Text version
SF1442 Cover Page
191S7020Q0003 RESIDENTIAL PAINTING SOLICITATION
TABLE OF CONTENTS
Section 1 - The Schedule
• SF 18 or SF 1442 cover sheet
• Continuation To SF-1442, RFQ Number 191S7020Q0003, Prices, Block 17
• Continuation To SF-1442, RFQ 191S7020Q0003, Schedule Of Supplies/Services, Block
10 Description/Specifications/Work Statement
• Attachment 1 to Description/Specifications/Statement of Work, Government Furnished
Property
Section 2 - Contract Clauses
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
Section 3 - Solicitation Provisions
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in
Part 12
Section 4 - Evaluation Factors
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
Section 5 - Representations and Certifications
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1442
RFQ NUMBER 191S7020Q0003
PRICES, BLOCK 23
1. SCOPE OF SERVICES
A. The contractor shall furnish painting, drywall/plaster repair, and related services for real property owned or managed by the U.S. Government at (name of post(s)) in accordance with Attachment 1.
B. The Government will order all work by issuing task orders.
C. This is an indefinite-delivery indefinite-quantity type contract under which may be placed firm-fixed price task orders.
2. CONTRACT PRICE - GENERAL
A. The Contractor shall complete all work, including furnishing all labor, material, equipment and services, required under this contract, for painting services. This price listed below shall include all labor, materials, overhead (including cost of Workers’
Compensation and War-Hazard Insurance, which shall not be a direct reimbursement) and profit.
B. All prices are in local currency and the Government will make payment in local currency.
C. VALUE ADDED TAX
VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates.
Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:
3. PRICING - BASE PERIOD
A. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are:
Contract
Line Item
Number
Description of Service Un it
Unit Price Estima ted
Quanti ty
Estimated
Total in
NIS
Painting Residential Building Interior
001 Type A - Six bedrooms, huge living room, dining room, Kitchen, Basement
Stair case with railing, hallway
Four bathrooms, one guest toilet ea 10
002 Type B- six bedrooms, living room, dining room, Kitchen
Stair case with railing, hallway
Three bathrooms and one gust toilet.
ea 10
003 Type C - Five bedrooms, living room, dining room, Kitchen
Stair case with railing, hallway
Three bathrooms and one gust toilet.
ea
004 Type D - Four bedrooms, living room, dining room, Kitchen, Basement
Stair case with railing, hallway and
Two bathrooms, one guest toilet
005 Type E –Duplex apartment with two floor – four bed rooms living room, dining room, Kitchen, hallway, Two bathrooms, one guest toilet.
ea 5
006 Type F – Apartment - Four bedrooms, living room, dining room, Kitchen, hallway, Two bathrooms, one guest toilet.
007 Type G – Apartment - Three bedrooms, living room, dining room, Kitchen, hallway, 008 Type H – Apartment - Two bedrooms, living room, dining room, Kitchen, hallway, 009 Type I – Additional Bedroom 50
010 Type J – Additional Bathroom 10
011 Type K – Painting window bar – 1 Sq”m 1000
012 Type L – Painting Door and Door frame 130
013 Type M – Painting wooden window (Glass, screen and shutter)
014 Type N – Painting metal/wood fence – 1 Sq”m 500
015 Type P- painting close balcony 20
016 Total Estimated Amount Base Year:
B. Contract Minimum and Maximum Amounts
1. Contract Minimum During the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of performance.
2. Contract Maximum During the contract period, the amount of all orders shall not $300,000. This is the contract maximum for this period of performance.
4. PRICING – 1ST OPTION PERIOD
Number
Description of Service Un it
Unit Price Estima ted
Quanti ty
Estimated
Total in
NIS
Painting Residential Building Interior
001 Type A - Six bedrooms, huge living room, dining room, Kitchen, Basement
Stair case with railing, hallway
Four bathrooms, one guest toilet ea 10
002 Type B- six bedrooms, living room, dining room, Kitchen room, Kitchen
Stair case with railing, hallway
Three bathrooms and one gust toilet.
room, Kitchen, Basement bed rooms living room, dining room, Kitchen, hallway, Two bathrooms, one guest toilet.
