This document is an Amendment (A0001) to a Request for Quotations (RFQ) No. 19JA8025Q0018 for Residential Restoration Services at the U.S. Embassy Apartment Compound in Tokyo, Japan, specifically for mold damage restoration work in Perry 3067. The amendment revises the Statement of Work (SOW) and removes a certification paragraph, with detailed modifications to restoration requirements including wall, ceiling, and fixture restoration procedures.
Key restoration specifications include installing fire-resistant and moisture-resistant gypsum board, applying various insulation methods (such as rigid Styrofoam, glass wool, and closed-cell spray polyurethane foam), implementing moisture barriers, and reinstalling fixtures and finishes. The work encompasses comprehensive restoration of exterior and interior walls, ceilings, hallways, and specific areas like kitchens and bathrooms, with emphasis on fire resistance, moisture control, and adherence to local building codes and standards. The contractor is required to provide all materials, labor, and equipment, with work to be performed Monday through Friday during specified hours.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19JA8025Q0018 RFQ COsigned II.pdf | ||
| 19JA8025Q0018 - RFQ-COsigned.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
A0001
3. EFFECTIVE DATE
See Item 16C.
4. REQUISITION/PURCHASE REQ. NO.
PR15338170 / PR15343685
5. PROJECT NO.
6. ISSUED BY CODE 7. ADMINISTERED BY CODE
Procurement/Contracting Unit U.S. Embassy 1-10-5 Akasaka Minato-ku, Tokyo 107-8420 Japan
See Item 6.
8. NAME AND ADDRESS OF CONTRACTOR
9a. AMENDMENT OF SOLICITATION NO.
19JA8025Q0018
9b. DATED (SEE ITEM 11)
May 29, 2025
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ ✓ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ ✓ ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation, or as amended, by one of the following methods:
(a) by completing Items 8 and 15 and returning one copy of the amendment;
(b) by acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE
HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA
Not applicable.
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS;
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER:
E. IMPORTANT: Contractor [ ✓ ] is not, [ ] is required to sign this document and return one copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to revise the Statement of Work (SOW). See following page 2 through page 5 of this Amendment 0001.
Also, this amendment is to remove complete paragraph of Sub-Section L.9 CERTIFICATION REGARDING COMPLIANCE WITH APPLICABLE FEDERAL ANTI-DISCRIMINATION LAWS, refer to the page 55 and 56 of original RFQ.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (type or print)
16A. NAME OF CONTRACTING OFFICER
Christopher G. Staff
15B. NAME OF CONTRACTOR/OFFEROR
BY
(signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(signature of Contracting Officer)
16C. DATE SIGNED
6/10/2025
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Request for Quotations (RFQ) No. 19jA8025Q0018 Amendment 0001
See the amended items in red font in SOW as follows:
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Mold Damage Restoration Work in P3067
A. Scope of Work
The Contractor shall perform the following restoration work to remediate mold damage in Perry 3067:
1. Re-insulation inside exterior wall space in the entire residence (Refer to Section D for exterior wall insulation methods and finish details.)
2. Re-insulation inside the residence (Refer to Sections I (for interior wall insulation and moisture barrier application) and F (for ceiling and drop-ceiling insulation and restoration) for detailed procedures.)
3. Restoration of interior walls, including wall assemblies in wet areas and living spaces as well as partitions (Refer to
Section I for interior wall restoration guidelines for both wet and dry areas; also see Section E for interior/neighbor partition assemblies.)
4. Restoration of kitchen cabinets, bathrooms, laundry room, and other fixtures such as re-installation of lights, outlets, switches, curtain rails, etc. (See Section H for fixture and finish restoration procedures.)
5. Restoration of the exterior wall (See Section D for specifics on exterior wall insulation, moisture barriers, and gypsum board finish.)
6. Cleaning of all existing molds (General mold remediation applies; also refer to the anti-mold provisions in Sections F and I to ensure proper moisture control.)
7. Full putty work (Refer to Section G for the surface preparation and baseboard restoration details.)
B. General Requirements
B.1. Materials, Workforce, and Workmanship: Unless otherwise stipulated, the Contractor shall provide all materials, labor, tools, equipment, transportation, and other facilities necessary for the execution and completion of the work. All materials and workmanship shall meet or exceed industry standards, Japan Industrial Standards (JIS), and Japan Architectural Specification Standards (JASS).
B.2. Schedule of Work: All work shall be performed from Monday to Friday except holidays, during the hours between 08:30 – 17:30. Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative (COR). The Contractor shall give 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours, initiated by the Contractor, will not be a cause for a price increase.
B.3. Contractor’s Submittals: The Contractor shall submit shop drawings, material samples, and personnel/vehicle numbers to the COR for approval prior to commencing work.
B.4. Inspection and Acceptance: The COR or the Contracting Officer’s Technical Representative (COTR) may inspect and test work in progress or completed. Should any work fail to meet contract requirements or specifications, the contractor shall correct deficiencies at no additional cost.
B.5. Guarantee: The Contractor shall guarantee all work completed under this contract against defects resulting from workmanship or materials for a period of one (1) year following final inspection and acceptance by the COR. Any defects identified during the guarantee period shall be corrected by the contractor at no additional cost.
B.6. Utilities: Electricity (240V 3-phase and 115V single phase, 50 Hz) and city water are available at the housing compound site at no cost; these utilities are to be used solely for the contracted work.
B.7. Debris and Site Cleanliness: Debris from the work shall be disposed of daily in accordance with applicable local industrial waste disposal codes. The Contractor shall always maintain a clean site, ensuring that waste materials, rubbish, or debris are not allowed to accumulate.
C. Restoration of the Hallway Wall
C.1. Removal & Ceiling Access:
• Remove the existing double wall on the hallway outside P3067. The double wall is on 2 SIDES of the apartment and on both 5F and 6F.
