This document is an Amendment to Solicitation 19RB1024R0003 for the Reconstruction of Walkways at a U.S. Embassy Residence in Belgrade, Serbia.
The key changes made in this Amendment 001 are: 1) The contractor is now required to furnish performance and payment bonds, with 21 calendar days given to submit them. 2) The solicitation has been updated to include new Section G requirements G.1.0 through G.1.3. The solicitation remains a Request for Proposals (RFP) for construction services, with an LPTA (Lowest Price Technically Acceptable) evaluation method. Proposals are due by 17:00 local time on May 28, 2024. All responsible sources may submit a response which, if received on time, shall be considered. The Government reserves the right to conduct discussions if necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19RB1024R0003-002.pdf | ||
| 19RB1024R0003_RFP.pdf | ||
| 19RB1024R0003_Questions and Answers Form.docx | DOCX document | |
| 19RB1024R0003_Site Visit Registration Form.pdf | ||
| 19RB1024R0003_Experience and Past Performance Form.docx | DOCX document | |
| 19RB1024R0003_RFP Cover letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
AMENDMENT OF SOLICIT ATION/MODIFICATION OF CONTRACT PAGE 1 OF 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. 5. PROJECT NO. (If applicable)
NO.
6. ISSUED BY CODE
I
7. ADMINISTERED BY (If other than Item 6)
I CODE
U.S. Embassy/GSO, Bui. Kneza A. Karadjordjevica 92, 11040 Belgrade, Serbia
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,Sta/e,ancl ZIP Code) 9a. AMENDMENT OF SOLICITATION NO.
I 9RB"I 024R0003
9b. DATED (SEE ITEM 11)
May 13, 2024 10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
181 The above numbered solicilation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is D extended, i8l is not exlended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one or the following methods: (a) By completing Items 8 and 15, and returning_ 1 _ copies or the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLED GMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR ANO DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or eleclronic communication makes reference to the solicitation and this amendment. and is received orior to the ooenino hour and date soecified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify au/hodty) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 1 OA.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor Dis not, C8l is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including so/icitalion/con/ract subject matter where feasible.)
Amendment 001 is to make the following changes to the solicitation document:
I. The requirement in cover sheet SF 1442 form, Block 12A and 12B - The Contractor must furnish and required performance and payment bonds-from NO to YES, and in Block 12B Calendar days 21.
2. Change in Section G - Special requirements - from G.1.0 RESERVED to G.1.0 through G.1.3, as stated on the next page:
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. NAME OF CONTRACTOR/OFFEROR 15C.DATE SIGNED
BY
(Sianature of oerson authorized to sicmJ
PREVIOUS EDITION UNUSABLE
16A. NAME OF CONTRACTING OFFICER
_Richard Damian
B. UNITED STA
0F
16C.DATE SIGNED
11 ��y 202l /Sianature of Conrhictir\a ruii,,,,,,rJ
STANDARD FORM 30 (REV. 11-2015)
Prescrlbed by GSA
FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .