2-2015 Vault Toilets (Connected Lakes).pdf

PDF 367 KB Posted

Attached to
PMAA, RMCR, Vault Toilet Replacement
Solicitation number
DQ1 PMAA 2015001423 1
Issued by
Colorado

About this file

This is a design drawing set for a vault toilet installation project at Connected Lakes, located within the James M. Robb - Colorado River park system. The project involves the construction and installation of vault toilets at the Connected Lakes recreation area. The document package consists of three sheets: a cover sheet, a site plan showing the toilet locations and layout, and detailed drawings specifying construction specifications and installation requirements. The drawings were finalized on May 4, 2015, and serve as the basis for bidding and construction of this park infrastructure improvement.

The file does not contain information regarding pricing terms, bidding deadlines, award dates, contract duration, funding sources, or other procurement-related details. The drawings are technical design documents intended to guide contractors in understanding the scope and specifications of the vault toilet installation project. Additional procurement documents would be necessary to determine budget allocations, bid submission requirements, evaluation criteria, and contract terms for this project.

View the file

Other files

File Type Posted
3tioga_dwgs.pdf PDF
1A-Connected Lakes- Vault ToiletR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q

P R

O J

E C

T S

_P ar ks

\J am es M

. R ob b

- C ol or ad o

R iv er \2

V au lt To ile t (

C on ne ct ed L ak es

)\1 -D

ES

IG

N \7

- D ra w in gs \2

V au lt To ile ts

(C on ne ct ed L ak es

).d w g, /4 /2

:5

5:

A M

P R

O J

E C

T S

_P ar ks

\J am es M

. R ob b

- C ol or ad o

R iv er \2

V au lt To ile t (

C on ne ct ed L ak es

)\1 -D

ES

IG

N \7

- D ra w in gs \2

V au lt To ile ts

(C on ne ct ed L ak es

).d w g, /4 /2

:5

5:

P R

O J

E C

T S

_P ar ks

\J am es M

. R ob b

- C ol or ad o

R iv er \2

V au lt To ile t (

C on ne ct ed L ak es

)\1 -D

ES

IG

N \7

- D ra w in gs \2

V au lt To ile ts

(C on ne ct ed L ak es

).d w g, /4 /2

:5

5:

2015 Vault Toilets (Connected Lakes)-1 Cover Sheet
2015 Vault Toilets (Connected Lakes)-2 Site Plan
2015 Vault Toilets (Connected Lakes)-3 Details

File details come from the government source that posted it. Updated .