVERINGS SECURED
TO THE BUILDING OR STRUCTURE IN ACCORDANCE WITH THE PROVISIONS OF
THIS CHAPTER. ROOF COVERINGS SHALL SERVE TO PROTECT THE BUILDING OR
STRUCTURE. [CDN.FS.PATHLMS.COM]
PROVIDED: EXISTING ROOFING AND INSULATION SHALL BE REMOVED AND
REPLACED WITH A NEW ROOFING ASSEMBLY AND INSULATION SYSTEM
DESIGNED TO MAINTAIN A WEATHER-RESISTANT BUILDING ENVELOPE.
SECTION 1504 - PERFORMANCE REQUIREMENTS
1504.1 WIND RESISTANCE OF ROOFS
ROOF ASSEMBLIES SHALL BE DESIGNED AND INSTALLED TO RESIST APPLICABLE
WIND LOADS AND SHALL BE INSTALLED IN ACCORDANCE WITH THE CODE AND
MANUFACTURER'S REQUIREMENTS.
PROVIDED: NEW ROOFING ASSEMBLY SHALL BE INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S REQUIREMENTS AND APPLICABLE WIND UPLIFT DESIGN
CRITERIA.
SECTION 1505 - FIRE CLASSIFICATION
1505.1 GENERAL
ROOF ASSEMBLIES SHALL BE CLASSIFIED IN ACCORDANCE WITH APPROVED
TESTING STANDARDS AND SHALL MAINTAIN THE MINIMUM FIRE CLASSIFICATION
REQUIRED FOR THE BUILDING.
PROVIDED: NEW ROOFING ASSEMBLY SHALL MAINTAIN THE REQUIRED ROOF
COVERING FIRE CLASSIFICATION OF THE EXISTING BUILDING.
SECTION 1511 - REROOFING
1511.1 GENERAL
MATERIALS AND METHODS OF APPLICATION USED FOR RECOVERING OR
REPLACING AN EXISTING ROOF COVERING SHALL COMPLY WITH THE
REQUIREMENTS OF CHAPTER 15.
1511.3 ROOF REPLACEMENT
WHERE ROOF REPLACEMENT OCCURS, THE EXISTING ROOF COVERING SHALL
BE REMOVED AS NECESSARY TO PERMIT INSTALLATION OF THE NEW ROOFING
SYSTEM IN ACCORDANCE WITH CODE REQUIREMENTS AND MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
NOTE: EXISTING ROOFING SYSTEM AND INSULATION SHALL BE REMOVED AND
REPLACED WITH A NEW CODE-COMPLIANT ROOFING ASSEMBLY AND
INSULATION SYSTEM.
2021 I.B.C. CODE REVIEW
2021 I.E.C.C. CODE REVIEW
SHEET
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
DATE
PR
O
JE
C
T N
O
SCALE
D
ES
IG
N
ED
B
Y:
PR
EL
IM
IN
A R
Y N
O T
N
ST
R
U C
TI
O
N
PROJECT STATUS
TH
IS
D
RA
W
IN
G
RE
PR
ES
EN
TS
A D
ES
IG
N
IN
TE
NT
A
ND
C
ON
CE
PT
O
NL
Y.
T
HI
S
DO
CU
ME
NT
A
ND
A
LL
A
SS
OC
IA
TE
D
DO
CU
ME
NT
S
AR
E
PR
EP
AR
ED
F
OR
A
S
PE
CI
FI
C
SI
TE
A
ND
E
VE
NT
, A
ND
IN
CO
RP
OR
AT
E
CA
LC
UL
AT
IO
NS
A
ND
M
EA
SU
RE
ME
NT
S
AV
AI
LA
BL
E
FR
OM
T
IM
E
OF
D
RA
FT
IN
G.
U
SE
O
F
TH
IS
D
ES
IG
N
IS
G
RA
NT
ED
T O
TH
E
CL
IE
NT
F
OR
T
HE
S
PE
CI
FI
ED
A
ND
N
AM
ED
E
VE
NT
O
NL
Y.
2 3 4 5 6 7 8
B
C
D
E
F
A
AS NOTED
ST
AT
E:
PL
A
IN
S
TO
W
N
SH
IP
PL
A
IN
S~
LU
ZE
R
N E~
PA
AG002
SP
EC
IF
IC
A
TI
O N
S
C O
D E
R
EV
IE
W
C
LK
M R
S
M R
S
ISSUED FOR BID
09/21/2026
M U
N
IC
IP
A
L B
LD
G
R O
O F
R
EP
LA
C
EM
EN
T
1.
N o.
R
EV
IS
IO
N D
AT
E
C H
K' D
IS
SU
ED
A. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS ON THE SITE PRIOR TO COMMENCING WORK. ALL INQUIRIES AND
DISCREPANCIES SHALL BE DIRECTED TO ARCHITECT.