ea 5
006 Type F – Apartment - Four bedrooms, living room, dining room, Kitchen, hallway, room, dining room, Kitchen, hallway, 011 Type K – Painting window bar – 1 Sq”m 1000
012 Type L – Painting Door and Door frame 130
013 Type M – Painting wooden window (Glass, screen and shutter)
014 Type N – Painting metal/wood fence – 1 Sq”m 500
1. Contract Minimum During the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of
5. PRICING – 2ND OPTION PERIOD
Number
Description of Service Un it
Unit Price Estima ted
Quanti ty
Estimated
Total in
NIS
Painting Residential Building Interior
001 Type A - Six bedrooms, huge living room, dining room, Kitchen, Basement
Stair case with railing, hallway
Four bathrooms, one guest toilet ea 10
002 Type B- six bedrooms, living room, dining room, Kitchen room, Kitchen
Stair case with railing, hallway
Three bathrooms and one gust toilet.
room, Kitchen, Basement bed rooms living room, dining room, Kitchen, hallway, Two bathrooms, one guest toilet.
ea 5
006 Type F – Apartment - Four bedrooms, living room, dining room, Kitchen, hallway, room, dining room, Kitchen, hallway, 012 Type L – Painting Door and Door frame 130
013 Type M – Painting wooden window (Glass, screen and shutter)
014 Type N – Painting metal/wood fence – 1 Sq”m 500
1. Contract Minimum During the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of
6. PRICING – 3RD OPTION PERIOD
Number
Description of Service Un it
Unit Price Estima ted
Quanti ty
Estimated
Total in
NIS
Painting Residential Building Interior
001 Type A - Six bedrooms, huge living room, dining room, Kitchen, Basement
Stair case with railing, hallway
Four bathrooms, one guest toilet ea 10
002 Type B- six bedrooms, living room, dining room, Kitchen room, Kitchen
Stair case with railing, hallway
Three bathrooms and one gust toilet.
room, Kitchen, Basement bed rooms living room, dining room, Kitchen, hallway, Two bathrooms, one guest toilet.
ea 5
006 Type F – Apartment - Four bedrooms, living room, dining room, Kitchen, hallway, room, dining room, Kitchen, hallway, 012 Type L – Painting Door and Door frame 130
013 Type M – Painting wooden window (Glass, screen and shutter)
014 Type N – Painting metal/wood fence – 1 Sq”m 500
1. Contract Minimum During the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of
7. PRICING – 4TH OPTION PERIOD
Number
Description of Service Un it
Unit Price Estima ted
Quanti ty
Estimated
Total in
NIS
Painting Residential Building Interior
001 Type A - Six bedrooms, huge living room, dining room, Kitchen, Basement
Stair case with railing, hallway
Four bathrooms, one guest toilet ea 10
002 Type B- six bedrooms, living room, dining room, Kitchen room, Kitchen
Stair case with railing, hallway
Three bathrooms and one gust toilet.
room, Kitchen, Basement bed rooms living room, dining room, Kitchen, hallway, Two bathrooms, one guest toilet.
ea 5
006 Type F – Apartment - Four bedrooms, living room, dining room, Kitchen, hallway, room, dining room, Kitchen, hallway, 012 Type L – Painting Door and Door frame 130
013 Type M – Painting wooden window (Glass, screen and shutter)
014 Type N – Painting metal/wood fence – 1 Sq”m 500
8. TOTAL CONTRACT PRICE
3.016 Base Year Total NIS
4.016 Option Year 1 Total NIS
5.016 Option Year 2 Total NIS
6.016 Option Year 3 Total NIS
7.016 Option Year 4 Total NIS
VAT NIS
GRAND TOTAL FOR BASE + ALL OPTION YEARS NIS
PERIOD OF PERFORMANCE
The contract will be for a one-year period from the date of the contract award, with 4 one-year options to renew.
(a) The Contractor shall provide the services for the base period of the contract at the rates shown in Section 1 and any option years exercised by the U.S. Government.
(b) The quantities of supplies and services specified in the Schedule are estimates only and are not guaranteed by this contract.
(c) The Contractor shall furnish to the Government, when and if ordered, services as specified in the Schedule. The Government may issue orders requiring delivery to multiple destinations, or performance at multiple locations. Except as specified in the
Delivery-Order limitations clause or in the paragraph below, there is no limit on the number of orders that may be issued/ordered.
