2-02 Lower Gwnedd Signal Plans.pdf

PDF 10 MB Posted

Attached to
Lower Gwynedd Township Traffic Signal Maintenance
Solicitation number
US.260533
Issued by
Montgomery County, Pennsylvania

About this file

This document is a traffic signal design plan prepared by the Pennsylvania Department of Transportation (PennDOT) Engineering District 6-0 for Lower Gwynedd Township in Montgomery County, Pennsylvania, detailing signal specifications for the intersection of DeKalb Pike (State Route 0202) and Sumneytown Pike. The plan encompasses comprehensive traffic signal installation requirements including vehicular signal heads, pedestrian signals with countdown timers, lane control signs, and directional arrows positioned at multiple approaches. The design specifies 16-inch by 18-inch LED countdown pedestrian signals, 12-inch lens vehicular signals, various regulatory and directional signs with specific dimensions, and overhead street name signs for both roadways. The document includes detailed traffic volume data compiled from DVRPC 2020 data, showing peak hour movements ranging from 20 to 1,030 vehicles, along with pedestrian counts throughout a 12-hour period from 7:00 AM to 6:00 PM. The plan incorporates emergency pre-emption capabilities for both northbound and southbound approaches on DeKalb Pike and eastbound and westbound approaches on Sumneytown Pike, with fail-safe flashing white flood light devices. Signal timing diagrams indicate fixed coordination patterns with multiple phases (1 through 8) and maximum timing options, pedestrian-actuated clearance intervals, and adaptive signal control references to System Permit I-0004.

General notes emphasize that no modifications are permitted without prior written approval from PennDOT, with maintenance responsibilities assigned to the permittee including tree trimming for signal visibility. Installation requirements mandate post-mounted signals positioned minimum 2 feet behind curb faces with 8-foot minimum spacing between signal heads, overhead signals requiring 16-foot minimum vertical clearance, and all support structures rigidly mounted with backplates. The plan references compliance with PennDOT Traffic Signal Standards TC-8800 Series, Pennsylvania Act 287 underground utility protection requirements, and Form 408 specifications for curbing installation. Multiple revisions documented through 2024 reflect timing adjustments, pre-emption additions, phase number corrections, and updates to maximum signal timing for phases 4+8, with the latest modifications dated May 6, 2024. The document contains design details for both sign types and directional specifications, detectable warning surfaces at pedestrian crossing areas, and controller cabinet placement with video camera monitoring capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S u m n eytow n P i ke

Norr i stown Rd

S u m n eytow n P i ke

Norr i stown Rd

B et h l e h em P i ke

MJS

Digitally signed by

MJS

Date: 2024.10.08 08:32:02 -04'00'

KPL Digitally signed by KPL Date: 2024.10.08 09:44:37 -04'00'

MJS Digitally signed by MJS

08:32:47 -04'00' KPL Digitally signed by KPL

09:44:55 -04'00'

MJS

Digitally signed by

MJS

Date: 2024.05.06 08:40:32 -04'00'

KPL

Digitally signed by

KPL

Date: 2024.05.06 09:40:41 -04'00'

MJS

MJS

Date: 2024.05.06 08:40:53 -04'00'

KPL

Digitally signed by

KPL

Date: 2024.05.06 09:40:59 -04'00'

Y

G

RY

G

R

FY

R Y G

Y

G

R Y G 2

AutoCAD SHX Text

SUMNEYTOWN PIKE

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SIGN TABULATION

AutoCAD SHX Text

SIZE

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text G

AutoCAD SHX Text R3-7L

AutoCAD SHX Text R3-7R

AutoCAD SHX Text R10-10L

AutoCAD SHX Text R10-11

AutoCAD SHX Text D3-4

AutoCAD SHX Text D3-4

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text

LEFT LANE MUST TURN LEFT

AutoCAD SHX Text

RIGHT LANE MUST TURN RIGHT

AutoCAD SHX Text

LEFT TURN SIGNAL

AutoCAD SHX Text

NO TURN ON RED

AutoCAD SHX Text D

AutoCAD SHX Text 45'

AutoCAD SHX Text 58'

AutoCAD SHX Text 13'

AutoCAD SHX Text 11'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 14'

AutoCAD SHX Text 5'

AutoCAD SHX Text 5'

AutoCAD SHX Text 84'

AutoCAD SHX Text 113'

AutoCAD SHX Text 75'

AutoCAD SHX Text 60'

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text R9-3

AutoCAD SHX Text

NO PEDESTRIAN CROSSING

AutoCAD SHX Text M

AutoCAD SHX Text 150'

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

SERIES NUMBER

AutoCAD SHX Text

PLAN SYMBOL

AutoCAD SHX Text 16"x18" LED COUNTDOWN

AutoCAD SHX Text 17,18,19,20

AutoCAD SHX Text

12" LENS

AutoCAD SHX Text

35 MPH +2.52%

AutoCAD SHX Text

35 MPH -0.28%

AutoCAD SHX Text

NO SIGNAL WITHIN ONE MILE

AutoCAD SHX Text

SUMNEYTOWN PIKE

AutoCAD SHX Text 10'

AutoCAD SHX Text 12'

AutoCAD SHX Text

40 MPH +2.20%

AutoCAD SHX Text 12'

AutoCAD SHX Text

NEAREST SIGNAL 3,575' AT EVANS ROAD

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 4'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 5'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text 5'x40'

AutoCAD SHX Text 10'

AutoCAD SHX Text 13'

AutoCAD SHX Text 90'

AutoCAD SHX Text 70'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text 5'

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text 4'x40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 45'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text J

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text R10-3E(L)

AutoCAD SHX Text R10-3E(R)

AutoCAD SHX Text

OVERHEAD STREET NAME - DEKALB PIKE

AutoCAD SHX Text

EDUCATIONAL PUSH BUTTON FOR WALK SIGNAL WITH COUNTDOWN TIMER-LEFT

AutoCAD SHX Text

EDUCATIONAL PUSH BUTTON FOR WALK SIGNAL WITH COUNTDOWN TIMER-RIGHT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text 11'

AutoCAD SHX Text C

AutoCAD SHX Text

SIGNALS TO BE EQUIPPED W/TUNNEL VISORS

AutoCAD SHX Text 1-16

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text 45'

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text %%uSIGNAL INDICATIONS%%U

AutoCAD SHX Text P

AutoCAD SHX Text

S.R. 0202, SEG. 0284, OFF. 1155 S.R. 0202, SEG. 0285, OFF. 1150

AutoCAD SHX Text

OVERHEAD STREET NAME - SUMNEYTOWN PIKE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text R1-2

AutoCAD SHX Text

YIELD

AutoCAD SHX Text

AutoCAD SHX Text

CC

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

R10-6AL

AutoCAD SHX Text

STOP HERE ON RED LEFT

AutoCAD SHX Text R3-7L

AutoCAD SHX Text

LEFT LANE MUST TURN LEFT

AutoCAD SHX Text R

AutoCAD SHX Text R3-7R

AutoCAD SHX Text

RIGHT LANE MUST TURN RIGHT

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

DO NOT ENTER

AutoCAD SHX Text R5-1

AutoCAD SHX Text 30"x30"

AutoCAD SHX Text 30"x30"

AutoCAD SHX Text 30"x36"

AutoCAD SHX Text 30"x36"

AutoCAD SHX Text 30"x36"

AutoCAD SHX Text 9"x15"

AutoCAD SHX Text 9"x15"

AutoCAD SHX Text 78"x24"

AutoCAD SHX Text 108"x24"

AutoCAD SHX Text 36"x36"

AutoCAD SHX Text 18"x18"

AutoCAD SHX Text 24"x30"

AutoCAD SHX Text 36"x36"

AutoCAD SHX Text 36"x36"

AutoCAD SHX Text 36"x36"

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

AutoCAD SHX Text 1,4, 11,12,13

AutoCAD SHX Text

12" LENS

AutoCAD SHX Text 7,8

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text 5'x40'

AutoCAD SHX Text 6'x40'

AutoCAD SHX Text

MATCH LINE A

AutoCAD SHX Text

MATCH LINE B

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text R10-12A

AutoCAD SHX Text

LEFT TURN YIELD ON FLASHING YELLOW ARROW

AutoCAD SHX Text

12" LENS

AutoCAD SHX Text

AutoCAD SHX Text

12" LENS

AutoCAD SHX Text 2,3,5,6, 9,14,15,16

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text 30"x36"

AutoCAD SHX Text R10-10R

AutoCAD SHX Text

RIGHT TURN SIGNAL

AutoCAD SHX Text

AutoCAD SHX Text

MATCH LINE C

AutoCAD SHX Text 48"x30"

AutoCAD SHX Text V

AutoCAD SHX Text R3-8B

AutoCAD SHX Text

LANE USE CONTROL (L-S-SR)

AutoCAD SHX Text %%uSIGN J%%U

AutoCAD SHX Text 78"

AutoCAD SHX Text 9"

AutoCAD SHX Text 7.6"

AutoCAD SHX Text DeKalb Pike

AutoCAD SHX Text 12"

AutoCAD SHX Text 4.4"

AutoCAD SHX Text 24"

AutoCAD SHX Text 108"

AutoCAD SHX Text 9"

AutoCAD SHX Text 7.6"

AutoCAD SHX Text 12"

AutoCAD SHX Text 4.4"

AutoCAD SHX Text 24"

AutoCAD SHX Text %%uSIGN K%%U

AutoCAD SHX Text Sumneytown Pike

AutoCAD SHX Text

12. 6 PM TO 7 PM

AutoCAD SHX Text

11. 5 PM TO 6 PM

AutoCAD SHX Text

10. 4 PM TO 5 PM

AutoCAD SHX Text

9. 3 PM TO 4 PM

AutoCAD SHX Text

8. 2 PM TO 3 PM

AutoCAD SHX Text

7. 1 PM TO 2 PM

AutoCAD SHX Text

4. 10 AM TO 11 AM

AutoCAD SHX Text

3. 9 AM TO 10 AM

AutoCAD SHX Text

2. 8 AM TO 9 AM

AutoCAD SHX Text

1. 7 AM TO 8 AM

AutoCAD SHX Text

PED

AutoCAD SHX Text Totals

AutoCAD SHX Text Totals

AutoCAD SHX Text

PED

AutoCAD SHX Text

PED

AutoCAD SHX Text Totals

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PED

AutoCAD SHX Text Totals

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5. 11 AM TO 12 PM

AutoCAD SHX Text

6. 12 PM TO 1 PM

AutoCAD SHX Text

PED

AutoCAD SHX Text

BUILD FORECAST

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DEKALB PIKE (SR 0202)

