About this file

Extend Due Date

View the file

Other files

File Type Posted
Q A 3 PV.doc DOC document
Q A 2 PV.doc DOC document
Q A 1 PV.doc DOC document
Region 1SubconPlan - Dec2008.doc DOC document
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Pre_Bid_Meeting_Minutes Concord Revised 2 12 10.doc DOC document
SIGNINSHEET PRE-Proposal PV Concord.doc DOC document
Pre-Solicitation Letter.pdf PDF
Vol 1.pdf PDF
Vol 3.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

2. In Subsection II.C of the “Solicitation” entitled “Technical Proposal”, “II.C.4 Design Development” (page 11 of 26), ADD the following paragraph:

“The Design Build Contractor must employ qualified personnel with prior experience with vegetative roofs to execute in accordance with all applicable codes and standards the design and construction of the project as defined in the solicitation for this project.

Members of the team may include but are not limited to a registered Architect, licensed Structural Engineer, Landscape Architect (or credentialed vegetative roof specialist), and experienced (manufactures authorized/certified) – vegetative roofing system subcontractors.”

3. In Subsection II.C of the “Solicitation” entitled “Technical Proposal”, in the first paragraph of “II.C.4 Design Development” (page 11 of 26), REPLACE the words “12 written narrative pages” with the following:

“12 written narrative pages for each roofing system”.

GS-01P-10-BZ-C-0013 Page 2 of 2 Amendment 0003

IDCode:
EffDate: MAR 01, 2010
ReqNo: 1PCS-10-0054
ProjNo:
IssuedBy: GSA/PBS SERVICE CENTERS DIVISION

NORTH SERVICE CENTER BRANCH

TP O'NEILL FOB, 10 CAUSEWAY ST., 11TH FLOOR

BOSTON MA 02222-1077

AdminBy: See Block 6
NoCopies: 1
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: 1. The Due Date for proposals for Solicitation GS-01P-10-BZ-C-0013 for Design-Build of a Building Integrated Photovoltaic Roof at the Cleveland Federal Building and an Extensive Vegetative Roof at the Rudman Federal Courthouse in Concord New Hampshire is extended to March 8th, 2010 at 12:00 Noon local time.

The Solicitation is further amended as follows: (see attached)

All other terms and conditions of the Solicitation remain unchanged. Please acknowledge this amendment by one of the means specified in Block 11.

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-01P-10-BZ-C-0013
SolDate: JAN 29, 2010
AwdNo:
IssuedByCode: 1PSK
AdminByCode:
ContrOfficerInfo:
DocNo: 0003
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule
Pages: 2
Page: 1

File details come from the government source that posted it. Updated .