This document is a municipal engineering bid package for the Industrial Drive Sewer Main Replacement project for the Borough of Orwigsburg in Schuylkill County, Pennsylvania. The project involves replacing the existing sanitary sewer main along Industrial Drive, with work spanning approximately 9.57 station lengths. The bid was issued on November 12, 2025, for bidding purposes, with the project located in Orwigsburg Borough. The scope includes installing new 8-inch PVC sewer pipe, replacing existing manholes, connecting lateral services, and performing necessary road and surface restoration. The project involves multiple utility coordination points, including interactions with Verizon Pennsylvania LLC, PPL Electric Utilities, and local municipal authorities.
The project documents include detailed civil engineering specifications, erosion and sedimentation control plans, construction sequencing, and restoration details. The work requires careful utility coordination, maintenance of existing services during construction, and adherence to Pennsylvania Department of Environmental Protection regulations. Key technical requirements include maintaining minimum grades per domestic wastewater facilities guidelines, providing detailed as-built drawings, and ensuring all existing sewer connections are properly reconnected to the new infrastructure. The contractor will be responsible for site access, utility protection, trench restoration, and achieving final site stabilization with a minimum of 70% perennial vegetative cover.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL LEGEND
LIMIT OF DISTURBANCE
Bh SwD
PROPOSED CLEAN OUTCO
PROPOSED SANITARY MANHOLES
MATCH LINE REFER TO DWG C-101
PROPOSED SANITARY SEWER
PROPOSED SANITARY LATERALSL
DRAWING MATCHLINE
PROPOSED TEXTTEXT
INLET FILTER PROTECTION
PROPOSED WATERLINE (BY OTHERS)W
PROPOSED STORM DRAIN (BY OTHERS)
PROPOSED STORM DRAIN MANHOLE (BY OTHERS)D
CB
PROPOSED INLET (BY OTHERS)
PROPOSED STORM UNDERDRAIN (BY OTHERS)
CS-12 CS-12 12" COMPOST FILTER SOCK
PROPOSED OVERHEAD ELECTRIC (BY OTHERS)
TRENCH PLUG
PROPOSED TREE LINE
NOVEMBER 12, 2025
1-800-242-1776
(TOLL FREE)
"Pa. Law requires advance notification"
PA ONE CALL FOR DESIGN
COORDINATE PA PROJECT #: 11576849
SERIAL NUMBERS ISSUED:
20252262883 - PRELIMINARY
20253041271 - FINAL
1-800-242-1776
PE
NN
SY
LV
AN
IA ONE CALL SYSTEM
, INC
STOP-CALL BEFORE YOU D
IG
DESIGN PA ONE CALL
UTILITY RESPONSE ADDRESS CONTACT INFORMATION CONTACT PERSON
CABLE PROTECTION SERVICES INC PO BOX 4816, MIDLOTHIAN, VA. 23112 EMAIL: debbie_king@cableps.com
PHONE: 804-562-3409 DEBBIE KING
VERIZON PENNSYLVANIA LLC 1050 VIRGINIA DRIVE, FORT WASHINGTON, PA. 19034 EMAIL: diane.c.redilla@verizon.com
PHONE: 215-591-6210 DIANE REDILLA
ORWIGSBURG BOROUGH 333 S LIBERTY STREET, ORWIGSBURG, PA. 17961 EMAIL: manager@orwigsburg.gov
PHONE: 570-366-3103 WILLIAM REPPY
PPL ELECTRIC UTILITIES CORPORATION 437 BLUE CHURCH ROAD, PAXINOS, PA. 17860 EMAIL: dlhaupt@pplweb.com
PHONE: 570-490-5684 DOUG HAUPT
1. FIELD SURVEY BY BRINKASH & ASSOCIATES, DATED AUGUST 28, 2020, AND
NOVEMBER 12, 2020.
2. PROPERTY LINES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
SURVEYED OR FIELD VERIFIED.
3. THE LOCATION AND DIMENSIONS OF ALL SITE FEATURES SHOWN ARE
APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE
CONTRACTOR PRIOR TO BIDDING.
4. ALL UNDERGROUND UTILITIES SHALL BE LOCATED BY THE CONTRACTOR
PRIOR TO ANY EARTH MOVING ACTIVITIES, PURSUANT TO ACT 287.
UNDERGROUND UTILITY LOCATIONS MUST BE VERIFIED BY CALLING
1-800-242-1776.
5. ALL UNDERGROUND UTILITY LOCATIONS AND ELEVATIONS ON THE
CONSTRUCTION PLANS APPROXIMATE LOCATIONS DELINEATED FROM
LIMITED FIELD MARKINGS AND AVAILABLE RECORDS. THEREFORE, ANY
UTILITIES NOT SHOWN OR NOT LOCATED AS SHOWN, SHALL NOT BE THE
CAUSE OF THE CONTRACTOR TO DENY RESPONSIBILITY FOR PROTECTION
AND/OR REPAIR DURING CONSTRUCTION. CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING FACILITIES AND PROVIDE ALL PROTECTIVE
MEASUREMENTS, RESTRAINTS AND APPURTENANCES AS NECESSARY.
6. THESE DESIGN DRAWINGS MUST BE WORKED IN CONJUNCTION WITH THE
PROJECT MANUAL/SPECIFICATIONS.
7. CONTRACTOR TO PROVIDE DETAILED AS-BUILTS. I.E. INTERSECTIONS
DRAWINGS, PROVIDE TRIANGLIZATION FOR ALL CLEANOUTS AND
CONNECTION POINTS TIED BACK TO STATIONARY OBJECTS SUCH
AS BUILDING FOUNDATION CORNERS, POWER POLES ETC. ALSO PROVIDE
DEPTHS OF PIPING.
8. CONTRACTOR SHALL USE, MAINTAIN AND PROVIDE ADEQUATE, PROPER
SHORING DEVICES ON SITE AT ALL TIMES. CONTRACTOR SHALL CONFORM
TO ALL LOCAL, STATE AND FEDERAL REGULATIONS.
9. CONTRACTOR SHALL USE RUBBER - TRACKED EXCAVATOR OR PROVIDE 1"
THICK (MINIMUM) MATTING TO PROTECT PAVED LOCAL MUNICIPAL, STATE
AND PRIVATE ROAD SURFACES, DURING TRENCHING, EXCAVATION AND
GENERAL CONSTRUCTION OPERATIONS.
10. CONTRACTOR IS RESPONSIBLE TO MAINTAIN UTILITY SERVICES TO ALL
RESIDENTS THROUGHOUT CONSTRUCTION.
11. ANY STORMWATER SOURCES FOUND CONNECTED TO THE EXISTING
SANITARY SEWER SHALL BE REDIRECTED AS PER ENGINEERS DIRECTION
IN THE EVENT IT IS NOT CURRENTLY SHOWN ON THE DESIGN DRAWINGS.
12. THE PROPOSED SANITARY SEWER LINE IS TO REPLACE THE EXISTING
SANITARY SEWER LINE. THE CONTRACTOR SHALL MAINTAIN OPERATIONS
DURING CONSTRUCTION AND ENSURE ALL EXISTING CONNECTIONS TO
THE SANITARY SEWER ARE RECONNECTED TO THE PROPOSED SANITARY
SEWER LINE UNLESS SPECIFICALLY NOTED.
13. THE PLAN SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND WILL
NEED TO BE FIELD VERIFIED DURING CONSTRUCTION. BIDDING AND
CONSTRUCTION DRAWINGS WILL ALSO DEPICT AN APPROXIMATE PROFILE
THAT WILL ALSO NEED TO BE FIELD VERIFIED DURING CONSTRUCTION.