AutoCAD SHX Text

DEKALB PIKE (SR 0202)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DVRPC 2020

AutoCAD SHX Text

TRAFFIC VOLUMES

AutoCAD SHX Text

SUMNEYTOWN PIKE

AutoCAD SHX Text

SUMNEYTOWN PIKE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 35'

AutoCAD SHX Text

40 MPH -2.20%

AutoCAD SHX Text P

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

ADDED PRE-EMPTION & SIGNS K,L,N

AutoCAD SHX Text

ADDED PRE-EMPTION & SIGNS K,L,N

AutoCAD SHX Text

TIMING REVISIONS & REMOVED "WAIT FOR GREEN" SIGN

AutoCAD SHX Text

REVISED TIMINGS, PRE-EMPT NOTES

AutoCAD SHX Text

PAI

AutoCAD SHX Text

PAI

AutoCAD SHX Text

JLH

AutoCAD SHX Text

KPL

AutoCAD SHX Text

TTI

AutoCAD SHX Text 6/9/99

AutoCAD SHX Text 8/2/10

AutoCAD SHX Text 2/20/24

AutoCAD SHX Text 5/16/01

AutoCAD SHX Text 2/18/16

AutoCAD SHX Text

MLK

AutoCAD SHX Text

MLK

AutoCAD SHX Text

DLA

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/4/01

AutoCAD SHX Text 8/6/10

AutoCAD SHX Text 6/22/99

AutoCAD SHX Text

DWM

AutoCAD SHX Text

WJE

AutoCAD SHX Text

ABP

AutoCAD SHX Text

ABP

AutoCAD SHX Text 8/23/99

AutoCAD SHX Text 8/7/10

AutoCAD SHX Text 3/1/16

AutoCAD SHX Text 6/20/01

AutoCAD SHX Text 2/21/16

AutoCAD SHX Text

SR 0202-65S AS-BUILT

AutoCAD SHX Text

NEAREST SIGNAL 4,155' AT HANCOCK ROAD

AutoCAD SHX Text

NEAREST SIGNAL 3,405' AT SCHOOL HOUSE ROAD

AutoCAD SHX Text

CRAIG MCANALLY

AutoCAD SHX Text 4/23/19

AutoCAD SHX Text

HIGHWAY GOTHIC 12" UPPERCASE 9" LOWERCASE

AutoCAD SHX Text %%uSIGN DETAILS%%U

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF THE DEPARTMENT OF TRANSPORTATION. ALL MAINTENANCE WORK INCLUDING TRIMMING OF TREES, NECESSARY FOR PROPER VISIBILITY OF THE SIGNALS IS THE RESPONSIBILITY OF THE PERMITTEE. ALL SIGNS AND PAVEMENT MARKINGS INDICATED ON THIS DRAWING ARE CONSIDERED PART OF THE PERMIT AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PUBLICATION NO. 212. POST MOUNTED SIGNALS SHALL BE INSTALLED WITH THE SIGNAL HEADS A MINIMUM OF 2 FEET BEHIND THE FACE OF CURB OR THE EDGE OF THE SHOULDER. SUPPORT POLES FOR OVERHEAD SIGNALS SHALL ALSO HAVE A MINIMUM CLEARANCE HORIZONTALLY OF 2 FEET. SIGNALS ERECTED OVER THE ROADWAY SHALL HAVE A MINIMUM VERTICAL CLEARANCE OF 16 FT. ABOVE THE ROADWAY. POST MOUNTED SIGNALS SHALL BE A MINIMUM OF 8 FT. ABOVE THE SIDEWALK OR PAVEMENT. ALL OVERHEAD SIGNALS MUST BE RIGIDLY MOUNTED, TOP AND BOTTOM, AND EQUIPPED WITH BACKPLATES. THE MINIMUM HORIZONTAL DISTANCE BETWEEN SIGNALS MEASURED AT RIGHT ANGLES TO THE APPROACH SHALL BE 8 FEET. EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO INSTALLATION BY A REPRESENTATIVE OF PENNDOT. CURBING TO BE INSTALLED BY MUNICIPALITY AND WHERE NOTED, SHALL BE PLAIN CEMENT CONCRETE CURB OR GRANITE CURB, INSTALLED IN ACCORDANCE WITH DEPARTMENT SPECIFICATIONS FORM 408. PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES. THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING UNLESS THE PERMITTEE COMPLIES WITH THE PROVISIONS OF THE LATEST AMENDMENT TO ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES, DATED DECEMBER 20, 1974. WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST CONFORM TO FORM 408 AND A COPY OF THE PROPOSED SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT FOR REVIEW PRIOR TO BIDDING. PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION. CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DISTRICT TRAFFIC ENGINEER

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MUNICIPAL OFFICIAL

AutoCAD SHX Text

REVIEWED:

AutoCAD SHX Text

ENGINEERING DISTRICT 6-0

AutoCAD SHX Text

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PERMIT #

AutoCAD SHX Text

FILE #

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COUNTY:

AutoCAD SHX Text

MUNICIPALITY:

AutoCAD SHX Text

INTERSECTION:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

RECOM

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVW

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DES/ REVW

AutoCAD SHX Text

NO

AutoCAD SHX Text

AutoCAD SHX Text

SYSTEM PERMIT #

AutoCAD SHX Text

MONTGOMERY

AutoCAD SHX Text

LOWER GWYNEDD TOWNSHIP

AutoCAD SHX Text

DEKALB PIKE (SR 0202)

AutoCAD SHX Text

AND SUMNEYTOWN PIKE

AutoCAD SHX Text I-0108

AutoCAD SHX Text 64-0961

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MAST ARM/ IDENTIFYING LENGTH

AutoCAD SHX Text

EMERGENCY PRE-EMPTION FLASHING BEACON

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE NUMBER

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

ZONE OF DETECTION

AutoCAD SHX Text

EMERGENCY PRE-EMPTION DETECTOR

AutoCAD SHX Text

LUMINAIRE/ IDENTIFYING LENGTH

AutoCAD SHX Text

PEDESTRIAN SIGNAL HEAD/ IDENTIFYING NUMBER

AutoCAD SHX Text

SIGN/IDENTIFYING LETTER

AutoCAD SHX Text VEHICULAR SIGNAL HEAD/BACKPLATE/TUNNEL VISOR/DIRECTIONAL ARROW/IDENTIFYING NUMBER

AutoCAD SHX Text

PEDESTAL POLE

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

DETECTABLE WARNING SURFACE

AutoCAD SHX Text 25'

AutoCAD SHX Text

AutoCAD SHX Text

PEDESTRIAN PUSHBUTTON AND SIGN

AutoCAD SHX Text

INLET

AutoCAD SHX Text

PEDSTRIAN STUB POLE

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

VIDEO CAMERA

AutoCAD SHX Text

CONTROLLER CABINET

AutoCAD SHX Text

MARK L. KRAY

AutoCAD SHX Text

DOUGLAS W. MAY, P.E.

AutoCAD SHX Text 1/8/97

AutoCAD SHX Text 1/8/97

AutoCAD SHX Text

DEKALB PIKE (S.R. 0202)

AutoCAD SHX Text

DEKALB PIKE (S.R. 0202)

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

REVISE PHASE NUMBERS TO, MATCH FIELD CONDITIONS

AutoCAD SHX Text

KPL

AutoCAD SHX Text 7/25/17

AutoCAD SHX Text

KPL

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/15/17

AutoCAD SHX Text 8/17/17

AutoCAD SHX Text

UPDATED MAX TIMINGS FOR PHASE 4+8

AutoCAD SHX Text

EJR

AutoCAD SHX Text 5/22/18

AutoCAD SHX Text

KPL

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/18/18

AutoCAD SHX Text 6/18/18

AutoCAD SHX Text

MJS

AutoCAD SHX Text 5/6/24

AutoCAD SHX Text

KPL

AutoCAD SHX Text 5/6/24

SUMNEYTOWN PIKE

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

MATCH LINE B

AutoCAD SHX Text

MATCH LINE C

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE FOR COUNTY ROAD

AutoCAD SHX Text

SUMNEYTOWN PIKE

AutoCAD SHX Text R

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

LEGAL RIGHT-OF-WAY LINE

AutoCAD SHX Text

MATCH LINE A

AutoCAD SHX Text

ADDED PRE-EMPTION & SIGNS K,L,N

AutoCAD SHX Text

ADDED PRE-EMPTION & SIGNS K,L,N

AutoCAD SHX Text

TIMING REVISIONS & REMOVED "WAIT FOR GREEN" SIGN

AutoCAD SHX Text

REVISED TIMINGS, PRE-EMPT NOTES

AutoCAD SHX Text 6/9/99

AutoCAD SHX Text 8/2/10

AutoCAD SHX Text 5/16/01

AutoCAD SHX Text 2/18/16

AutoCAD SHX Text

MLK

AutoCAD SHX Text

MLK

AutoCAD SHX Text

DLA

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/4/01

AutoCAD SHX Text 8/6/10

AutoCAD SHX Text 6/22/99

AutoCAD SHX Text

DWM

AutoCAD SHX Text

WJE

AutoCAD SHX Text

ABP

AutoCAD SHX Text

ABP

AutoCAD SHX Text 8/23/99

AutoCAD SHX Text 8/7/10

AutoCAD SHX Text 3/1/16

AutoCAD SHX Text 6/20/01

AutoCAD SHX Text 2/21/16

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text V

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF THE DEPARTMENT OF TRANSPORTATION. ALL MAINTENANCE WORK INCLUDING TRIMMING OF TREES, NECESSARY FOR PROPER VISIBILITY OF THE SIGNALS IS THE RESPONSIBILITY OF THE PERMITTEE. ALL SIGNS AND PAVEMENT MARKINGS INDICATED ON THIS DRAWING ARE CONSIDERED PART OF THE PERMIT AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PUBLICATION NO. 212. POST MOUNTED SIGNALS SHALL BE INSTALLED WITH THE SIGNAL HEADS A MINIMUM OF 2 FEET BEHIND THE FACE OF CURB OR THE EDGE OF THE SHOULDER. SUPPORT POLES FOR OVERHEAD SIGNALS SHALL ALSO HAVE A MINIMUM CLEARANCE HORIZONTALLY OF 2 FEET. SIGNALS ERECTED OVER THE ROADWAY SHALL HAVE A MINIMUM VERTICAL CLEARANCE OF 16 FT. ABOVE THE ROADWAY. POST MOUNTED SIGNALS SHALL BE A MINIMUM OF 8 FT. ABOVE THE SIDEWALK OR PAVEMENT. ALL OVERHEAD SIGNALS MUST BE RIGIDLY MOUNTED, TOP AND BOTTOM, AND EQUIPPED WITH BACKPLATES. THE MINIMUM HORIZONTAL DISTANCE BETWEEN SIGNALS MEASURED AT RIGHT ANGLES TO THE APPROACH SHALL BE 8 FEET. EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO INSTALLATION BY A REPRESENTATIVE OF PENNDOT. CURBING TO BE INSTALLED BY MUNICIPALITY AND WHERE NOTED, SHALL BE PLAIN CEMENT CONCRETE CURB OR GRANITE CURB, INSTALLED IN ACCORDANCE WITH DEPARTMENT SPECIFICATIONS FORM 408. PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES. THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING UNLESS THE PERMITTEE COMPLIES WITH THE PROVISIONS OF THE LATEST AMENDMENT TO ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES, DATED DECEMBER 20, 1974. WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST CONFORM TO FORM 408 AND A COPY OF THE PROPOSED SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT FOR REVIEW PRIOR TO BIDDING. PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION. CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DISTRICT TRAFFIC ENGINEER

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MUNICIPAL OFFICIAL

AutoCAD SHX Text

REVIEWED:

AutoCAD SHX Text

ENGINEERING DISTRICT 6-0

AutoCAD SHX Text

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PERMIT #

AutoCAD SHX Text

FILE #

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COUNTY:

AutoCAD SHX Text

MUNICIPALITY:

AutoCAD SHX Text

INTERSECTION:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

RECOM

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVW

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DES/ REVW

AutoCAD SHX Text

NO

AutoCAD SHX Text

AutoCAD SHX Text

SYSTEM PERMIT #

AutoCAD SHX Text

MONTGOMERY

AutoCAD SHX Text

LOWER GWYNEDD TOWNSHIP

AutoCAD SHX Text

DEKALB PIKE (SR 0202)

AutoCAD SHX Text

AND SUMNEYTOWN PIKE

AutoCAD SHX Text I-0108

AutoCAD SHX Text 64-0961

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text 25'

AutoCAD SHX Text

AutoCAD SHX Text

MAST ARM/ IDENTIFYING LENGTH

AutoCAD SHX Text

EMERGENCY PRE-EMPTION FLASHING BEACON

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE NUMBER

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

ZONE OF DETECTION

AutoCAD SHX Text

EMERGENCY PRE-EMPTION DETECTOR

AutoCAD SHX Text

LUMINAIRE/ IDENTIFYING LENGTH

AutoCAD SHX Text

PEDESTRIAN SIGNAL HEAD/ IDENTIFYING NUMBER

AutoCAD SHX Text

SIGN/IDENTIFYING LETTER

AutoCAD SHX Text VEHICULAR SIGNAL HEAD/BACKPLATE/TUNNEL VISOR/DIRECTIONAL ARROW/IDENTIFYING NUMBER

AutoCAD SHX Text

PEDESTAL POLE

AutoCAD SHX Text

DETECTABLE WARNING SURFACE

AutoCAD SHX Text

PEDESTRIAN PUSHBUTTON AND SIGN

AutoCAD SHX Text

PEDSTRIAN STUB POLE

AutoCAD SHX Text

INLET

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

CRAIG MCANALLY

AutoCAD SHX Text 4/23/19

AutoCAD SHX Text

VIDEO CAMERA

AutoCAD SHX Text

CONTROLLER CABINET

AutoCAD SHX Text

DEKALB PIKE (S.R. 0202)

AutoCAD SHX Text

MARK L. KRAY

AutoCAD SHX Text

DOUGLAS W. MAY, P.E.

