2-2024-BRP-011 Specs - REBID.pdf
PDF 9 MB Posted
- Solicitation number
- US.258237
- Issued by
- Allegheny County, Pennsylvania
About this file
This is a Scope of Work document issued by the Steel Rivers Council of Governments on behalf of the Borough of Whitaker, Pennsylvania, for a residential blight removal and demolition project. The project involves the complete demolition of three residential structures located at 112 Chalfont Street, 116 Regina Street, and 172 Frank Street in Whitaker Borough, Allegheny County. The work includes asbestos removal and abatement, utility disconnection and termination, foundation removal to two feet below ground level, site grading, backfilling with clean soil or slag, removal of associated site elements such as sidewalks and fences, and seeding with a minimum of ten inches of topsoil for erosion prevention and revegetation. The contractor must complete all work within forty-five consecutive calendar days from the issuance of the Notice to Proceed and must notify the Borough and Glenn Engineering & Associates, Ltd. (the project engineer) at least seventy-two hours before construction commences. Sealed bid proposals were to be received by November 3, 2026, at 10:00 a.m. prevailing time via PennBid.
The lump sum bid price must include all labor, materials, equipment, permits, utility clearances, inspections, and hazardous material disposal costs. Due to the extremely deteriorated condition of the structures, asbestos surveys were not completed; therefore, the contractor must budget for asbestos abatement as if all materials are contaminated and must comply with all Allegheny County Health Department, Bureau of Air Pollution Control requirements. Liquidated damages of three hundred fifty dollars per consecutive calendar day apply for failure to complete work on schedule. The contractor is fully responsible for compliance with Pennsylvania's Act 121 regarding utility notification and all Public Utility Commission regulations, bearing all associated fines. A bid bond equal to ten percent of the proposal amount is required. Compliance is mandated with the Pennsylvania Prevailing Wage Act, Civil Rights Act of 1964, and applicable federal executive orders, with Allegheny County MBE/WBE program goals of thirteen percent minority and two percent female business enterprise participation, plus five percent veteran-owned small business goals per Ordinance #6867-12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-PA Prevailing Wages - REBID 2024-BRP-011.pdf | ||
| 3-2024-BRP-011 ReqDocs REBID.pdf | ||
| 1-2024-BRP-011 Terms Condition - REBID.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEEL RIVERS COUNCIL OF GOVERNMENTS
Request for Bids
November 2026
2024-BRP-011
WHITAKER BLIGHT REMOVAL - REBID
WHITAKER BOROUGH, PA
Steel Rivers Council of Governments
1705 Maple Street, Room 100
Homestead, PA 15120
412-462-7600 (phone)
412-462-3986 (fax)
Glenn Engineering & Associates, Ltd.
14920 US-30
Irwin, PA 15642
412-824-5672
Project Timeline: 45-Day Completion Period
Glenn Engineering & Associates
DIVISION V
SCOPE OF WORK
DIVISIONV - SCOPE OF WORK 2000 PAGE V 1
NOTE: Bidders shall not remove any pages from this volume of Contract Documents.
Proposals shall be submitted intact with this volume together with all drawings and addenda.
All additional sheets or special forms used shall be inserted behind Division in which it applies.
ARTICLE 1 - CHARACTER AND LOCATION OF WORK:
Demolition of Residential Structures in the Borough of Whitaker
ARTICLE 2 - TIME ALLOTTED FOR COMPLETION
the
02.01 General - The Bidder's attention is called to the time allowed for completion of the work as specified under this contract which is Forty-Five (45) consecutive calendar days from the date of issuance of the "NOTICE TO PROCEED" from the engineer.
ARTICLE 3 - SCHEDULE OF DRAWINGS
03.01 General - The following drawings are to be considered part of this contract just as if they were included herein:
As included.
1. LOCATION OF THE WORK
SCOPE OF WORK
All work under this Contract will be performed at various locations within the Borough of Whitaker, AlleghenyCounty, Pennsylvania. The Borough is located in south central Allegheny County, along the South Bank of the Monongahela River approximately six miles southeast of the downtown area of the City of Pittsburgh.
2. DRAWINGS
The following drawings are included herein and made an integral part of the Contract Documents: GIS Site Plans.
These drawings are bound within these documents and follow this Scope of Work.
3. GENERAL DESCRIPTION OF PROJECT
The work under this project includes the furnishing of all labor, materials, and equipment required for the performance of all work as indicated in the Contract Documents. The work essentially includes the demolition of structure, including removal of asbestos, if present, site grading, placement of backfill, required restoration, and all other relatedappurtenances.
