19H08026Q0014 - FAC-MXS PMSC and Training Embassys Fuel System.pdf

PDF 2 MB Posted

Attached to
TEGUC – FAC-MXS PMSC & Training Embassy's Fuel System
Solicitation number
19H08026Q0014
Issued by

About this file

This is a Request for Quotations (RFQ) issued by the U.S. Embassy in Tegucigalpa, Honduras for preventive maintenance and personnel training services for the embassy's compound fuel management system. The RFQ number is 19H08026Q0014, issued January 23, 2026, with quotations due February 13, 2026 at 10:00 a.m. local time. The contract will be a one-year base period with four optional one-year renewal periods, for a potential five-year contract term. Delivery is required by April 15, 2026. The government intends to award to the responsible offeror providing the lowest-priced technically acceptable offer and will evaluate based on price and non-price factors including technical compliance, past performance, business qualifications, and contractor responsibility per FAR 9.1 standards.

The scope of work requires preventive maintenance of the embassy's fuel management system including fuel dispensing equipment, underground storage tanks, fuel pumps, monitoring stations, and control panels, performed by technicians with SECRET or TOP SECRET security clearances. Maintenance services must be performed according to manufacturer specifications at a minimum frequency of annually or every five years depending on component type. The contractor must provide unlimited remote support for troubleshooting, supply all materials and tools, maintain a spare parts inventory on-site, and deliver O&M manuals and software licenses to the post. Additionally, the contractor must provide minimum eight hours of technical training to embassy personnel covering system overview, safety compliance, leak detection, fuel monitoring, and spill prevention. Required deliverables include maintenance checklists, invoices, insurance certificates, and contact information for emergency support. Public liability insurance of $100,000 and workers' compensation insurance are required. The contractor must comply with all Department of State security protocols, maintain standards of conduct for personnel, obtain all necessary local licenses, and register in the System for Award Management (SAM) prior to proposal submission. Quotations must be submitted electronically in PDF format not exceeding 30MB and include Standard Form 18 with pricing for base year and four option years, business qualifications, past performance references, strategic work plan, quality control plan, training provider qualifications, security clearance documentation, and all required representations and certifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 18 cover sheet

• Continuation To SF-18, RFQ Number 19H08026Q0014, Prices, Block 11

• Continuation To SF-18, RFQ Number 19H08026Q0014, Schedule Of

Supplies/Services, Block 11.b Description/Specifications/Work Statement

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

ATTACHMENT A – EQUIPMENT LIST

PAGE OF PAGESREQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS x IS NOT A SMALL BUSINESS SET-ASIDE 1 75

1. REQUEST NO.

19H08026Q0014

2. DATE ISSUED

01/23/2026

3. REQUISITION/PURCHASE REQUEST NO.

PR15691196

4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY

AMERICAN EMBASSY TEGUCIGALPA

GSO, ACQUISITIONS UNIT, ATTN: GSO

TEGUCIGALPA

HONDURAS

6. DELIVER BY (Date) 04/15/2026

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

TELEPHONE NUMBER

7. DELIVERY

FOB DESTINATION x OTHER (See Schedule)

9. DESTINATION

NAME

Ivan A Pineda

AREA CODE NUMBER

8. TO:

a. NAME OF CONSIGNEE

AMERICAN EMBASSY TEGUCIGALPA

a. NAME b. COMPANY b. STREET ADDRESS

APARTADO POSTAL NO. 3453, ATTN: GSO

c. STREET ADDRESS c. CITY

TEGUCIGALPA

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

02/13/2026

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%)

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF QUOTATION

16. SIGNERb. STREET ADDRESS

b. TELEPHONE

c. COUNTY

a. NAME (Type or print)

AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

U.S. Embassy Tegucigalpa Compound Fuel System – Preventive Maintenance & Personnel Training Services.

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-18

RFQ NUMBER 19H08026Q0014

PRICES, BLOCK 11

I. PERFORMANCE WORK STATEMENT

A. The purpose of this firm fixed price purchase order is to provide services regarding the U.S.

Embassy Tegucigalpa Compound Fuel System – Preventive Maintenance & Personnel

Training Services.

B. The contract will be for a one-year period from the date of the contract award, with four (4) year option years.

II. PRICING

The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).

Please note that your quote must be valid for 90 days after the offer submission due date

(February 13, 2026).

The dates on which the services will begin will be established between the U.S. Embassy

Tegucigalpa and the awardee.

2.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.

Base Year

Supplies/Services Quantity Unit Unit Price Total

Preventive maintenance for Fuel

Management System (Pumps, USTs, Panels) & Technical Training for U.S.

Embassy Personnel (Minimum 8 hours)

1 Service $ $

Unlimited remote support for troubleshooting issues.