(d) Prices shall remain firm and fixed for the entire duration of the contract.
(e) The prices listed below shall include all labor, materials, overhead, and profit.
(f) Line item prices do not include VAT, which must be shown separately on invoices.
10. COMPLETION DATES UNDER TASK ORDERS
A. The Contractor shall have a minimum of Five working days in order to commence work under each task order issued.
B. The following are minimum completion times that will be included in individual task orders, dependent upon the type and amount of work to be done:
Painting Type A house – Eight working days
Painting Type B House – Eight working days
Painting Type C House – Seven working days
Painting Type D House – Six working days
Painting Type E Apartment – Five working days
Painting Type F Apartment – Four working days
Painting Type G Apartment – Four working days
Painting Type H Apartment – Four working days
11. ACCEPTANCE OF SCHEDULE
When the Government has accepted any time schedule, this acceptance shall be binding on the Contractor. The completion date is fixed and may be extended only by a written contract modification signed by the Contracting Officer. Acceptance or approval of any schedule or revision by the Government shall not:
(1) extend the completion date or obligate the Government to do so;
(2) constitute acceptance or approval of any delay, or;
(3) excuse or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.
12. WORKING HOURS
The Contractor shall perform all work during Sunday through Thursday, 08:00 to 16:30 and Friday 08:00 to 14:30except for the holidays identified in Section I, DOSAR 652.237-82, “Observance of Legal Holidays and Administrative Leave. The Contracting Officer may approve other hours, if the Contractor gives at least 24 hours advance notice. Contractor initiated changes in work hours will not be a cause for a price increase.
13. TASK ORDERS
A. General. The Government will order all services under this contract on a
Delivery/Task Order Form OF 347, issued by the Contracting Officer, as the need arises.
B. Content Task orders shall include:
Date of order
Contract number
Task Order number
Location of property
Amount of work (square meters or linear meters)
Required completion date
C. Procedures
1. Before issuing a task order, the Government may issue a written request for quotation that includes the work to be performed and the required completion date.
The Contractor shall respond to that request for quotation in writing within three working days to the following address:
American Embassy Jerusalem – Embassy Branch Office Tel Aviv
71 Hayarkon St.
Tel Aviv, 63903 Attn: GSO - Procurement Alternatively, the Government may simply issue a firm-fixed price task order, if it has the measurements of the work to be performed.
2. If requested to submit a firm-fixed price quotation for a task order, the
Contractor shall compute a price for the required work by multiplying the unit prices in
Section B by the amount of work required.
14. SELECTION OF AWARDEE FOR INDIVIDUAL TASK ORDERS
A. If more than one Contractor receives an award for these services, the following procedures shall govern the issuance of individual task orders. The Contractor shall perform no work without a task order issued by the Contracting Officer.
B. As the need for services arises, the Government will develop a price estimate.
If the estimate does not exceed US$10,000, the Government will follow the procedures in paragraph C. below. If the estimate exceeds US$10,000, the
Government will follow the procedures in paragraph D. below.
C. Orders not exceeding US$10,000 - The Government will select a Contractor for the task order. This decision will be based on the Government's best interests, which may include factors such as estimated price; past performance record; need to meet contractual minimums; or desire to avoid exceeding task order limitations set forth in
Section I, FAR 52.216-19, "Order Limitations".
D. Orders exceeding US$10,000
1. Unless one of the exceptions in paragraph E. below applies, the
Government will make its award selection based on the prices in the contract and past performance information gained as a result of Contractor performance under this contract.
2. Selection of Contractors shall not be protestable to GAO under Subpart 33.1 of the Federal
Acquisition Regulation, except on the grounds that the order increases the scope, period, or maximum value of the contract. The Department of State has an Acquisition Ombudsman who will review complaints by Contractors to ensure that all Contractors are afforded a fair opportunity to be considered for these task orders under the terms of this contract.