B. DURING DEMOLITION CONSTRUCTION CONTRACTOR MUST CONTAIN THE DUST AND DEBRIS WITHIN THE AREA OF THEIR WORK.
C. COORDINATE DEMOLITION LIMITS WITH NEW WORK PLANS.
D. PROTECT OTHER EXISTING STRUCTURES THAT ARE TO REMAIN AND ARE EXPOSED DURING DEMOLITION.
E. WHERE REMOVING PORTIONS OF MASONRY OR CONCRETE, USE A SAW TO CUT CLEAN, SHARP LINES. REMOVE MASONRY AT NEAREST
EXISTING MORTAR JOINT(S).
F. WHERE ADJACENT OR INTERSECTING CONSTRUCTION IS TO REMAIN, TRIM, GRIND, SCRAPE, OR SAND FACES OF DEMOLISHED ITEMS FLUSH
WITH ADJACENT SURFACES TO REMAIN.
G. COORDINATE WORK BETWEEN TRADES AND OTHER DISCIPLINES. ADDITIONAL ITEMS OF WORK, APPLICABLE TO THESE AREAS, MAY APPEAR
ELSEWHERE IN THE CONSTRUCTION DOCUMENTS.
H. ALL CONSTRUCTION DEBRIS SHALL BE REMOVED EACH DAY AND CONSTRUCTION AREA SHALL BE CLEANED.
I. PHASING AND SEQUENCING TO BE DETERMINED BY GENERAL CONTRACTOR IN COORDINATION WITH THE OWNER.
GENERAL DEMOLITION NOTES
AD1
AD1
AD1
RH
EXIST.
CURB
EXIST.
CURB
EF
EXIST.
CHIMNEY
EF
EF
PB
PB
PB
RDRD
EXIST.
LIGHTNING
PROTECTION
EF
EF
AD2
AD2
AD2
AD3AD3
PB
AD4
AD5
AD7
AD6 AD6
AD5
AD5
AD5
AD5 AD4
AD4
AD4
AD8
PB
PP
PB
AD9AD9
PB
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
THE CONTRACTOR WILL BE RESPONSIBLE TO VISIT THE SITE TO INSPECT EXISTING CONDITIONS PRIOR TO SUBMITTING A BID ON THIS PROJECT.
ANY DISCREPANCIES OR DETAILS THAT VARY FROM WHAT IS SHOWN OR SPECIFIED SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT / ENGINEER FOR POSSIBLE INCORPORATION INTO AN ADDENDUM TO BE ISSUED TO ALL BIDDERS.
THE SCOPE OF WORK GENERALLY CONSISTS BUT IS NOT LIMITED TO THE REMOVAL OF THE EXISTING ROOFING SYSTEM TO EXPOSE THE EXISTING METAL DECKING INCLUDING ALL FLASHINGS, BLOCKING, FASTENERS, EQUIPMENT, CURBS, VENT FLASHING AND ROOF DRAIN STRAINERS. THE EXISTING ROOF TEAR-OFF TO THE EXISTING METAL DECK IS APPROXIMATELY 3" TO 4" CONSISTING OF RIGID INSULATION AND SINGLE PLY MEMBRANE. IN ADDITION TO THE FULLY ADHERED E.P.D.M. ROOFING MEMBRANE AND RIGID INSULATION, THE G.C. SHALL ALSO PROVIDE NEW WOOD NAILERS AND BLOCKING AS REQUIRED TO INSTALL THE NEW ROOF SYSTEM TO ACHIEVE THE SPECIFIED WARRANTY.
INCLUDED IN THE SCOPE OF WORK IS THE INSTALLATION OF NEW ALUMINUM FASCIA AND ROOF EDGING AS DETAILED ON THE DRAWINGS AND
DESCRIBED IN THE TECHNICAL SPECIFICATIONS.
ALL CONTRACT WORK IS TO BE SCHEDULED IN ADVANCE WITH THE OWNER. UPON AWARD OF THE CONTRACT THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A WORK PROGRESS SCHEDULE FOR APPROVAL. THE SCHEDULE SHALL BE IN BAR CHART FORMAT AND SHALL INDICATE THE STARTING AND COMPLETION DATE. THE CONTRACTOR WILL BE REQUIRED TO ADHERE TO THE APPROVED WORK SCHEDULE. DELAYS CAUSED BY MATERIAL DELIVERIES OR INCLEMENT WEATHER SHALL BE DOCUMENTED AND THE WORK PROGRESS SCHEDULE UPDATED AND
REVIEWED ACCORDINGLY.
THE CONTRACTOR SHALL REMOVE ONLY THOSE PORTIONS OF THE ROOF THAT CAN BE RE-ROOFED AND MADE WATERTIGHT IN THE SAME DAY
INCLUDING ALL TEMPORARY PROTECTION, SEALS, COVERING AND FLASHING.
