2-2026-02-06 Drainage Projects Plans and Specs.pdf
PDF 4 MB Posted
- Attached to
- LABOR AND MATERIALS TO REMOVE AND REPLACE DRAINAGE PIPES ON TWO (2) ROADS IN CLARENDON COUNTY, SC.
- Solicitation number
- ITB 2026-013
- Issued by
- Chesterfield County, South Carolina
About this file
This document is a Plans and Specifications file from Clarendon County Engineering in South Carolina for drainage pipe replacement projects on two county-maintained dirt roads. The project involves removal and replacement of drainage pipes at two separate locations: Padgett Highway in the Northeast section of the county, where 2 existing 36-inch corrugated metal pipes (CMP) will be removed and 3 new 48-inch reinforced concrete pipes (RCP) at 40 feet in length will be installed to accommodate drainage from approximately 614 acres including a section of US Highway 378; and David Chalmers Road in the Northwest section, where 1 existing 30-inch CMP will be removed and 2 new 48-inch RCP pipes at 40 feet in length will be installed to serve a drainage area of approximately 352 acres, with additional outlet ditch cleaning and regrading for 100 feet downstream. The scope of work includes approximately 200 linear feet of 48-inch Class III reinforced concrete pipe installation and requires all labor, equipment, materials, traffic control, and incidentals necessary for completion.
The contractor must furnish all work in accordance with South Carolina Department of Transportation (SCDOT) Standard Specifications and Standard Drawings, including specifications for excavation, backfill, pipe materials meeting ASTM C76 standards, rubber gasketed joints per ASTM C443, compacted backfill to 95 percent AASHTO T-99 density, riprap end treatments, and site restoration with seeding of disturbed areas. Payment will be rendered as a lump sum for the 48-inch RCP pipe installation and mobilization, with additional lump sum or per-unit payments for excavation, bedding, backfill, end treatments, riprap, or geotextile as listed in the bid schedule. The contractor is responsible for verifying field conditions prior to bidding, coordinating with Clarendon County Public Works for site access, maintaining safe work zones in accordance with SCDOT and MUTCD requirements, and completing all work within the contract timeframe specified by the County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-ITB 2025 -013 FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
P
IP
E R
E P
LA
C
E M
E N
T
C la re nd o n
C o un ty
P ad g et t H w y
P ip e W o rk
P ub lic W o rk s D ep ar tm en t
P
LA
N V
IE
W
Padgett Highway is a dirt county road that runs from
Carleton Road to Lucky Road in the Northeast section of Clarendon County. It crosses an unnamed branch that eventually drains into Smith's
Bay and into the Black River. The unnamed branch drains about 614 acres including a section of US
Hwy 378. Work includes removal of 2 - 36" CMP pipes and installation of 3 - 48" RCP 40' in length.
re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
P
IP
E R
E P
LA
C
E M
E N
T
C la re nd o n
C o un ty
D av id C h al m er s P ip e
W o rk P ub lic
W o rk s
D ep ar tm en t
P
LA
N V
IE
W
David Chalmers Road is a dirt road in the
Northwest section of Clarendon County that runs between Shiloh Road and Puddin Swamp Road.
The work as shown is at the crossing of an unnamed Branch that eventually drains into
Puddin Swamp. The branch drains about 352 acres. Existing crossing at David Chalmers is a
30" CMP pipe. Remove the 30" CMP and install
2 - 48" RCP 40' in length as shown and clean and regrade the outlet ditch for 100' downstream.
re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
P
IP
E R
E P
LA
C
E M
E N
T
C la re nd o n
C o un ty
P
IP
E R
E P
LA
C
E M
E N
T P ub lic
W o rk s
D ep ar tm en t
D E
TA
IL
S A
N D
S P
E C
S
Technical Specification
1. General The Contractor shall furnish all labor, equipment, materials, traffic control, and incidentals necessary to install approximately 200 L.F.
of 48-inch Class III Reinforced Concrete Pipe (RCP) at two locations on County-maintained dirt roads. All work shall conform to the South Carolina Department of Transportation (SCDOT) Standard Specifications for Highway Construction, latest edition, and applicable SCDOT Standard Drawings.
2. Applicable Standards SCDOT Standard Specifications (latest edition):
o Section 205 - Excavation and Backfill for Structures o Section 714 - Reinforced Concrete Pipe o Section 719 - Structure Backfill o Section 625 - Geotextiles (if required for stabilization)
SCDOT Standard Drawings:
o SC-M-714-1 - Reinforced Concrete Pipe Details o SC-M-205-1 - Trench Construction o SC-M-715 Series - End Treatments (if headwalls, flared end sections, or riprap aprons are included)
3. Materials 48-inch RCP, Class III minimum, meeting ASTM C76 and SCDOT
Section 714.
Joints: Rubber gasketed, meeting ASTM C443.
Bedding: Granular material meeting SCDOT Section 205 or native material if approved by the Engineer.
Backfill: Select material compacted to 95% AASHTO T-99 density.
Riprap: If specified, shall meet SCDOT Section 718 (Class A or B as directed).
4. Installation Requirements Excavate trench per SC-M-205-1, maintaining required width, grade, and safety conditions.
Provide stable foundation; undercut and place stabilization stone or geotextile if unsuitable soils are encountered.
Install pipe to the line and grade shown on County-provided sketches or plans.
Place bedding uniformly to required depth; cradle pipe per
SCDOT Standard Drawings.
Join pipe sections using manufacturer-recommended methods ensuring watertight joints.
Backfill in lifts not exceeding 8 inches (loose), compacted to required density.
Maintain access for local traffic; provide temporary drainage during construction.
5. End Treatments Riprap inlet and outlet protection per SC-M-715-3.
6. Site Restoration Restore disturbed roadway surface to pre-construction condition or better.
Grade shoulders and ditches to ensure positive drainage.
Seed disturbed areas with DOT-approved seed mix.
7. Measurement and Payment 48" RCP: Paid per proposal lump sum Excavation, bedding, and backfill: Incidental to pipe installation unless otherwise noted.
End treatments, riprap, or geotextile: Paid per each or per ton as listed in the bid schedule.
Mobilization: Lump sum per proposal.
8. Contractor Responsibilities Verify field conditions prior to bidding.
Coordinate with Clarendon County Public Works for site access.
Maintain safe work zones in accordance with SCDOT and
MUTCD requirements.
Complete work within the contract time specified by the
County.
Comply with all requirements provided in Request for Bids.