E. Exceptions to the procedures in Paragraph D above:
1. The order should be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order; or
2. It is necessary to place an order to satisfy a minimum guarantee.
1. DELIVERABLES
The Contractor shall delivery the following items under this contract:
Description Quantity Delivery Date Deliver to
Insurance 1 10 days after Award Contracting Officer
Safety Plan 1 10 days after Award COR
List of Personnel 1 10 days after Award COR
Construction Schedule 1 identified in each task order COR
Payment Request/Invoice 1 completion of each task order COR
16. INSURANCE
A. Amount of Insurance
The Contractor is required to provide whatever insurance is legally necessary under
52.228-5, "Insurance - Work on a Government Installation.” The Contractor shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:
General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)
1. Bodily Injury on or off the site stated in U.S. Dollars:
Per Occurrence $ 2,000,000
Cumulative $ 2,000,000
2. Property Damage on or off the site in U.S. Dollars:
Per Occurrence $ 25,000
Cumulative $ 150,000
The types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to:
(a) any property of the Contractor,
(b) its officers,
(c) agents,
(d) servants,
(e) employees, or
(f) any other person, Arising from an incident to the Contractor's performance of this contract.
The Contractor shall hold harmless and indemnify the Government from any and all claims arising, except in the instance of gross negligence on the part of the Government.
The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
B. Government as Additional Insured
The general liability policy required of the Contractor shall name "the United States of
America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
C. Insurance-Related Disputes
Failure to agree to any adjustment contemplated under this contract regarding insurance shall be a dispute within the meaning of FAR 52.233-1, Alternate I, "Disputes". Nothing in this clause shall excuse the Contractor from proceeding with the work, including the repair and/or replacement as herein above provided.
D. Time for Submission of Evidence of Insurance
The Contractor shall provide evidence of the insurance required under this contract within ten (10) calendar days after contract award. Failure to timely submit this evidence, in a form acceptable to the Contracting Officer, may result in rescinding or termination of the contract by the Government.
17. LANGUAGE PROFICIENCY
The project manager assigned by the Contractor to superintend the work on-site, as required by 52.236-6, "Superintendence by the Contractor", shall be fluent in written and spoken
English.
18. LAWS AND REGULATIONS
A. Compliance Required
The Contractor shall, without additional expense to the Government, be responsible for complying with all host country laws, codes, ordinances, and regulations applicable to the performance of the work, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the construction site without the permission of the Contracting Officer. Unless directed by the Contracting Officer, the contractor shall comply with the more stringent of:
(a) the requirements of such laws, regulations and orders; or
(b) the contract.
If a conflict among the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and recommend a proposed course of action for resolution by the Contracting Officer.
B. Labor, Health and Safety Laws and Customs
The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.
C. Evidence of Compliance
The Contractor shall submit proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause.
19. SAFETY – ACCIDENT PREVENTION
A. General. The Contractor shall provide and maintain work environments and procedures that will:
(1) safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities;
(2) avoid interruptions of Government operations and delays in project completion dates; and
(3) control costs in the performance of this contract.
For these purposes, the Contractor shall:
(a) Provide appropriate safety barricades, signs and signal lights;
(b) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and
(c) Take any additional measures the Contracting Officer determines to be reasonably necessary for this purpose.
B. Records. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in:
(1) death,
(2) traumatic injury,
(3) occupational disease, or
(4) damage to or theft or loss of property, materials, supplies, or equipment.
The Contractor shall report this data as directed by the Contracting Officer.
C. Subcontracts. The Contractor shall be responsible for its subcontractors’ compliance with this clause.
D. Written Program. Before starting the work, the Contractor shall:
(1) Submit a written proposal for implementing this clause; and
(2) Meet with the Contracting Officer to discuss and develop a mutual understanding of the overall safety program.
E. The Contracting Officer shall notify the Contractor of any non-compliance with these requirements and the corrective actions required. The Contractor shall immediately take corrective action after receiving the notice. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order suspending all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule for any suspension of work issued under this clause.
20. CONSTRUCTION PERSONNEL
A. PERSONNEL AT JOB SITE
The Contractor will have at a minimum four(4) construction personnel at all full house painting orders and two (2) construction personnel at all full apartment painting orders.
All construction personnel shall maintain active legal work permits to work in Israel.
B. Removal of Personnel
The Contractor shall:
(1) maintain discipline at the site and at all times;
(2) take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by or amongst those employed at the site; and
(3) take all reasonable precautions for the preservation of peace and protection of persons and property in the neighborhood of the project against unlawful, riotous, or disorderly conduct.
