QA_sheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Janitorial Services Contract for US Consulate, DUBAI Federal contract opportunity
Solicitation number
19TC1218R0040
Issued by
Department of State US Consulate Dubai

About this file

QA sheet

View the file

Other files for this federal contract opportunity

Other files attached to Janitorial Services Contract for US Consulate, DUBAI, newest first.
File Type Posted
Janitorial_Synopsis_on_FBO.docx DOCX document
Minutes_of_Meeting.pdf PDF
19TC1218R0040_SOLICITATION_FOR_JANITORIAL_SERVICES.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SL NOQUESTIONANSWERREFERENCE to SOLICITATIONPage number
1If there is an incumbent contractor currently performing the work, would the Government please provide the following information: a. Name of the Incumbent Contractor?Yes, AL FAJER SECURITY & MAINTENANCE SERVICES LLC
2Contract number of the current contract?STC12013C0001
3What is the total square footage of the Consulate Facility?Internal area - 180,000 sqft

Roof area - 68,000 sqft

External area- 208,000 sqft (Hardscape + Landscape)Refer 3.0 - Locations for Janitorial Services12
4Will the government provide a storage area (cleaning closet) within the facility, and if so, what is the total square footage of the cleaning closet?Restroom - 260 sqft

Store - 130 sqft

Janitor closet - 192 sqft ( 6 units @ approximately 30 -32 sqft )Refer 3.0 - Locations for Janitorial Services12
5Removing dried leaves and trash from the outside area. What is the total Square feet of the hardscape and landscape to be maintained?Hardscape - 153,000 sqft
Landscape - 55,000 sqftRefer 1.3.1.129
6The Contractor shall perform inspection visits to the work site on a regular basis. What is considered a regular visit by the Contractor?Once in a monthRefer 2.311
7Is the 9,096.823 Sq Meter (97,917.40 Sq Ft) the total square footage to be cleaned within the Consulate Facility?Please refer our response to question 3Refer 3.0 - Locations for Janitorial Services
8Personal Security. The Contractor shall perform inspection visits to the work site on a regular basis. If a US Employee is hired what type of clearance is required?Only local Dubai Police clearance certficate and background verification will be required.Refer 4.4.114
9Minimum Wages Under Executive Order 13658. Is there a wage determination scale for foreign national employees?The current Local Labor Law does not specify any minimum wages or a wage determination scale for janitorial staff. The contract is required to be in complaince with the local labor laws.
10Who will provide the dispensers?Will be provided by consulateAppendix A62
11Which type of hygienic consumables required? (Toilet Rolls, M-Tork, Interfold etc)Please refer to page 62, appendix A of solicitation documentAppendix A62
12Kindly clarify if the leed certified cleaning chemicals are requiredAs per point 5.0 on page 14 of solicitation document, all chemicals shall be green products and shall be approved by the POSHO for use at the Consulate.
13What is the current contract value including all option years?$697,230.00
14Will there be a site map available?While location map is available, a detailed site map will not be provided.
15Can the services be provided using a sub-contractorYes
16Can the submit sub-contractor’s past performance as part of its proposal?Yes
17Does sub-contractor need to be enrolled in SAM / DUNS and CAGE or it is just for the prime contractor level?The Contractor and the subcontractor will be required to be registered prior to award of the contract or within 30 days of award of the contract.52.204-739
18What is the daily and weekly working hours?7.30 AM to 5.00 PM
19Does the façade belong to monthly or other cleaning period?Window washing - Quarterly (Please refer to page 10, point 1.3.5 of solicitation document)

Wall washing - Semi Annual (Please refer to page 10, point 1.3.6 of solicitation document)

20Does there any specific machine brand(s) to be used in work?No.
21Any specific requirements needed for Bins (like color) and garbage collection’s trolley’s?No. Bins are provided by Consulate.
22Is there any specific requirement of staff selection by nationality or by qualifications?No
23Are there specific brands for consumables items? (chemical items used in work, tissues, garbage bags, soap,…, etc.)No
24As provided in the responsibility matrix/ history, the manpower structure. We need to provide the exact number of staff / or we can propose alternative structure other than that.The solicitation does not specify the total number of persons to be delpoyed under this contract. It is up to the contractor to decide the reasonable number of staff that will be required t o perform all the services under this contract. Please also refer to 4.1 on page 12 for more details.
25How many wash rooms are available?22
26Please specify the working hours for female cleaners.7.30 AM to 5.00 PM
27A recruitment plan is required if the tender is more than 150,000 USD and third country employees are contracted. All our employees are from third countries. What does this section mean for us?Please refer to the solicitation which clearly explains the recruitment plan
28Insurance policy must cover "The US Government" as insured. Please specify and what if insurer does not include this in the policy?An insurance that covers the " US Government" in the policy will be required
29The RFP is linked to several hyperlinked contractual references. Do we need to accept and sign off all those references?All the hyperlinks relate to this contract, a signature will not be required on each page of the solicitation document. By signing the cover page the contractor accpets the terms and conditions laid forth in the contract.
30Total cubicles in both CAA and non CAA areasApproximately 250
31Estimated number of visitors & current staffing numbers for calculation of materialsApproximately 300
32Is there a specific supplier requested for the janitory materials and hand soaps?There is no specific supplier for the materials. All materials under this contract must be furnished by the contractor
33For specification of floor types - Operating & ManualsWill be provided
34As per Clause 4 of work statement the indicative number inclusive of 2 Female cleaners is 14 stating that this is a reference to the exisiting contract. Are we allowed to mobilize based on our own methods by providing minimum 2 females?There is no particular ratio of male vs female staff. However we require atleast 2 female staff to be a part of the team.
35As per clause 4.4 of work statement, we understand that the Government will run Security check on the propsoed staff which will take 3 months. This effectively means that we can not start the service earlier than 3 months from the award of the contract, please clarify.The Government will issue temporary permits upon submission of good conduct certificates issued by local government and clearance after the back ground checks are complete.

Sheet2

Sheet3

File details come from the government source that posted it.