This document is a Sole Source (Including Brand Name) Justification for a federal contract with Resonant Sciences for B-2 RAZR Programming and Maintenance. The contract is for specialized services related to a radar cross section (RCS) measurement system for B-2 composite flight control surfaces, valued between $750K and $15M. The primary objectives include evaluation and integration of the RAZR system, development of functional operations (FUNOPS), system relocation to a new facility at Hill Air Force Base, and familiarization training for Air Force personnel.

The contract will span from May 2025 to May 2026, with services including system evaluation, software integration, data collection, performance verification, and technical training. Resonant Sciences is identified as the sole source provider due to their proprietary software, unique system knowledge, and status as the original equipment manufacturer (OEM). The justification notes that no other vendors were found capable of performing these specialized services, and a sources sought notice on SAM.gov yielded only one unqualified response. The contract is being awarded through the Air Force Materiel Command (AFMC) with simplified acquisition procedures under statutory authority AFFARS 5313.501.

View the file

Other files

File Type Posted
3 - A001 CDRL.pdf PDF
5 - A003 CDRL.pdf PDF
6 - A004 CDRL.pdf PDF
11866 B-2 RAZR Programming and Maintenance Combo.docx DOCX document
1 - B-2 RAZR Programing and Upgrade SOW cw6.pdf PDF
4 - A002 CDRL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

CONTROLLED UNCLASSIFIED INFORMATION

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 7March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 7

- Determine the number of azimuth (AZ) scans needed to produce the required imaging of the component.

- Demonstrate a full data collection and confirm that output file can be read by CompuQuest software.

- The contractor shall verify to the 309 MXSG/EN that the RAZR collection repeats the MRK V collection. Verification of the B-2 composite flight control surfaces RCS will be done using an arithmetic mean of the data collection and a visual inspection of the image plotted at the angle of interest.

- Assist with additional development of the FUNOP setup for that component as types/test articles become available.

CLIN 003 Relocation:

- Assist with the relocation of the RAZR to the new CAACF by offering:

- Determination on where to deploy pylon and RAZR system.

- Verification of RAZR performance in new facility.

- Estimated time for this relocation will occur after October 2025.

CLIN 004 Familiarization:

- Familiarize Hill AFB engineers on how to setup the FUNOPs for collecting B2 data. This effort shall take place at Hill AFB and take no longer than seven (7) days.

- Familiarize technicians and engineers on how to perform health checks on the RAZR and command of the rotator.

This effort shall take place at Hill AFB and take no longer than five (5) days.

- Assist Hill personnel with developing FUNOPS with additional B-2 assets as they become available.

- Familiarize Hill AFB engineers on the physics and background of the RAZR function and operations such that the Hill engineers can create additional FUNOPs.

C. Contract Summary:

Evaluation /Integration: Estimated POP: May 2025 - May 2026 Program Manager Level 3 80 hours $ Sr. Staff Engineer Level 2 400 hours $ Sr. Staff Engineer Level 3 140 hours $ Human Resources Level 3 10 hours $ Contracts Manager Level 2 10 hours $ Financial Analyst Level 3 10 hours $ Logistics Manager Level 1 10 hours $ Finance Manager Level 2 10 hours $ Travel 60 Days 6 People $

Development: Estimated POP: May 2025 - May 2026 Program Manager Level 3 20 hours $ Staff Engineer level 3 260 hours $ Sr. Staff Engineer Level 2 260 hours $ Sr. Staff Engineer Level 3 260 hours $ Human Resources Level 3 10 hours $ Contracts Manager Level 2 10 hours $ Financial Analyst Level 3 10 hours $ Logistics Manager Level 1 10 hours $ Finance Manager Level 2 10 hours $ Travel 35 Days 3 People $

Relocation: Estimated POP: May 2025 - May 2026 Program Manager Level 3 140 hours $ Sr. Staff Engineer Level 2 140 hours $ Sr. Staff Engineer Level 3 160 hours $ Human Resources Level 3 10 hours $ Contracts Manager Level2 10 hours $ Financial Analyst Level 3 10 hours $ Logistics Manager Level 1 10 hours $ Finance Manager Level 2 10 hours $ Travel 8 Days 3 People $

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 7March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 7

Familiarization: Estimated POP: May 2025 - May 2026 Curriculum: $ Travel 3 Days 2 People $

Parts: Estimated delivery: June 2025 - June 2026 Rotator $

Contract total with all options: $ The Funding to be used for this requirement will be The following supporting attachments:

1.) 11866 B-2 RAZR Programing and Maintenance IGCE 2.) 11866 Resonant Sciences Quote 3.) 11866 Resonant Sciences Email (Labor Categories and Rates)

IV. Statutory authority permitting other than full and open competition.

AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

The B-2 RAZR is a radar system utilized for measuring the radar cross section (RCS) of B-2 composite flight control surfaces. The RAZR system was procured by AFLCMC as part of the University of Dayton Research Institute (UDRI) contract Order # and was delivered to Hill AFB in Nov 2024. It uses proprietary software specific to the OEM for the development of functional operations (FUNOPS) that must be compatible with existing MRK V government files (see the attached Data Rights Assertion Table for the basic contract). Additional FUNOP programing and government employee familiarization will be required for verification of B-2 flight control surfaces. Specialized knowledge and proprietary data rights for the RAZR software will be required to perform initial evaluation and setup. B-2 RAZR will be relocated to a new facility and will require specialized services for the determination of where to deploy the pylon, the RAZR system, and verification of RAZR performance in the new facility.

