1B QASP - Retailer Investigations 1-20261.pdf
PDF 411 KB Posted
- Attached to
- 12319826R5000 Retailer Investigations
- Solicitation number
- 12319826R5000
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the USDA Retailer Investigations contract (IAS #1162667), effective January 2026. The QASP establishes procedures and guidelines for the USDA Retailer Operations and Compliance (ROC) unit to monitor contractor performance against standards defined in the associated Performance Work Statement (PWS). The plan defines roles and responsibilities, performance objectives, surveillance methodologies, and quality assurance reporting requirements to ensure the contractor meets established service levels.
The contractor is responsible for delivering retailer investigation services in accordance with contract specifications, implementing a Quality Control Plan (QCP), and maintaining quality control records. Key performance requirements include: field work results timeliness (95% of data entered within 24 hours), field work quality (95% error-free upon submission), investigation timeliness (95% completed within 30 calendar days of assignment), investigation report timeliness (95% submitted within 12 calendar days of last pass, with corrections within 7 days), sanctionable attempt rates (90% minimum), and trafficking attempt rates (60% minimum). The government employs 100 percent inspection conducted daily by ROC's Special Investigations Unit with daily task order tracking via the Contractor Performance and Rating System (CPARS). The COR performs monthly and quarterly analyses of contractor performance against Acceptable Quality Levels (AQLs), resulting in ratings of Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory. Non-performance triggers documentation through Discrepancy Reports and potential remedial actions determined by the Contracting Officer, with the contractor bearing correction costs at no additional government expense.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Quality Assurance Surveillance Plan Retailer Investigations
January 2026
Retailer Investigations January 2026
Contents Retailer Project Name Solicitation/Contract Number Section 1: Introduction
1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance of Performance Progression
1.3 QASP Relation to the Quality Control Plan (QCP)
Section 2: Performance Description
2.1 Performance Standards and Acceptable Quality Levels (AQLs)
2.1.1 Allowable Deviation
2.1.2 Substantially Complete
2.2 Non-Performance
2.2.1 Documentation
2.2.2 Remedial Actions
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
3.2.2 Contracting Officer Representative (COR)
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
4.2 Analysis and Results
Appendix A: Performance Requirement Summaries Appendix B: Discrepancy Report
Retailer Investigations January 2026
Project Name Retailer Investigations
Solicitation/Contract Number
IAS #1162667
Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Retailer Investigations. This plan sets forth the procedures and guidelines that the USDA, Retailer Operations and Compliance (ROC) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression
As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP)
The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.
Retailer Investigations January 2026
Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4:
Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.
2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.
The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government.
The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.
2.1.1 Allowable Deviation
The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).
2.1.2 Substantially Complete
In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.
2.2 Non-Performance
Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement.
Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.
When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.
Retailer Investigations January 2026
2.2.1 Documentation
Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix A – Performance Requirement Summary. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
2.2.2 Remedial Actions
The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
The Contractor is responsible for delivering products or services in accordance with the contract.
Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions.
Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.
3.2.2 Contracting Officer Representative (COR)
The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP;
make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP; and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.
The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR 52.246-4 - Inspection of Services-Fixed-Price.
Retailer Investigations January 2026
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.
ROC’s Special Investigations Unit (SUI) will conduct daily reviews of the deliverables to make sure that they are delivered according to the contract and the PWS and the results will be submitted to the COR.
4.1.1 100 Percent Inspection The 100 percent inspection method requires complete inspection each month and will be used for critical contract requirements.
4.1.1.1 Performance Standards and AQLs
The performance standards and AQLs may be stated as either percentages or absolute numbers.
4.1.1.2 Evaluation Procedures
Observed defects for a service monitored by 100 percent inspection is compared to the performance standard and AQL.
SUI will conduct daily reviews of the deliverables to make sure that they are delivered according to the contract and the PWS and the results will be submitted to the COR.
4.2 Analysis and Results
When the inspections validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:
4.2.1 Outstanding Performance
Outstanding performance is the result of the Contractor substantially exceeding the performance standards with significant achievements and no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that significantly exceeds the requirements with no significant deficiencies.
