Avondale Borough 2026 Pavement Repair Project – Project Manual and Bidding Documents
This project manual contains the complete bidding documents and contract forms prepared by Carroll Engineering Corporation for the Avondale Borough 2026 Pavement Repair Project located in Avondale, Pennsylvania. The project scope includes milling and overlaying approximately 1.42 miles of asphalt roadway across nine streets (Chatham Street, Morris Street, Fifth Street, Fourth Street, New Street, Watson Park Parking Lot, Minor Street, Maple Street, and East Third Street) and construction of eight ADA concrete curb ramps. Sealed bids will be received online via PennBid until 11:00 A.M. prevailing time on August 13, 2026. A pre-bid virtual meeting is scheduled for August 5, 2026 at 11:00 A.M., which prospective bidders are encouraged to attend. The contract timeframe requires Substantial Completion within 61 calendar days and final completion within 91 calendar days from the Notice to Proceed. Key bid items include milling to 5-inch depth (1,876 square yards), base course asphalt overlay (549 tons), wearing course asphalt overlay (12,510 square yards), scratch/leveling course (1,241 tons), ADA concrete curb ramps (eight each), mobilization, trackless tack coat, and traffic control and safety devices.
The bid must be accompanied by a certified check or bid bond in the amount of 10% of the base bid price made payable to Avondale Borough. The awarded contractor shall provide performance and payment bonds equal to 100% of the contract price. This project is subject to the Pennsylvania Prevailing Wage Act, requiring contractors to pay prevailing minimum wage rates established by the Pennsylvania Secretary of Labor. Liquidated damages are assessed at $885.00 per calendar day for delays beyond the Substantial Completion date and an additional $885.00 per day after the final completion date. Bidders are required to submit a Contractor's Qualification Statement, Anti-Collusion Affidavit, Workmen's Compensation Act Affidavit, Public Works Employment Verification Form, and other required documentation with their bids. The contract includes provisions for monthly progress payments with 10% retainage until 50% completion, after which retainage reduces to 5%, plus interest at 5% per annum on all unpaid amounts. The Notice of Award will be issued to the lowest responsible bidder, and the successful bidder must execute all contract documents and furnish required bonds within 15 days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-02 - Technical Specifications.pdf | ||
| 3-03 - 2026 Avondale Paving Repair Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(7/26) 264128_400_Title Page.docx
PROJECT MANUAL
AVONDALE BOROUGH
2026 PAVEMENT REPAIR PROJECT
JULY 2026
PREPARED FOR:
110 POMEROY AVENUE
P.O. BOX 247
AVONDALE, PA 19311
PREPARED BY:
CARROLL ENGINEERING CORPORATION
949 EASTON ROAD
WARRINGTON, PA 18976
“Copyright - 2026 Carroll Engineering Corporation - All Rights Reserved - These documents were prepared by, and are owned by, Carroll Engineering Corporation; and as such, represent instruments of professional service with respect to the project for which they were specifically designed and to the listed client and/or applicant. The documents and information are not intended or represented to be suitable for reuse by the listed client/applicant, or by others, on extensions or modification of the project or any other project. The reproduction of a copy of these plans, or reuse of these documents, and/or the copying of any portion of information shown on these plans is not permitted and in no circumstance will be approved without an assignment of copyright privileges.
Violation of this restriction shall be considered a violation of the Professional Code of Ethics and a theft of corporate assets, both of which shall be prosecuted to the fullest extent of current statutes. In the event of any unauthorized use, the person initiating the use shall accept all responsibility, both for copyright violation and professional liability, for any claims, damages, losses, and expenses arising from the unauthorized reproduction, misuse, or misappropriation of these documents or information shown on said documents.”