AutoCAD SHX Text 1/8/97

AutoCAD SHX Text 1/8/97

AutoCAD SHX Text

PAI

AutoCAD SHX Text

PAI

AutoCAD SHX Text

JLH

AutoCAD SHX Text

KPL

AutoCAD SHX Text

TTI

AutoCAD SHX Text 2/20/24

AutoCAD SHX Text

SR 0202-65S AS-BUILT

AutoCAD SHX Text

REVISE PHASE NUMBERS TO, MATCH FIELD CONDITIONS

AutoCAD SHX Text

KPL

AutoCAD SHX Text 7/25/17

AutoCAD SHX Text

KPL

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/15/17

AutoCAD SHX Text 8/17/17

AutoCAD SHX Text

UPDATED MAX TIMINGS FOR PHASE 4+8

AutoCAD SHX Text

EJR

AutoCAD SHX Text 5/22/18

AutoCAD SHX Text

KPL

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/18/18

AutoCAD SHX Text 6/18/18

AutoCAD SHX Text

MJS

AutoCAD SHX Text 5/6/24

AutoCAD SHX Text

KPL

GENERAL NOTES

AutoCAD SHX Text NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF THE DEPARTMENT OF TRANSPORTATION. ALL MAINTENANCE WORK INCLUDING TRIMMING OF TREES, NECESSARY FOR PROPER VISIBILITY OF THE SIGNALS IS THE RESPONSIBILITY OF THE PERMITTEE. ALL SIGNS AND PAVEMENT MARKINGS INDICATED ON THIS DRAWING ARE CONSIDERED PART OF THE PERMIT AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PUBLICATION NO. 212. POST MOUNTED SIGNALS SHALL BE INSTALLED WITH THE SIGNAL HEADS A MINIMUM OF 2 FEET BEHIND THE FACE OF CURB OR THE EDGE OF THE SHOULDER. SUPPORT POLES FOR OVERHEAD SIGNALS SHALL ALSO HAVE A MINIMUM CLEARANCE HORIZONTALLY OF 2 FEET. SIGNALS ERECTED OVER THE ROADWAY SHALL HAVE A MINIMUM VERTICAL CLEARANCE OF 16 FT. ABOVE THE ROADWAY. POST MOUNTED SIGNALS SHALL BE A MINIMUM OF 8 FT. ABOVE THE SIDEWALK OR PAVEMENT. ALL OVERHEAD SIGNALS MUST BE RIGIDLY MOUNTED, TOP AND BOTTOM, AND EQUIPPED WITH BACKPLATES. THE MINIMUM HORIZONTAL DISTANCE BETWEEN SIGNALS MEASURED AT RIGHT ANGLES TO THE APPROACH SHALL BE 8 FEET. EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO INSTALLATION BY A REPRESENTATIVE OF PENNDOT. CURBING TO BE INSTALLED BY MUNICIPALITY AND WHERE NOTED, SHALL BE PLAIN CEMENT CONCRETE CURB OR GRANITE CURB, INSTALLED IN ACCORDANCE WITH DEPARTMENT SPECIFICATIONS FORM 408. PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES. THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING UNLESS THE PERMITTEE COMPLIES WITH THE PROVISIONS OF THE LATEST AMENDMENT TO ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES, DATED DECEMBER 20, 1974. WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST CONFORM TO FORM 408 AND A COPY OF THE PROPOSED SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT FOR REVIEW PRIOR TO BIDDING. PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION. CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DISTRICT TRAFFIC ENGINEER

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MUNICIPAL OFFICIAL

AutoCAD SHX Text

REVIEWED:

AutoCAD SHX Text

ENGINEERING DISTRICT 6-0

AutoCAD SHX Text

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PERMIT #

AutoCAD SHX Text

FILE #

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COUNTY:

AutoCAD SHX Text

MUNICIPALITY:

AutoCAD SHX Text

INTERSECTION:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

RECOM

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVW

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DES/ REVW

AutoCAD SHX Text

NO

AutoCAD SHX Text

AutoCAD SHX Text

SYSTEM PERMIT #

AutoCAD SHX Text

MONTGOMERY

AutoCAD SHX Text

LOWER GWYNEDD TOWNSHIP

AutoCAD SHX Text

DEKALB PIKE (SR 0202)

AutoCAD SHX Text

AND SUMNEYTOWN PIKE

AutoCAD SHX Text I-0108

AutoCAD SHX Text 64-0961

AutoCAD SHX Text

ADDED PRE-EMPTION & SIGNS K,L,N

AutoCAD SHX Text

ADDED PRE-EMPTION & SIGNS K,L,N

AutoCAD SHX Text

TIMING REVISIONS & REMOVED "WAIT FOR GREEN" SIGN

AutoCAD SHX Text

REVISED TIMINGS, PRE-EMPT NOTES

AutoCAD SHX Text 6/9/99

AutoCAD SHX Text 8/2/10

AutoCAD SHX Text 5/16/01

AutoCAD SHX Text 2/18/16

AutoCAD SHX Text

MLK

AutoCAD SHX Text

MLK

AutoCAD SHX Text

DLA

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/4/01

AutoCAD SHX Text 8/6/10

AutoCAD SHX Text 6/22/99

AutoCAD SHX Text

DWM

AutoCAD SHX Text

WJE

AutoCAD SHX Text

ABP

AutoCAD SHX Text

ABP

AutoCAD SHX Text 8/23/99

AutoCAD SHX Text 8/7/10

AutoCAD SHX Text 3/1/16

AutoCAD SHX Text 6/20/01

AutoCAD SHX Text 2/21/16

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

PHASE

AutoCAD SHX Text

INTERVAL

AutoCAD SHX Text

SIGNALS

AutoCAD SHX Text 2,3

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

FIXED

AutoCAD SHX Text 2+5

AutoCAD SHX Text 1+6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text 1+5

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

PASSAGE

AutoCAD SHX Text 2+6

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLASHING

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text 4+8

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

OFF

AutoCAD SHX Text

OFF

AutoCAD SHX Text 3+8

AutoCAD SHX Text

MAXIMUM I

AutoCAD SHX Text

MAXIMUM II

AutoCAD SHX Text

PEDESTRIAN*

AutoCAD SHX Text

MEMORY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5,6

AutoCAD SHX Text 7,8

AutoCAD SHX Text 17,18

AutoCAD SHX Text 19,20

AutoCAD SHX Text M

AutoCAD SHX Text

FH

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text M

AutoCAD SHX Text

FH

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text

FH

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text M

AutoCAD SHX Text

FH

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text 3+7

AutoCAD SHX Text 4+7

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text

MOVEMENT, SEQUENCE, AND TIMING DIAGRAM

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

NL

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text

* UPON PEDESTRIAN ACTUATION ONLY, OTHERWISE HAND SYMBOL AT ALL TIMES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text SvR

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 11,12,13

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text 14,15,16

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text

FY

AutoCAD SHX Text

FY

AutoCAD SHX Text

FY

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text REFER TO SYSTEM PERMIT #I-0004 FOR TRAFFIC ADAPTIVE OPERATION. # PHASE PASSAGE CALCULATED BY TRAFFIC ADAPTIVE PROCESSOR. - PHASE SEQUENCE SELECTED BY TRAFFIC ADAPTIVE PROCESSOR.

