This is a Statement of Work (SOW) for interior painting and repairs services at the Consul General Residence.

The SOW outlines maintenance and repair work required at the Consul General Residence property. The associated solicitation (RFQ 19M03027Q0004) issued by the Department of State's Casablanca office seeks competitive quotations for this project on a firm-fixed-price basis. Quotations are due December 7, 2026, at 16:00 Casablanca local time and must be submitted in English to CasablancaProc@state.gov in Microsoft Word, Excel, or PDF format, with a maximum file size of 30 MB. The Government intends to award to the responsible quoter offering the lowest evaluated price without discussion. Required submission documentation includes a completed and signed SF-18 form, pricing details in Section A, applicable representations and certifications from Section L, UEI and SAM registration information, and any additional information specified in Section J of the solicitation. Quotations received after the deadline will not be reviewed, and offerors must send a separate confirmation email after submission to receive acknowledgment of receipt from the Consulate.

View the file

Other files

File Type Posted
SF18.pdf PDF
19M03027Q0004-CGR Interior repairs and Painting-RFQ.pdf PDF
Appendix 1 - Architectural Plans 1 (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consulate of the United States of America Casablanca, Moracco

FACILITY MANAGEMENT OFFICE

SCOPE OF WORK

DATE: November 17, 2026

PROJECT: VILLA MIRADOR MAINTENACE AND REPAIR

The Consulate of the United States of America in Casablanca, requests a proposal for the project as described below.

Foreword: Strategic Significance, Asset Condition, and Professional Imperatives

The U.S. Consul General’s Residence (CGR), historically known as Villa Mirador, is located within the premier Anfa-Supérieur neighborhood of Casablanca, Morocco. Acquired by the United States government in 1947, this landmark property is officially registered in Washington, D.C., as a Culturally Significant Heritage Property. Beyond its architectural value, Villa Mirador stands as a vital piece of American diplomatic history and serves as an active, high-profile platform for U.S. diplomacy, bilateral engagement, and international outreach in North Africa.

Current Condition and Project Objective

Due to successive years of deferred maintenance and systemic repair backlogs, the residence has experienced significant material and structural degradation. Prolonged exposure to intense solar radiation and aggressive coastal marine atmospheric conditions have caused severe silvering in the historic wood windows. Additionally, the extensive decorative metal gratings protecting the first-floor windows suffer from deep rust and failing paint layers, while the upper masonry ramparts exhibit structural spalling.

The primary objective of this Scope of Work (SOW) is to arrest this environmental decline while returning the interior to its original luster. The selected contractor will completely rehabilitate the facility, returning it to an elite, institutional standard that ensures its long-term preservation and provides a safe, highly functional environment for the current and future Consul Generals.

Demanded Professionalism and Engineering Rigor

Because Villa Mirador is an active, registered diplomatic heritage asset, standard commercial construction tolerances and methods are entirely insufficient. Bidding companies must approach this project with a sophisticated hybrid discipline, blending civil and mechanical engineering controls with meticulous historical restoration techniques. Every phase of execution requires an absolute commitment to structural integrity, material longevity, and architectural authenticity.

Contractors must strictly adhere to the following professional and operational mandates:

· Engineering Quality & Material Science: All structural mortars, wood stabilizers, and industrial coatings must be chemically compatible with the existing 1940s-era substrates. Material data sheets must be verified to withstand Casablanca's coastal climate before application.

· Artisanal Restoration Standards: Technicians must possess proven, specialized experience in treating aged wood fibers, stabilizing historic concrete, and remediating heavily oxidized ironwork without altering original design profiles.

· Security & Logistics Discipline: Ground-floor decorative gratings represent the site's primary physical security barrier. The logistical pipeline for removing, cataloging, transporting, sandblasting offsite, and reinstalling these heavy assemblies must be tightly controlled.

· Finally: This project demands unparalleled operational discipline, strict scheduling, and clear technical communication. By submitting a bid, the contractor commits to delivering a restored diplomatic facility that reflects the prestige of the United States and honors the cultural heritage of Morocco.

· CGR Interior maintenance & repair work.

Section X: CGR Interior/Exterior Maintenance and Repair Work X.1 Scope of Work

The Contractor shall provide all labor, supervision, materials, tools, equipment, transport, and safety measures necessary to perform interior and exterior maintenance and surface restoration at the Consul General Residence (CGR) in Casablanca. All work shall progress through the systematic execution steps outlined below.

