This document is a traffic signal design plan prepared by the Pennsylvania Department of Transportation (PennDOT) Engineering District 6-0 for Lower Gwynedd Township in Montgomery County, Pennsylvania, detailing signal specifications for the intersection of DeKalb Pike (State Route 0202) and Sumneytown Pike. The plan encompasses comprehensive traffic signal installation requirements including vehicular signal heads, pedestrian signals with countdown timers, lane control signs, and directional arrows positioned at multiple approaches. The design specifies 16-inch by 18-inch LED countdown pedestrian signals, 12-inch lens vehicular signals, various regulatory and directional signs with specific dimensions, and overhead street name signs for both roadways. The document includes detailed traffic volume data compiled from DVRPC 2020 data, showing peak hour movements ranging from 20 to 1,030 vehicles, along with pedestrian counts throughout a 12-hour period from 7:00 AM to 6:00 PM. The plan incorporates emergency pre-emption capabilities for both northbound and southbound approaches on DeKalb Pike and eastbound and westbound approaches on Sumneytown Pike, with fail-safe flashing white flood light devices. Signal timing diagrams indicate fixed coordination patterns with multiple phases (1 through 8) and maximum timing options, pedestrian-actuated clearance intervals, and adaptive signal control references to System Permit I-0004.
General notes emphasize that no modifications are permitted without prior written approval from PennDOT, with maintenance responsibilities assigned to the permittee including tree trimming for signal visibility. Installation requirements mandate post-mounted signals positioned minimum 2 feet behind curb faces with 8-foot minimum spacing between signal heads, overhead signals requiring 16-foot minimum vertical clearance, and all support structures rigidly mounted with backplates. The plan references compliance with PennDOT Traffic Signal Standards TC-8800 Series, Pennsylvania Act 287 underground utility protection requirements, and Form 408 specifications for curbing installation. Multiple revisions documented through 2024 reflect timing adjustments, pre-emption additions, phase number corrections, and updates to maximum signal timing for phases 4+8, with the latest modifications dated May 6, 2024. The document contains design details for both sign types and directional specifications, detectable warning surfaces at pedestrian crossing areas, and controller cabinet placement with video camera monitoring capabilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S u m n eytow n P i ke
Norr i stown Rd
S u m n eytow n P i ke
Norr i stown Rd
B et h l e h em P i ke
MJS
Digitally signed by
MJS
Date: 2024.10.08 08:32:02 -04'00'
KPL Digitally signed by KPL Date: 2024.10.08 09:44:37 -04'00'
MJS Digitally signed by MJS
08:32:47 -04'00' KPL Digitally signed by KPL
09:44:55 -04'00'
MJS
Digitally signed by
MJS
Date: 2024.05.06 08:40:32 -04'00'
KPL
Digitally signed by
KPL
Date: 2024.05.06 09:40:41 -04'00'
MJS
MJS
Date: 2024.05.06 08:40:53 -04'00'
KPL
Digitally signed by
KPL
Date: 2024.05.06 09:40:59 -04'00'
Y
G
RY
G
R
FY
R Y G
Y
G
R Y G 2
AutoCAD SHX Text
SUMNEYTOWN PIKE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SIGN TABULATION
AutoCAD SHX Text
SIZE
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text G
AutoCAD SHX Text R3-7L
AutoCAD SHX Text R3-7R
AutoCAD SHX Text R10-10L
AutoCAD SHX Text R10-11
AutoCAD SHX Text D3-4
AutoCAD SHX Text D3-4
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text
LEFT LANE MUST TURN LEFT
AutoCAD SHX Text
RIGHT LANE MUST TURN RIGHT
AutoCAD SHX Text
LEFT TURN SIGNAL
AutoCAD SHX Text
NO TURN ON RED
AutoCAD SHX Text D
AutoCAD SHX Text 45'
AutoCAD SHX Text 58'
AutoCAD SHX Text 13'
AutoCAD SHX Text 11'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 14'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5'
AutoCAD SHX Text 84'
AutoCAD SHX Text 113'
AutoCAD SHX Text 75'
AutoCAD SHX Text 60'
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text R9-3
AutoCAD SHX Text
NO PEDESTRIAN CROSSING
AutoCAD SHX Text M
AutoCAD SHX Text 150'
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
SERIES NUMBER
AutoCAD SHX Text