HOWEVER, A MINIMUM GRADE, AS PER THE PADEP DOMESTIC
WASTEWATER FACILITIES MANUAL LATEST REVISIONS, MUST BE MET.
14. IF DEEMED REQUIRED, ENGINEER SHALL DIRECT CONTRACTOR
REGARDING TEST PIT LOCATIONS IN AN ATTEMPT TO AVOID UTILITY
CONFLICTS AND WILL VERIFY DESIGN DEPTHS AND LOCATIONS AT THAT
TIME. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY FORESEEABLE
CONFLICTS AND WILL BE RESPONSIBLE FOR PROVIDING SURVEY
INFORMATION REGARDING EXISTING UTILITY DEPTHS TO THE ENGINEER.
GENERAL PROJECT NOTES
REFERENCE LEGEND
DETAIL INDICATOR1
?-501
Scale:1 1" = 1'-0"
DRAWING TITLE
IDENTIFICATION NUMBER/LETTER
DRAWING TITLE
SHEET KEYNOTE SYMBOL
DRAWING NUMBER
DETAIL NUMBER
TEXT
INDICATES EXISTING
CONDITIONS/FEATURES
INDICATES NEW
WORK/FEATURES
REFERENCE: USGS 7.5 MINUTE SERIES (TOPOGRAPHIC MAP) - ORWIGSBURG, PA
INDUSTRIAL DRIVE SEWER MAIN REPLACEMENT
BOROUGH OF ORWIGSBURG
ISSUED FOR BIDDING
BOROUGH OF ORWIGSBURG
SCHUYLKILL COUNTY, PENNSYLVANIA
DRAWING INDEX
DWG. NO. DRAWING DESCRIPTION/TITLE
GENERAL
G-001 COVER SHEET
G-101 INDEX PLAN
CIVIL
C-101 INDUSTRIAL DRIVE PLAN AND PROFILE (STA 0+00 TO STA 5+70)
C-102 INDUSTRIAL DRIVE PLAN AND PROFILE (STA 5+70 TO STA 9+57)
C-501 CONSTRUCTION DETAILS
C-701 RESTORATION DETAILS
ES-501 EROSION AND SEDIMENTATION CONTROL NOTES
ES-502 EROSION AND SEDIMENTATION CONTROL DETAILS
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\G-001.dwgLa st
E di te d by : s ba pt is ta
G-001
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
SCALE:1 1" = 2000'
LOCATION / TOPOGRAPHICAL MAP
00 2000' 4000'
PROJECT AREA
C O
VE
R
S H
EE
T
G
EN
ER
AL
S
S
S
S
CO
CO
CO
CO
CO
CO
CO
IN
D
EX
P
LA
N
G
EN
ER
AL
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, DRAWING CONVENTIONS AND LEGENDS.
2. ANY SIGNAGE LOCATED ALONG PROJECT CORRIDOR THAT IS
DISTURBED DURING CONSTRUCTION SHALL BE RE-INSTALLED AT ITS
EXISTING LOCATION.
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\G-101.dwgLa st
E di te d by : s ba pt is ta
G-101
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
DWG C-101
DWG C-101
DWG C-102
DWG C-102
SCALE:1 1" = 100'-0"
INDEX PLAN
00 100' 200'
W W W W
N/F BOROUGH OF ORW
IGSBURG
D
N/F BLQ PROPERTIES, LLC
N/F RYON REALTY
W
S
MH-38B
STA 0+09
S
MH-38C
STA 3+92
CO CO
CO
At WaB
AgA
At
At At AgA AgA
AgA
WaB
CO
0+00
0+60 1+20 1+80 2+40 3+00 3+60 4+20 4+80
5+40D D
CS-12 CS-12 CS-12
SL SL
CS-12
0+00 0+30 0+60 0+90 1+20 1+50 1+80 2+10 2+40 2+70 3+00 3+30 3+60 3+90 4+20 4+50 4+80 5+10 5+40 5+70
MH-38B
STA 0+09
TOP 599.44
INV IN 588.38 (8", E)
INV IN 588.38 (8", NW)
INV OUT 588.28 (8", SE)
379' of 8" PVC @ 0.49%
MH-38C
STA 3+92
TOP 600.34
INV IN 590.34 (8", E)
INV OUT 590.24 (8", W)
331' of 8" PVC @ 0.75%
FUTURE 24" STORM
(BY OTHERS)
INV ≈ 595.34
6' -3
S
0+00 D
SL
SL
SL SL
Bh SwD
LIMIT OF DISTURBANCE
INLET FILTER PROTECTION
12" COMPOST FILTER SOCKCS-12 CS-12
TRENCH PLUG
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\C-101.dwgLa st
E di te d by : s ba pt is ta
C-101
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
IN
D
U
ST
R
IA
L D
R
IV
E
PL
AN
A
N D
P R
O
FI
LE
(S
TA
+0
TO
S
TA
+7 0)
C
IV
IL
M A
T C
H L
IN
E
R E
FE
R
T O
D W
G C
-1
SCALE:1 1" = 30'
INDUSTRIAL DRIVE PLAN (STA 0+00 TO STA 5+70)
00 30' 60'
SCALE:2 H: 1" = 30'
INDUSTRIAL DRIVE PROFILE (STA 0+00 TO STA 5+70)
V: 1" = 3'-0"
00 30' 60'
00 3' 6'
8"x6" WYE
CONNECTION
TO EXISTING
SEWER MAIN
(TYP. 2 PLCS.)
C-501
MH-38B
STA 0+09
ENLARGED
PLAN
C-101
SCALE:3 1" = 10'
ENLARGED PLAN
00 10' 20'
2 2
SANITARY
SEWER MANHOLE
C-501
SEWER LATERAL
(TYP. 4 PLCS.)
C-501
INLET FILTER
PROTECTION
(TYP. 3 PLCS.)
ES-502
SANITARY
SEWER
MANHOLE
C-501
8" COUPLING
8"x6" WYE
8"x6" WYE 8"x6" WYE
FUTURE STORM PIPING
(BY OTHERS, TYP.)FUTURE WATER MAIN
(BY OTHERS, TYP.)
12" COMPOST
FILTER SOCK (TYP.)
ES-502
LIMIT OF DISTURBANCE:
0.25 ACRES
ABANDON SEWER
MAIN / LATERAL
C-501
GENERAL SHEET NOTES
SHEET KEYNOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, DRAWING CONVENTIONS AND LEGENDS.
2. ANY SIGNAGE LOCATED ALONG PROJECT CORRIDOR THAT IS
DISTURBED DURING CONSTRUCTION SHALL BE RE-INSTALLED AT ITS
EXISTING LOCATION.
3. THIS PROJECT IS INTENDED TO REPLACE THE EXISTING SEWER MAIN IN
THE SAME LOCATION AT THE SAME ELEVATION UNLESS OTHERWISE
NOTED IN THE PLANS. CONTRACTOR IS RESPONSIBLE FOR LOCATING
AND RECONNECTING ALL EXISTING LATERALS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING ALL EXISTING
UTILITIES EXPOSED WITHIN TRENCHES.
5. PENNDOT ROAD RESTORATION AND MANHOLE PAVEMENT
RESTORATION IS TO BE COMPLETED FOR THIS PROJECT. BOROUGH
ROAD PAVEMENT RESTORATION IS TO BE COMPLETED DURING A
SEPARATE PROJECT.
6. EXISTING CLEANOUTS SHOWN ON THE PLANS ARE NOT SURVEYED BUT
FIELD VERIFIED/ LOCATED. EXISTING SANITARY SEWER LATERAL
LOCATIONS ARE ESTIMATED BASED ON CCTV. CONTRACTOR TO LOCATE
EXISTING SANITARY SEWER LATERALS IN ORDER TO INSTALL NEW
CLEANOUTS AT RIGHT-OF-WAY.
7. THE LIMIT OF DISTURBANCE LINES SHOWN ARE AN ESTIMATE. THE
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE ACTUAL TRENCH
WIDTH. THE CONTRACTOR SHALL HAVE NO CLAIM FOR THE EXTRA
COMPENSATION BASED ON TRENCH WIDTH.
E&S LEGEND
SOIL TYPES LIST
AgA ALVIRA SILT LOAM, 0 TO 3 PERCENT SLOPES At ATKINS SILT LOAM BeB BERKS CHANNERY SILT LOAM, 3 TO 8 PERCENT SLOPES ShB SHELMADINE SILT LOAM, 3 TO 8 PERCENT SLOPES WaB WATSON SILT LOAM, 3 TO 8 PERCENT SLOPES
1. CONTRACTOR TO PROVIDE TEST PIT TO VERIFY EXISTING PIPE
LOCATION, SIZE, MATERIAL, AND DEPTH.
2. CONTRACTOR TO PROVIDE MINIMUM 18" SEPARATION BETWEEN THE
NEW SANITARY SEWER LATERAL AND THE FUTURE STORM WATER
PIPING.
3. CONTRACTOR TO PROVIDE NEW SEWER LATERAL WYE LOCATION FOR
EXISTING SERVICE TO AVOID REINSTATING SERVICE INTO NEW
MANHOLE.
4. CONTRACTOR TO REMOVE EXISTING 8" TC SANITARY SEWER STUB.
5. PROVIDE 8'x8' PAVING AROUND MANHOLE LID.
W W W W W W W W W W W W
W W W W W W
S
MH-38D
STA 7+27
S
MH-38E
STA 9+57
CO
CO
AgA ShB
ShB BeB
CO
9+576+00 6+60 7+20 7+80 8+40 9+00
CS-12 CS-12 CS-12 CS-12 CS-12
SLSL
5+70 6+00 6+30 6+60 6+90 7+20 7+50 7+80 8+10 8+40 8+70 9+00 9+30 9+57
MH-38D
STA 7+27
TOP 601.29
INV IN 592.91 (8", E)
INV OUT 592.81 (8", W)
226' of 8" PVC @ 0.57%
MH-38E
STA 9+57
TOP 600.79
INV OUT 594.19 (8", W)
331' of 8" PVC @ 0.75%
FUTURE 24" STORM
(BY OTHERS)
INV ≈ 598.34
4' -0
Bh SwD
LIMIT OF DISTURBANCE
INLET FILTER PROTECTION
12" COMPOST FILTER SOCKCS-12 CS-12
TRENCH PLUG
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\C-102.dwgLa st
E di te d by : s ba pt is ta
C-102
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
IN
D
U
ST
R
IA
L D
R
IV
E
PL
AN
A
N D
P R
O
FI
LE
(S
TA
+7
TO
S
TA
+5 7)
C
IV
IL
M A
T C
H
LIN
E R
E
FE
R T
O D
W G
C -101
SCALE:1 1" = 30'
INDUSTRIAL DRIVE PLAN (STA 5+70 TO STA 9+57)
00 30' 60'
SCALE:2 H: 1" = 30'
INDUSTRIAL DRIVE PROFILE (STA 5+70 TO STA 9+57)
V: 1" = 3'-0"
00 30' 60'
SANITARY
SEWER MANHOLE
(TYP. 2 PLCS.)
C-501
SEWER LATERAL
(TYP. 3 PLCS.)
C-501
8"x6" WYE
8"x6" WYE
FUTURE STORM PIPING
(BY OTHERS, TYP.)
FUTURE WATER MAIN
(BY OTHERS, TYP.)
12" COMPOST
FILTER SOCK (TYP.) CULVERT
CROSSING
ES-502
CULVERT
CROSSING
ES-502
LIMIT OF DISTURBANCE:
0.25 ACRES
ABANDON SEWER
MAIN / LATERAL
FUTURE STORM CULVERT
(BY OTHERS)
00 3' 6'
ABANDON SEWER
MAIN / LATERAL
C-501
ES-502
ABANDON SEWER
MAIN / LATERAL
C-501
FUTURE OVERHEAD ELECTRIC
(BY OTHERS, TYP.)
8"x6" WYE
C-501
TRENCH PLUG
(TYP. 2 PLCS.)
ES-502
TRENCH PLUG
(TYP. 2 PLCS.)
ES-502
GENERAL SHEET NOTES
SHEET KEYNOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, DRAWING CONVENTIONS AND LEGENDS.
2. ANY SIGNAGE LOCATED ALONG PROJECT CORRIDOR THAT IS
DISTURBED DURING CONSTRUCTION SHALL BE RE-INSTALLED AT ITS
EXISTING LOCATION.
3. THIS PROJECT IS INTENDED TO REPLACE THE EXISTING SEWER MAIN IN
THE SAME LOCATION AT THE SAME ELEVATION UNLESS OTHERWISE
NOTED IN THE PLANS. CONTRACTOR IS RESPONSIBLE FOR LOCATING
AND RECONNECTING ALL EXISTING LATERALS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING ALL EXISTING
UTILITIES EXPOSED WITHIN TRENCHES.
5. PENNDOT ROAD RESTORATION AND MANHOLE PAVEMENT
RESTORATION IS TO BE COMPLETED FOR THIS PROJECT. BOROUGH
ROAD PAVEMENT RESTORATION IS TO BE COMPLETED DURING A
SEPARATE PROJECT.
6. EXISTING CLEANOUTS SHOWN ON THE PLANS ARE NOT SURVEYED BUT
FIELD VERIFIED/ LOCATED. EXISTING SANITARY SEWER LATERAL
LOCATIONS ARE ESTIMATED BASED ON CCTV. CONTRACTOR TO LOCATE
EXISTING SANITARY SEWER LATERALS IN ORDER TO INSTALL NEW
CLEANOUTS AT RIGHT-OF-WAY.
7. THE LIMIT OF DISTURBANCE LINES SHOWN ARE AN ESTIMATE. THE
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE ACTUAL TRENCH
WIDTH. THE CONTRACTOR SHALL HAVE NO CLAIM FOR THE EXTRA
COMPENSATION BASED ON TRENCH WIDTH.
E&S LEGEND
SOIL TYPES LIST
AgA ALVIRA SILT LOAM, 0 TO 3 PERCENT SLOPES At ATKINS SILT LOAM BeB BERKS CHANNERY SILT LOAM, 3 TO 8 PERCENT SLOPES ShB SHELMADINE SILT LOAM, 3 TO 8 PERCENT SLOPES WaB WATSON SILT LOAM, 3 TO 8 PERCENT SLOPES
1. CONTRACTOR TO PROVIDE TEST PIT TO VERIFY EXISTING PIPE
LOCATION, SIZE, MATERIAL, AND DEPTH.
2. CONTRACTOR TO PROVIDE MINIMUM 18" SEPARATION BETWEEN THE
NEW SANITARY SEWER LATERAL AND THE FUTURE STORM WATER
PIPING.
3. CONTRACTOR TO PROVIDE NEW SEWER LATERAL WYE LOCATION FOR
EXISTING SERVICE TO AVOID REINSTATING SERVICE INTO NEW
MANHOLE.
4. CONTRACTOR TO REMOVE EXISTING 8" TC SANITARY SEWER STUB.
5. PROVIDE 8'x8' PAVING AROUND MANHOLE LID.
VA
R
IE
S
9"
M
AX
.6"
4'-0"
INSIDE
5"
8"
(TYP.)
ADAPTER
24"x48"
MANHOLE EXTERIOR
TO BE COATED WITH
BITUMASTIC SEALANT
CHANNEL
PRECAST
MAX. 12")
O-RING JOINT
FS SS-S-210A,
FORM (TYP.)