REFER TO THE SPECIFICATIONS ON AG102 FOR ROOF DECKING INFORMATION. THE CONTRACTOR SHALL INCLUDE IN THEIR BID THE DEMOLITION
AND REPLACEMENT OF 500SF OF DETERIORATED AND UNSOUND METAL DECKING.
ALL DEMOLISHED MATERIALS ARE TO BE REMOVED FROM THE ROOF ON A DAILY BASIS AND BE PLACED IN DISPOSAL CONTAINERS PROVIDED BY THE CONTRACTOR. DISPOSAL CONTAINERS OR DUMPSTERS ARE TO BE LOCATED IN AREAS DESIGNATED BY THE OWNER. ALL DEMOLITION DEBRIS IS TO BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN ALL LEGAL D.E.P. AND E.P.A. MANNER.
STOCKPILING DEMOLISHED ROOF MATERIAL ON THE ROOF WILL NOT BE PERMITTED. TEMPORARY STORAGE OF INSULATION BOARD, ROOFING MEMBRANE, ADHESIVE, ETC... ON THE ROOF WILL BE ALLOWED FOR THE DURATION OF THE PROJECT. MATERIALS SHALL BE STORED ALONG ROOF EDGE OR BEARING WALLS. MATERIALS SHALL BE STORED IN SUCH A MANNER AS TO NOT EXCEED LOADING OF 25 LBS/ S.F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS OR EQUIPMENT STORED ON SITE. MATERIALS AND EQUIPMENT SHALL BE PROTECTED
AND SECURED TO PREVENT BLOW-OFF OF MOVEMENT ON THE ROOF.
THE CONTRACTOR SHALL PROTECT ALL ROOF DRAINS FROM DEBRIS. THE CONTRACTOR SHALL CERTIFY THAT ALL EXISTING ROOF DRAINS ARE IN WORKING CONDITION PRIOR TO THE START OF WORK. THE EXISTING ROOF DRAINS SHALL REMAIN. THE CONTRACTOR SHALL CLEAN ALL ROOF DRAINS AND REPLACE ALL STRAINERS WITH NEW STRAINERS THAT ARE SIMILAR TO EXISTING UPON COMPLETION OF THE WORK. ROOF DRAINS
SHALL BE KEPT IN OPERATION AND WATERTIGHT THROUGHOUT THE ROOFING CONTRACT WORK.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ROOF EDGE PROTECTION AS REQUIRED TO PREVENT WORKERS FROM FALLING OFF
THE ROOF. PROTECTION SHALL BE IN ACCORDANCE WITH O.S.H.A. REQUIREMENTS.
THE ROOF INSULATION SHALL BE INSTALLED IN 2 LAYERS OF 2 1/2" THICK. ALSO INCLUDED IS 1/4" PER FOOT TAPERED INSULATION (MINIMUM 1"
THICK") AS REQUIRED TO CREATED POSITIVE WATER FLOW TO ROOF DRAINS.
THE CONTRACTOR SHALL ADVISE THE OWNER BEFORE DISCONNECTING ANY MECHANICAL / ELECTRICAL EQUIPMENT AND COORDINATE ALL
RELATED SHUT-DOWNS.
IT IS THE INTENT OF THE CONTRACT WORK THAT ALL MATERIALS BE LIFTED FROM THE BUILDING EXTERIOR WITH STAGING AREAS AS
DESIGNATED BY THE OWNER.
PROVIDE NEW ROOF CURB EXTENSION PIECES AS REQUIRED ONTO EXISTING ROOF CURBS. CONTRACTOR TO FIELD VERIFY ALL EXISTING ROOF CURB DIMENSIONS. PROVIDE CONTINUOUS COUNTERFLASHING OVER EXISTING ROOF CURB. RE-INSTALL EXISTING MECHANICAL EQUIPMENT ONTO NEW CURB EXTENSION PIECE. ENSURE ALL NEW CONNECTIONS ARE WEATHERTIGHT. NEW ROOF CURB EXTENSION PIECE TO BE OF A LENGTH TO ENSURE A TOTAL CURB HEIGHT OF 12 INCHES MINIMUM ABOVE TOP OF INSULATION ( EXISTING CURB PLUS NEW EXTENSION ).
ROOF REPLACEMENT NOTESROOF LEGEND
PB
PP
RD ROOF DRAIN, FIELD VERIFY
SIZES. SEE DETAIL 2/AC101.
PREMOLDED BOOT, FIELD
VERIFY SIZES. SEE DETAIL
8/AC101.
PITCH BOX, FIELD VERIFY
SIZES.SEE DETAIL 6/AC101.
EF EXHAUST FAN, FIELD VERIFY
SIZES. SEE DETAIL 4/AC101.
RH
ROOF HATCH, FIELD VERIFY
SIZES. SEE DETAIL 5/AC101.
PR
O
JE
C
T N
O R
TH
TRUE N
ORTH
SHEET
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
DATE
PR
O
JE
C
T N
O
SCALE
D
ES
IG
N
ED
B
Y:
PR
EL
IM
IN
A R
Y N
O T
N
ST
R
U C
TI
O
N
PROJECT STATUS
TH
IS
D
RA
W
IN
G
RE
PR
ES
EN
TS
A D
ES
IG
N
IN
TE
NT
A
ND
C
ON
CE
PT
O
NL
Y.
T
HI
S
DO
CU
ME
NT
A
ND
A
LL
A
SS
OC
IA
TE
D
DO
CU
ME
NT
S
AR
E
PR
EP
AR
ED
F
OR
A
S
PE
CI
FI
C
SI
TE
A
ND
E
VE
NT
, A
ND
IN
CO
RP
OR
AT
E
CA
LC
UL
AT
IO
NS
A
ND
M
EA
SU
RE
ME
NT
S
AV
AI
LA
BL
E
FR
OM
T
IM
E
OF
D
RA
FT
IN
G.
U
SE
O
F
TH
IS
D
ES
IG
N
IS
G
RA
NT
ED
T O
TH
E
CL
IE
NT
F
OR
T
HE
S
PE
CI
FI
ED
A
ND
N
AM
ED
E
VE
NT
O
NL
Y.
2 3 4 5 6 7 8
B
C
D
E
F
A
AS NOTED
ST
AT
E:
PL
A
IN
S
TO
W
N
SH
IP
PL
A
IN
S~
LU
ZE
R
N E~
PA
AD101
R O
O F
D
EM
O
LI
TI
O
N P
LA
N
C
LK
M R
S
M R
S
(N
AM
E_ O
N _S
TA
M
P)
XX
(R
A, PE
BA
LT
IM
O
R E
D R
IV
E, S U
IT
E
W
IL
KE
S-
BA
R
R E, P A
TE
L.
-8
-1
ISSUED FOR BID
09/21/2026
M U
N
IC
IP
A
L B
LD
G
R O
O F
R
EP
LA
C
EM
EN
T
1.
DEMOLITION NOTES
NUMBER DESCRIPTION
AD1
REMOVE AND DISPOSE OF EXISTING ROOFING SYSTEM MATERIALS DOWN
TO EXISTING METAL DECK. NOTIFY ARCHITECT BEFORE PATCHING AND
REPAIRING ANY AREA OF DETERIORATED DECK.
AD2 REMOVE AND DISPOSE OF EXISTING METAL PARAPET COPING AND
ACCESSORIES DOWN TO WOOD BLOCKING.
AD3
DISCONNECT AND REMOVE EXISTING ROOF DRAIN STRAINER AND ALL
HARDWARE NOT NEEDED FOR THE INSTALLATION OF THE RETROFIT DRAIN,
PER MANUFACTURER'S RECOMMENDATIONS. ROOF DRAIN BODY AND
ASSOCIATED OUTLET PIPING TO REMAIN. REMOVE ALL DEBRIS AND CLEAN
EXISTING ROOF DRAIN BODY. FLUSH ASSOCIATED DRAIN PIPING.
AD4 EXISTING VENT STACK TO REMAIN. REMOVE EXISTING FLASHING. SQUARE
OFF PIPE END IN PREPARATION FOR INSTALLATION OF NEW EXTENSION.
AD5
TEMPORARILY DISCONNECT AND REMOVE EXHUAST FAN FROM EXISTING
DUCTWORK AND ROOF CURB. PREPARE EXISTING ROOF CURB FOR NEW
CURB EXTENSION PIECE. ALL ACCESSORIES (DAMPERS, FLEXIBLE
CONNECTIONS, ETC.) ARE TO REMAIN IN PLACE.
AD6
DEMOLISH EXISTING CURB. CUT BACK EXISTING ROOF DECK AS REQUIRED
TO PROVIDE SOUND SUBSTRATE FOR INSTALLATION OF NEW METAL DECK
INFILL AND NEW ROOFING MATERIAL.
AD7
REMOVE EXISTING CONCRETE CHIMNEY WASH/CAP, FLASHING,
COUNTERFLASHING, SEALANTS, AND RELATED ACCESSORIES AS
REQUIRED TO ACCOMMODATE NEW WORK. PREPARE EXISTING MASONRY
FOR REPAIRS. REFER TO NEW WORK DETAIL 7/AC101 FOR LIMITS OF CMU
DEMOLITION.
AD8 REMOVE AND DISPOSE OF CMU BLOCKS, PLASTIC PALLETS, ETC.
AD9
REMOVE PORTION OF EXISTING MASONRY PARAPET WALL FOR NEW
THROUGH-WALL STAINLESS STEEL SCUPPER AND ASSOCIATED FLASHING.
REFER TO NEW WORK DETAIL 3/AC101 FOR LIMITS OF DEMOLITION.SCALE: 1/8" = 1'-0"AD101
1 ROOF DEMOLITION PLAN
N o.
R
EV
IS
IO
N D
AT
E
C H
K' D
IS
SU
ED
NEW 0.60 BLACK
EPDM ROOFING
SYSTEM
SL
OP
E 1/4
" P
ER
1' -0
NEW 0.60 BLACK
EPDM ROOFING
SYSTEM
NEW 0.60 BLACK
EPDM ROOFING
SYSTEM
AC1
AC2
AC2
AC2
AC1
RH
EF
EF
EF
PB
PB
PB
RDRD
EXIST.
LIGHTNING
PROTECTION
EF
EF
PB
AC101
SIM.
AC101
SIM.
AC101
SIM.
AC101
SIM.
AC101
SIM.
AC101
SIM.
PB
PP
PB
AC101
SL
OP
E 1/4
" P
ER
1' -0
" PB
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
THE CONTRACTOR WILL BE RESPONSIBLE TO VISIT THE SITE TO INSPECT EXISTING CONDITIONS PRIOR TO SUBMITTING A BID ON THIS PROJECT.
ANY DISCREPANCIES OR DETAILS THAT VARY FROM WHAT IS SHOWN OR SPECIFIED SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT / ENGINEER FOR POSSIBLE INCORPORATION INTO AN ADDENDUM TO BE ISSUED TO ALL BIDDERS.
THE SCOPE OF WORK GENERALLY CONSISTS BUT IS NOT LIMITED TO THE REMOVAL OF THE EXISTING ROOFING SYSTEM TO EXPOSE THE EXISTING METAL DECKING INCLUDING ALL FLASHINGS, BLOCKING, FASTENERS, EQUIPMENT, CURBS, VENT FLASHING AND ROOF DRAIN STRAINERS. THE EXISTING ROOF TEAR-OFF TO THE EXISTING METAL DECK IS APPROXIMATELY 3" TO 4" CONSISTING OF RIGID INSULATION AND SINGLE PLY MEMBRANE. IN ADDITION TO THE FULLY ADHERED E.P.D.M. ROOFING MEMBRANE AND RIGID INSULATION, THE G.C. SHALL ALSO PROVIDE NEW WOOD NAILERS AND BLOCKING AS REQUIRED TO INSTALL THE NEW ROOF SYSTEM TO ACHIEVE THE SPECIFIED WARRANTY.
INCLUDED IN THE SCOPE OF WORK IS THE INSTALLATION OF NEW ALUMINUM FASCIA AND ROOF EDGING AS DETAILED ON THE DRAWINGS AND
DESCRIBED IN THE TECHNICAL SPECIFICATIONS.
ALL CONTRACT WORK IS TO BE SCHEDULED IN ADVANCE WITH THE OWNER. UPON AWARD OF THE CONTRACT THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A WORK PROGRESS SCHEDULE FOR APPROVAL. THE SCHEDULE SHALL BE IN BAR CHART FORMAT AND SHALL INDICATE THE STARTING AND COMPLETION DATE. THE CONTRACTOR WILL BE REQUIRED TO ADHERE TO THE APPROVED WORK SCHEDULE. DELAYS CAUSED BY MATERIAL DELIVERIES OR INCLEMENT WEATHER SHALL BE DOCUMENTED AND THE WORK PROGRESS SCHEDULE UPDATED AND
REVIEWED ACCORDINGLY.
THE CONTRACTOR SHALL REMOVE ONLY THOSE PORTIONS OF THE ROOF THAT CAN BE RE-ROOFED AND MADE WATERTIGHT IN THE SAME DAY
INCLUDING ALL TEMPORARY PROTECTION, SEALS, COVERING AND FLASHING.
REFER TO THE SPECIFICATIONS ON AG102 FOR ROOF DECKING INFORMATION. THE CONTRACTOR SHALL INCLUDE IN THEIR BID THE DEMOLITION
AND REPLACEMENT OF 500SF OF DETERIORATED AND UNSOUND METAL DECKING.
ALL DEMOLISHED MATERIALS ARE TO BE REMOVED FROM THE ROOF ON A DAILY BASIS AND BE PLACED IN DISPOSAL CONTAINERS PROVIDED BY THE CONTRACTOR. DISPOSAL CONTAINERS OR DUMPSTERS ARE TO BE LOCATED IN AREAS DESIGNATED BY THE OWNER. ALL DEMOLITION DEBRIS IS TO BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN ALL LEGAL D.E.P. AND E.P.A. MANNER.
STOCKPILING DEMOLISHED ROOF MATERIAL ON THE ROOF WILL NOT BE PERMITTED. TEMPORARY STORAGE OF INSULATION BOARD, ROOFING MEMBRANE, ADHESIVE, ETC... ON THE ROOF WILL BE ALLOWED FOR THE DURATION OF THE PROJECT. MATERIALS SHALL BE STORED ALONG ROOF EDGE OR BEARING WALLS. MATERIALS SHALL BE STORED IN SUCH A MANNER AS TO NOT EXCEED LOADING OF 25 LBS/ S.F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS OR EQUIPMENT STORED ON SITE. MATERIALS AND EQUIPMENT SHALL BE PROTECTED
AND SECURED TO PREVENT BLOW-OFF OF MOVEMENT ON THE ROOF.
THE CONTRACTOR SHALL PROTECT ALL ROOF DRAINS FROM DEBRIS. THE CONTRACTOR SHALL CERTIFY THAT ALL EXISTING ROOF DRAINS ARE IN WORKING CONDITION PRIOR TO THE START OF WORK. THE EXISTING ROOF DRAINS SHALL REMAIN. THE CONTRACTOR SHALL CLEAN ALL ROOF DRAINS AND REPLACE ALL STRAINERS WITH NEW STRAINERS THAT ARE SIMILAR TO EXISTING UPON COMPLETION OF THE WORK. ROOF DRAINS
SHALL BE KEPT IN OPERATION AND WATERTIGHT THROUGHOUT THE ROOFING CONTRACT WORK.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ROOF EDGE PROTECTION AS REQUIRED TO PREVENT WORKERS FROM FALLING OFF
THE ROOF. PROTECTION SHALL BE IN ACCORDANCE WITH O.S.H.A. REQUIREMENTS.
THE ROOF INSULATION SHALL BE INSTALLED IN 2 LAYERS OF 2 1/2" THICK. ALSO INCLUDED IS 1/4" PER FOOT TAPERED INSULATION (MINIMUM 1"
THICK") AS REQUIRED TO CREATED POSITIVE WATER FLOW TO ROOF DRAINS.
THE CONTRACTOR SHALL ADVISE THE OWNER BEFORE DISCONNECTING ANY MECHANICAL / ELECTRICAL EQUIPMENT AND COORDINATE ALL
RELATED SHUT-DOWNS.
IT IS THE INTENT OF THE CONTRACT WORK THAT ALL MATERIALS BE LIFTED FROM THE BUILDING EXTERIOR WITH STAGING AREAS AS
DESIGNATED BY THE OWNER.
PROVIDE NEW ROOF CURB EXTENSION PIECES AS REQUIRED ONTO EXISTING ROOF CURBS. CONTRACTOR TO FIELD VERIFY ALL EXISTING ROOF CURB DIMENSIONS. PROVIDE CONTINUOUS COUNTERFLASHING OVER EXISTING ROOF CURB. RE-INSTALL EXISTING MECHANICAL EQUIPMENT ONTO NEW CURB EXTENSION PIECE. ENSURE ALL NEW CONNECTIONS ARE WEATHERTIGHT. NEW ROOF CURB EXTENSION PIECE TO BE OF A LENGTH TO ENSURE A TOTAL CURB HEIGHT OF 12 INCHES MINIMUM ABOVE TOP OF INSULATION ( EXISTING CURB PLUS NEW EXTENSION ).
ROOF REPLACEMENT NOTESROOF LEGEND
PB
PP
RD ROOF DRAIN, FIELD VERIFY
SIZES. SEE DETAIL 2/AC101.
PREMOLDED BOOT, FIELD
VERIFY SIZES. SEE DETAIL
8/AC101.
PITCH BOX, FIELD VERIFY
SIZES.SEE DETAIL 6/AC101.
EF EXHAUST FAN, FIELD VERIFY
SIZES. SEE DETAIL 4/AC101.
RH
ROOF HATCH, FIELD VERIFY
SIZES. SEE DETAIL 5/AC101.
NOTE: HOLE IN MEMBRANE SHOULD
EXTEND BEYOND CLAMPING RING PER
MANUFACTURER'S RECOMMENDATIONS
AND SHOULD NOT BE SMALLER THAN THE
DIAMETER OF THE LEADER PIPE.
EXIST. MTL DECK
1/4"/FT TAPERED INSUL
SLOPE TO DRAIN
2 LAYERS OF
2 1/2" RIGID INSUL.
RETROFIT ROOF DRAIN FURNISHED WITH #16
GAGE TYPE 304 STAINLESS STEEL BODY AND
NEOPRENE GASKET, COMPLETE WITH
DURACOATED CAST IRON CLAMPING COLLAR
AND DOME WITH STAINLESS STEEL HARDWARE
WATER CUT-OFF
MASTIC
ROOFING MEMBRANE
GASKET EXIST. LEADER
PIPE
RUSS STRIP
ROOFING MEMBRANE
2x6 WD. BLOCKING.