PLAN SYMBOL
AutoCAD SHX Text 16"x18" LED COUNTDOWN
AutoCAD SHX Text 17,18,19,20
AutoCAD SHX Text
12" LENS
AutoCAD SHX Text
35 MPH +2.52%
AutoCAD SHX Text
35 MPH -0.28%
AutoCAD SHX Text
NO SIGNAL WITHIN ONE MILE
AutoCAD SHX Text
SUMNEYTOWN PIKE
AutoCAD SHX Text 10'
AutoCAD SHX Text 12'
AutoCAD SHX Text
40 MPH +2.20%
AutoCAD SHX Text 12'
AutoCAD SHX Text
NEAREST SIGNAL 3,575' AT EVANS ROAD
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 4'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 5'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text 5'x40'
AutoCAD SHX Text 10'
AutoCAD SHX Text 13'
AutoCAD SHX Text 90'
AutoCAD SHX Text 70'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 12'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text 4'x40'
AutoCAD SHX Text 40'
AutoCAD SHX Text 45'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text R10-3E(L)
AutoCAD SHX Text R10-3E(R)
AutoCAD SHX Text
OVERHEAD STREET NAME - DEKALB PIKE
AutoCAD SHX Text
EDUCATIONAL PUSH BUTTON FOR WALK SIGNAL WITH COUNTDOWN TIMER-LEFT
AutoCAD SHX Text
EDUCATIONAL PUSH BUTTON FOR WALK SIGNAL WITH COUNTDOWN TIMER-RIGHT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text 11'
AutoCAD SHX Text C
AutoCAD SHX Text
SIGNALS TO BE EQUIPPED W/TUNNEL VISORS
AutoCAD SHX Text 1-16
AutoCAD SHX Text
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text 45'
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text %%uSIGNAL INDICATIONS%%U
AutoCAD SHX Text P
AutoCAD SHX Text
S.R. 0202, SEG. 0284, OFF. 1155 S.R. 0202, SEG. 0285, OFF. 1150
AutoCAD SHX Text
OVERHEAD STREET NAME - SUMNEYTOWN PIKE
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text R1-2
AutoCAD SHX Text
YIELD
AutoCAD SHX Text
AutoCAD SHX Text
CC
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
R10-6AL
AutoCAD SHX Text
STOP HERE ON RED LEFT
AutoCAD SHX Text R3-7L
AutoCAD SHX Text
LEFT LANE MUST TURN LEFT
AutoCAD SHX Text R
AutoCAD SHX Text R3-7R
AutoCAD SHX Text
RIGHT LANE MUST TURN RIGHT
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
DO NOT ENTER
AutoCAD SHX Text R5-1
AutoCAD SHX Text 30"x30"
AutoCAD SHX Text 30"x30"
AutoCAD SHX Text 30"x36"
AutoCAD SHX Text 30"x36"
AutoCAD SHX Text 30"x36"
AutoCAD SHX Text 9"x15"
AutoCAD SHX Text 9"x15"
AutoCAD SHX Text 78"x24"
AutoCAD SHX Text 108"x24"
AutoCAD SHX Text 36"x36"
AutoCAD SHX Text 18"x18"
AutoCAD SHX Text 24"x30"
AutoCAD SHX Text 36"x36"
AutoCAD SHX Text 36"x36"
AutoCAD SHX Text 36"x36"
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
AutoCAD SHX Text 1,4, 11,12,13
AutoCAD SHX Text
12" LENS
AutoCAD SHX Text 7,8
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text 5'x40'
AutoCAD SHX Text 6'x40'
AutoCAD SHX Text
MATCH LINE A
AutoCAD SHX Text
MATCH LINE B
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text R10-12A
AutoCAD SHX Text
LEFT TURN YIELD ON FLASHING YELLOW ARROW
AutoCAD SHX Text
12" LENS
AutoCAD SHX Text
AutoCAD SHX Text
12" LENS
AutoCAD SHX Text 2,3,5,6, 9,14,15,16
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text 30"x36"
AutoCAD SHX Text R10-10R
AutoCAD SHX Text
RIGHT TURN SIGNAL
AutoCAD SHX Text
AutoCAD SHX Text
MATCH LINE C
AutoCAD SHX Text 48"x30"
AutoCAD SHX Text V
AutoCAD SHX Text R3-8B
AutoCAD SHX Text
LANE USE CONTROL (L-S-SR)
AutoCAD SHX Text %%uSIGN J%%U
AutoCAD SHX Text 78"
AutoCAD SHX Text 9"
AutoCAD SHX Text 7.6"
AutoCAD SHX Text DeKalb Pike
AutoCAD SHX Text 12"
AutoCAD SHX Text 4.4"
AutoCAD SHX Text 24"
AutoCAD SHX Text 108"
AutoCAD SHX Text 9"
AutoCAD SHX Text 7.6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 4.4"
AutoCAD SHX Text 24"
AutoCAD SHX Text %%uSIGN K%%U
AutoCAD SHX Text Sumneytown Pike
AutoCAD SHX Text
12. 6 PM TO 7 PM
AutoCAD SHX Text
11. 5 PM TO 6 PM
AutoCAD SHX Text
10. 4 PM TO 5 PM
AutoCAD SHX Text
9. 3 PM TO 4 PM
AutoCAD SHX Text
8. 2 PM TO 3 PM
AutoCAD SHX Text
7. 1 PM TO 2 PM
AutoCAD SHX Text
4. 10 AM TO 11 AM
AutoCAD SHX Text
3. 9 AM TO 10 AM
AutoCAD SHX Text
2. 8 AM TO 9 AM
AutoCAD SHX Text
1. 7 AM TO 8 AM
AutoCAD SHX Text
PED
AutoCAD SHX Text Totals
AutoCAD SHX Text Totals
AutoCAD SHX Text
PED
AutoCAD SHX Text
PED
AutoCAD SHX Text Totals
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PED
AutoCAD SHX Text Totals
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