SUI will conduct daily reviews of the deliverables to make sure that they are delivered according to the contract and the PWS and the results will be submitted to the COR.
Retailer Investigations January 2026
Appendix A: Performance Requirement Summaries The following document is an example only, which may not be all inclusive and it can be revised if applicable.
PERFORMANCE REQUIREMENTS SUMMARY
Field Work Results
Timeliness:
Enter into designated FNS System or reported to FNS within 24 hours of each pass
95% are entered on time
100% Inspection
Daily Task Order via the Contractor Performance and Rating System
(CPARS)
Field Work
Quality:
Data is of sufficient quality such that FNS does not have to return it for re-work of the product
95% of reports are error-free upon submission to FNS (error-free are reports that will not change the outcome of the investigation)
100% Inspection
Daily Task Order via the Contractor Performance and Rating
Investigation
Timeliness:
Investigation completed and submitted to FNS within 30 calendar days of being assigned by
FNS
At least 95% of investigations are completed and submitted to FNS within 30 calendar days of being assigned
100% Inspection
Monthly Task Order via the Contractor Performance and Rating
Reports - Timeliness
Case reports submitted to FNS within 12 calendar days of the last conducted pass
At least 95% submitted within 12 calendar days
100% Inspection
Monthly Task Order via the Contractor Performance and Rating
Retailer Investigations January 2026
Reports - Timeliness
Case reports returned for correction must be corrected and resubmitted to FNS within 7 calendar days of returned date
At least 95% submitted within 7 calendar days
100% Inspection
Monthly Task Order via the Contractor Performance and Rating
Quality:
Sanctionable attempt rate
At least 90% of passes are attempts at sanctionable items
Quarterly performance evaluation
Quarterly Task Order via the Contractor Performance and Rating
Quality:
Trafficking attempt rate
At least 60% of passes are attempts at trafficking
Quarterly performance evaluation
Quarterly Task Order via the Contractor Performance and Rating
Business Relations
Professional and respectful of all parties
Regular and ad-hoc meetings between contractor and
FNS
Quarterly performance evaluation
Quarterly Contractor Performance and Rating
Management of Key Personnel
Appropriate credentials & experience for the work involved
Regular and ad-hoc meetings between contractor and
FNS
Quarterly performance evaluation
Quarterly Contractor Performance and Rating
Management of Key Personnel
Attends scheduled meetings & available for ad-hoc meetings as necessary for contractual concerns
Regular and ad-hoc meetings between contractor and
FNS
Quarterly performance evaluation
Quarterly Contractor Performance and Rating
Rating Definitions Exceptional Performance exceeds contractual requirements. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-
Retailer Investigations January 2026 element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub- element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements, and recovery is not likely promptly. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Appendix B: Discrepancy Report The following document is an example only, which may not be all inclusive and it can be revised if applicable.
Retailer Investigations January 2026
| Project Name |
| Solicitation/Contract Number |
| Section 1: Introduction |
| 1.1 Purpose |
| 1.2 QASP Relation to the Contract |
| 1.2.1 QASP Revisions |
| 1.2.2 Surveillance of Performance Progression |
| 1.3 QASP Relation to the Quality Control Plan (QCP) |
| Section 2: Performance Description |
| 2 |
| 2.1 Performance Standards and Acceptable Quality Levels (AQLs) |
| 2.1.1 Allowable Deviation |
| 2.1.2 Substantially Complete |
| 2.2 Non-Performance |
| 2.2.1 Documentation |
| 2.2.2 Remedial Actions |
| Section 3: Contractor and Government Responsibilities |
| 3 |
| 3.1 Contractor Responsibility |
| 3.2 Government Responsibility |
| 3.2.1 Contracting Officer (CO) |
| 3.2.2 Contracting Officer Representative (COR) |
| Section 4: Surveillance Methods to Perform Quality Assurance |
| 4 |
| 4.1 Surveillance Methods |
| 4.2 Analysis and Results |
| Appendix A: Performance Requirement Summaries |
| Appendix B: Discrepancy Report |