AutoCAD SHX Text %%uOPERATION NOTES%%U

AutoCAD SHX Text

1 IF FOLLOWED BY 2+5

AutoCAD SHX Text

2 IF FOLLOWED BY 1+6

AutoCAD SHX Text

3 G IF FOLLOWED BY 2+6

AutoCAD SHX Text

6 G IF FOLLOWED BY 4+8

AutoCAD SHX Text

8 G IF FOLLOWED BY 4+7

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text

7 IF FOLLOWED BY 1+6

AutoCAD SHX Text

CONTROLLER TO DWELL IN PHASE 2+6 UNTIL ACTUATED BY PHASE 4+8.

AutoCAD SHX Text

PHASE 3+8 SHALL NOT FOLLOW PHASE 4+8

AutoCAD SHX Text

PHASE 4+7 SHALL NOT FOLLOW PHASE 4+8.

AutoCAD SHX Text

4 IF FOLLOWED BY 3+8

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FY

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text

5 IF FOLLOWED BY 4+8

AutoCAD SHX Text

10 M IF FOLLOWED BY 4+8

AutoCAD SHX Text

9 M IF FOLLOWED BY 2+6

AutoCAD SHX Text TIMING WILL BE AS SHOWN IN PHASE 4+8. IT MAY TIME OUT IN THIS PHASE OR PHASE 4+8.

AutoCAD SHX Text TIMING WILL BE AS SHOWN IN PHASE 2+6. IT MAY TIME OUT IN THIS PHASE OR PHASE 2+6.

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

PHASE

AutoCAD SHX Text

INTERVAL

AutoCAD SHX Text

SIGNALS

AutoCAD SHX Text

FIXED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text 2,3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

SELECTIVE CLEARANCES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5,6

AutoCAD SHX Text 7,8

AutoCAD SHX Text 19,20

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text %%uPRE-EMPTION PHASING NOTES:%%U

AutoCAD SHX Text A

AutoCAD SHX Text

SIGNAL TO INDICATE G WHEN RETURNING TO NORMAL OPERATION

AutoCAD SHX Text NOTE: IF PRE-EMPTION EQUIPMENT HAS ENCODING CAPABILITIES FOR VEHICLE IDENTIFICATION, IT IS RECOMMENDED TO HAVE THE ZERO "00" FEATURE ON, TO GIVE UNCODED EMITTERS THE ABILITY TO ACTIVATE THE EMERGENCY PRE-EMPTION.

AutoCAD SHX Text

DURATION OF PRE-EMPTION

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

SELECTIVE CLEARANCES

AutoCAD SHX Text

SELECTIVE CLEARANCES

AutoCAD SHX Text

SELECTIVE CLEARANCES

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text 17,18

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text 14,15,16

AutoCAD SHX Text 11,12,13

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text

FY

AutoCAD SHX Text Y

AutoCAD SHX Text R

AutoCAD SHX Text %%uEMERGENCY PRE-EMPTION NOTES:%%U

AutoCAD SHX Text

1. 2. 3. 4. 5. 6. 7. 8. 9.