5. 11 AM TO 12 PM
AutoCAD SHX Text
6. 12 PM TO 1 PM
AutoCAD SHX Text
PED
AutoCAD SHX Text
BUILD FORECAST
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DEKALB PIKE (SR 0202)
AutoCAD SHX Text
DEKALB PIKE (SR 0202)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DVRPC 2020
AutoCAD SHX Text
TRAFFIC VOLUMES
AutoCAD SHX Text
SUMNEYTOWN PIKE
AutoCAD SHX Text
SUMNEYTOWN PIKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 35'
AutoCAD SHX Text
40 MPH -2.20%
AutoCAD SHX Text P
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
ADDED PRE-EMPTION & SIGNS K,L,N
AutoCAD SHX Text
ADDED PRE-EMPTION & SIGNS K,L,N
AutoCAD SHX Text
TIMING REVISIONS & REMOVED "WAIT FOR GREEN" SIGN
AutoCAD SHX Text
REVISED TIMINGS, PRE-EMPT NOTES
AutoCAD SHX Text
PAI
AutoCAD SHX Text
PAI
AutoCAD SHX Text
JLH
AutoCAD SHX Text
KPL
AutoCAD SHX Text
TTI
AutoCAD SHX Text 6/9/99
AutoCAD SHX Text 8/2/10
AutoCAD SHX Text 2/20/24
AutoCAD SHX Text 5/16/01
AutoCAD SHX Text 2/18/16
AutoCAD SHX Text
MLK
AutoCAD SHX Text
MLK
AutoCAD SHX Text
DLA
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/4/01
AutoCAD SHX Text 8/6/10
AutoCAD SHX Text 6/22/99
AutoCAD SHX Text
DWM
AutoCAD SHX Text
WJE
AutoCAD SHX Text
ABP
AutoCAD SHX Text
ABP
AutoCAD SHX Text 8/23/99
AutoCAD SHX Text 8/7/10
AutoCAD SHX Text 3/1/16
AutoCAD SHX Text 6/20/01
AutoCAD SHX Text 2/21/16
AutoCAD SHX Text
SR 0202-65S AS-BUILT
AutoCAD SHX Text
NEAREST SIGNAL 4,155' AT HANCOCK ROAD
AutoCAD SHX Text
NEAREST SIGNAL 3,405' AT SCHOOL HOUSE ROAD
AutoCAD SHX Text
CRAIG MCANALLY
AutoCAD SHX Text 4/23/19
AutoCAD SHX Text
HIGHWAY GOTHIC 12" UPPERCASE 9" LOWERCASE
AutoCAD SHX Text %%uSIGN DETAILS%%U
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF THE DEPARTMENT OF TRANSPORTATION. ALL MAINTENANCE WORK INCLUDING TRIMMING OF TREES, NECESSARY FOR PROPER VISIBILITY OF THE SIGNALS IS THE RESPONSIBILITY OF THE PERMITTEE. ALL SIGNS AND PAVEMENT MARKINGS INDICATED ON THIS DRAWING ARE CONSIDERED PART OF THE PERMIT AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PUBLICATION NO. 212. POST MOUNTED SIGNALS SHALL BE INSTALLED WITH THE SIGNAL HEADS A MINIMUM OF 2 FEET BEHIND THE FACE OF CURB OR THE EDGE OF THE SHOULDER. SUPPORT POLES FOR OVERHEAD SIGNALS SHALL ALSO HAVE A MINIMUM CLEARANCE HORIZONTALLY OF 2 FEET. SIGNALS ERECTED OVER THE ROADWAY SHALL HAVE A MINIMUM VERTICAL CLEARANCE OF 16 FT. ABOVE THE ROADWAY. POST MOUNTED SIGNALS SHALL BE A MINIMUM OF 8 FT. ABOVE THE SIDEWALK OR PAVEMENT. ALL OVERHEAD SIGNALS MUST BE RIGIDLY MOUNTED, TOP AND BOTTOM, AND EQUIPPED WITH BACKPLATES. THE MINIMUM HORIZONTAL DISTANCE BETWEEN SIGNALS MEASURED AT RIGHT ANGLES TO THE APPROACH SHALL BE 8 FEET. EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO INSTALLATION BY A REPRESENTATIVE OF PENNDOT. CURBING TO BE INSTALLED BY MUNICIPALITY AND WHERE NOTED, SHALL BE PLAIN CEMENT CONCRETE CURB OR GRANITE CURB, INSTALLED IN ACCORDANCE WITH DEPARTMENT SPECIFICATIONS FORM 408. PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES. THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING UNLESS THE PERMITTEE COMPLIES WITH THE PROVISIONS OF THE LATEST AMENDMENT TO ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES, DATED DECEMBER 20, 1974. WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST CONFORM TO FORM 408 AND A COPY OF THE PROPOSED SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT FOR REVIEW PRIOR TO BIDDING. PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION. CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DISTRICT TRAFFIC ENGINEER
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MUNICIPAL OFFICIAL
AutoCAD SHX Text
REVIEWED:
AutoCAD SHX Text
ENGINEERING DISTRICT 6-0
AutoCAD SHX Text
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PERMIT #
AutoCAD SHX Text
FILE #
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COUNTY:
AutoCAD SHX Text
MUNICIPALITY:
AutoCAD SHX Text
INTERSECTION:
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RECOM
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVW
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DES/ REVW
AutoCAD SHX Text
NO
AutoCAD SHX Text
AutoCAD SHX Text
SYSTEM PERMIT #
AutoCAD SHX Text
MONTGOMERY
AutoCAD SHX Text
LOWER GWYNEDD TOWNSHIP
AutoCAD SHX Text