i (7/26) 264128_400_TOC.docx
TABLE OF CONTENTS
BIDDING REQUIREMENTS, CONTRACT FORMS,
AND CONDITIONS OF THE CONTRACT
00 1113 Advertisement for Bid 00 2113 Instructions to Bidders 00 4315 Bid Bond 00 4513 Construction Contractor’s Qualification Statement for Engineered Construction 00 5000 Forms for Agreement 00 5100 Notice of Award 00 5200 Standard Form of Agreement
MS-944 – Proposal & Contract MS-944 – Attachment 1 – Schedule of Prices MS-944 – Attachment 1A – Special Provisions to Contract MS-944 – Attachment 2 - Performance Bond MS-944 – Attachment 3 - Payment Bond MS-944 – Attachment 4 – Workmen’s Compensation Act Affidavit MS-944 - Anti-Collusion Affidavit Notice of Completion Certificate of Compliance
00 5500 Notice to Proceed 00 6519.16 Contractor’s Affidavit Concerning Releases Or Waivers Of Lien 00 6519.17 Contractor’s Release 00 7200 General Conditions 00 7300 Supplementary Conditions 00 7310 State Funding Agreement Requirements
Exhibit A (LSA) - Nondiscrimination/Sexual Harassment Clause Exhibit A (MTF) - Nondiscrimination/Sexual Harassment Clause
00 7340 Public Works Employment Verification Act 00 7346 Pennsylvania Prevailing Wage Rates 00 7373 Steel Products Procurement Act 00 7374 Trade Practices Act 00 9100 Precontract Revisions
TECHNICAL SPECIFICATIONS
Division 1 - General Requirements
01010 General Requirements 012300 Alternates 01020 Measurement and Payment 01300 Submittals 01560 Maintenance of Traffic 01565 Erosion and Sedimentation Control 01700 Project Closeout & MS-NCP ii (7/26) 264128_400_TOC.docx
AVONDALE BOROUGH
2026 PAVEMENT REPAIR PROJECT
TABLE OF CONTENTS
continued
Division 2 - Site Work
02200 Earthwork 02510 Bituminous Paving
Division 3 – Concrete
03 3000 Cast-in-Place Concrete
Division 9 – Painting
09913 Pavement Markings
00 1113-1 (7/30) 264128_400 00 1113.docx
DOCUMENT 00 1113
ADVERTISEMENT FOR BID
Sealed bids will be received online by Avondale Borough via PennBid until 11:00 A.M. prevailing time, on August 13, 2026, at which time they will be opened online and posted via PennBid for:
The project consists of milling and overlaying approximately 1.20 miles of asphalt roadway and the construction of eight (8) ADA concrete curb ramps, as shown on the plans.
All documents and details are available at PennBid (https://pennbid.bonfirehub.com/portal/). The designated website will be updated periodically with addenda, lists of regular plan holders, reports, and other information relevant to submitting a Bid for the Project. Neither the Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from other sources other than the designated website.
PennBid is free for all vendors to access and submit bids. Only vendors awarded a contract are assessed a fee; for current fee information, visit https://pennbid.net/vendor-bidder-information/.
Each bid must be accompanied by a certified check drawn to the order of Avondale Borough or a Bid Bond in favor of Avondale Borough in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders.
The work in connection with this project constitutes Public Work by a Public Body under the Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project.
The awarded contractor shall also provide a performance and payment bond provided equal to 100% of the contract price.
No bid may be withdrawn within sixty (60) days of the date of the bid opening.
Avondale Borough reserves the right to reject any and all bids and to waive any bidding informalities.
Sharon Norris
Borough Administrator
END OF DOCUMENT
00 2113-1 (7/26) 264128_400 00 2113.docx
DOCUMENT 00 2113
INSTRUCTIONS TO BIDDERS
ARTICLE 1 - DEFINED TERMS 00 2113-2
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 00 2113-2
ARTICLE 3 - QUALIFICATIONS OF BIDDERS 00 2113-2
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED 00 2113-3
DATA AND SITE
ARTICLE 5 - PRE-BID CONFERENCE 00 2113-5
ARTICLE 6 - SITE AND OTHER AREAS 00 2113-5
ARTICLE 7 - INTERPRETATIONS AND ADDENDA 00 2113-6
ARTICLE 8 - BID SECURITY 00 2113-6
ARTICLE 9 - CONTRACT TIMES 00 2113-6
ARTICLE 10 - LIQUIDATED DAMAGES 00 2113-6
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS 00 2113-7
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS 00 2113-7
ARTICLE 13 - PREPARATION OF BID 00 2113-7
ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS 00 2113-8
ARTICLE 15 - SUBMITTAL OF BID 00 2113-8
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID 00 2113-9
ARTICLE 17 - OPENING BIDS 00 2113-9
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE 00 2113-9
ARTICLE 19 - AWARD OF CONTRACT 00 2113-9
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE 00 2113-10
ARTICLE 21 - SIGNING OF AGREEMENT 00 2113-10
00 2113-2
DOCUMENT 00 2113
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof:
A. Bidder:
The individual or entity who submits a Bid directly to OWNER.
B. Successful Bidder:
The lowest responsible Bidder submitting a responsive Bid to whom OWNER (on the basis of OWNER’s evaluation as hereinafter provided) makes an award.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents stated in the Advertisement for Bids may be obtained from
PennBid, PA’s electronic document and bid management program.
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor
ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, upon request only, each Bidder must complete the Bidder’s Qualification Statement given in Document 00 4513. Each Bid must contain evidence of Bidder’s qualification to do business in the State where the Project is located or covenant to obtain such qualification prior to award of the contract.
00 2113-3
ARTICLE 4 – EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA AND SITE
4.01 SUBSURFACE AND PHYSICAL CONDITIONS
A. The Supplementary Conditions Identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in paragraph 4.01.A.1 will be made available by
OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely on provided in paragraph 4.02 of the General Conditions has been identified and established in paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.02 UNDERGROUND FACILITIES
Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities, including OWNER, or others.
4.03 HAZARDOUS ENVIRONMENTAL CONDITION
A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by
OWNER to any Bidder on request. Those reports and drawings are not part of the contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General Conditions has been identified and established in paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
00 2113-4
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions.
4.05 On request, OWNER will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.
Bidder shall fill all holes, clean up, and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by OWNER or others (such as utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. Examine and carefully study the Bidding Documents, including any Addenda and the other related data identified in the Bidding Documents;
B. Visit the Site and become familiar with and satisfy Bidder as to the general, local and Site conditions that may affect cost, progress, and performance of the Work;
C. Become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, or performance of the Work;
D. Carefully study all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions;
E. Obtain and carefully study (or assume responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
00 2113-5
F. Agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. Become aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. Correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. Promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder, and;
J. Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and apply any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – PRE-BID CONFERENCE
5.01 A Pre-Bid virtual meeting will be held for this Project on August 5, 2026 at 11:00 A.M. See
PennBid events for this Project.
Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Via PennBid, ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 – SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents.
00 2113-6
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the bidding Documents are to be submitted to
ENGINEER in writing via PennBid. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda and emailed to all parties recorded by PennBid as having received the Bidding Documents. Additionally, all addenda will be posted in PennBid “documents”. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by OWNER or ENGINEER.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of
Bidder’s base Bid price and in the form of a certified or bank check or a Bid Bond on the form attached issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions. The amount of the bid bond shall be specified in dollars and cents in both words and figures, not merely 10% of the bid amount or similar language.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the
Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award, and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially
Completed and (b) also completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
00 2113-7
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may be supplemented in the General Requirements.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualifications for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
12.02 If the apparent Successful Bidder declines to make any such substitution, OWNER may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions.
12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified.
00 2113-8
ARTICLE 14 – BASIS OF BID; EVALUATION OF BIDS
14.01 UNIT PRICE
A. Bidders shall submit a Bid on a unit price basis for each item contained on the Bid Form. The price for each alternate will be the amount added to or deleted from the base Bid if OWNER selects the alternate.
B. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.
ARTICLE 15 - SUBMITTAL OF BID VIA PENNBID
15.01 Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com) by the date and time indicated in the invitation for Bids. Additionally, the Bidder will need to answer the required questions and upload/submit the other documents required below:
• Bidder Qualification Statement - Document 00 4513
• Anti-Collusion Affidavit – Document 00 5200 MS-944
• Workmen’s Compensation Act Affidavit – Document 00 5200 MS-944 – Attachment 4
• State Funding Agreement Requirements Acknowledgment – Document 00 7310
• Exhibit A (LSA) - Nondiscrimination/Sexual Harassment Clause – Document 00 7310 Exhibit
• Exhibit A (MTF) - Nondiscrimination/Sexual Harassment Clause – Document 00 7310 Exhibit
• Public Works Employment Verification Form – Document 00 7340
• Bid Bond (bonding company can provide an electronic file)
Important Note
Upon request only, bidders will need to submit their documents in their original form with signatures to the agency within three (3) business days.
Technical Support
You can contact the PennBid public portal technical support via the link below.
(https://pennbid.bonfirehub.com/portal/support)
15.02 A Bid shall be submitted via PennBid, no later than the date and time prescribed in the
Advertisement for Bid.
15.03 The bidder is solely responsible for their timely submission.
15.04 Internet connectivity, software compatibility, user error, or PennBid access issues are at the bidder’s risk.
15.05 Failure to submit before the deadline, for any reason, results in a non-responsive bid. The owner will not extend deadlines or consider claims arising from electronic submission issues.
https://pennbid.bonfirehub.com/
00 2113-9
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn via PennBid at any time up to the bid due date and time.
16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 – OPENING BIDS
17.01 Bids will be opened at the time and place indicated in the Advertisement for Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and alternates, if any, will be made available to Bidders after the opening of Bids via PennBid.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid form, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – AWARD OF CONTRACT
19.01 OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible.
OWNER may also reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
19.05 OWNER may conduct such investigations as OWNER deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
00 2113-10
19.06 If the Contract is to be awarded, OWNER will award the Contract to the Bidder whose Bid is in the best interests of the Project. Alternate Bid items may or may not be awarded based on the discretion of the OWNER.
ARTICLE 20 – CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth
OWNER’s requirements as to performance and payment Bonds and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by such Bonds and Insurance certificates.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER. Within ten days thereafter, OWNER shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
00 4315-1 (7/26) 264128_400 00 4315.docx
DOCUMENT 00 4315
BID BOND
BIDDER (Name and Address)
SURETY (Name and Address of Principal Place of Business)
OWNER (Name and Address)
BID
BID DUE DATE:
PROJECT (Brief Description Including Location)
BOND
BOND NUMBER:
DATE (Not later than Bid due date):
PENAL SUM:
(Words) (Figures)
IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature and Title Signature and Title (Attach Power of Attorney)
Attest: Attest:
Signature and Title Signature and Title
Note: (1) Above addresses are to be used for giving required notice.
(2) Any singular reference to Bidder, Surety, OWNER, or other party shall be considered plural where applicable.
00 4315-2 (7/26) 264128_400 00 4315.docx
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 OWNER accepts Bidder’s Bid and Bidder
delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the bidding Documents and any performance and payment Bonds required by the Bidding Documents, or
3.2 All Bids are rejected by OWNER, or
3.3 OWNER fails to issue a Notice of Intent to
Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project, and including a statement of the amount due.
5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the State in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent to personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power or Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statue, then the provision of said statue shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein include a Bid, offer or proposal as applicable.
00 4513-1 (7/26) 264128_400 00 4513.docx
DOCUMENT 00 4513
THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA
CONSTRUCTION CONTRACTOR’S
QUALIFICATION STATEMENT
FOR ENGINEERED CONSTRUCTION
This qualification statement was developed by AGC of America in cooperation with the Engineers Joint Contract Documents Committee (EJCDC) which recommends its use as a suggested generic prequalification statement or a contract-specific qualification statement. In the latter case, the owner or engineer may wish to make appropriate supplemental inquires.
The Engineers Joint Contract Documents Committee consists of representatives of the following organizations:
National Society of Professional Engineers American Consulting Engineers Council
American Society of Civil Engineers Construction Specifications Institute
The contents of this statement are CONFIDENTIAL.
Submitted by:
Name of Organization _______________________________________________________
Name of Individual ________________________________________________________
Title _______________________________________________________
Address _______________________________________________________
Telephone
00 4513-2
Submitted to:
Name AVONDALE BOROUGH
Address 110 Pomeroy Avenue, PO Box 247
Avondale, PA 19311
Telephone (610) 268-8501
Project Name and Description (if applicable)
1. Contractor’s General Business Information
Check If:
Corporation Partnership Joint Venture Sole Proprietorship
If Corporation:
a. Date and State of Incorporation
00 4513-3
b. List of Executive Officers
Name Title
If partnership:
a. Date and State of Organization
b. Names of Current General Partners
c. Type of Partnership
General Limited Publicly Traded Other (describe): _________________________________
If Joint Venture:
a. Date and State of Organization
00 4513-4
b. Name, Address and Form of Organization of Joint Venture Partners: (Indicate managing partner by an asterisk *)
If Sole Proprietorship:
a. Date and State of Organization
b. Name and Address of Owner or Owners
2. On Schedule A, attached, list major engineered construction projects completed by this organization in the past five (5) years. (If joint venture list each participant’s projects separately).
On Schedule B, attached, list current project under construction by this organization.
(If joint venture, list each participant’s projects separately).
3. Name or Surety Company and name, address, and phone number of agent.
00 4513-5
4. Is your organization a member of a controlled group of corporations as defined in I.R.C. Sec. 1563?
Yes No
If yes, show names and addresses of affiliated companies.
5. Furnish on Schedule C, attached, details of the construction experience of the principal individuals of your organization directly involved in construction operations.