The Contracting Officer may require, in writing, that the Contractor remove from the work any employee that the Contracting Officer determines:
(1) incompetent,
(2) careless,
(3) insubordinate or
(4) otherwise objectionable, or
(5) whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.
Construction Personnel Security
At any time after award of the contract, and the issuance of a task order that required the contractor to work inside a US Government facility, the Contracting Officer may request that the
Contractor to submit personnel for security clearance. If required the Contractor will have ten calendar days after the official request to submit to the Contracting Officer a list of workers and supervisors assigned to this project for the Government to conduct all necessary security checks.
It is anticipated that security checks will take 30 days to perform. For each individual the list shall include:
Full Name
Place and Date of Birth
Current Address
Identification number
Failure to provide any of the above information may be considered grounds for rejections and/or resubmittal of the application. Once the Government has completed the security screening and approved the applicants a badge will be provided to the individual for access to the site. This badge may be revoked at any time due to the falsification of data, or misconduct on site. These passes must be displayed visibly by all Contractor personnel working on site. The Contractor shall inform its employees to be used under this contract that they may be subject to search by the
Government when entering or leaving work. The Contractor shall return all passes upon conclusion of the contract.
21. MATERIALS AND EQUIPMENT
A. General. The Contractor shall provide all necessary painting supplies and equipment, including brushes, rollers, buckets, mixers, space heaters, drop cloths, scrapers, sanding gear, electric sprayers, and texture sprayers if necessary to perform the work. No materials will be furnished by the Government.
B. Selection and Approval of Materials
1. Standard of quality. All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified, and all workmanship shall be of good quality and performed in a skillful manner as determined by the Contracting Officer.
2. Selection by Contractor. Where the contract permits the Contractor to select products, materials or equipment to be incorporated into the work, or where specific approval is otherwise required by the contract, the Contractor shall give the Contracting Officer, for approval:
(a) the names of the manufacturer;
(b) model number;
(c) source of procurement of each such product, material or equipment; and
(d) other pertinent information concerning the:
(i) nature,
(ii) appearance,
(iii) dimensions,
(iv) performance,
(v) capacity, and
(vi) rating, unless otherwise required by the Contracting Officer.
3. The Contractor shall provide this information in a timely manner to permit the
Government to evaluate the information against the requirements of the contract.
The Contractor shall provide a submittal register ten (10) days after contract award showing when shop drawings, samples, or submittals shall be made. The
Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid, when directed to do so by the Contracting Officer or
COR. Installation or use of any products, materials or equipment without the required approval shall be at the risk of rejection.
B. Custody of Materials
The Contractor shall be responsible for the custody of all materials received for incorporation into the project, including Government furnished materials, upon delivery to the
Contractor or to any person for whom it is responsible, including subcontractors. The Contractor shall deliver all such items to the site as soon as practicable. If required by the Contracting
Officer, the Contractor shall clearly mark in a manner directed by the Contracting Officer all items of which the Contractor has custody but which have not been delivered or secured at the site, clearly indicating the use of such items for this U.S. Government project.
22. WARRANTIES
Under FAR 52.212-4, Contract Terms and Conditions-Commercial Items, the Contractor warrants items and services provided. The Contractor shall obtain and furnish to the
Government all information that is required in order to make any subcontractors, manufacturers, or supplier's guarantee or warranty legally binding and effective. The Contractor shall submit both information and the guarantee or warranty to the Government in sufficient time to permit the Government to meet any time limit requirements specified in the guarantee or warranty, but not later than completion and acceptance of all work under this contract. The warranty shall be valid for 3 year after the final inspection. During the warranty period, the Contractor shall repair or replace, free of charge, any occurring defects or ensuing damages.
23. PAYMENT
The Contractor shall submit invoices as instructed by FAR 52.212-4(g). The Government will make payment for all work under an individual task order in a lump sum for all completed and accepted work.
American Embassy Jerusalem, Embassy Branch Office Tel Aviv 71 Hayarkon St.
Tel Aviv, 63903.
24. VALUE ADDED TAX (VAT)
The Contractor shall show VAT as a separate charge on invoices submitted.
CONTINUATION TO SF-1442, RFQ NUMBER 191S7020Q0003
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1. SURVEY
The Contractor shall survey the property and verify the work required against the task order before beginning work, to determine if any discrepancies exist. The Contractor shall be responsible for any errors that might have been avoided by such a survey/review. The Contractor shall immediately report any discrepancies to the COR or the Contracting Officer and shall not begin work until such matters are resolved.