Specialized knowledge of the B-2 RAZR system, components and access to proprietary data rights for the RAZR software will be required to perform these services and meet the needs of the government. Therefore, this acquisition is for performance of a highly specialized service.

Resonant Sciences is the designer and manufacture of the RAZR system. In a letter dated 2 October 2024 Resonant Sciences confirmed they're the only service provider that provides the "uniquely qualified" maintenance and services for the RAZR and radar systems. Uniquely qualified maintenance and services encompasses the work described in the paragraph above and the SOW, all of which requires access to the proprietary RAZR software. Resonant Sciences does not authorize any third party service providers, and services completed by anyone other than OEM could result in potential damage of the RAZR. The Resonant Science B-2 RAZR performs B-2 Pylon radar analysis that require FUNOP programing. Resonant Sciences is the OEM of the RAZR and the only company capable of performing FUNOP programing.

The government does not possess the organic capabilities to service the B-2 RAZR and the OEM is currently the only service provider with the uniquely qualified capabilities. There are currently no Adaptable Zonal Radar options that do not have an OEM proprietary rights required for service. The B-2 RAZR demonstrated the best value to the government at the time of procurement with a cost of approximately $ Another vendor was identified for a similar system, with a price of approximately $ Due to the purchase of the B-2 RAZR on contract Order # and as described in section two above, Resonant Sciences is the only vendor capable of performing the requirements of this contract. Award to any other company that does not possess the specialized knowledge of the B-2 RAZR would potentially result in damage to the existing government equipment, that may lead to replacement of parts or the need of replacement to the entire system. Additionally a government contract is

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 6 of 7March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 6 of 7 currently being established for the sustainment of other Resonant Sciences RAZR systems. It is expected that the sustainment of the RAZR system at Hill AFB will be accomplished with this pending contract. Award of the services such as initial RAZR setup, FUNOP programing, and relocation to the Composite Aircraft Antenna Calibration Facility (CAACF) to any other company that does not possess the specialized knowledge of the RAZR could result in damage to the system and compromise the continuity of services provided for the RAZR systems across multiple installations.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

IAW FAR 5.201(a), a sources sought (FA822724Q5006) was posted on SAM.gov from 9/3/2024 to 9/18/2024 in an effort to identify additional sources. The source sought included a statement of work listing the requirements needed to accomplish this effort. Only one vendor (BHPE LLC) replied to the source sought, and they are unable to demonstrate the specialized skills required for this effort. Their response lacked any specific information related to the requirement and did not showcase in their response that they have the capability nor skills to accomplish the work outlined in the requirement. No additional vendors were identified, and the CO determined there was no reasonable expectation that additional vendors with the qualified skills and data rights access to the RAZR software would provide a quote to a solicitation for this requirement.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

The following steps will be taken to ensure that the anticipated cost of this acquisition will be fair and reasonable. The Contracting Officer will comply with the procedures and criteria contained in Federal Acquisition Regulation (FAR) under Part 30 - Cost Accounting Standards, Part 31- Contract Cost Principles and Procedures, Subparts 15.4 - Contract Pricing; to include technical evaluations and audits, as appropriate. Additional steps to ensure price reasonableness will be under the guidance of the Contract Pricing Reference Guides, jointly developed by the Federal Acquisition Institute and the Air Force Institute of Technology. The Final Step is to include the Price Negotiation Memorandum (PNM). This detailed documentation and justification of price reasonableness will be disclosed in the official PNM, to be prepared upon completion of negotiations.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

Internet searches were conducted using google, and a search for Electronic and Precision repair and maintenance. No companies were found that showed the capabilities to perform these services. Government Databases including GSA advantage and DLA troop support were searched for potential contracting vehicles with no new potential options being identified. A sources sought (FA822724Q5006) was posted on SAM.gov from 9/3/2024, closed 9/18/2024 which had only one response that was not capable performing the services for this effort. The government SME contacted Resonant Sciences who is a known source of services, and they provided a full capability statement as well as documentation showing they are the sole source provider of these services.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

N/A

X. List of any sources that expressed, in writing, an interest in the acquisition.

A. Resonant Sciences RAZR and Radar, Cage Code 78V26 3975 Research Boulevard Dayton, Ohio 45430

B. BHPE LLC, Cage Code 9SWS7 901 S Spring LN

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 7 of 7March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 7 of 7

Blanchard, Oklahoma 73010-9689, United States

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

As a result of continued refusal by the Sole Source contractor to provide or license data as well as the unacceptable delay of developing additional sources per Sections VI and X, there are no known additional actions which can be taken to remove barriers to competition and therefore, specific actions and milestones cannot be established.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my signature above, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.