TYPE 1, ROPE
TO NOTE 2)
STEPS (REFER
48" RISERS
CONCRETE
GRADE RINGS
(VARIES, MIN. 6",
SEALING COMPOUND
PREFORMED PLASTIC
6" MIN. 2A
PRECAST BASE
1.
2.
COMPACTED
AGGREGATE
NOTES:
AT 12" O.C.; SECURED WITH NON-SHRINK GROUT.
MANHOLE FRAME & COVER
MINIMUM 24" OPENING.
ALL PIPE TO MANHOLE CONNECTIONS SHALL BE MADE WITH A
CAST-IN-PLACE GASKET.
STEPS SHALL BE A MINIMUM OF 12" WIDE AND POLYPROPYLENE COATED
3. ALL FLOW CHANNELS SHALL BE PRE-CAST BY MANUFACTURER UNLESS
AUTHORIZED BY ENGINEER.
WORDS "SANITARY SEWER "
TO BE CAST IN LID
SCALE:1 NONE
TYPICAL SANITARY MANHOLE DETAIL
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, DRAWING CONVENTIONS AND LEGENDS.
GENERAL SHEET NOTES
HEAT SHRINKABLE WRAP
(TYP.)
C
IV
IL
C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
24"
36"
7"
1/
2"
26 1/4"
1 1/2"
FRAME 4 - 1"Ø CORED OR DRILLED
HOLES ON 32 3/4" BOLT CIRCLE
3/8" 1/2"
5/8"
NEOPRENE
GASKET
3/8"
PICK HOLE DETAIL
3/4" W FLAT
PLAN
(TYP 2 PLACES)
PICK HOLE
MIN
LETTERS TO
BE 2" HIGH
LUGS
NON-SKID
SECTION
AS SHOWN
SCALE:2 NONE
MANHOLE FRAME & COVER DETAIL
TYPICAL CAST IRON STANDARD
HEAT SHRINKABLE WRAP
(TYP.)
NON- PENETRATING
HDPE MANHOLE INSERT
" M
IN
8" 8"
8"8"
WHEN VERTICAL SEPARATION IS
LESS THAN 18"; PROVIDE CONCRETE
ENCASEMENT ON UNDISTURBED
GROUND. THE LENGTH OF THE
ENCASEMENT SHALL BE EXTENDED
A MINIMUM OF 3'-0" BEYOND THE
CENTERLINE OF THE WATER
MAIN IN BOTH DIRECTIONS
PROPOSED PVC
SEWER LINE
NOTES:
1. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
3,000 PSI AT THE END OF 28 DAYS.
MANHOLE
SCALE:6 NONE
CONNECTION TO EXISTING SANITARY SEWER
5'-0"+-
REFER TO PRECAST SEWER
MANHOLE DETAIL ON THIS SHEET
NEW PIPE STUB
COUPLING
NEW SANITARY SEWER PIPE
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\C-501.dwgLa st
E di te d by : s ba pt is ta
C-501
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
SCALE:5 NONE
ABANDONMENT DETAIL
TYPICAL SEWER MAIN / LATERAL
NOTES:
1. TRANSITION END CAP MAY BE USED IN LIEU OF A TRANSITION COUPLING.
2. FILL MAIN WITH FLOWABLE FILL WHERE INDICATED ON PLANS.
SANITARY SEWER MAIN / LATERAL
TO BE ABANDONED
DIP OR
PVC C900
MEGA-LUG RESTRAINT
MJ CAP
TRANSITION COUPLING,
WHEN NECESSARY
SCALE:4 NONE
UNDER EXISTING UTILITY DETAIL
NEW SEWER MAIN CROSSING
SCALE:3 NONE
SANITARY SEWER LATERAL DETAIL
NONE
FL
O
W
LATERAL SEWER
NOTES:
1. PROVIDE 6" OF AASHTO #8 (1B) STONE BELOW PIPE AND 6" ABOVE PIPE (TYP. ENTIRE LENGTH OF LATERAL).
2. MINIMUM SERVICE LINE AND LATERAL SLOPE = 1% (1/8" PER FT.).
3. MINIMUM SERVICE LINE AND LATERAL DEPTH = 3'-0".
4. PIPE MATERIALS: LATERALS AND SERVICE LINES = PVC SDR 26.
5. THE LATERAL SEWER SHALL BE INSTALLED TO THE EDGE OF THE (IN GRASS AREAS) STREET RIGHT-OF-WAY AS
A MINIMUM, OR TO SUCH A POINT, AS REQUIRED TO CLEAR STREET SIDEWALKS AND UNDERGROUND UTILITIES.
RIGHT-OF-WAY
FLEXIBLE PIPE COUPLING
6"Ø RISER W/ CAP
6" SEWER LATERAL
SANITARY SEWER MAIN
6" SINGLE SWEEP TEE
SDR 26
PVC PIPE
WYE
6" PVC SEWER LATERAL
RIGHT-OF-WAY/PROPERTY LINE
6" PVC BEND(S) AS REQUIRED
SCALE:3.1 NONE
CLEANOUT CAP DETAIL
AGGREGATE BACKFILL
COVER MARKED "CO"
4" SUPERPAVE ASPHALT MIXTURE DESIGN
25.0MM MIX, PG.64-22, 3 TO < 30M ESALS,
HMA BASE COURSE, PAD 18" SQ
SECTION
PLAN
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, DRAWING CONVENTIONS AND LEGENDS.
GENERAL SHEET NOTES
C
IV
IL
R
ES
TO
R
AT
IO
N
D
ET
AI
LS
6" TOPSOIL AND SEED
6" - 2A AGGREGATE
COMPACTED
REFER TO TRENCH
RESTORATION DETAILS
SCALE:2 NONE
(GRAVEL DRIVEWAY & GRAVEL SHOULDER)
SURFACE RESTORATION DETAIL
SCALE:3 NONE
(GRASS AREAS)
SURFACE RESTORATION DETAIL
REFER TO TRENCH
RESTORATION DETAILS
EXISTING PAVEMENT (TYP.)
SAW-CUT FULL DEPTH
NOTE: REFER TO PLANS FOR
EXISTING PENNDOT PAVEMENT
STRUCTURE (TYP.)
SCALE:4 NONE
FOR S.R. 2006 (STATE ROAD)
TYPICAL SURFACE RESTORATION DETAIL
REFER TO TRENCH
RESTORATION DETAILS
NOTE:
1. EXISTING DOUBLE-YELLOW LINE/PARKING LINES/PAVEMENT MARKINGS/WHITE
EDGE LINE (4"/W) SHALL BE REPLACED IF DISTURBED.
1 1/2" SUPERPAVE ASPHALT MIXTURE DESIGN HMA
WEARING COURSE, PG 64S-22, 3 TO 30M ESALS,
9.5 MM MIX, SRL H
5" SUPERPAVE ASPHALT MIXTURE DESIGN
25.0MM MIX, PG.64S-22, 3 TO < 30M ESALS, HMA
BASE COURSE OR MATCH EXISTING
WHICHEVER IS GREATER
6" #2A COARSE AGGREGATE
OR MATCH EXISTING,
WHICHEVER IS GREATER
2 1/2" SUPERPAVE ASPHALT MIXTURE DESIGN
19.0 MM MIX, PG 64S-22, 3 TO 30M ESALS, HMA
BINDER COURSE.
12" WIDE BITUMINOUS
SEAL PG 64S-22
(TYP.)
SAW-CUT (TYP.)