1 Service $ $

DBA Insurance 1 Service $ $

Total $

2.2 Option Year One. The Contractor shall provide the services shown below for the option year one period of the contract and continuing for a period of 12 months.

Option Year One

Supplies/Services Quantity Unit Unit Price Total

Preventive maintenance for Fuel

Management System (Pumps, USTs, 1 Service $ $

Panels) & Technical Training for U.S.

Embassy Personnel (Minimum 8 hours)

Unlimited remote support for troubleshooting issues.

1 Service $ $

DBA Insurance 1 Service $ $

Total $

2.2 Option Year Two. The Contractor shall provide the services shown below for the option year two period of the contract and continuing for a period of 12 months.

Option Year Two

Supplies/Services Quantity Unit Unit Price Total

Preventive maintenance for Fuel

Management System (Pumps, USTs, Panels) & Technical Training for U.S.

Embassy Personnel (Minimum 8 hours)

1 Service $ $

Unlimited remote support for troubleshooting issues.

1 Service $ $

2.2 Option Year Three. The Contractor shall provide the services shown below for the option year three period of the contract and continuing for a period of 12 months.

Option Year Three

Preventive maintenance for Fuel

Management System (Pumps, USTs, Panels) & Technical Training for U.S.

Embassy Personnel (Minimum 8 hours)

1 Service $ $

Unlimited remote support for troubleshooting issues.

1 Service $ $

2.2 Option Year Four. The Contractor shall provide the services shown below for the option year four period of the contract and continuing for a period of 12 months.

Option Year Four

Preventive maintenance for Fuel

Management System (Pumps, USTs, Panels) & Technical Training for U.S.

Embassy Personnel (Minimum 8 hours)

1 Service $ $

Unlimited remote support for troubleshooting issues.

1 Service $ $

No. Contract Year Total

1 Base Year $

2 Option Year One $

3 Option Year Two $

4 Option Year Three $

5 Option Year Four $

GRAND TOTAL $

III. VALUE ADDED TAX

Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or Invoices because the U.S. Embassy has a tax exemption certificate from the host government.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The

QASP provides a method for the Contracting Officer's Representative (COR) to monitor

Contractor performance, advise the Contractor of unsatisfactory performance, and notify the

Contracting Officer of continued unsatisfactory performance. The Contractor, not the

Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work

Paragraphs Performance Threshold

Services. Perform all preventive maintenance for the Embassy Tegucigalpa Compound Fuel System and provide specialized training services for U.S. Embassy personnel in Honduras, as set forth in the scope of work.

1 thru 14

All required services are performed and no more than two

(2) one customer complaint is received per month.

The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.

CONTINUATION TO SF-18,

RFQ NUMBER 19H08026Q0014

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 11

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1. DESCRIPTION

The American Embassy in Tegucigalpa requires preventive maintenance services for the Fuel

Management System from a contractor with technicians that hold United States Government

SECRET or TOP SECRET clearances. This work is to be performed on systems accessing the

PCC/CAA areas of the building. The contractor must hold training and authorization to work in equipment at a minimum from the following manufacturers: PNEUMERCATOR, BENNETT

PUMP CO. FUELMASTER, FRANKLIN FUELING SYSTEMS and CONTAINMENT

SOLUTIONS. These services shall result in all systems being serviced under this agreement being in good operational condition when activated.

2. EQUIPMENT AND PERFORMANCE REQUIREMENTS

The Tegucigalpa Embassy requires the Contractor to maintain the following equipment in a safe, reliable and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.

1. Fuel dispensing equipment

2. Fuel management controller

3. Fuel Monitoring stations

4. Fuel pumps

5. Underground storage tanks

6. Day tanks

The Contractor shall provide all necessary managerial, administrative and direct labor personnel, as well as all transportation, equipment, tools, supplies and materials required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Under this Contract the Contractor shall provide:

• The services of trained and qualified technicians to inspect, adjust, and perform scheduled preventive maintenance.

• Unlimited remote support for operational or troubleshooting issues.

3. PERFORMANCE STANDARDS

The fuel management system shall be clean and in good operating condition upon completion of the service. The preventive maintenance service shall result in the parts of the system serviced being in a condition to operate efficiently and effectively.

4. HOURS OF PERFORMANCE

The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of 8:00 a.m. and 4:30 p.m. Monday through Friday. No work shall be performed on US Government and local holidays.

5. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

5.1 The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Embassy at Tegucigalpa. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees will be given access to the equipment and equipment areas and will be escorted by Embassy personnel.

5.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who to be used on this Contract prior to their utilization. Submission of information shall be made within 30 days of award of contract. No technician will be allowed on site without prior authorization. Note: this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.

5.2.1 Vehicles. Contractor vehicles will not be permitted inside the embassy compound without prior approval. If vehicle access is necessary, submit contractor vehicle information (Make, Model, License Plate number) along with written justification as to why access is necessary. This shall be submitted to the Facility Manager at least one (1) week prior to the visit.