DEKALB PIKE (SR 0202)
AutoCAD SHX Text
AND SUMNEYTOWN PIKE
AutoCAD SHX Text I-0108
AutoCAD SHX Text 64-0961
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MAST ARM/ IDENTIFYING LENGTH
AutoCAD SHX Text
EMERGENCY PRE-EMPTION FLASHING BEACON
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE NUMBER
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
ZONE OF DETECTION
AutoCAD SHX Text
EMERGENCY PRE-EMPTION DETECTOR
AutoCAD SHX Text
LUMINAIRE/ IDENTIFYING LENGTH
AutoCAD SHX Text
PEDESTRIAN SIGNAL HEAD/ IDENTIFYING NUMBER
AutoCAD SHX Text
SIGN/IDENTIFYING LETTER
AutoCAD SHX Text VEHICULAR SIGNAL HEAD/BACKPLATE/TUNNEL VISOR/DIRECTIONAL ARROW/IDENTIFYING NUMBER
AutoCAD SHX Text
PEDESTAL POLE
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
DETECTABLE WARNING SURFACE
AutoCAD SHX Text 25'
AutoCAD SHX Text
AutoCAD SHX Text
PEDESTRIAN PUSHBUTTON AND SIGN
AutoCAD SHX Text
INLET
AutoCAD SHX Text
PEDSTRIAN STUB POLE
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
VIDEO CAMERA
AutoCAD SHX Text
CONTROLLER CABINET
AutoCAD SHX Text
MARK L. KRAY
AutoCAD SHX Text
DOUGLAS W. MAY, P.E.
AutoCAD SHX Text 1/8/97
AutoCAD SHX Text 1/8/97
AutoCAD SHX Text
DEKALB PIKE (S.R. 0202)
AutoCAD SHX Text
DEKALB PIKE (S.R. 0202)
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
REVISE PHASE NUMBERS TO, MATCH FIELD CONDITIONS
AutoCAD SHX Text
KPL
AutoCAD SHX Text 7/25/17
AutoCAD SHX Text
KPL
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/15/17
AutoCAD SHX Text 8/17/17
AutoCAD SHX Text
UPDATED MAX TIMINGS FOR PHASE 4+8
AutoCAD SHX Text
EJR
AutoCAD SHX Text 5/22/18
AutoCAD SHX Text
KPL
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/18/18
AutoCAD SHX Text 6/18/18
AutoCAD SHX Text
MJS
AutoCAD SHX Text 5/6/24
AutoCAD SHX Text
KPL
AutoCAD SHX Text 5/6/24
SUMNEYTOWN PIKE
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
MATCH LINE B
AutoCAD SHX Text
MATCH LINE C
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD
AutoCAD SHX Text
SUMNEYTOWN PIKE
AutoCAD SHX Text R
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
MATCH LINE A
AutoCAD SHX Text
ADDED PRE-EMPTION & SIGNS K,L,N
AutoCAD SHX Text
ADDED PRE-EMPTION & SIGNS K,L,N
AutoCAD SHX Text
TIMING REVISIONS & REMOVED "WAIT FOR GREEN" SIGN
AutoCAD SHX Text
REVISED TIMINGS, PRE-EMPT NOTES
AutoCAD SHX Text 6/9/99
AutoCAD SHX Text 8/2/10
AutoCAD SHX Text 5/16/01
AutoCAD SHX Text 2/18/16
AutoCAD SHX Text
MLK
AutoCAD SHX Text
MLK
AutoCAD SHX Text
DLA
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/4/01
AutoCAD SHX Text 8/6/10
AutoCAD SHX Text 6/22/99
AutoCAD SHX Text
DWM
AutoCAD SHX Text
WJE
AutoCAD SHX Text
ABP
AutoCAD SHX Text
ABP
AutoCAD SHX Text 8/23/99
AutoCAD SHX Text 8/7/10
AutoCAD SHX Text 3/1/16
AutoCAD SHX Text 6/20/01
AutoCAD SHX Text 2/21/16
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text V
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF THE DEPARTMENT OF TRANSPORTATION. ALL MAINTENANCE WORK INCLUDING TRIMMING OF TREES, NECESSARY FOR PROPER VISIBILITY OF THE SIGNALS IS THE RESPONSIBILITY OF THE PERMITTEE. ALL SIGNS AND PAVEMENT MARKINGS INDICATED ON THIS DRAWING ARE CONSIDERED PART OF THE PERMIT AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PUBLICATION NO. 212. POST MOUNTED SIGNALS SHALL BE INSTALLED WITH THE SIGNAL HEADS A MINIMUM OF 2 FEET BEHIND THE FACE OF CURB OR THE EDGE OF THE SHOULDER. SUPPORT POLES FOR OVERHEAD SIGNALS SHALL ALSO HAVE A MINIMUM CLEARANCE HORIZONTALLY OF 2 FEET. SIGNALS ERECTED OVER THE ROADWAY SHALL HAVE A MINIMUM VERTICAL CLEARANCE OF 16 FT. ABOVE THE ROADWAY. POST MOUNTED SIGNALS SHALL BE A MINIMUM OF 8 FT. ABOVE THE SIDEWALK OR PAVEMENT. ALL OVERHEAD SIGNALS MUST BE RIGIDLY MOUNTED, TOP AND BOTTOM, AND EQUIPPED WITH BACKPLATES. THE MINIMUM HORIZONTAL DISTANCE BETWEEN SIGNALS MEASURED AT RIGHT ANGLES TO THE APPROACH SHALL BE 8 FEET. EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO INSTALLATION BY A REPRESENTATIVE OF PENNDOT. CURBING TO BE INSTALLED BY MUNICIPALITY AND WHERE NOTED, SHALL BE PLAIN CEMENT CONCRETE CURB OR GRANITE CURB, INSTALLED IN ACCORDANCE WITH DEPARTMENT SPECIFICATIONS FORM 408. PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES. THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING UNLESS THE PERMITTEE COMPLIES WITH THE PROVISIONS OF THE LATEST AMENDMENT TO ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES, DATED DECEMBER 20, 1974. WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST CONFORM TO FORM 408 AND A COPY OF THE PROPOSED SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT FOR REVIEW PRIOR TO BIDDING. PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION. CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DISTRICT TRAFFIC ENGINEER