INITIAL FULL DEPTH
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\C-701.dwgLa st
E di te d by : s ba pt is ta
C-701
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
3" SUPERPAVE 25.00 MM, PG 64S-22
BITUMINOUS CONCRETE BASE COURSE
OR MATCH EXISTING WHICHEVER IS GREATER
REFER TO TRENCH
RESTORATION DETAILS
SCALE:1 NONE
TEMPORARY SURFACE RESTORATION DETAIL
SAW-CUT FULL DEPTH
EXISTING PAVEMENT
(INITIAL SAW CUT) (TYP.)
6" 2A COURSE AGGREGATE COMPACTED
OR MATCH EXISTING, WHICHEVER
IS GREATER
NOTES:
1. TEMPORARY PAVING SHALL BE PLACED ON ALL BACK FILLED TRENCHES DAILY.
2. TEMPORARY PAVING SHALL BE MAINTAINED (FLUSH WITH ADJOINING PAVED
SURFACES) FOR A MINIMUM OF THIRTY DAYS PRIOR TO FINAL TRENCH RESTORATION.
3. TEMPORARY SURFACE RESTORATION SHALL BE HOT MIX ASPHALT.
4. EXTEND PAVING RESTORATION TO A MINIMUM OF 3 FEET BEYOND THE MANHOLE
COVERS IN ALL DIRECTIONS.
EXISTING PAVEMENT (TYP.)
SAW-CUT FULL DEPTH
3" WARNING
TAPE
SCALE:6 NONE
FOR BOROUGH DRIVEWAYS
TYPICAL SURFACE RESTORATION DETAIL
REFER TO TRENCH
RESTORATION DETAILS
MATCH EXISTING PAVEMENT
6" #2A COARSE AGGREGATE
OR MATCH EXISTING,
WHICHEVER IS GREATER
12" WIDE BITUMINOUS
SEAL PG 64S-22
(TYP.)
SAW-CUT (TYP.)
INITIAL FULL DEPTH
SCALE:5 TRENCH RESTORATION DETAIL
TYPICAL AGGREGATE BACKFILL
NONE
6" B
ED
D
IN
G
IN
E
AR
TH
8"
IN
R O
C K
H
AU
N C
H
IN
G 6" MIN.6" MIN.
REFER TO SURFACE
RESTORATION DETAILS
D
EP
TH
F
R O
M F
IN
IS
H
ED
G R
AD
E
(V
AR
IE
S)
6"
NO. 8 COARSE AGGREGATE
HAND TAMPED IN 4" LAYERS
PIPE
NO. 3 COARSE AGGREGATE
SUB-BEDDING
UNDISTURBED
SUBGRADE
PAY LINE FOR ADDITIONAL
COARSE AGGREGATE AND
MISCELLANEOUS EXCAVATION
IN UNSTABLE MATERIAL
3" WARNING
TAPE
1' -0
BE
LO
W
G R
AD
E
PA NO. 2A BACKFILL HAND
TAMPED IN 4" LAYERS, MACHINE
TAMPED IN 8" LAYERS, TO 100%
PROCTOR DENSITY IN STATE ROAD
AND 95% IN ALL OTHER AREAS
NOTES:
1. ALL STONE GRADATIONS ARE AASHTO CLASSIFICATION.
2. TRENCH WIDTH SHOWN IS A MINIMUM REQUIREMENT. THE TRENCH
WIDTH REQUIRED TO COMPLETE THE UTILITY INSTALLATION IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
3" WARNING TAPE
(12" BELOW GRADE)
3" WARNING TAPE
(12" BELOW GRADE)
CONSTRUCTION SEQUENCE
STANDARD NOTES
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN
ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE
REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED
OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY
REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE
OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S
PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF
THE E&S PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION
MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY
UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING
UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN
DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT
OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS
AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE
CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY
STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE
BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE
BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING
AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE
PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE
STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS.
STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H: 1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION
AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE
THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE
REGIONAL OFFICE OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE
WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ.
NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED
AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR
THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL.
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE
TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM
CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE
TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE
AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED
FOR RE-USE).
CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR
RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED THE TESTING REVEALS THAT THE FILL
MATERIAL CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE RESIDENTIAL LIMITS IN TABLES
FP-1A AND FP-1B FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST
USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY
THE MATERIAL AS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING THE FILL.
ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE DILIGENCE TO DETERMINE IF THE
FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS:
INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE
SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL
QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL
TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE
OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED
SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE
TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A
OF THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL" .
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE
MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE
CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS APPLICABLE. THESE
REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DIRECTED INTO A PUMPED WATER FILTER BAG AND DISCHARGED
TO AN UNDISTURBED VEGETATED AREA.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL
INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL
PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RESEEDING, RE-MULCHING AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS
EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
15. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE
CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME
OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE
END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE
WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
18. AREAS WHICH ARE TO BE TOP SOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES - 6 TO 12 INCHES ON
COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF
TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL SLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER
RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN
ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE
MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND
SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN
COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR
AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR
SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE
APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE
STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE
REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT
NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE
CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR
UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE
OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO
REMOVAL/CONVERSION OF THE E&S BMPS.
30. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR
CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL
OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID RE-VEGETATION OF
DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE
OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION.
32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE
CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT
IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602
OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL
PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR
EACH VIOLATION.
33. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE OR ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION
OF EARTH DISTURBANCE ACTIVITIES EXCEED 4 DAYS, THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE
PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION PENDING FUTURE EARTH DISTURBANCE ACTIVITIES.
CONSTRUCTION SEQUENCE
1. LOCATE ALL ACCESS POINTS, STORAGE, AND LAYDOWN AREAS THAT WILL BE NECESSARY FOR PROPER EXECUTION OF THE
WORK, PRIOR TO THE START OF ANY WORK. THE PROJECT SITE WILL BE ACCESSED FROM THE EXISTING ROADWAY/PAVED
AREAS.
2. INSTALL ALL PERIMETER BMP'S AS SHOWN ON THE PLANS. PERIMETER BMP'S INCLUDE ALL PROJECT AND INLET FILTER
PROTECTION AND COMPOST FILTER SOCK.
3. CLEAR AND GRUB PROJECT AREA AS NECESSARY.
4. THE CONTRACTOR WILL INSPECT WEEKLY AND AFTER EACH RAIN EVENT, THE PROJECT'S EROSION AND SEDIMENTATION
CONTROLS DURING THE ENTIRE ACTIVE CONSTRUCTION STAGES. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE
INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND SEDIMENTATION CONTROLS THROUGHOUT
THE ENTIRE CONSTRUCTION PROJECT.
THE CONTRACTOR MUST IMMEDIATELY REPAIR ANY DAMAGED EROSION CONTROLS (BMPS). SEDIMENT REMOVED FROM THE
BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS, OR DRAINAGE
SWALES AND IMMEDIATELY STABILIZED OR PLACED IN TOPSOIL STOCKPILES.
5. THE CONTRACTOR SHALL THEN PERFORM THE NECESSARY EXCAVATION, BACKFILL, AND COMPACTION FOR THE INSTALLATION
OF THE SEWER MAIN. DAILY TRENCH EXCAVATION WILL BE LIMITED TO THE LENGTH OF PIPE, BACKFILLING, AND STABILIZATION
THAT CAN BE COMPLETED THE SAME DAY. THE AREAS WILL BE GRADED TO FINAL CONTOURS. ALL COMPLETED AREAS SHALL
BE STABILIZED WITH PAVING, STONE, OR SEED DAILY.
a) WHEN CALLED FOR, BACKFILL WITH “SELECT BACKFILL”, IN WHICH CASE SOIL WILL BE STORED UNTIL PIPE INSTALLATION IS
COMPLETE. THIS EXCAVATED MATERIAL WILL BE LAID UP GRADIENT OF THE OPEN TRENCH DIRECTING DRAINAGE BACK INTO
THE TRENCH, THUS PREVENTING SEDIMENT FROM MIGRATING TO NEARBY DRAINAGE CHANNELS.
b) IF EXCAVATIONS NEED TO BE DEWATERED, THE WATER IN THE EXCAVATIONS SHALL BE PUMPED AND DISCHARGED INTO A
PUMPED WATER FILTER BAG OR OTHER APPROVED FACILITY. DISCHARGE POINTS SHOULD BE ESTABLISHED TO PROVIDE
FOR MAXIMUM DISTANCE TO ACTIVE WATERWAYS.