4. BOROUGH/ENGINEER/COUNCIL OF GOVERNMENTS
The Borough herein referred to shall be the Borough of Whitaker. The Engineer shall be defined as Glenn Engineering & Associates, Ltd. The Steel Rivers Council of Governments (SRCOG) shall administer the Project on behalf of theOwner
5. SCHEDULE OF WORK AND LIQUIDATED DAMAGES
The Contractor shall notify the Borough of Whitaker and Glenn Engineering, not less than seventy-two (72) hours before construction is to start. This project shall be completed not more than forty-five (45) consecutive calendar days following the issuance of the Notice to Proceed.
The liquidated damages will be Three Hundred Fifty Dollars ($350) per consecutive calendar day as a measure ofliquidated damages the Owner will sustain for failure of the Contractor to promptly complete the work.
6. PROJECT DELAYS
If inclement weather or conditions beyond the control of the Contractor and the Owner inhibit the performance of this Contract, such delays will be at no additional cost to the Owner.
7. RESPONSIBILITY FOR BIDDING DOCUMENTS
Plans and specifications in the possession of any prospective Bidder are not transferable to another Bidder. If a planholder wishes to give his set of bidding documents to another potential Bidder, he must first secure the permissionof the Engineer.
8. VISITING THE PREMISES
Before submitting any proposal, the Contractor shall visit the site and examine, thoroughly familiarize himself with the existing conditions and the work to be performed under this Contract. Should any Contractor accept the work, it shall be construed as an acceptance by him of all responsibility and as a guarantee to perform all work required, whether or not distinctly shown on the Drawings or specified.
9. CLEANUP
The Contractor shall be responsible for regular cleaning up of the premises. All refuse, dirt, rubbish, and trash of any kind shall be removed regardless of who may have left same. All such dirt and debris shall be removed from the Owner's property. All removed materials and equipment which may have salvageable value will remain the propertyof the Owner, unless otherwise advised by the Owner.
10. CONFLICTS IN WORDING
Wherever conflict occurs between sections of the Contract Documents, if the conflict is one of degree, the strictershall apply. If the conflict is one of intent, Bidders have the responsibility to contact the Owner for resolution of the conflict. In all cases where the Scope of Work in this Division differs from other Divisions of the Contract Documents in their content, the wording of this Scope of Work will apply.
11. UTILITIES
SCOPE OF WORK (Cont.) PAGE V 2
The Contractor shall determine the exact location of all utilities affected by this work and shall protect the utilities during the course of the work. The Contractor shall, at the discretion of the utility involved, repair or have repaired all damage to the utilities resulting due to the work at no cost to the Owner. These utilities may interfere with the work the Contractor must allow for such interference in his bid. The Contractor will be required to comply with all provisions of Act 121 of the Commonwealth of Pennsylvania of 2008, which requires notification of all utility companies of the impending excavation work. The Contractor shall be FULLY RESPONSIBLE for Compliance with ALL PUC Regulations and Requirements and shall pay ANY Fines Assessed against the Contractor, Owner (Borough of Whitaker or the Engineer (Glenn Engineering and Associates, Limited, resulting from ANY Utility Damage caused by the Contractor.
12. ARBITRATION
No arbitration will be considered for this project.
13. PERMITS
The Contractor, prior to any work, shall secure all necessary permits including any permits required by the Borough of Whitaker. Further, the Contractor shall pay any required taxes or fees specified by the Borough of Whitaker at no additional cost to the Borough. The Contractor shall be responsible for obtaining a permit from the Allegheny County Health Department - Plumbing Division relative to the inspection of and permanent sealing of the sanitary sewer service line and the water service connection. All associated costs shall be paid by the Contractor, at no additional cost to the Owner. All inspection shall be performed by the Allegheny County Health Department - Plumbing Division. The Contractor shall be required to submit the necessary certificates from the County Plumbing Inspector to the Engineer, prior to recommendation of payment. All associated costs shall be included in the Contractor's Lump Sum Prices. The Contractor shall also be required to contact Peoples Gas Company for disconnection of gas service by them. The Contractor shall also be required to contact the Pennsylvania American Water Company (PAWC), to arrange for them to remove and take the existing water meter prior to demolition.