X.2 Technical Performance Specifications

Step 1: Mobilization, Site Protection, and Surface Repair

· Pre-Work Protection: Prior to the commencement of any tradecraft, the Contractor shall install comprehensive surface protection across all affected areas. This includes protective coverings (e.g., PVC foil, heavy-duty drop cloths, and professional painter's tape) to secure flooring, fixtures, openings, cabinetry, millwork, and furnishings.

· MEP Coordination: The Contractor shall coordinate continuously with concurrent Mechanical, Electrical, and Plumbing (MEP) trades to avoid operational conflicts.

· Penetration & Opening Patching: Repair and patch all wall and ceiling penetrations, chases, and openings resulting from electrical or plumbing demolition.

· Stone Rampart Restoration: The Contractor shall ensure all stone ramparts located on the second floor are structurally patched using hydraulic concrete and fully sealed against environmental degradation.

· Structural Defects & Crack Repair: Repair all pre-existing cracks, holes, and surface irregularities. If structural supports were removed during prior renovations, the Contractor shall engineer and add necessary structural reinforcement to properly support the load.

· Finish Sanding & Pre-Treatment: Sand and feather all patched surfaces to achieve a perfectly smooth, flush finish. Perform thorough wall and ceiling cleaning to remove dust, grit, and loose elements.

· Spot-Priming: Apply a targeted spot-prime coat on all repaired wall and ceiling segments.

Step 2: Interior Primer Coating

· Full-Surface Application: Apply one full-surface primer coat across all interior walls and ceilings using TOUPRET CB, STOPASTRAL (ASTRAL) (White), or a pre-approved equivalent product.

Step 3: Interior Impregnation Layer

· Moisture/Base Binding: Apply a comprehensive interior impregnation layer using PRIMOREX (ASTRAL) or a pre-approved equivalent product to stabilize the substrate.

Step 4: Interior Painting (Two-Coat Application)

· First Undercoat: Apply a uniform first coat of white paint utilizing VINYLASTRAL or a pre-approved equivalent product.

· Second Finishing Coat: Apply a final topcoat utilizing color code GN.01.89 (or an alternate code explicitly specified by the Contracting Officer's Representative [COR]). The paint must be VINYLASTRAL or a pre-approved equivalent product.

Step 5: Woodwork and Varnishing

· Exterior Woodwork & Doors: Inspect and replace all rotted exterior wood components. Sand, re-stain, and apply weather-resistant protective coatings to all exterior wood finishes, including all terrace and balcony access doors.

· Interior Window Framing: Sand, re-stain, and apply an interior-grade finish to all wood window framing and associated wood accessories.

· Main Entrance Lattice Décor: Replace the main entrance lattice wood décor. The installation must be fully framed, stained, treated for pests, and finished against weather exposure.

· Pre-Treatment and Finishes: Apply FORMOPRIM for wood surface preparation. Apply VERNISCELLUC V.108 (or a COR-approved equivalent) for final varnish applications.

· Interior Doors: Remove existing failing paint layers from interior wood doors and repaint them to a smooth finish.

· Mechanical Access Panels: Fabricate and install matching access panels over all structural cavities containing exposed shut-off valves on the second floor.

Step 6: Metal Painting and Historical Restoration

· General Metal Repairs: Perform comprehensive repairs, sanding, and structural tuning on all exterior metal items, including doors, railings, window grills, garage doors, terrace doors, canopies, and equipment supports.

· Welding and Framework Processing: Remove sandblast materials off-site, re-weld structural defects as needed, and paint/reweld touch-up points on all exposed metal welds. The structural framework for awnings shall remain in place; however, the blue fabric must be carefully removed prior to work and reinstalled properly after framework painting is dry.

· Cultural Heritage Components: The main entry metal door and decorative grating are classified as critical components of the building's cultural heritage. The Contractor shall handle these items with specific attention, care, and detail in accordance with the approved Historical Metal Restoration Plan outlined in Section X.3.d.

· Metal Coating Application: Apply CELLUC FER or a pre-approved equivalent product subject to final COR approval.

Step 7: Window Roll-Down Shutter Restoration and Maintenance

The Contractor shall provide all labor, parts, materials, and specialized expertise necessary to restore all non-functional window roll-down shutter systems at the residence to fully operational status.

a. Diagnostic Inspection, Parts Sourcing, and Warranty

The Contractor shall inspect each shutter assembly to determine mechanical and electrical failures. If original components are obsolete, the Contractor shall source and install high-quality, like-kind replacement parts that match the technical footprint, voltage requirements, and structural dimensions of the existing systems. The Contractor shall provide a minimum one (1) year operational warranty on all newly installed motors and electrical components from the date of final project acceptance.

b. Mechanical and Electrical Rehabilitation

· Motor Replacement: Remove all failed or degraded shutter motors and replace them with brand-new, industrially rated tubular motors.