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MUNICIPAL OFFICIAL
AutoCAD SHX Text
REVIEWED:
AutoCAD SHX Text
ENGINEERING DISTRICT 6-0
AutoCAD SHX Text
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PERMIT #
AutoCAD SHX Text
FILE #
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COUNTY:
AutoCAD SHX Text
MUNICIPALITY:
AutoCAD SHX Text
INTERSECTION:
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RECOM
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVW
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DES/ REVW
AutoCAD SHX Text
NO
AutoCAD SHX Text
AutoCAD SHX Text
SYSTEM PERMIT #
AutoCAD SHX Text
MONTGOMERY
AutoCAD SHX Text
LOWER GWYNEDD TOWNSHIP
AutoCAD SHX Text
DEKALB PIKE (SR 0202)
AutoCAD SHX Text
AND SUMNEYTOWN PIKE
AutoCAD SHX Text I-0108
AutoCAD SHX Text 64-0961
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text 25'
AutoCAD SHX Text
AutoCAD SHX Text
MAST ARM/ IDENTIFYING LENGTH
AutoCAD SHX Text
EMERGENCY PRE-EMPTION FLASHING BEACON
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE NUMBER
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
ZONE OF DETECTION
AutoCAD SHX Text
EMERGENCY PRE-EMPTION DETECTOR
AutoCAD SHX Text
LUMINAIRE/ IDENTIFYING LENGTH
AutoCAD SHX Text
PEDESTRIAN SIGNAL HEAD/ IDENTIFYING NUMBER
AutoCAD SHX Text
SIGN/IDENTIFYING LETTER
AutoCAD SHX Text VEHICULAR SIGNAL HEAD/BACKPLATE/TUNNEL VISOR/DIRECTIONAL ARROW/IDENTIFYING NUMBER
AutoCAD SHX Text
PEDESTAL POLE
AutoCAD SHX Text
DETECTABLE WARNING SURFACE
AutoCAD SHX Text
PEDESTRIAN PUSHBUTTON AND SIGN
AutoCAD SHX Text
PEDSTRIAN STUB POLE
AutoCAD SHX Text
INLET
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
CRAIG MCANALLY
AutoCAD SHX Text 4/23/19
AutoCAD SHX Text
VIDEO CAMERA
AutoCAD SHX Text
CONTROLLER CABINET
AutoCAD SHX Text
DEKALB PIKE (S.R. 0202)
AutoCAD SHX Text
MARK L. KRAY
AutoCAD SHX Text
DOUGLAS W. MAY, P.E.
AutoCAD SHX Text 1/8/97
AutoCAD SHX Text 1/8/97
AutoCAD SHX Text
PAI
AutoCAD SHX Text
PAI
AutoCAD SHX Text
JLH
AutoCAD SHX Text
KPL
AutoCAD SHX Text
TTI
AutoCAD SHX Text 2/20/24
AutoCAD SHX Text
SR 0202-65S AS-BUILT
AutoCAD SHX Text
REVISE PHASE NUMBERS TO, MATCH FIELD CONDITIONS
AutoCAD SHX Text
KPL
AutoCAD SHX Text 7/25/17
AutoCAD SHX Text
KPL
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/15/17
AutoCAD SHX Text 8/17/17
AutoCAD SHX Text
UPDATED MAX TIMINGS FOR PHASE 4+8
AutoCAD SHX Text
EJR
AutoCAD SHX Text 5/22/18
AutoCAD SHX Text
KPL
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/18/18
AutoCAD SHX Text 6/18/18
AutoCAD SHX Text
MJS
AutoCAD SHX Text 5/6/24
AutoCAD SHX Text
KPL
GENERAL NOTES
AutoCAD SHX Text NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF THE DEPARTMENT OF TRANSPORTATION. ALL MAINTENANCE WORK INCLUDING TRIMMING OF TREES, NECESSARY FOR PROPER VISIBILITY OF THE SIGNALS IS THE RESPONSIBILITY OF THE PERMITTEE. ALL SIGNS AND PAVEMENT MARKINGS INDICATED ON THIS DRAWING ARE CONSIDERED PART OF THE PERMIT AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PUBLICATION NO. 212. POST MOUNTED SIGNALS SHALL BE INSTALLED WITH THE SIGNAL HEADS A MINIMUM OF 2 FEET BEHIND THE FACE OF CURB OR THE EDGE OF THE SHOULDER. SUPPORT POLES FOR OVERHEAD SIGNALS SHALL ALSO HAVE A MINIMUM CLEARANCE HORIZONTALLY OF 2 FEET. SIGNALS ERECTED OVER THE ROADWAY SHALL HAVE A MINIMUM VERTICAL CLEARANCE OF 16 FT. ABOVE THE ROADWAY. POST MOUNTED SIGNALS SHALL BE A MINIMUM OF 8 FT. ABOVE THE SIDEWALK OR PAVEMENT. ALL OVERHEAD SIGNALS MUST BE RIGIDLY MOUNTED, TOP AND BOTTOM, AND EQUIPPED WITH BACKPLATES. THE MINIMUM HORIZONTAL DISTANCE BETWEEN SIGNALS MEASURED AT RIGHT ANGLES TO THE APPROACH SHALL BE 8 FEET. EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO INSTALLATION BY A REPRESENTATIVE OF PENNDOT. CURBING TO BE INSTALLED BY MUNICIPALITY AND WHERE NOTED, SHALL BE PLAIN CEMENT CONCRETE CURB OR GRANITE CURB, INSTALLED IN ACCORDANCE WITH DEPARTMENT SPECIFICATIONS FORM 408. PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES. THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING UNLESS THE PERMITTEE COMPLIES WITH THE PROVISIONS OF THE LATEST AMENDMENT TO ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES, DATED DECEMBER 20, 1974. WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST CONFORM TO FORM 408 AND A COPY OF THE PROPOSED SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT FOR REVIEW PRIOR TO BIDDING. PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION. CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DISTRICT TRAFFIC ENGINEER
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MUNICIPAL OFFICIAL
AutoCAD SHX Text
REVIEWED:
AutoCAD SHX Text
ENGINEERING DISTRICT 6-0
AutoCAD SHX Text
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PERMIT #
AutoCAD SHX Text
FILE #
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COUNTY:
AutoCAD SHX Text
MUNICIPALITY:
AutoCAD SHX Text
INTERSECTION:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RECOM
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVW
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DES/ REVW
AutoCAD SHX Text
NO
AutoCAD SHX Text
AutoCAD SHX Text
SYSTEM PERMIT #
AutoCAD SHX Text
MONTGOMERY
AutoCAD SHX Text
LOWER GWYNEDD TOWNSHIP
AutoCAD SHX Text
DEKALB PIKE (SR 0202)
AutoCAD SHX Text
AND SUMNEYTOWN PIKE
AutoCAD SHX Text I-0108
AutoCAD SHX Text 64-0961
AutoCAD SHX Text
ADDED PRE-EMPTION & SIGNS K,L,N
AutoCAD SHX Text
ADDED PRE-EMPTION & SIGNS K,L,N
AutoCAD SHX Text
TIMING REVISIONS & REMOVED "WAIT FOR GREEN" SIGN
AutoCAD SHX Text
REVISED TIMINGS, PRE-EMPT NOTES
AutoCAD SHX Text 6/9/99
AutoCAD SHX Text 8/2/10
AutoCAD SHX Text 5/16/01
AutoCAD SHX Text 2/18/16
AutoCAD SHX Text
MLK
AutoCAD SHX Text
MLK
AutoCAD SHX Text
DLA
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/4/01
AutoCAD SHX Text 8/6/10
AutoCAD SHX Text 6/22/99
AutoCAD SHX Text
DWM
AutoCAD SHX Text
WJE
AutoCAD SHX Text
ABP
AutoCAD SHX Text
ABP
AutoCAD SHX Text 8/23/99
AutoCAD SHX Text 8/7/10
AutoCAD SHX Text 3/1/16
AutoCAD SHX Text 6/20/01
AutoCAD SHX Text 2/21/16
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
INTERVAL
AutoCAD SHX Text
SIGNALS
AutoCAD SHX Text 2,3
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
FIXED
AutoCAD SHX Text 2+5
AutoCAD SHX Text 1+6
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text 1+5
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
PASSAGE
AutoCAD SHX Text 2+6
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FLASHING
AutoCAD SHX Text
EMERGENCY
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text 4+8
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
OFF
AutoCAD SHX Text
OFF
AutoCAD SHX Text 3+8
AutoCAD SHX Text
MAXIMUM I
AutoCAD SHX Text
MAXIMUM II
AutoCAD SHX Text
PEDESTRIAN*
AutoCAD SHX Text
MEMORY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5,6
AutoCAD SHX Text 7,8
AutoCAD SHX Text 17,18
AutoCAD SHX Text 19,20
AutoCAD SHX Text M
AutoCAD SHX Text
FH
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text M
AutoCAD SHX Text
FH
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text
FH
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text M
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text M
AutoCAD SHX Text
FH
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 3+7
AutoCAD SHX Text 4+7
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text
MOVEMENT, SEQUENCE, AND TIMING DIAGRAM
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
NL
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text
* UPON PEDESTRIAN ACTUATION ONLY, OTHERWISE HAND SYMBOL AT ALL TIMES.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text SvR
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 11,12,13
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text 14,15,16
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text
FY
AutoCAD SHX Text
FY
AutoCAD SHX Text
FY
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text REFER TO SYSTEM PERMIT #I-0004 FOR TRAFFIC ADAPTIVE OPERATION. # PHASE PASSAGE CALCULATED BY TRAFFIC ADAPTIVE PROCESSOR. - PHASE SEQUENCE SELECTED BY TRAFFIC ADAPTIVE PROCESSOR.
AutoCAD SHX Text %%uOPERATION NOTES%%U
AutoCAD SHX Text
1 IF FOLLOWED BY 2+5
AutoCAD SHX Text
2 IF FOLLOWED BY 1+6
AutoCAD SHX Text
3 G IF FOLLOWED BY 2+6
AutoCAD SHX Text
6 G IF FOLLOWED BY 4+8
AutoCAD SHX Text
8 G IF FOLLOWED BY 4+7
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
7 IF FOLLOWED BY 1+6
AutoCAD SHX Text
CONTROLLER TO DWELL IN PHASE 2+6 UNTIL ACTUATED BY PHASE 4+8.
AutoCAD SHX Text
PHASE 3+8 SHALL NOT FOLLOW PHASE 4+8
AutoCAD SHX Text
PHASE 4+7 SHALL NOT FOLLOW PHASE 4+8.
AutoCAD SHX Text
4 IF FOLLOWED BY 3+8
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FY
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text
5 IF FOLLOWED BY 4+8
AutoCAD SHX Text
10 M IF FOLLOWED BY 4+8
AutoCAD SHX Text
9 M IF FOLLOWED BY 2+6
AutoCAD SHX Text TIMING WILL BE AS SHOWN IN PHASE 4+8. IT MAY TIME OUT IN THIS PHASE OR PHASE 4+8.
AutoCAD SHX Text TIMING WILL BE AS SHOWN IN PHASE 2+6. IT MAY TIME OUT IN THIS PHASE OR PHASE 2+6.
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
INTERVAL
AutoCAD SHX Text
SIGNALS
AutoCAD SHX Text
FIXED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text 2,3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
SELECTIVE CLEARANCES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5,6
AutoCAD SHX Text 7,8
AutoCAD SHX Text 19,20
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text %%uPRE-EMPTION PHASING NOTES:%%U
AutoCAD SHX Text A
AutoCAD SHX Text
SIGNAL TO INDICATE G WHEN RETURNING TO NORMAL OPERATION
AutoCAD SHX Text NOTE: IF PRE-EMPTION EQUIPMENT HAS ENCODING CAPABILITIES FOR VEHICLE IDENTIFICATION, IT IS RECOMMENDED TO HAVE THE ZERO "00" FEATURE ON, TO GIVE UNCODED EMITTERS THE ABILITY TO ACTIVATE THE EMERGENCY PRE-EMPTION.
AutoCAD SHX Text
DURATION OF PRE-EMPTION
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
SELECTIVE CLEARANCES
AutoCAD SHX Text
SELECTIVE CLEARANCES
AutoCAD SHX Text
SELECTIVE CLEARANCES
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text 17,18
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text 14,15,16
AutoCAD SHX Text 11,12,13
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text
FY
AutoCAD SHX Text Y
AutoCAD SHX Text R
AutoCAD SHX Text %%uEMERGENCY PRE-EMPTION NOTES:%%U
AutoCAD SHX Text
1. 2. 3. 4. 5. 6. 7. 8. 9.
AutoCAD SHX Text CONTROLLER TO BE EQUIPPED WITH EMERGENCY PRE-EMPTION FOR THE NORTHBOUND AND SOUTHBOUND APPROACHES OF S.R. 202 (DEKALB PIKE) AND THE EASTBOUND AND WESTBOUND APPROACHES OF SUMNEYTOWN PIKE WITH A FAIL SAFE DEVICE FOR EACH DIRECTION OF OPERATION. THE FAIL SAFE DEVICE SHALL CONSIST OF A FLASHING WHITE FLOOD LIGHT, AND SHALL BEGIN FLASHING WHEN THE PRE-EMPTION PHASE DISPLAYS PRE-EMPTION GREEN FOR THE EMERGENCY VEHICLE APPROACH. THE SIGNALS, WHEN ACTIVATED BY EMERGENCY VEHICLE, SHALL TERMINATE ALL GREEN INDICATIONS IMMEDIATELY, EXCEPT THE GREEN INDICATIONS FOR THE PHASE GOVERNED BY THE APPROACHING EMERGENCY VEHICLE, FOLLOWED BY SELECTIVE CLEARANCES DEPENDENT UPON THE PHASE IN WHICH THE PRE-EMPTION OCCURS. THE GREEN INDICATIONS FOR THE PRE-EMPTED PHASE SHALL REMAIN GREEN FOR THE DURATION OF SIGNAL PRE-EMPTION AND RED INDICATIONS DISPLAYED FOR ALL OTHER PHASES. ANY FLASHING YELLOW ARROW INDICATIONS FOR THE PRE-EMPTED PHASE SHALL REMAIN FLASHING YELLOW ARROW DURING THE ENTRY ROUTINE FOLLOWED BY GREEN ARROW FOR THE