5.2.2 Government shall issue identity cards to Contractor personnel, after they are approved.

Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

5.3 Security Clearances. All Work under this contractor that are designated as non-CAA areas may be performed by un-cleared American or local workers. However, all work done in CAA and PCC areas shall be performed by cleared American Construction personnel as needed to complete the services. The Contractor shall work closely with the COR, the Post Facility Manager [FM] or the General Services Officer [GSO].

5.4 Security Clearances. Security clearances are a requirement for performance on this contract, as there will be access to classified information or areas.

5.4.1 The Contractor must comply with all of the following requirements relating to the protection of U.S. Embassy in Tegucigalpa personnel, property and compound project information and cooperate fully in all security matters Sensitive But Unclassified (SBU) and information that may arise relating to this contract.

Contractor personnel may also be exposed to various documents and signs, including Post notices, event schedules, DoS regulations and conversations or announcements relating to the operation of the U. S. Embassy Tegucigalpa and diplomatic personnel. This information should not be shared with anyone not employed by or falling under the protection of the Embassy.

Contractor personnel may be exposed to various documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, and specifications, received or generated in conjunction with this contract. These documents contain information associated with diplomatic facilities for the U.S. Department of State. These documents have been marked with the handling designations “Unclassified” or “Sensitive But Unclassified” and US Government warnings against reproduction and distribution. These documents require special handling and dissemination restrictions. All handling designations and warnings on original documents must be reproduced on subsequent copies.

The loss, compromise, or suspected compromise or loss of any SBU information, contract related information (personnel files, payroll information, etc.), any post or diplomatic facility related information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs), or ANY information which may adversely affect the security interests of the United States, must be immediately brought to the attention of the Contracting Officer (CO) and Contracting Officer’s Representative (COR).

Photographs of any diplomatic overseas building or facility must be authorized in advance by the COR and Regional Security Officer (RSO), who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment by appropriately cleared personnel. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from DS. DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.

Transmission of any information marked Sensitive But Unclassified (SBU) or contract/personnel sensitive information, via the Internet, is prohibited. SBU information can be transmitted via ProjNet, mail, FedEx (or other commercial carrier) or fax, or handcarried by authorized contractor personnel.

Discussion of U.S. Diplomatic post activities while not on post, to include in homes, hotel rooms, restaurants and all other public places, is prohibited. Any contact with host or third country nationals that seems suspicious (such as undue curiosity in the project or project personnel) shall be reported immediately to the COR and RSO.

The Contractor and its employees shall exercise utmost discretion in regard to all matters relating to their duties and functions. They shall not communicate to any person any information known to them by reason of their performance of services under this contract which has not been made public, except to the extent necessary to perform their required duties in the performance of the contract requirements or as provided by written authorization of the Contracting Officer. All documents and records (including photographs) generated during the performance of work under this contract shall be for sole use of and shall become the exclusive property of the U.S.

Government. No article, book, pamphlet, recording, broadcast, speech, television appearance, film or photograph concerning any aspect of the work performed under this contract shall be published or disseminated through any media, to include company or personal websites, without the prior written authorization of the Contracting Officer. These obligations do not cease upon the expiration or termination of this contract or at any other point in time. The Contract shall include the substance of this provision in all subcontracts hereunder.

5.5 Standards of Conduct

5.5.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

5.5.2 Neglect of Duties. Neglect of duties is unacceptable. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

5.5.3 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.

5.5.4 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

5.5.4 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct;

unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

5.5.5 Key Control. The Contractor will not be issued any keys. The keys will be checked out by a “Cleared American” escort on the day of service requirements.

5.5.6 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.

6. SCHEDULED PREVENTIVE MAINTENANCE

6.1. General

6.1.1. The Contractor shall perform preventive maintenance as outlined in the Performance Work Statement. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.

6.1.2. The Contractor shall inventory, supply and replace expendable parts (e.g., filters, cables, bolts, gaskets, etc.) that have become worn due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, filters (Air, Fuel, Oil), grease, sealant; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor shall inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts shall be OEM approved.

6.1.3. Exclusion. This contract does NOT include repairing equipment and replacement of hardware (e.g. bearings, pistons, piston rings, crankshafts, gears.) Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.

6.1.4. Replacement/repair of any electronic or electrical parts shall be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.

6.1.5. Stocking of recommended repair parts is at the discretion of the Facility Manager and is dependent upon the nearest location of the Equipment manufacturer, distributor or dealer. A recommended spare parts list shall be obtained by the contractor from the manufacturer or distributor and provided to the Facility Manager to procure.

6.1.6. Parts/materials/tools procurement and delivery for the CAA/PCC areas shall be at the discretion of the Regional Security Officer (RSO).