AutoCAD SHX Text CONTROLLER TO BE EQUIPPED WITH EMERGENCY PRE-EMPTION FOR THE NORTHBOUND AND SOUTHBOUND APPROACHES OF S.R. 202 (DEKALB PIKE) AND THE EASTBOUND AND WESTBOUND APPROACHES OF SUMNEYTOWN PIKE WITH A FAIL SAFE DEVICE FOR EACH DIRECTION OF OPERATION. THE FAIL SAFE DEVICE SHALL CONSIST OF A FLASHING WHITE FLOOD LIGHT, AND SHALL BEGIN FLASHING WHEN THE PRE-EMPTION PHASE DISPLAYS PRE-EMPTION GREEN FOR THE EMERGENCY VEHICLE APPROACH. THE SIGNALS, WHEN ACTIVATED BY EMERGENCY VEHICLE, SHALL TERMINATE ALL GREEN INDICATIONS IMMEDIATELY, EXCEPT THE GREEN INDICATIONS FOR THE PHASE GOVERNED BY THE APPROACHING EMERGENCY VEHICLE, FOLLOWED BY SELECTIVE CLEARANCES DEPENDENT UPON THE PHASE IN WHICH THE PRE-EMPTION OCCURS. THE GREEN INDICATIONS FOR THE PRE-EMPTED PHASE SHALL REMAIN GREEN FOR THE DURATION OF SIGNAL PRE-EMPTION AND RED INDICATIONS DISPLAYED FOR ALL OTHER PHASES. ANY FLASHING YELLOW ARROW INDICATIONS FOR THE PRE-EMPTED PHASE SHALL REMAIN FLASHING YELLOW ARROW DURING THE ENTRY ROUTINE FOLLOWED BY GREEN ARROW FOR THE DURATION OF SIGNAL PRE-EMPTION. ANY FLASHING YELLOW ARROW INDICATIONS FOR THE PHASE OPPOSITE THE PRE-EMPTED PHASE SHALL REMAIN FLASHING YELLOW ARROW DURING THE ENTRY ROUTINE AND FOR THE DURATION OF SIGNAL PRE-EMPTION. THE SIGNALS, WHEN ACTIVATED BY EMERGENCY VEHICLE SHALL TIME OUT ALL YELLOW AND RED INDICATIONS, FOLLOWED BY THE GREEN INTERVAL OF THE PRE-EMPTION PHASE GOVERNED BY THE APPROACHING EMERGENCY VEHICLE. IF THE SIGNALS WERE ACTIVATED BY A PEDESTRIAN PUSH BUTTON AND THE SIGNAL IS PRE-EMPTED, THE PEDESTRIAN WALK (MAN) INTERVAL SHALL TERMINATE IMMEDIATELY AND THE PEDESTRIAN CLEARANCE (CLEAR FLASHING HAND AND COUNTDOWN TIMER) INTERVAL SHALL TIME OUT THIS INTERVAL FOLLOWED BY THE APPROPRIATE SELECTIVE CLEARANCES BEFORE GOING INTO EMERGENCY PRE-EMPTION. IF THE SIGNALS, WHEN ACTIVATED BY AN EMERGENCY VEHICLE, ARE FLASHING ALL SIGNALS SHALL REMAIN FLASHING. IF ADDITIONAL PRE-EMPTION PHASES ARE ACTIVATED WHILE IN PRE-EMPTION, THE ORIGINAL PRE-EMPTION PHASE SHALL TIME OUT BEFORE PROCEEDING TO THE NEXT PRE-EMPTION PHASE. UPON COMPLETION OF PRE-EMPTION, PHASE 2,4,6 OR 8 IN RETURNING TO NORMAL OPERATION, PHASE 2+6 INTERVAL 11 SHALL FOLLOW. IN EMERGENCY PRE-EMPTION, NO PRIORITY SHALL BE ESTABLISHED, PRE-EMPTION SHALL BE A "FIRST COME, FIRST SERVE" OPERATION. LOCATION OF EMERGENCY VEHICLE DETECTORS ARE TO BE FIELD ADJUSTED TO ACHIEVE THE MAXIMUM OPERATION.

AutoCAD SHX Text

PRE-EMPTION PHASING

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

CRAIG MCANALLY

AutoCAD SHX Text 4/23/19

AutoCAD SHX Text

MARK L. KRAY

AutoCAD SHX Text

DOUGLAS W. MAY, P.E.

AutoCAD SHX Text 1/8/97

AutoCAD SHX Text 1/8/97

AutoCAD SHX Text

PAI

AutoCAD SHX Text

PAI

AutoCAD SHX Text

JLH

AutoCAD SHX Text

KPL

AutoCAD SHX Text

TTI

AutoCAD SHX Text 2/20/24

AutoCAD SHX Text

SR 0202-65S AS-BUILT

AutoCAD SHX Text

REVISE PHASE NUMBERS TO, MATCH FIELD CONDITIONS

AutoCAD SHX Text

KPL

AutoCAD SHX Text 7/25/17

AutoCAD SHX Text

KPL

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/15/17

AutoCAD SHX Text 8/17/17

AutoCAD SHX Text

UPDATED MAX TIMINGS FOR PHASE 4+8

AutoCAD SHX Text

EJR

AutoCAD SHX Text 5/22/18

AutoCAD SHX Text

KPL

AutoCAD SHX Text

DLA

AutoCAD SHX Text 6/18/18

AutoCAD SHX Text 6/18/18

AutoCAD SHX Text

MJS

AutoCAD SHX Text 5/6/24

AutoCAD SHX Text

KPL

MJS Digitally signed by MJS Date: 2023.10.23 07:53:01 -04'00' KPL Digitally signed by KPL

Date: 2023.10.23 10:03:04 -04'00'

Pk

Old Pk

Penllyn

TrewellynAve Penllyn

TrewellynAve OldPenllynPk

MJS Digitally signed by MJS Date: 2026.05.14

12:14:12 -04'00' KPL

Digitally signed by

KPL

Date: 2026.05.14 14:26:48 -04'00'

MJS

Digitally signed by

MJS

Date: 2026.05.14 12:14:38 -04'00'

KPL

Digitally signed by

KPL

Date: 2026.05.14 14:27:07 -04'00'

S u m n eyt ow n P i ke

We l l i n g to n D r We l l i n g to n D r

S p r i n g h o u se Ct rS h o p p i n g

S p r i n g h o u se Ct rS h o p p i n g

KPL

Digitally signed by

KPL

Date: 2023.03.08 16:06:16 -05'00'

ABP

Digitally signed by

ABP

Date: 2023.03.16 11:32:21 -04'00'

KPL

KPL

Date: 2023.03.08

16:06:34 -05'00' ABP

Digitally signed by ABP Date: 2023.03.16 11:32:41 -04'00'

Welsh Rd

Evans Rd

5/15/2025

MJS

Digitally signed by

MJS

Date: 2025.06.17 09:20:55 -04'00'

KPL Digitally signed by KPL Date: 2025.06.17 11:59:27 -04'00'

File details come from the government source that posted it. Updated .