About this file

This bid set document provides comprehensive engineering plans and specifications for the Paxinos Drive and Lehigh Drive Improvements project in Coolbaugh Township, Monroe County, Pennsylvania, managed by the Arrowhead Lake Community Association. The project encompasses replacement of sanitary sewer collection systems, installation of storm sewer mains and related drainage improvements, and reconstruction of roadway infrastructure along both drives. The work includes approximately 43.4 station miles on Paxinos Drive and 27.49 station miles on Lehigh Drive, featuring multiple proposed sanitary and storm sewer manholes, inlet boxes, culvert replacements, and pavement reconstruction. The mandatory pre-bid conference is scheduled for Thursday, March 19, 2026, at 1:00 p.m. at the Arrowhead Lake Community Association office located at 961 Arrowhead Drive, Pocono Lake, Pennsylvania. Bids submitted electronically through the PennBid Program must be received by 1:00 p.m. local time on Wednesday, April 8, 2026. The bid documents include detailed site plans, profiles, construction details, erosion and sedimentation control plans, and post-construction stormwater management specifications conforming to NPDES permit PAD450138 and associated amendments.

The bid set requires contractors to address extensive utility coordination, including locating and protecting existing sanitary sewer lines, storm drainage systems, water mains, and electric utilities. Critical project requirements include proof-rolling and overexcavation of soft subgrade materials, restoration of private driveway connections to new road elevations, installation of temporary and permanent swale linings per erosion and sedimentation plans, and compliance with all local, state, and federal regulations including prevailing wage requirements. The project documents specify that all steel products must be domestically produced and establish the contractor's responsibility for maintaining utility services to all residences throughout construction. Site features, property lines, and underground utility locations are noted as approximate and require field verification by the contractor prior to bidding. The work is divided into two general contracts: Contract 2026-01 for sanitary improvements and Contract 2026-02 for storm sewer and roadway improvements, with drawings issued for bid on March 13, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .