1st Heli Camera Solication Q and A Pre-Site Visit 12 Sep.docx

DOCX document 17 KB Posted

Attached to
1st Helicopter Sq Camera System Upgrade
Solicitation number
FA286024Q4049
Issued by

About this file

This document is a Questions and Answers (Q&A) session from a pre-site visit for a solicitation to upgrade the camera system for the 1st Helicopter Squadron. The key details are:

The solicitation is for a camera system upgrade at the 1st Helicopter Squadron, with a total of 15 cameras to be installed in and around Buildings 1910, 1911, and 1914. The contractor is expected to remove the old system and install the new one per the Performance Work Statement. The acquisition is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Interested offerors must request access to the Non-nuclear (CMD) Equipment Approval memorandum to review camera requirements. Offers are to be submitted via email to the points of contact by the response deadline. The solicitation is being re-issued by the Department of the Air Force Headquarters District Washington to provide fair opportunity to all interested parties after additional details were added to the Performance Work Statement and Combined Synopsis/Solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1st Helicopter Squadron Camera System Upgrade Vendor Q/A

1. What is the height of the poles the cameras will be mounted on? 19’

1. What is the height of the highest camera in the hanger?

35 feet

1. Can a lift be brought on base or do you have a department that will provide a lift due to security reasons? A lift can be brought on base with Security Forces Clearance

1. Will you provide space to store and stage equipment or does it have to be removed daily? Space for storage will be provided

1. Will there be a site visit? Site visit Scheduled for 09:30 AM EST 9 September 2024

1. Is there a current maintenance agreement for the existing CCTV system? No.

1. Does the IT department of the 1st Helicopter Squadron have network infrastructure installed between Building 1910, Building 1911, and the Hangar? Infrastructure is in place for the buildings

1. Is the current infrastructure fiber optic? Yes all current cameras are fiber optic. 1 coaxial camera on the Northeast corner of the hangar

1. According to code, does any outdoor cabling need to be enclosed in conduit? Yes

1. Is there a requirement for mounting racks and lock boxes for network equipment? We have plenty of rack space and all the equipment would be in a secure location so no need for lockbox.

1. Does any cabling need to be replaced? Yes, all cameras that are fed off of COAX shall be replaced with indoor/outdoor gel filled Category 6A cable. Existing Category will only need to be replaced if the length exceeds ANSI TIA standard for channel length (100M 328 feet). In these cases, the 744th recommends using Paige Datacomm “Game Changer” cable.

Can the 1st Helicopter Squadron's facilities provide the dimensions for the following buildings?

1. Building 1910: Height and depth The measurement from the concrete slab to the bottom of the rafters/gutters is 29 feet. The sim bay is 44 feet tall. Dimensions are 225ft x 225

13. Building 1911: Height and depth 117 feet by 90 feet and 15 feet tall

14. Hangar: Height and depth 387’ x 245. The height of the interior hangar cameras is 35 feet. The exterior cameras are mounted to the railing or a pole on the railing which takes up to an additional 4 feet. 39 feet tall for exterior cameras which can be reached along the catwalk on the exterior area.