SF-30 Amendment 0002.pdf
PDF 282 KB Posted
- Solicitation number
- 19UP3024Q0018
- Issued by
-
Department of State
About this file
This document is an Amendment of Solicitation/Modification of Contract (SF-30) for Solicitation Number 19UP3024Q0018, which is a Request for Quotation for the "Repair of Parking Garage at the U.S. Embassy Kyiv Compound". The amendment revises Attachment A of the Scope of Work and Attachment 4 - Breakdown of Price by Divisions of Specifications. The solicitation is for a firm to repair an existing parking garage structure at the U.S. Embassy Kyiv Compound, with an estimated value between $100,000 and $250,000 and a 60-calendar day period of performance. Firms must be technically qualified, financially responsible, registered in SAM.gov, and meet other requirements to be eligible. The Embassy will conduct a site visit on May 31, 2024, and all quotations must be submitted by June 11, 2024. The U.S. Government intends to award a contract/purchase order to the responsible company that submits the lowest priced, acceptable quotation, without holding discussions unless necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 19UP3024Q0018.pdf | ||
| Site-Visit Minutes 19UP3024Q0018.pdf | ||
| SF-30 Amendment 0001.pdf | ||
| SF1442 RFQ 19UP3024Q0018 Repair Parking.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
June 6, 2024
4. REQUISITION/PURCHASE REQ. NO.
PR12314546
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
U.S. Embassy Kyiv
4 Igor Sikorsky St.
04112, Kyiv, Ukraine
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
X
9a. AMENDMENT OF SOLICITATION NO.
19UP3024Q0018
9b. DATED (SEE ITEM 11)
May 28, 2024
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
[ ] is extended, [X] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF
OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return __ copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Amendment 0002 was issued to revise Attachment A of the Attachment #1- Scope of Work, and Attachment #4 – United
States Department of State Breakdown of Price by Divisions of Specifications of Request for Quotations. Accordingly, SEE NEXT PAGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
Patrick Murphy
15B. NAME OF CONTRACTOR/OFFEROR
BY
(Signature of person authorized to sign)
15C.DATE
SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 Standard Form 30 (revised 10/83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
19UP3024Q0018- 0002
1. In Attachment #1 – Scope of Work, Attachment A is hereby revised to read as follows:
ATTACHMENT A
It is the responsibility of the Contactor to verify dimensions and existing condition of the parking garage area.
Total floors area: 6,100 sq m
Total ceilings area: 6,425 sq m
Total walls area (including concrete fencing, columns, stairs) – 1,100 sq m.
Total stairs area: 54 sq m
Total length of parking lines: 3,135 l/m
Total length of metal handrails: 110 l/m with height 0.9 m.
19UP3024Q0018- 0002
2. Attachment #4 – Scope of Work, United States Department of State Breakdown of Price by
Divisions of Specifications is hereby revised to read as follows:
ATTACHMENT #4 - UNITED STATES DEPARTMENT OF STATE
BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS
1. Labor and Materials
Item of Work Quan tity
Unit of
Measure
MATERIAL COST LABOR & EQUIP COST
TOTAL
Per Unit Subtotal Per Unit Subtotal
Mobilization/Demobilization Lump
Sum
Administration (Scheduling, Planning, and Safety/Quality
Control Plan Preparation)
On-Site
Management/Supervision
Clean-up Lump
Sum
Repair of floors area Square
Meter
Repair of ceilings area Square
Meter
Repair of walls area Square
Meter
Repair of stairs area Square
Meter
Repair of parking lines Linear
Meter
Repair of metal handrails Linear
Meter
2. General Overhead and Administration, Insurances and Profit
Insurances and Profit TOTAL
General Overhead and Administration
General Liability Insurance
Defense Base Act Insurance (if applicable).
Contractor shall cover each of its workers at the site with DBA Workers’ Compensation coverage and require its subcontractors to do the same.
Contractor must furnish certificate evidencing this coverage to Engineer prior to starting work.
Profit
SUBTOTAL - Insurances and Profit:
TOTAL PRICE OF OFFER (Items 1 and 2) Applicable taxes (i.e., VAT), Offeror shall specify applicable tax and its percentage_______
GRAND TOTAL PRICE OF OFFER
Currency of Offer
OFFEROR
(name, signature, date):
File details come from the government source that posted it. Updated .