6. CULVERT CROSSING:
· EXCAVATE TRENCH UP TO 18" FROM EITHER SIDE OF EXISTING CULVERT.
· INSTALL SANITARY SEWER UNDERNEATH CULVERT MAINTAINING AT LEAST 3' SEPARATION FROM THE BOTTOM OF THE
CULVERT PIPE.
7. ONCE UTILITY CONSTRUCTION IS COMPLETE, BEGIN ROADWAY RESTORATION, BACKFILL TRENCH AND RESTORE BITUMINOUS
PAVEMENT SURFACE. IN ANY DISTURBED GRASS AREAS INSTALL TOPSOIL AND SEED (STABILIZE). AFTER FINAL STABILIZATION
HAS BEEN ACHIEVED, TEMPORARY E&S BMP SHALL BE REMOVED. AREAS DISTURBED DURING REMOVAL OF TEMPORARY E&S
BMPS ARE TO BE IMMEDIATELY STABILIZED.
8. REMOVE PUMPED WATER FILTER BAGS IF USED. IMMEDIATELY STABILIZE AREAS DISTURBED DURING REMOVAL OF TEMPORARY
E&S BMPS.
9. IF CONSTRUCTION IS TERMINATED OR SUSPENDED PRIOR TO CONSTRUCTION COMPLETION, ALL EXPOSED SOIL AREAS SHALL
BE SEEDED WITH TEMPORARY SEEDING AND MULCHED IMMEDIATELY. SEED FOLLOWING TEMPORARY SEEDING GUIDELINES ON
ES-501.
10. STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL STABILIZATION OF
VEGETATED AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE
OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY
STABILIZED WITH THE APPLICATION OF THE BASE COURSE LAYER.
11. AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMPS SHALL BE REMOVED. AREAS DISTURBED DURING
REMOVAL OF TEMPORARY E&S BMPS ARE TO BE IMMEDIATELY STABILIZED.
NOTE:A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION
UNTIL THE SITE IS STABILIZED.
GROUND COVER
AFTER THE EARTH DISTURBANCE ACTIVITY IS COMPLETED, THE DISTURBED AREA MUST BE REVEGETATED. THE VEGETATIVE
COVER MUST BE A UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION
AND SEDIMENTATION. ANOTHER OPTION IS TO USE AN ACCEPTABLE BMP, WHICH PERMANENTLY MINIMIZES ACCELERATED
EROSION AND SEDIMENTATION.
TEMPORARY SEEDING
TEMPORARY SEEDING WILL BE PERFORMED DURING THE GERMINATION SEASON (APRIL TO OCTOBER) FOR THE
ESTABLISHMENT OF GRASS SEED ON DISTURBED AREAS BEFORE THE START OF THE DORMANT SEASON. DURING THE
NON-GERMINATION SEASON, MULCH SHALL BE APPLIED TO THE DISTURBED SURFACES AND THE SEED MIXTURE WILL BE ADDED
AT THE START OF THE GERMINATION PERIOD.
· ALL GRASS AREAS DISTURBED BY THE WORK OF THIS PROJECT SHALL BE SEEDED AS FOLLOWS:
O APPLY AGRICULTURAL LIME AND FERTILIZER AS FOLLOWS FOR TEMPORARY SEEDING:
¨ AGRICULTURAL LIME - 40 POUNDS PER 1,000 SQUARE FEET
¨ FERTILIZER - 12.5 POUNDS PER 1,000 SQUARE FEET
O FERTILIZER SHALL BE A COMMERCIAL TYPE 10-10-10.
O TEMPORARY SEED MIXTURE ANNUAL RYEGRASS -- 1 POUND PER 1,000 SQUARE FEET.
· ALL TEMPORARY SEEDING SHALL BE MULCHED. TEMPORARY SEEDING SHALL BE WATERED AS REQUIRED TO DEVELOP
COVER. NON-POTABLE UTILITY WATER SHALL BE PROVIDED BY THE CONTRACTOR.
· MULCH SHALL BE STRAW, SHALL BE CLEAN AND FREE FROM NOXIOUS WEEDS, AND SHALL BE APPLIED AT THE RATE OF
140 POUNDS PER 1,000 SQUARE FEET (3.0 TONS PER ACRE).
O APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER OR A SIMILAR METHOD IN
ORDER TO PREVENT MULCH FROM BEING WINDBLOWN.
PERMANENT SEEDING
PERMANENT SEEDING SHALL TAKE PLACE IN ALL DISTURBED AREAS AS FOLLOWS:
· UPON COMPLETION OF EARTH DISTURBANCE ACTIVITIES, THE SITE SHALL BE IMMEDIATELY STABILIZED.
· THE FOLLOWING SHALL BE SPREAD AND WORKED INTO THE TOPSOIL TO A DEPTH OF 2 TO 4 INCHES.
O AGRICULTURAL LIME - 240 POUNDS PER 1,000 SQUARE FEET
O FERTILIZER - 25 POUNDS PER 1,000 SQUARE FEET
· THE FERTILIZER SHALL BE A COMMERCIAL TYPE 10-20-20.
· NOTE - IF AGRICULTURAL LIME AND FERTILIZER HAVE BEEN APPLIED PREVIOUSLY TO THE GROUND WHERE THE PERMANENT SEED IS TO BE APPLIED, THE LIME AND FERTILIZER RATES SHALL BE REDUCED BY THE AMOUNT BY WHAT
HAS BEEN APPLIED PREVIOUSLY.
· PERMANENT SEED MIXTURE: THE FOLLOWING SEED MIXTURES SHALL BE APPLIED AS FOLLOWS:
O APPLY MULCH TO ALL PERMANENTLY SEEDED AREAS.
O MATERIALS: STRAW, AIR-DRIED AND FREE FROM UNDESIRABLE SEEDS AND COURSE MATERIALS. APPLICATION: 140
POUNDS PER 1,000 SQUARE FEET.
· APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER OR A SIMILAR METHOD IN
ORDER TO PREVENT MULCH FROM BEING WINDBLOWN.
· EROSION CONTROL BLANKETS SHALL BE USED ON SLOPES 3:1 (H:V) OR GREATER.
MAINTENANCE PROGRAM
EMERGENCY EROSION PROTECTION
IF EROSION DOES OCCUR, THE CONTRACTOR SHALL REPAIR AND RESEED THOSE AREAS OR USE OTHER STABILIZATION METHODS
AS REQUIRED. THE CONTRACTOR SHALL USE JUTE, WOOD FIBER, OR OTHER TIE DOWN FILTER NETTING ON TOP OF THE NEW SEED
AS REQUIRED, REGARDLESS OF THE SLOPE OF THE LAND.
MULCHED AREAS SHALL BE CHECKED WEEKLY AND AFTER EACH RAIN EVENT FOR DAMAGE, UNTIL THE MULCHING IS NO LONGER
NECESSARY FOR PROTECTION AGAINST EROSION. DAMAGED PORTIONS OF THE MULCH OR TIE DOWN MATERIALS SHALL BE
REPAIRED AS SOON AS DISCOVERED.