SPLICING CEMENT
FASTENER
BONDING ADHESIVE
TERMINATION BAR W/
WATER CUT-OFF MASTIC
AND SEALANT
MECHANICAL CURB
TAPERED
INSULATION
CU
RB
M
IN
. 1 2-
AB
OV
E
RO
OF
S
UR
FA
CE
EXISTING MTL
DECK
TAPERED
INSULATION
SEALANT
ROOFING MEMBRANE
MEMBRANE FLASHING
& SPLICING CEMENT
FASTENER
POURABLE SEALER
EXIST. GAS LINE, CONDUIT,
PIPE PENETRATION
F.V. EXIST. DIAMETER &
HEIGHT
METAL DAM
2X6 WD. BLOCKING
EXIST. VENT OR CONDUIT
F.V. EXIST. DIAMETER & HEIGHT
STAINLESS STEEL
CLAMPING RING W/
WATER CUT-OFF MASTIC
PRE-MOLDED PIPE SEAL
SPLICING CEMENT
SEALANT
EXISTING MTL
DECK
TAPERED
INSULATION
ROOFING MEMBRANE
NE
W
E
XT
EN
SI
ON
S
IZ
E
FO
R
VE
NT
S
MI
N.
2'
0"
A .F
. R
OO
F F.
V.
MTL DECK SEE STRUCT.
DWG'S.
TAPERED
INSULATION
WALKWAY PAD &
BONDING ADHESIVE
SEALANT (TYPICAL ALL
AROUND)
ROOFING MEMBRANE
EXISTING MTL
DECK
TAPERED
INSULATION
SEALANT
ROOFING
MEMBRANE
2x6 WD. BLOCKING - SAME
LENGTH AS SLEEPERS
WALKWAY PAD &
BONDING ADHESIVE
PRESSURE TREATED WD.
SLEEPER - LENGTH SHALL
EXTEND OVER A MIN. OF
THREE ROOF TRUSSES
MECH. UNIT
BONDING ADHESIVE
EPDM PRIMER
WATER CUT-OFF
MASTIC
MIN. 6" WIDE PRESSURE-
SENSITIVE ELASTOFORM
FLASHING AND EPDM PRIMER
LAP SEALANT
WATER CUT-OFF
MASTIC
WOOD NAILER
NOTES:
1. METAL SCUPPER BOX MUST HAVE
CONTINUOUS FLANGES WITH
ROUNDED CORNERS. SOLDER ALL
SCUPPER SEAMS WATER-TIGHT.
2. WATER CUT-OFF MASTIC UNDER
SCUPPER FLANGES MUST BE UNDER
CONSTANT COMPRESSION.
3. CLEAN METAL FLANGE WITH
WEATHERED MEMBRANE CLEANER
AND ALLOW TO DRY.
STAINLESS
STEEL SCUPPER
SEALANT
T.
O.
D
EC
K
RUSS STRIP
EXIST. MTL DECK
TAPERED INSUL
2 LAYERS OF
2 1/2" RIGID INSUL.
ROOFING MEMBRANE
2x6 WD.
BLOCKING.
SPICING CEMENT
FASTENER
BONDING ADHESIVE
EXIST. ROOF HATCH
EXISTING
CONSTRUCTION
TAPERED INSULATION
ROOFING MEMBRANE
EXISTING METAL ROOF
DECK
EXISTING MASONRY
CONSTRUCTION
COVER BOARD
RUSS STRIP
2x6 WD. BLOCKING.
SPLICING CEMENT
FASTENER
BONDING ADHESIVE
TERMINATION BAR W/
WATER CUT-OFF MASTIC
AND SEALANT
ROOFING MEMBRANECARLISLE SECUREDGE
METAL SNAP-ON CANTED
FASCIA OR APPROVED
EQUAL; INSTALL PER
MANUFACTURER'S
RECOMMENDATIONS
EXISTING WOOD
BLOCKING TO REMAIN
EXIST. MTL DECK
& FRAMING
1/4"/FT
TAPERED INSUL
2 LAYERS OF
1 1/2" RIGID INSUL.
SEALANT
RUSS STRIP
SPLICING CEMENT
FASTENER
BONDING ADHESIVE
ROOFING MEMBRANE
EXPANSION TUBE
STAINLESS STEEL
CHIMNEY CAP W/ SPARK
ARRESTOR SCREEN
CONC. CAP W/ 1"
OVERHANG, SLOPE FOR
POSITIVE DRAINAGE
REMOVE EXISTING C.M.U. TO
BELOW EXISTING MTL. DECK
AND REBUILD W/ NEW C.M.U.,
WIDTH TO MATCH EXISTING
EXIST. MTL DECK
& FRAMING
TERMINATION BAR
LO
CA
L C
OD
E
OF
FI
CI
AL
VE
RI
FY
H
EI
GH
T
W
SEALANT
EXIST. FLUE TO
REMAIN
PR
O
JE
C
T N
O R
TH
TRUE N
ORTH
SHEET
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
DATE
PR
O
JE
C
T N
O
SCALE
D
ES
IG
N
ED
B
Y:
PR
EL
IM
IN
A R
Y N
O T
N
ST
R
U C
TI
O
N
PROJECT STATUS
TH
IS
D
RA
W
IN
G
RE
PR
ES
EN
TS
A D
ES
IG
N
IN
TE
NT
A
ND
C
ON
CE
PT
O
NL
Y.