• Cut and restore the ceiling—using the same materials as the existing assembly—to facilitate the wall’s full removal from floor to floor.
C.2. New Double Wall Installation:
• Exterior Layer: Install fire-resistant gypsum board rated for a minimum 60-minute fire resistance per applicable codes
(or the local equivalent. The new exterior wall shall be Type Z 21mm + Type Z 21mm. Example: Yoshino Fireproof
System S-Wall One).
• Interior Layer: Install moisture-resistant gypsum board to safeguard against humidity and incidental moisture.
• Stairwell Wall: The existing old stairway wall shall be demolished and replaced with new board where the interior and exterior side shall be Type Z-WR 12.5mm x 2 on each side. Install fire resistant gypsum board rated for a minimum 60-minute fire resistance per applicable codes (or the local equivalent. Example: Yoshino Fireproof System
S-Wall One).
D. Restoration on Exterior Wall Spaces Inside the Residence
D.1. Primary Insulation Method: Install a 40 mm thick rigid (hard) Styrofoam insulation panel combined with fiberglass insulation and spray-applied Styrofoam on the backside of the exterior wall panels.
D.2. Alternative Insulation Method: In areas where rigid Styrofoam is not feasible, fill the wall cavity with:
• 50 mm (24K) glass wool insulation combined with a damp-proof film (e.g., AQURIA MAT Alpha by Asahi Fiberglass K.K.
or equivalent), and/or
• Closed-cell spray polyurethane foam (SPF) with a Class 1 fire rating, ensuring an overall minimum 60-minute fire resistance per applicable codes (or the local equivalent).
Moisture Barrier Detail: When a damp-proof film is used, it serves as a continuous moisture barrier. The film should be of a comparable quality to a 6–10 mil polyethylene sheet (or as specified by local codes) and must be installed on the warm side of the insulation with all seams, overlaps, and penetrations sealed using approved tape or sealant.
D.3. Exterior Wall Finish: Furnish and install 12.5 mm thick anti-mold gypsum board for the wall finish.
E. Restoration on Interior/Neighbor Wall Spaces
E.1. Removal & Partition Access: Remove existing wall assemblies as detailed in Section C.1 for partitions adjoining neighbor spaces.
E.2. New Interior/Neighbor Partition Assembly: Install a new partition wall assembly that includes:
• A primary wall layer (as defined in Section C), and,
• An additional layer of fire-resistant gypsum (rated for a minimum 60-minute fire resistance per applicable codes or the local equivalent) on the side adjacent to neighbor spaces.
F. Restoration on Ceilings, Drop Ceilings, and Other Interior Ceilings
F.1. Insulation Application: Fill ceiling and drop-ceiling cavities with either:
• 50 mm (24K) grass wool insulation combined with a damp-proof film, and/or
• Closed-cell SPF with a Class 1 fire rating, ensuring an overall minimum of 60-minute fire resistance per applicable codes (or the local equivalent).
F.2. Ceiling Restoration:
• Moisture-Prone/Wet Areas (e.g., kitchens, bathrooms, laundry rooms): Install anti-mold treated gypsum board and appropriate moisture barrier.
Moisture Barrier Detail: When a damp-proof film is used, it serves as a continuous moisture barrier. The film should be of a comparable quality to a 6–10 mil polyethylene sheet (or as specified by local codes) and must be installed on the warm side of the insulation with all seams, overlaps, and penetrations sealed using approved tape or sealant.
• Dry Areas: Restore using moisture resistant gypsum board.
G. Wall Finish
G.1. Surface Preparation & Baseboard Restoration:
• Restore baseboards using pin nails; caulk any gaps between drywall / flooring and baseboards.
• Execute full paint-ready putty work on all surfaces. (Note: Wall painting will be performed under a separate IDIQ contract.)
H. Restoration of Fixtures and Finishes
H.1. Fixture & Cabinet Reinstallation: Reinstall all cabinetry, countertops, and other fixed items in kitchens, bathrooms, and laundry rooms. Major appliance reinstallation (e.g., dryer, washer, dishwasher) is excluded from this scope. (Refer to the sample vacant room for details.)
H.2. Electrical & Other Fixture Reinstallation: Reinstall lighting fixtures, outlets, switches, curtain pulleys, and hangers.
(Refer to the sample vacant room for details.)
H.3. Bathroom Restoration: Restore plastic panels and reinstall all plumbing fixtures in the bathrooms. (Refer to the sample bathroom for details.)
I. Interior Wall Restoration for Wet and Living Areas (Kitchens, Bathrooms, Dining Rooms, etc.)
I.1. Wet Areas (Kitchens, Bathrooms, Laundry Rooms):
• Gypsum Board: Install moisture-resistant gypsum board per applicable codes (or the local equivalent).
• Moisture Barrier: Prior to gypsum board installation, apply a continuous moisture barrier (typically a 6-mil polyethylene sheet or its equivalent, unless local codes specify otherwise) on the warm side of the insulation. Ensure that all edges, overlaps, and penetrations are sealed with approved tape or sealant. (Note: Do not install a moisture barrier behind cement board in areas intended for direct water exposure to allow for proper drainage and ventilation.)
I.2. Dry Living Areas (Dining Rooms, Living Rooms, etc.): Install moisture resistant drywall assemblies without an additional moisture barrier unless local conditions or codes dictate otherwise.
I.3. Insulation Options for Interior Walls: Where thermal or acoustic insulation is required, install either:
• 50 mm (24K) grass wool insulation combined with a damp-proof film, or
• Closed-cell SPF with a Class 1 fire rating (ensuring a minimum overall 60-minute fire resistance per applicable codes or the local equivalent).