DURATION OF SIGNAL PRE-EMPTION. ANY FLASHING YELLOW ARROW INDICATIONS FOR THE PHASE OPPOSITE THE PRE-EMPTED PHASE SHALL REMAIN FLASHING YELLOW ARROW DURING THE ENTRY ROUTINE AND FOR THE DURATION OF SIGNAL PRE-EMPTION. THE SIGNALS, WHEN ACTIVATED BY EMERGENCY VEHICLE SHALL TIME OUT ALL YELLOW AND RED INDICATIONS, FOLLOWED BY THE GREEN INTERVAL OF THE PRE-EMPTION PHASE GOVERNED BY THE APPROACHING EMERGENCY VEHICLE. IF THE SIGNALS WERE ACTIVATED BY A PEDESTRIAN PUSH BUTTON AND THE SIGNAL IS PRE-EMPTED, THE PEDESTRIAN WALK (MAN) INTERVAL SHALL TERMINATE IMMEDIATELY AND THE PEDESTRIAN CLEARANCE (CLEAR FLASHING HAND AND COUNTDOWN TIMER) INTERVAL SHALL TIME OUT THIS INTERVAL FOLLOWED BY THE APPROPRIATE SELECTIVE CLEARANCES BEFORE GOING INTO EMERGENCY PRE-EMPTION. IF THE SIGNALS, WHEN ACTIVATED BY AN EMERGENCY VEHICLE, ARE FLASHING ALL SIGNALS SHALL REMAIN FLASHING. IF ADDITIONAL PRE-EMPTION PHASES ARE ACTIVATED WHILE IN PRE-EMPTION, THE ORIGINAL PRE-EMPTION PHASE SHALL TIME OUT BEFORE PROCEEDING TO THE NEXT PRE-EMPTION PHASE. UPON COMPLETION OF PRE-EMPTION, PHASE 2,4,6 OR 8 IN RETURNING TO NORMAL OPERATION, PHASE 2+6 INTERVAL 11 SHALL FOLLOW. IN EMERGENCY PRE-EMPTION, NO PRIORITY SHALL BE ESTABLISHED, PRE-EMPTION SHALL BE A "FIRST COME, FIRST SERVE" OPERATION. LOCATION OF EMERGENCY VEHICLE DETECTORS ARE TO BE FIELD ADJUSTED TO ACHIEVE THE MAXIMUM OPERATION.
AutoCAD SHX Text
PRE-EMPTION PHASING
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
CRAIG MCANALLY
AutoCAD SHX Text 4/23/19
AutoCAD SHX Text
MARK L. KRAY
AutoCAD SHX Text
DOUGLAS W. MAY, P.E.
AutoCAD SHX Text 1/8/97
AutoCAD SHX Text 1/8/97
AutoCAD SHX Text
PAI
AutoCAD SHX Text
PAI
AutoCAD SHX Text
JLH
AutoCAD SHX Text
KPL
AutoCAD SHX Text
TTI
AutoCAD SHX Text 2/20/24
AutoCAD SHX Text
SR 0202-65S AS-BUILT
AutoCAD SHX Text
REVISE PHASE NUMBERS TO, MATCH FIELD CONDITIONS
AutoCAD SHX Text
KPL
AutoCAD SHX Text 7/25/17
AutoCAD SHX Text
KPL
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/15/17
AutoCAD SHX Text 8/17/17
AutoCAD SHX Text
UPDATED MAX TIMINGS FOR PHASE 4+8
AutoCAD SHX Text
EJR
AutoCAD SHX Text 5/22/18
AutoCAD SHX Text
KPL
AutoCAD SHX Text
DLA
AutoCAD SHX Text 6/18/18
AutoCAD SHX Text 6/18/18
AutoCAD SHX Text
MJS
AutoCAD SHX Text 5/6/24
AutoCAD SHX Text
KPL
MJS Digitally signed by MJS Date: 2023.10.23 07:53:01 -04'00' KPL Digitally signed by KPL
Date: 2023.10.23 10:03:04 -04'00'
Pk
Old Pk
Penllyn
TrewellynAve Penllyn
TrewellynAve OldPenllynPk
MJS Digitally signed by MJS Date: 2026.05.14
12:14:12 -04'00' KPL
Digitally signed by
KPL
Date: 2026.05.14 14:26:48 -04'00'
MJS
Digitally signed by
MJS
Date: 2026.05.14 12:14:38 -04'00'
KPL
Digitally signed by
KPL
Date: 2026.05.14 14:27:07 -04'00'
S u m n eyt ow n P i ke
We l l i n g to n D r We l l i n g to n D r
S p r i n g h o u se Ct rS h o p p i n g
S p r i n g h o u se Ct rS h o p p i n g
KPL
Digitally signed by
KPL
Date: 2023.03.08 16:06:16 -05'00'
ABP
Digitally signed by
ABP
Date: 2023.03.16 11:32:21 -04'00'
KPL
KPL
Date: 2023.03.08
16:06:34 -05'00' ABP
Digitally signed by ABP Date: 2023.03.16 11:32:41 -04'00'
Welsh Rd
Evans Rd
5/15/2025
MJS
Digitally signed by
MJS
Date: 2025.06.17 09:20:55 -04'00'
KPL Digitally signed by KPL Date: 2025.06.17 11:59:27 -04'00'
File details come from the government source that posted it. Updated .