T
HI
S
DO
CU
ME
NT
A
ND
A
LL
A
SS
OC
IA
TE
D
DO
CU
ME
NT
S
AR
E
PR
EP
AR
ED
F
OR
A
S
PE
CI
FI
C
SI
TE
A
ND
E
VE
NT
, A
ND
IN
CO
RP
OR
AT
E
CA
LC
UL
AT
IO
NS
A
ND
M
EA
SU
RE
ME
NT
S
AV
AI
LA
BL
E
FR
OM
T
IM
E
OF
D
RA
FT
IN
G.
U
SE
O
F
TH
IS
D
ES
IG
N
IS
G
RA
NT
ED
T O
TH
E
CL
IE
NT
F
OR
T
HE
S
PE
CI
FI
ED
A
ND
N
AM
ED
E
VE
NT
O
NL
Y.
2 3 4 5 6 7 8
B
C
D
E
F
A
AS NOTED
ST
AT
E:
PL
A
IN
S
TO
W
N
SH
IP
PL
A
IN
S~
LU
ZE
R
N E~
PA
AC101
R O
O F
N
EW
W O
R K
P
LA
N C
LK
M R
S
M R
S
(N
AM
E_ O
N _S
TA
M
P)
XX
(R
A, PE
BA
LT
IM
O
R E
D R
IV
E, S U
IT
E
W
IL
KE
S-
BA
R
R E, P A
TE
L.
-8
-1
ISSUED FOR BID
09/21/2026
M U
N
IC
IP
A
L B
LD
G
R O
O F
R
EP
LA
C
EM
EN
T
1.
NEW WORK NOTES
NUMBER DESCRIPTION
AC1 INFILL EXISTING ROOF OPENING WITH NEW METAL DECK VULCRAFT 1.5B 20
GA. OR APPROVED EQUAL, INSULATION, AND ROOFING TO MATCH
ADJACENT CONSTRUCTION. NEW METAL DECK SHALL MATCH EXISTING
DECK PROFILE AND THICKNESS. END LAPS MUST HAVE MIN. BEARING OF 6"
ONTO THE EXISTING STRUCTURAL FRAMING. SIDE LAPS MUST HAVE MIN. (2)
TWO FULL INTERLOCKING LAPS. MECHANICALLY FASTEN ALL EDGES 3"
MAX. SURFACE SHALL BE FLUSH WITH ADJACENT ROOF AREAS.
AC2 INSTALL NEW METAL FASCIA FOLLOWING ROOF REPLACEMENT. PROVIDE
NEW FASTENERS, SPLICE PLATES, SEALANT, AND ACCESSORIES AS
REQUIRED FOR A COMPLETE AND WEATHER-TIGHT INSTALLATION.
SCALE: 1/8" = 1'-0"AC101
1 ROOF NEW WORK PLAN
SCALE: 1 1/2" = 1'-0"AC101
2 ROOF DRAIN DETAIL
SCALE: 1 1/2" = 1'-0"AC101
4 MECHANICAL CURB DETAIL
SCALE: 1 1/2" = 1'-0"AC101
6 PITCH POCKET DETAIL
SCALE: 1 1/2" = 1'-0"AC101
8 PREMOLDED BOOT DETAIL
SCALE: 1 1/2" = 1'-0"AC101
10 WALKWAY PAD DETAIL
SCALE: 1 1/2" = 1'-0"AC101
9 WOOD SLEEPER DETAIL
SCALE: 1 1/2" = 1'-0"AC101
3 SCUPPER THROUGH WALL DETAIL
SCALE: 1 1/2" = 1'-0"AC101
5 ROOF HATCH DETAIL
SCALE: 1 1/2" = 1'-0"AC101
11 ROOF DETAIL @ PARAPET
N o.
R
EV
IS
IO
N D
AT
E
C H
K' D
IS
SU
ED
B Y
SCALE: 1 1/2" = 1'-0"AC101
7 CHIMNEY DETAIL
| CS - COVERSHEET |
| AG001 - LEGENDS, NOTES AND ABBREVIATIOINS |
| AG002 - SPECIFICATIONS & CODE REVIEW |
| AD101 - ROOF DEMOLITION PLAN |
| AC101 - ROOF NEW WORK PLAN |