2. APPLICABLE PAINTING STANDARDS/PAINT SPECIFICATIONS
Painting and preparatory work shall match the paint to similar adjacent materials or surfaces. The following paint specifications will apply, unless notified otherwise by the COR:
• For all rooms, kitchens, laundry areas and patio: high-quality, semi-gloss, “SuperCrill” or “Nirocrill” latex paint; manufactured by Tambur or Nirlat.
Or similar.
• For bathrooms walls and ceilings: Mold and Mildew proof White
“Parma” paint or similar.
• For wood or metal: semi-glossy, oil based paint.
• For all ceiling except of bathrooms: Non latex, non-plastic paint typically known as “Policid” or similar.
3. PREPARATION/PROTECTION OF WORK AREA
Painting shall not disturb or damage any fixed property (including light fixtures, floors, carpets, or windows). The Contractor shall move, protect and return such property to its original position upon completion of work in that area.
The Contractor shall first remove or protect furnishings (such as furniture and rugs) by appropriate covering. The Contractor shall protect floors from soiling and paint spills. Wooden floors shall not be washed under any circumstances. To protect floors (of all types) from damage, the Contractor shall use a suitable protective cover. The Contractor shall also equip ladders and scaffolding with clean rubber shoes or similar protection devices.
If the Contractor spills any paint, or in any way soils the floors, the Contractor shall clean up using a specialist floor finishing company at the Contractor's expense. After completion of the painting work, the Contractor shall return all furnishings to their original position, and clean the work area free of litter and debris.
4. UTILITIES
The Government cannot ensure that utilities will be available at all properties at all times.
The Contractor shall have an alternate source of power (generator) available if needed to ensure that paint will be applied following the manufacturer's specifications. The Contractor shall not adjust the heating or air conditioning controls in properties with utilities turned on to maintain temperature. The Contractor shall have its own source of water available for clean up if water has been turned off in the property for winterization of the plumbing system.
5. EQUIPMENT
The Contractor shall provide all necessary painting supplies and equipment, including brushes, rollers, buckets, mixers, space heaters, drop cloths, scrapers, sanding gear, electric sprayers, and texture sprayers if necessary to perform the work. The Government will not furnish any materials.
6. TECHNICAL SPECIFICATIONS FOR PAINTING WORK
1. Interior and Exterior Painting
Paint surfaces as directed by the task order. Match paint to similar adjacent materials or surfaces.
(a) Paint: This category includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats.
(b) Product Data: The Contractor shall submit manufacturer's technical information, label analysis, and application instructions to the COR for each paint material proposed for use, prior to starting work. The Contractor shall list each material and cross-reference specific coating and finish system and application as an attachment to the above submittal. The Contractor shall identify each material by the manufacturer's catalog number and general classification.
(c) Single Source Responsibility: The Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats.
(d) Material Quality: The Contractor shall provide the manufacturer's best quality trade sale type paint material. Paint material containers not displaying manufacturer's product identification are not acceptable.
(e) Material Delivery: The Contractor shall deliver materials to the job site in manufacturer's original, unopened packages and the containers shall bear the manufacturer's name and label with trade name and manufacturer's instructions.
(f) Material Storage: The Contractor shall store materials not in use in tightly covered containers in a well ventilated area at a minimum ambient temperature of 45 degrees F (7 degrees
C). The Contractor shall protect materials from freezing and keep storage area neat and orderly.
Contractor shall remove oily rags and waste daily.
(g) Project Conditions: The Contractor shall not apply paint when the relative humidity exceeds 85 percent, or at temperatures less than 5 degrees F (3 degrees C) above the dew point, or to damp or wet surfaces. The Contractor shall apply paint only in temperatures that comply with the manufacturer's specifications.
(h) Preliminary Examination: The Contractor shall examine substrates and conditions under which painting will be performed for compliance with requirements and shall not begin application until unsatisfactory conditions have been corrected.
Preparation:
(i) The Contractor shall remove hardware and hardware accessories, plates, light fixtures, and items in place that are not to be painted, or provide protection such as taping, prior to surface preparation and painting. (Taping includes windows, door jams, etc.)