14. INSURANCE
In addition to the insurance requirements set forth elsewhere herein, the Contractor shall include the following additional named insured on his insurance policies: Borough of Whitaker
15. PROTECTION OF EXISTING STRUCTURES
as
Any and all structures adjacent to the sites of construction such as manholes, other castings, poles, pipes, or any such structure shall be safeguarded against damage from the construction operation. Any damage to such structures shall be immediately corrected to the satisfaction of the Owner, by the Contractor, at no expense to the Owner.
16. TECHNICAL QUESTIONS
Technical questions pertinent to the work to be performed under this Contract may be addressed to:
Robert E. Zischkau, Jr.
Glenn Engineering & Associates, Ltd.
14920 Route 30, North Huntingdon, PA 15642 Phone: 412-667-0218 Fax: 412-824-9587 Email: bobz@glennengr.com
17. DEMOLITION OF STRUCTURES
A. General
Division IX - Section 2.1 - Demolition, Major, shall apply to this project and is intended to provide specific details pertinent to the demolition of residential structures required herein. The aforementioned Division and Section shall apply, except where specifically amended or modified herein this section of the Scope of Work. If conflicts between these sections occur, refer to Paragraph 10 of this Scope of Work.
ASBESTOS SURVEYS AND ABATEMENT –NOTE WELL: Due to the extremely deteriorated condition of these structures and the unsafe conditions, Asbestos Surveys were not able to be performed. As such, the Contractor shall include ALL necessary associated costs to demolish and dispose of ALL materials on site as if it were Asbestos or other such Hazardous Materials, all in full compliance with ALL Regulatory Requirements.
SCOPE OF WORK (Cont.) PAGE V 3
B. Scope of Work
The Lump Sum Price in the Proposal Form shall include the cost of demolition and disposal of each of the structures contained in the following list including, but not limited, to the following work:
All site preparation work in terms of acquisition of required permits and utility clearances.The termination and disconnection of all utilities.
Removal of any foundation walls to a depth of two feet below ground level.
Removing wood, metal, or other building debris.
After review by the Engineer, backfilling with clean soil or slag to ground level as required by the municipality'sgrading ordinance.
Removal and disposal of all pillars, steps, sidewalks, walls, fences, trees, tree trunks, shrubs, and other suchfacilities and/or deleterious materials.
Backfill of the site with suitable material, including proper compaction.
Seeding of the demolition site in order to prevent erosion and provide revegetation, including placement of notless than ten inches (10") of suitable topsoil.
All work shall be performed in accordance with these Contract Documents and to the satisfaction of the Borough ofWhitaker Code Enforcement Department and the Engineer.
The Contractor shall notify the Whitaker Borough Engineer not less than seventy-two (72) hours prior to the actualcommencement of this work.
C. Properties to be Demolished
1. Lynn Ann Kinney 172 Frank Street
2 Story Sided Structure Block 180-G Lot 116
3. James & Carol Sotkowski
116 Regina Street
2 Story Frame & Sided Structure
Block 180-G Lot 281
2. Ohana Capital Investments 112 Chalfont Street
2 Story Frame Structure
Block 180-H Lot 229
D. Specific Modifications & Amendments to Division IX, Section 2.1 of the Engineering Specifications
Asbestos - In addition to other requirements, it shall be the Contractor's total responsibility to determine, remove, anddispose of any and all asbestos materials from residential structures. All such removal and disposal shall be in fullaccordance with all applicable local, county, state, and/or federal requirements. No additional compensation shall bepaid to the Contractor by the Borough for any required asbestos removal and disposal. The Asbestos Survey Reportis included herein and made a part of these Bid Documents. The Contractor shall determine the extent of all the asbestos, at this site. SPECIAL NOTES: NOTE WELL: Due to the extremely deteriorated condition of these structures and the unsafe conditions, Asbestos Surveys may not have been able to be performed. As such, theContractor shall include ALL necessary associated costs to demolish and dispose of ALL materials on site as if it were Asbestos or other such Hazardous Materials, all in full compliance with ALL Regulatory Requirements.
1.
ALL Demolition, Disposal and Abatement shall be performed in STRICT ACCORDANCE with therequirements of the Allegheny County Health Department, Bureau of Air Pollution Control. ALLassociated costs shall be included in the Contractor's Lump Sum Bid. ASBESTOS SURVEYS ARE
CONTAINED ELSEWHERE IN THESE CONTRACT DOCUMENTS AND ALSO PROVIDE SITE
SPECIFIC WRITTEN REQUIREMENTS FOR THE ASBESTOS ABATEMENT AS REQUIRED BY
THE COUNTY OF ALLEGHENY. Additional Requirements are Contained Immediately following thisScope of Work Section.