· Track Maintenance: Deep clean, clear of debris, align, and lubricate all shutter guide rails and tracks to ensure smooth, low-friction travel.

· Electrical Integration: Rewire and connect new motors to existing switches or control systems, ensuring strict compliance with safe grounding standards.

c. Surface Restoration and Painting

Prior to reassembly, the Contractor shall thoroughly clean, sand, remove corrosion or failing paint from, and repaint the shutter housing units, access doors, covers, and slats. The finish coating must be weather-resistant and color-matched to the adjacent exterior surfaces in accordance with COR approval.

Step 8: Waste Management and Final Restoration

· Debris Management: Collect and dispose of all patching, priming, and painting debris weekly. This waste stream must be segregated from general MEP renovation debris.

· Post-Work Turnover: Perform a final deep cleaning of all worked areas, return all furniture and furnishings to their exact original positions, and participate in a final closeout walk-through with the designated Point of Contact (POC).

X.3 Material Submittals and Pre-Approval Requirements

Prior to ordering materials, delivering supplies to the site, or commencing any application work under Steps 2 through 6, the Contractor shall submit the following documentation to the COR for formal review and written approval. The US Government will not be liable for any costs or project delays resulting from the installation of unapproved materials.

a. Product Data Sheets (PDS)

The Contractor shall submit manufacturer technical data sheets for all paints, primers, sealers, varnishes, wood treatments, hydraulic concrete, and metal coatings. The data must explicitly verify that the products meet or exceed the performance specifications outlined in this SOW (e.g., TOUPRET CB, STOPASTRAL, PRIMOREX, VINYLASTRAL, FORMOPRIM, VERNISCELLUC V.108, CELLUC FER, or their exact equivalents).

b. Safety Data Sheets (SDS)

The Contractor shall provide SDS for all chemical products, solvents, and coatings brought onto the residence grounds. These sheets must outline proper handling, ventilation requirements, storage protocols, and spill-containment procedures in accordance with both international safety practices and Moroccan environmental regulations.

c. Physical Samples and Color Swatches

· Paint and Varnish: The Contractor shall submit physical color drawdowns or swatches matching color code GN.01.89 (or alternative COR-specified tones) for visual approval.

· Wood Restoration: The Contractor shall provide a sample of the intended wood replacement species, along with a mock-up of the proposed stain and weather-protection finish.

· Access Panels: The Contractor shall submit material samples and design details for the mechanical access panels to ensure they visually match the surrounding second-floor architecture.

d. Historical Metal Restoration Plan

As required for the cultural heritage components (Main Entry metal door and decorative grating), the Contractor shall submit a written, step-by-step methodology detailing:

· The exact off-site sandblasting or cleaning methods to be used.

· Rust-inhibiting primer treatments.

· Final coating application techniques are designed to preserve the historical integrity of the metalwork.

X.4 Sufficiency of Specifications and Contractor Responsibility

The technical descriptions, material callouts, and quantities derived from the Independent Government Cost Estimate (IGCE) provided within this section are intended solely to establish a baseline estimate of the general scope of work. They do not purport to describe every minor detail, installation accessory, or standard trade practice required to take the project to a complete and fully functional status.

It is the explicit expectation of the US Government that a highly qualified, licensed contractor shall perform all necessary field verifications, understand the comprehensive requirements inherent to complete trade performance, and provide all incidental items or actions necessary to deliver an operationally ready, visually seamless project to completion without additional cost to the Government. No additional compensation or change orders will be approved for omissions resulting from a failure to accurately verify field conditions or estimate the scope of work required.

X.5 General Project Requirements and Execution Guidelines

a. As-Built Documentation and Project Closeout

The contractor shall submit all relevant construction files, including as-built drawings and manufacturer warranties, to the US Consulate General within ten (10) calendar days of substantial completion.

b. Safety Compliance

The contractor shall strictly comply with all provisions outlined in the attached “Contractor Safety Policy” (Appendix 1) and ensure all site personnel adhere to these safety protocols throughout the duration of the project.

c. Facilities Coordination

The contractor shall coordinate all site access, material deliveries, and daily work schedules with the US Consulate General Facilities Management section at least forty-eight (48) hours in advance of execution.

d. Protection of Existing Structure and Property

The contractor shall provide and maintain all necessary temporary bracing, shoring, dust barriers, and protective coverings required to safeguard the existing building structure, interior finishes, and contents from damage or weather exposure during construction. Any damage caused by the contractor shall be repaired to original condition at the contractor’s expense.

e. Site Cleanliness and Waste Removal

The contractor shall remove all rubbish, debris, crates, packaging, and surplus materials from the residence grounds on at least a weekly basis—or more frequently if required to maintain a safe, professional, and orderly environment.