6. Has your organization ever failed to complete any construction contract awarded to it?
Yes No If yes, describe circumstances on attachment.
7. Has any Corporate officer, partner, joint venture participant or proprietor ever failed to complete a construction contract awarded to him or her in their own name or when acting as a principal of another organization?
Yes No If yes, describe circumstances on attachment.
8. In the last five years, has your organization ever failed to substantially complete a project in a timely manner?
Yes No If yes, describe circumstances on attachment.
9. Indicate general types of work performed with your own work force.
10. What is your approximate total bonding capacity?
$500,000 to $2,000,000 $2,000,000 to $5,000,000 $5,000,000 to $10,000,000 $10,000,000 or more
00 4513-6
11. Furnish the following information with respect to an accredited banking institution familiar with your organization.
Name of Bank _____________________________________________________
Address _____________________________________________________
Account Manager _____________________________________________________
Telephone _____________________________________________________
I hereby certify that the information submitted herewith, including any attachment is true to the best of my knowledge and belief.
(Name of person authorized to sign)
By: _________________________________________ (Signature)
Title: _________________________________________
Dated: _________________________________________
Subscribed and sworn to before me this _____ day of ___________________, 20___.
Notary Public: ______________________________________________
My Commission Expires: ______________________________________________
00 4513-7
SCHEDULE A
Name, Location and
Description of Project
Owner
Design
Engineer
Date
Completed
Contract
Price
Reference/Contact Include
Address and Phone
00 4513-8
SCHEDULE B
Name, Location and
Description of Project
Owner
Design
Engineer
Contract
Price
Amount
Completed
Date of Scheduled Completion
Reference/Contact Include
Address & Phone
00 4513-9
SCHEDULE C
Name
Position
Date stated with this Organization
Date Started in Construction
Prior Positions and Experience in Construction
00 5000-1 (7/26) 264128_400 00 5000.docx
DOCUMENT 00 5000
FORMS FOR AGREEMENT
Agreement Forms have been assembled by the ENGINEER and are to be submitted in accordance with the Instructions to Bidders. Copies of forms for reference and bidding may be obtained at the office of the ENGINEER.
Agreement forms consist of:
Document 00 5100 – Notice of Award
Document 00 5200 – Agreement
MS-944 – Proposal and Contract MS-944 – Attachment 1 – Schedule of Prices MS-944 – Attachment 1A – Special Provisions to Contract MS-944 – Attachment 2 – Performance Bond MS-944 – Attachment 3 – Payment Bond MS-944 – Attachment 4 – Workmen’s Compensation Act Affidavit MS-944 – Anti-Collusion Affidavit MS-944 – Notice of Completion MS-944 – Certificate of Compliance
Document 00 5500 – Notice to Proceed
00 5100-1 (7/26) 264128_400 00 5100.docx
DOCUMENT 00 5100
NOTICE OF AWARD
Dated:
TO: (BIDDER)
ADDRESS:
OWNER’S PROJECT NO. 26-4128.00
CONTRACT FOR: 2026 PAVEMENT REPAIR PROJECT
You are notified that your Bid dated , , 2026 for the above Contract has been considered. You are the apparent successful bidder and have been awarded the above-referenced Contract.
The Contract Price of your Contract is Dollars ($ )
Five (5) copies of each of the proposed Contract Documents that need your signature accompany this Notice of Award. Please be advised that all five (5) copies of each of the enclosed Contract Documents must be properly executed, and require original signatures, and seal (where applicable).
You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award that is by , , 2026.
1. You must deliver to the ENGINEER five (5) fully executed counterparts of the Document 00 5000
Standard Form of Agreement and all relevant cover sheets of each Contract Document. These counterparts shall be delivered via certified mail.
2. You must deliver to the ENGINEER five (5) fully executed counterparts of the PennDOT MS-944, Attachment 1, Attachment 1A, and Attachment 4. The Schedule of Prices in Attachment 1 should be identical to those prepared on the bid form submitted on PennBid. These documents were submitted with your bid package.
3. You must deliver with the executed Contract Documents, the Contract Security (PennDOT MS-944
Attachment 2 & 3, Performance and Payment Bonds, respectively), and insurance certificates as specified in the Instructions to Bidders, and the General Conditions (paragraph 5.1). Blank copies of bond forms are included for your convenience.
*The Contract Date should be left blank on the Performance and Payment Bond forms. The Contract Date shall be entered as such time that the Borough signs the Agreements.
00 5100-2 (7/26) 264128_400 00 5100.docx
4. Other conditions precedent:
a. See Document 00700, Article 1 for meaning of Notice of Award.
b. Execution of the Agreement by the OWNER is subject to the CONTRACTOR’S compliance with the applicable parts of the Contract Documents.
c. Commencement of Work by the CONTRACTOR is governed by issuance of a Notice to
Proceed. See Document 00700, Article 1 and Article 2, Preliminary Matters.
d. The General Conditions, and Sections 01 3300, and 01 3235 of the General Requirements provide that the CONTRACTOR submits the following items within certain times following the Notice of Award:
1) Preliminary schedule of values to be submitted within thirty (30) days of the Notice of Award.
2) Submittal review schedule to be submitted within thirty (30) days of the Notice of
Award.
3) Preconstruction photography to be submitted within thirty (30) days of the Notice of
Award all for ENGINEER’s review and acceptance.
4) Listing of any proposed Subcontractor(s) to be submitted within ten (10) days of the
Notice of Award.
Failure to comply with these conditions within the time specified will entitle OWNER to consider your bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited.
Within ten (10) days after you comply with these conditions, OWNER will return to you one (1) fully signed counterpart of the Agreement with the Contract Documents.
Avondale Borough
(OWNER)
(AUTHORIZED SIGNATURE)
Agent for OWNER
(TITLE)
00 5200-1 (7/26) 264128_400 00 5200.docx
DOCUMENT 00 5200
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is by and between the AVONDALE BOROUGH (hereinafter called OWNER) and (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 – WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows:
The project consists of milling and overlaying approximately 1.42 miles of asphalt roadway, as shown on the plans.
ARTICLE 2 – THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Carroll Engineering Corporation, 949 Easton Road, Warrington, PA 18976 who is hereinafter called ENGINEER and who is to act as OWNER’s representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 TIME OF THE ESSENCE
All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
00 5200-2
4.02 DAYS TO ACHIEVE SUBSTANTIAL COMPLETION AND FINAL PAYMENT
The Work will be substantially completed within Sixty-One (61) Days after the date when the
Contract Times commence to run as provided in paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within Ninety-One (91) Days after the date when the Contract Times commence to run.
4.03 LIQUIDATED DAMAGES
CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that
OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $885.00 for each day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $885.00 for each day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.
ARTICLE 5 – CONTRACT PRICE
5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract
Documents an amount in current funds equal to the sum of the amounts determined pursuant to Article 6 below:
[Contractor’s Bid which is attached as an Exhibit to this Agreement.]
ARTICLE 6 – PAYMENT PROCEDURES
6.01 SUBMITTAL AND PROCESSING OF PAYMENTS
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.
6.02 PROGRESS PAYMENTS; RETAINAGE
OWNER shall make progress payments on account of the Contract Price on the basis of
CONTRACTOR’s Applications for Payment on or about the 25th day of each month during performance of the Work as provided in paragraphs 6.02.1 and 6.02.2 below. All such payments will be measured by the schedule of values established in paragraph 2.07.A of the General Conditions.
00 5200-3
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions.
a. In accordance with the provisions of 73 P.S. Section 1625, the OWNER may retain a portion of the amount due the CONTRACTOR to insure the proper performance of the contract. Where less than 50% of the Work has been completed, payment will be made with 10% retained. When the contract is 50% completed, one-half of the amount retained by the OWNER shall be returned to the CONTRACTOR provided that the ENGINEER approves the application for payment and provided further that the CONTRACTOR is making satisfactory progress and there is no specific cause for greater withholding. The sum or sums withheld by the OWNER from the CONTRACTOR after the contract is 50 percent completed shall not exceed 5 percent of the value of the completed work based on monthly progress payment requests. However, all such moneys retained by the OWNER may be withheld from the CONTRACTOR until substantial completion of the contract.
b. For materials and equipment not incorporated in the Work (but delivered, suitably stored, and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions), payment will be made with 10% retained.
2. Upon Substantial Completion, OWNER shall pay an amount sufficient to increase total payments to CONTRACTOR to 100% of the Work completed, less such amounts as ENGINEER shall determine in accordance with paragraph 14.02.B.5 of the General Conditions and less 110% of ENGINEER’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion.
6.03 FINAL PAYMENT
Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the
General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07.
ARTICLE 7 – INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at a rate of five percent (5%) per annum.
00 5200-4
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS
8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (Except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions.
E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the…