(ii) The Contractor shall clean and prepare surfaces to be painted following the manufacturer's instructions before applying paint or surface treatments. This preparation includes removal of oil, dust, direct, loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, the Contractor may be requested to remove all existing coats of paint and sealers if prior paint application is showing signs of improper adhesion, such as peeling, chipping, etc. All surfaces must be clean and dry. The Contractor shall schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted surfaces.
(iii) The Contractor shall notify the Contracting Officer or COR of problems anticipated for any minor preparatory work required, such as but not limited to, filling nail holes, cleaning surfaces to be painted, and priming any requisite areas. Plan preparatory work as most units in residential areas will have nail holes or areas that will need to be primed or sealed. Replace all electrical covers with new covers after painting.
(j) Materials Preparation: The Contractor shall mix and prepare paint following the manufacturer's directions.
(k) Application: The Contractor shall apply paint following the manufacturer's directions.
Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.
(i) Unless otherwise specified, the Contractor shall use a high quality semi-gloss latex paint
(containing no lead or mercury) for all kitchens, baths, laundry areas, door frames, and window frames. The Contractor shall use a flat or satin flat latex base paint (containing no lead or mercury) in the remainder of the unit. The color shall be consistent with the balance of the room, which will normally be an off-white. The Contractor shall provide samples of the color on sample of the type of material to be painted before actual paint date is scheduled.
(ii) On exterior surfaces, the Contractor shall apply a high quality exterior grade latex base paint that matches as closely as possible the existing color on the exterior of the property, or a color as otherwise specified by the COR. Prior to painting, the Contractor shall scrape, sand, fill, and prime the surface with a latex base primer. The Contractor should plan on extensive preparatory work prior to painting. The Contractor shall not apply exterior paint in snow, rain, fog or mist, or when the relative humidity exceeds 85 percent; or to damp or wet surfaces.
(iii) The Contractor shall provide finish coats that are compatible with primers used.
(iv) The number of coats and film thickness required is the same regardless of application method. The Contractor shall not apply succeeding coats until previous coat has cured. The
Contractor shall sand between applications where required to produce a smooth, even surface.
(v) The Contractor shall apply additional coats when undercoats or other conditions show through final coat, until paint film is of uniform finish, color, and appearance.
(l) Scheduling Painting: The Contractor shall apply the first coat to surfaces that have been cleaned, pretreated or otherwise prepared for painting as soon as practicable, and before subsequent surface deterioration. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried.
(m) Minimum Coating Thickness: The Contractor shall apply materials at the manufacturer's recommended spreading rate. The Contractor shall provide a total dry film thickness of the system as recommended by the manufacturer.
(n) Prime Coats: Before application of finish coats, the Contractor shall apply a prime coat as recommended by the manufacturer to material required to be painted or finished, and which has not been prime coated.
(o) Brush Application: The Contractor shall brush-out and work brush coats into surfaces in an even film. The Contractor shall eliminate cloudiness, spotting, laps, brush marks, runs, sags, ropiness, or other surface imperfections. The Contractor shall draw neat glass lines and color breaks.
The Contractor shall apply primers and first coats by brush unless manufacturer's instructions permit use of mechanical applicators.
(p) Mechanical Applications: The Contractor shall use mechanical methods for paint application when permitted by manufacturer's recommendations, governing ordinances, and trade union regulations.
Wherever spray application is used, the Contractor shall apply each coat to provide the equivalent hiding of brush-applied coats. The Contractor shall not double-back with spray equipment building-up film thickness of two coats in one pass, unless recommended by the manufacturer.
(q) Upon completion of painting, the Contractor shall clean the glass and paint-spattered surfaces. The Contractor shall remove spattered paint by washing, scraping or other proper methods, using care not to scratch or damage adjacent finished surfaces.
(r) The Contractor shall remove temporary protective wrappings after completion of painting operations.
2. Drywall/Plaster Repair
The Contractor shall patch defective drywall with a similar thickness and fire-rated drywall.
Joints shall be taped in a manner so they are not readily visible. The patch shall be textured with a texture consistent with the rest of the surface being patched. The Contractor shall set and spackle all nail heads. The Contractor shall tape joints and cover them with a joint compound.
The Contractor shall sand smooth spackled nail heads and tape joints and remove all dust prior to painting. The Contractor shall spackle exterior surfaces with exterior grade compounds.
3. Texture Only - Walls
Occasionally, the Government may require a wall to be textured that has not previously been textured. The Contractor shall prepare the wall by filling and sanding any small holes or cracks with a suitable "non-shrinking" material. After preparatory work, the Contractor shall furnish and apply a texture type material. If any other walls within that room are textured, the texture material shall closely match the texture of any other existing textured walls in that room. The
Contractor shall not be required to do less than one room on any individual task order.
4. Texture Only - Ceiling
Occasionally the Government may require a ceiling to be textured that has not previously been textured. The Contractor shall prepare the ceiling by filling and sanding any small holes or cracks with a suitable "non-shrinking" material. After preparatory work, the Contractor shall furnish and apply an "Acoustic" type texture.
5. Paint Exterior Trim
The Contractor shall apply a high quality exterior grade latex base paint that matches as closely as possible the existing color on the exterior trim of the property, or a color as specified by the
Contracting Officer. The Contractor shall scrap, sand, fill, and prime the trim with a latex base primer, prior to painting. The Contractor shall plan on extensive preparatory work prior to painting. The specifications for exterior paint apply, unless otherwise specified in the task order.
6. Remove Wall Covering
Upon assignment by task order, the Contractor shall remove the designated wall covering
(wallpaper, cork, mirror, tile, etc.). After removing the wall covering, the Contractor shall clean and make ready for painting the area. The Contractor shall remove and properly dispose of the old wall covering.
7. Plaster
The Contractor shall repair any damaged interior or exterior plaster as directed by the COR. The plaster material shall be of a similar material that matches as closely as possible the existing plaster in texture and color.
8. Stucco
The Contractor shall repair any damaged stucco and remove any loose stucco before applying paint.
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan provides an effective method to promote satisfactory contractor performance. The
QASP provides a method for the Contracting Officer's Representative (COR) to monitor
Contractor performance, advise the Contractor of unsatisfactory performance, and notify the
Contracting Officer of continued unsatisfactory performance. The Contractor, not the
Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work Para Performance Threshold
Services.
Performs all painting services set forth in the scope of work.
1. thru 19.
All required services are performed and no more than one (1 customer complaint is received per month.
SECTION 2 - CONTRACT CLAUSES
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL
ITEMS (OCT 2018) AND (DEVIATION 2017-02) (JUNE 2017), is incorporated by reference
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL ITEMS (MAY 2019)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or
Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L.
115-91).
(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the
Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with
Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C.
3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and
Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__ (3a) 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform
Employees Of Whistleblower Rights (Apr 2014)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards
(Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1158787 https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1159972 https://acquisition.gov/sites/default/files/current/far/html/52_207_211.html#wp1146366 https://acquisition.gov/sites/default/files/current/far/html/52_233_240.html#wp1113329 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://acquisition.gov/sites/default/files/current/far/html/52_233_240.html#wp1113344 http://uscode.house.gov/ https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137622 http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1141983 http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1144881 https://www.acquisition.gov/far/html/52_200_206.html#wp1150601 https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1141649 http://uscode.house.gov/ https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1151163
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility
Matters (Oct 2018) (41 U.S.C. 2313).
__ (10) [Reserved].
__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15
U.S.C. 657a).
__ (ii) Alternate I (Nov 2011) of 52.219-3.
__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)
(15 U.S.C. 657a).
__ (ii) Alternate I (JAN 2011) of 52.219-4.
__ (13) [Reserved]
__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C.
644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.
637(d)(2)and (3)).
__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Nov 2016) of 52.219-9.
__ (v) Alternate IV (Aug 2018) of 52.219-9.
__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
__ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).
__ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C.
637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside
(Nov 2011) (15 U.S.C. 657 f).
__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15
U.S.C. 632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15
U.S.C. 637(m)).
__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
https://acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1151299 https://acquisition.gov/sites/default/files/current/far/html/52_207_211.html#wp1140926 https://acquisition.gov/sites/default/files/current/far/html/52_207_211.html#wp1145644 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1135955 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1135955 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1135970 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1135970 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1136004 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1136017 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1136017 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1136017 https://acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1136032 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20…