X.6 Project Schedule and Performance Period

a. Performance Schedule and Progress Milestones

The contractor shall submit a comprehensive project work schedule and a baseline timeline (e.g., a critical path method or Gantt chart) to the US Consulate General Facilities Management section for review and formal approval prior to the commencement of any site work. The schedule must clearly outline all major milestones.

b. Hours of Work and After-Hours Requirements

· Standard Working Hours: Regular project work shall be performed Monday through Friday, from 08:00 to 11:30 and 13:30 to 17:00.

· After-Hours Work: The US Consulate General reserves the right to require the contractor to perform work outside of standard working hours (including evenings, nights, weekend or local holidays) to minimize disruption to operations or residency occupants.

· Cost Impact: The contractor shall accommodate all such after-hours requests at no additional cost to the US Government. All premium labor, overtime, or shift differentials required to fulfill this obligation must be factored into the contractor's initial base proposal.

c. Period of Performance

The contractor shall achieve full project completion and hand over an operational site within sixty (60) calendar days from the date specified in the official Notice to Proceed (NTP).

X.7 Key Milestones and Inspection Points

a. Pre-Construction Conference

Prior to the commencement of any physical work or material staging, a mandatory pre-construction meeting shall be held between the contractor and the US Consulate General Facilities Management section. This meeting will formally coordinate tradecraft schedules, security access requirements, and operational boundaries within the residence grounds.

b. Material Selection and Submittals

The contractor must submit all material specifications, samples, and manufacturer data sheets to the Contracting Officer’s Representative (COR) for written approval prior to purchasing or bringing materials onto the job site. Recommended enamel paint brands include Dufa, Dulux, or an approved equal. Color selections must match the confirmed paint schedule and be finalized with the owner prior to installation. No materials shall be installed without this explicit clearance.

c. Pre-Closure Inspections (Concealed Work)

The contractor shall notify the US Consulate General Facilities Management section at least forty-eight (48) hours prior to closing or covering up any structural elements, electrical wiring, plumbing, or hidden infrastructure. A formal site inspection and sign-off must be completed before any concealed work is permanently covered.

X.8 Quality Assurance and Control

a. Corporate Registration and Licensing

The contractor must be an officially registered construction company, legally licensed, and in good standing under the laws of the Kingdom of Morocco to perform commercial building or renovation works.

b. On-Site Supervision and Communication

The contractor shall provide a dedicated, full-time on-site supervisor who must always remain on the job site when work is actively being performed. The site supervisor must possess professional proficiency in English (both verbal and written) to seamlessly communicate with US Government personnel.

c. Material Integrity and Code Compliance

The site supervisor shall inspect and verify that all construction materials are protected from weather, handled with care, and free of damage prior to and during installation. All workmanship and construction methodologies must strictly adhere to the highest standard industry practices as outlined in the International Building Code (IBC).

d. Joint Final Inspection and Punch List

Upon project completion, the contractor’s site supervisor and the US Consulate General inspection team shall conduct a joint final walkthrough. A formal punch list will be generated, and any identified quality defects or incomplete works must be rectified by the contractor at their own expense before final payment is approved.

X.9 Safety and Accident Prevention

a. Equipment Safety and Stop-Work Authority

The contractor's site supervisor is responsible for ensuring that all machinery, tools, and equipment utilized on-site are in safe, code-compliant operating condition. The contractor must provide appropriate Personal Protective Equipment (PPE)—including but not limited to hard hats, safety glasses, high-visibility vests, and steel-toe footwear—to all site personnel as necessary for the work being performed. The US Consulate General explicitly reserves the unilateral right to halt all construction activities if any unsafe acts or conditions are observed, at no cost to the US Government.

b. Electrical Safety Standards

All portable electrical tools (such as drills, saws, and grinders) and heavy-duty extension cords must be properly grounded, free of defects, and insulated without damage or exposed wiring. Where required by the US Consulate General, equipment must be fitted with functional Ground Fault Circuit Interrupters (GFCI).

c. Ladder and Scaffolding Safety

All ladders, scaffolding, and staging equipment must be in structurally sound condition, industrially rated for the intended loads, and utilized in strict compliance with standard safety configurations.

d. Regulatory Compliance

The contractor shall strictly adhere to all applicable health and safety laws, environmental regulations, and building safety mandates dictated by the Moroccan National Building and Construction Standards.