PERIODIC INSPECTION PROGRAM
THE CONTRACTOR WILL INSPECT THE PROJECT'S EROSION AND SEDIMENTATION CONTROLS WEEKLY AND AFTER EACH RAIN EVENT
UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION. AS PART OF THE INSPECTION, THE CONTRACTOR SHALL UTILIZE THE CHAPTER
102 VISUAL SITE INSPECTION REPORT, PADEP FORM 3800-FM-BCW0271D, REVISED 12/2019 DURING THE WEEKLY AND RAIN EVENT
INSPECTIONS.
THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND
SEDIMENTATION CONTROLS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING MUST BE PERFORMED IMMEDIATELY. SEDIMENT THAT HAS
BEEN TRAPPED BY THE COMPOST SOCK WILL BE REMOVED AS REQUIRED, AND IN ALL CASES, BEFORE THE ACCUMULATION HAS
REACHED HALF THE HEIGHT OF THE SOCK. COMPOST SOCK WILL BE RE-ANCHORED, REPAIRED, OR REPLACED AS NECESSARY.
SEDIMENT MUST BE REMOVED FROM SILT SACKS AFTER EACH RUNOFF EVENT, OR WHEN THE DISTANCE BETWEEN THE GRATE AND
THE SEDIMENT LEVEL IN THE SILT SACK IS REDUCED TO 18". SILT SACKS WILL BE REPAIRED, OR REPLACED AS NECESSARY. ALL
OTHER CONTROLS WILL BE INSPECTED ON THE SAME SCHEDULE. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS
EXPECTED, REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED WILL BE REQUIRED.
MAINTENANCE OPERATIONS
AS PART OF THE LONG TERM OPERATION AND MAINTENANCE, ROUTINE MAINTENANCE INSPECTIONS WILL BE REQUIRED TO INSURE
THE EFFICIENCY OF ALL THE SEDIMENT CONTROL DEVICES. AT A MINIMUM, ALL BMP'S SHALL BE INSPECTED ON A WEEKLY BASIS
AND AFTER EACH MEASURABLE RUNOFF EVENT, INCLUDING THE REPAIR OF THE BMP'S TO ENSURE EFFECTIVE AND EFFICIENT
OPERATION. THIS INSPECTION SHALL BE FOLLOWED UP WITH A REPAIR SCHEDULE OF ALL NOTED DEFICIENCIES. VEGETATION
PROGRESS SHALL ALSO BE INCLUDED IN THIS INSPECTION. VOID AREAS SHALL PROMPTLY BE RESEEDED AND MULCHED TO
ESTABLISH PROTECTION.
BMP'S THAT FAIL AFTER INSTALLATION MUST BE REPAIRED TO FUNCTION PROPERLY OR BE REPLACED BY ALTERNATIVE BMP'S
THAT WILL SERVE THE INTENDED PURPOSE. IF UNFORESEEN CONDITIONS OCCUR ON A SITE, AND THE INSTALLED BMP'S ARE
OBVIOUSLY NOT EFFECTIVE, THEN ALTERNATE BMP'S MUST BE DESIGNED AND INSTALLED. THE NEED FOR REDESIGN WILL BE
DETERMINED ON A CASE-BY-CASE BASIS.
ANY CHANGES OR ADDITIONS MADE TO THIS PLAN WILL BE DONE SO IN WRITING WITH A SIGNATURE FROM A PERMITTEE OR
CO-PERMITTEE REPRESENTATIVE. THESE CHANGES OR ADDITIONS MUST BE APPROVED AND INITIALED BY A PA DEP OR
CONSERVATION DISTRICT REPRESENTATIVE AND KEPT ON-SITE WITH THIS NPDES PERMIT.
REMOVAL OF CONTROLS AND CONTINUING MAINTENANCE
ALL REQUIRED TEMPORARY EROSION AND SEDIMENTATION CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE
AREA THEY PROTECT HAS BEEN STABILIZED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED
IMMEDIATELY.
STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL STABILIZATION OF VEGETATED
AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING
ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY STABILIZED WITH THE
APPLICATION OF THE BASE COURSE LAYER.
REVEGETATION SHALL OCCUR AS SOON AS PRACTICAL AFTER COMPLETION OF THE FINAL GRADING. SHOULD CONDITIONS
PROHIBIT PERMANENT REVEGETATION EFFORTS, THE AREA WILL BE TEMPORARILY STABILIZED THROUGH THE USE OF
QUICK-GROWING GRASSES, NYLON EROSION CONTROL MATS OR SIMILAR MEASURES. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE PERMANENT STABILIZATION OF ALL AREAS EXPOSED OR DISTURBED DURING THE PROJECT.
THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES IN GOOD CONDITION
UNTIL ESTABLISHMENT OF GROUND COVER OVER TRIBUTARY AREAS. THIS WILL INCLUDE CLEANING AND, IF REQUIRED, REPAIR OF
ANY SEDIMENT CONTROL BMPS, AND SEEDING OF ERODED AREAS, AS NECESSARY.
PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES WILL BECOME THE RESPONSIBILITY OF THE FACILITY OWNER
UPON COMPLETION OF ALL ASPECTS OF THE PROJECT.
UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE PERMITTEE AND CO-PERMITTEE SHALL ASSURE THAT THE BEST MANAGEMENT
PRACTICES ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND COMPLETELY. MAINTENANCE SHALL INCLUDE
INSPECTIONS OF ALL BEST MANAGEMENT PRACTICE FACILITIES ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RAINFALL
EVENT AND MAINTAIN AND MAKE AVAILABLE TO THE REVIEWING AGENCY COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE
INSPECTIONS. ALL MAINTENANCE WORK, INCLUDING CLEANING, REPAIR, REPLACEMENT, REGARDING, RESEEDING, AND
RE-STABILIZATION SHALL BE PERFORMED IMMEDIATELY.
RECYCLING AND DISPOSAL METHODS
CONSTRUCTION MATERIALS AND OTHER CONSTRUCTION SITE WASTES MUST BE PROPERLY MANAGED AND DISPOSED OF TO
REDUCE POTENTIAL FOR POLLUTION TO SURFACE AND GROUND WATERS AS PER 25 PA. CODE § 102.4(B)(5)(XI). PROPER TRASH
DISPOSAL, RECYCLING OF MATERIALS, PROPER MATERIALS HANDLING, AND SPILL PREVENTION AND CLEAN-UP REDUCE THE
POTENTIAL FOR CONSTRUCTION SITE WASTES TO BE MOBILIZED BY STORMWATER RUNOFF AND CONVEYED TO SURFACE WATERS.
· COLLECTED SEDIMENT WILL BE PLACED ON FILL SLOPES AND GRADED, SEEDED AND MULCHED AS NEEDED TO ATTAIN
STABILIZATION.
· THE CONTRACTOR SHALL REMOVE FROM THE SITES, RECYCLE OR DISPOSE OF ALL MATERIALS AND WASTES IN
ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1
E. SEQ. AND 287.1 ET SEQ.
O ANTICIPATED CONSTRUCTION WASTES FOR THIS PROJECT MAY INCLUDE PAVEMENT, AND TREE SPOILS.
CONSTRUCTION WASTES WILL BE REMOVED AND HAULED OFF SITE.
C
IV
IL
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N C
O N
TR
O
L N
O
TE
S
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\ES-501.dwgLa st
E di te d by : s ba pt is ta
ES-501
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
C
IV
IL
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N C
O N
TR
O
L D
ET
AI
LS
NOTES:
1. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK
SHALL BE EXTENDED AT LEAST 8 FEET UPSLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT.
MAXIMUM SLOPE LENGTH ABOVE ANY 12" AND 18" DIAMETER SOCK SHALL NOT EXCEED THE SLOPE LENGTH THAT IS ALLOWED FOR 18" AND 30" REINFORCED SILT FENCE. MAXIMUM SLOPE LENGTH
FOR 24" DIAMETER SOCK SHALL NOT EXCEED THAT FOR SUPER SILT FENCE.
2. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS..
3. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVE GROUND
HEIGHT OF THE SOCKS AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
4. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL
BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS
OF INSPECTION.
5. BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE
SOCKS AFTER ONE YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
6. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE
SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH
SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
' M
IN
FL
O
W FLO
W
DISTURBED
AREA
UNDISTURBED AREA
2" x 2" WOODEN STAKES
PLACED 10' O.C.
2" x 2" WOODEN STAKES
PLACED 10' O.C.
COMPOST FILTER SOCK
UNDISTURBED AREA
BLOWN PLACED
FILTER MEDIA
DISTURBED AREA
PLAN VIEW
SECTION VIEW
TRENCH PLUG SPACING (L)
PIPELINE
TRENCH PLUGS
SLOPE%
MIN
FU
LL
T R
EN
C
H D
EP
TH
CL
CL
MAXIMUM SPACING AND MATERIAL FOR TRENCH PLUGS
TRENCH SLOPE (%) SPACING L (FT) PLUG MATERIAL
< 5 1,000 * CLAY, BENTONITE, OR CONCRETE FILLED SACK
5 - 15 500 * CLAY, BENTONITE, OR CONCRETE FILLED SACK
15 - 25 300 * CLAY, BENTONITE, OR CONCRETE FILLED SACK
25 - 35 200 * CLAY, BENTONITE, OR CONCRETE FILLED SACK
35 - 100 100 * CLAY, BENTONITE, OR CONCRETE FILLED SACK
> 100 50 CEMENT FILLED BAGS (WETTED) OR MORTARED STONE
* TOPSOIL MAY NOT BE USED TO FILL SACKS
NOTES:
1. IMPERVIOUS TRENCH PLUGS ARE REQUIRED FOR ALL STREAM, RIVER, WETLAND OR OTHER
WATER BODY CROSSING.
ELEVATION VIEW
SECTION VIEW
STANDARD COMPACT
BACKFILL
STACKED CLAY, BENTONITE
OR CONCRETE FILLED SACK
PIPE BEDDING
PIPE INVERT
TRENCH BOTTOM
SECTION A-A PROFILE VIEW
4"Ø PERFORATED END PLUG
(PERFORATIONS SHOULD BE
NO LARGER THAN 1/8"Ø) -
INSERT END PLUG INTO
AASHTO NO. 57 STONE LAYER
MIRAFI 1100 NPA
GEOTEXTILE, OR
EQUAL, WRAPPED
AROUND STONE
AASHTO NO. 57 STONE
(MIN. 2-FOOT THICK LAYER)
BEDDING
STONE
4"Ø NON-PERFORATED
SCHEDULE 80 PVC PIPE -
OUTLET ONTO SCOUR
STOP
PIPE TRENCH BACKFILL
2-FOOT WIDE
TRENCH PLUG
6" TOPSOIL LAYER
PLAN VIEW
PIPELINE MIRAFI 1100 NPA
GEOTEXTILE, OR
EQUAL, WRAPPED
AROUND STONE
AASHTO
NO. 57 STONE
2-FOOT WIDE
TRENCH PLUG
EDGE OF
PIPE TRENCH
4"Ø PERFORATED END PLUG
(PERFORATIONS SHOULD BE
NO LARGER THAN 1/8"Ø) -
INSERT END PLUG INTO
AASHTO NO. 57 STONE LAYER
4"Ø NON-PERFORATED SCHEDULE 80 PVC PIPE -
OUTLET ONTO SCOUR STOP
4169.090
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 10, 2025 H:\0004169.090\04-CAD\SheetFiles\ES-502.dwgLa st
E di te d by : s ba pt is ta
ES-502
/1
2/
BI
D
D
IN
G D
JH
BO
R
O U
G H
O F
O R
W
IG
SB
U
R G
O R
W
IG
SB
U
R G
B O
R O
U G
H , S
C H
U
YL
KI
LL
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
IN
D
U
ST
R
IA
L D
R
IV
E
SE
W
ER
M
AI
N R
EP
LA
C
EM
EN
T
DJH
EIW
SAB
AS NOTED
2 MIN. (TYP.)
INSTALLATION DETAIL
ISOMETRIC VIEW
PLAN VIEW
2'
4'
3'
WIDTH LENGTH
FLOW
ELEVATION VIEW FLOW
NOTES:
1. MAXIMUM DRAINAGE AREA= 1/2 ACRE
2. INLET PROTECTION SHALL NOT BE REQUIRED FOR INLET TRIBUTARY TO SEDIMENT BASIN OR TRAP.
BERMS SHALL BE REQUIRED FOR ALL INSTALLATIONS.
3. ROLLED EARTHEN BERM SHALL BE PROVIDED AND MAINTAINED IMMEDIATELY DOWN GRADIENT OF THE PROTECTED INLET UNTIL ROADWAY IS STONED. ROAD SUB-BASE BERM SHALL BE MAINTAINED UNTIL ROADWAY IS PAVED. SIX INCH MINIMUM HEIGHT ASPHALT BERM SHALL BE MAINTAINED UNTIL
ROADWAY SURFACE RECEIVES FINAL COAT.
4. AT A MINIMUM, THE FABRIC SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 120 LBS, A MINIMUM BURST STRENGTH OF 200 PSI, AND A MINIMUM TRAPEZOIDAL TEAR STRENGTH OF 50 LBS. FILTER
BAGS SHALL BE CAPABLE OF TRAPPING ALL PARTICLES NOT PASSING A NO. 40 SIEVE.
5. INLET FILTER BAGS SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH RUNOFF EVENT.
BAGS SHALL BE EMPTIED AND RINSED OR REPLACED WHEN HALF FULL OR WHEN FLOW CAPACITY
HAS BEEN REDUCED SO AS TO CAUSE FLOODING OR BYPASSING OF THE INLET. DAMAGED OR
CLOGGED BAGS SHALL BE REPLACED. A SUPPLY SHALL BE MAINTAINED ON SITE FOR REPLACEMENT OF BAGS. ALL NEEDED REPAIRS SHALL BE INITIATED IMMEDIATELY AFTER THE INSPECTION. DISPOSE
OF ACCUMULATED SEDIMENT AS WELL AS ALL USE BAGS ACCORDING TO THE PLAN NOTES
6. DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY CAUSE TRAFFIC HAZARDS.
EXPANSION RESTRAINT
(1/4" NYLON ROPE)
2" x 2" x 3/4"
RUBBER BLOCK
1" REBAR FOR BAG REMOVAL
FROM INLET REMOVAL FROM INLET
6" MIN. HEIGHT
BERM
3:1
EARTHEN BERM TO BE STABILIZED
W/ TEMPORARY OR PERMANENT VEGETATION
2 MIN. : 1STORM
INLET
EXTEND BERM OVER CURB
IF RUN-OFF IS BYPASSING
INLET ON LANDWARD SIDE
SCALE:2 NONE
FILTER BAG INLET PROTECTION - TYPE M INLET
STANDARD CONSTRUCTION DETAIL #4-16
SCALE:3 NONE
COMPOST FILTER SOCK
STANDARD CONSTRUCTION DETAIL #4-1
NOTES:
1. CONTRACTOR TO EXCAVATE TRENCH UP TO 18" FROM BOTH SIDES OF THE EXISTING
CULVERT. PROPOSED UTILITY SHALL BE PUSHED THROUGH UNDERNEATH THE EXISTING
CULVERT…