6.2 Checklist Approval. The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to perform. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.

6.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW.

6.2.2. It is the responsibility of the Contractor to perform all manufacturers’ recommended preventive maintenance including preventive maintenance recommended by the manufacturers’ technical manuals for the respective equipment.

6.2.3 Additionally, the maintenance contractor shall obtain and keep at the post O&M binders provided by the manufacturers. These binders shall be placed in a location accessible to post personnel to review as needed.

7. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.

7.1 Contractor furnished materials include but are not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing and eye protection, MSDS, cleaning material and oil spill containment kit. Expendable/consumable items (e.g. hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), bolts, grease, sealant, thermostat, fuse), shall be maintained in the onsite inventory. See 7.1.2.

7.2 Repairs are not included in this contract. See 7.1.3. Exclusions.

7.3 Disposal of used oil, fuel, battery and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to

Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.

8. SOFTWARE, LICENSES AND PASSWORDS

Copies of any and all software and licenses needed to control or to adjust the communications module shall be given to the post upon completion of the work.

9. DELIVERABLES

Provide a typewritten report to Post Facilities Manager containing the following:

a) System information (make, model, all devices types)

b) Pass/Fail of each feature and type of component tested. If a device fails, note device type, address and location within Post

c) Any comments on system (or device) condition pertaining to service life and dependability.

d) Full printout of test from system printer

e) Testing of exhaust gas by Gas Analyzer

The following items shall be delivered under this contract:

Description QTY Delivery Date Deliver to Names, biographic data, police clearance on Contractor personnel

1 30 days after contract award

COR

Certificate of Insurance 1 30 days after contract award PM Checklist signed by Contractor’s employee

1 After completion of each maintenance service

Invoice 1 After completion of each maintenance service

For unlimited remote support and emergency support: Names, Telephone Numbers, email addresses and any other contact method that can be used to reach contractor support

30 days after contract award

10. INSURANCE REQUIREMENTS

10.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract.

The Contractor’s assumption of absolute liability is independent of any insurance policies.

10.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:

Public Liability Insurance

Property damage: $ 100,000.00 Cumulative: $ 100,000.00

Workers’ Compensation and Employer’s Liability

10.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required under local laws (see FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”).

11. LOCAL LAW REGISTRATION

If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.

12. GENERAL INSTRUCTIONS AND REQUIREMENTS

The contractor shall provide all materials, supervision, labor, tools, and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use appropriate safety protection while work is performed. Any questions or injuries shall be brought to the attention of the Post COR and Occupation Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the contractor for all HAZMAT materials. Copies will be provided to the COR for approval.

The systems and components to be maintained include fuel pumps, fuel storage tanks, start and transfer systems, dispensing systems, as well as control and monitoring systems. The attached equipment list provides details.

1. The contractor shall provide the COR with a list of necessary parts and materials.

2. Fuel, oil, fluids, filters and preventive maintenance parts shall be provided at the expense of the U.S. Govt.

a. Only fluids which meet or exceed manufacturer’s specifications shall be used.

b. All fluids shall be delivered in original sealed containers.

3. The contractor shall provide unlimited remote emergency assistance for fuel system support, within 24 hours of being contacted by the COR.

If any discrepancies are found with the fuel management system that are not covered under this scope of work, the contractor shall provide the following:

1. Detailed report noting the discrepancy found.

2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.

3. Price quote for repair labor.

SAFETY & SPECIAL INSTRUCTIONS:

1. Use appropriate personal protective equipment (PPE) when performing work

2. Check all work areas, tools, and equipment to ensure unsafe conditions are eliminated or guarded against.

3. Follow site safety procedures.

4. Entries into confined spaces are subject to AIT’s regulations. Any task requiring entry into a confined space must be approved by the Post Occupational Safety and Health

Officer (POSHO) PRIOR TO BEGINNING WORK.

5. Schedule maintenance with operating personnel and affected offices (security).

6. Follow approved lockout/tag out procedures.

7. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.

8. Review and follow the manufacturer’s instructions.

9. Record results in the equipment history log.

10. Remove lockout/tag out in accordance with appropriate procedures.

11. Report all incidents and near miss incidents to COR and assist as requested in the investigation and corrective action.

At a minimum, the following work shall be completed:

Notes:

• Contractor shall submit to the COR for review, work sheet/checklist that will be used for performing maintenance service.

• A discrepancy report shall be submitted to the COR immediately upon discovery of any condition that could result in equipment failure.

• Laboratory report for all chemicals (fuel analysis) shall be submitted to the COR within

30 days from date of service.

Maintenance Interval Schedule

The purpose of this Statement of Work is to ensure the entire fuel management system for this facility is maintained according to manufacturer’s recommendations to ensure the readiness and proper operation of the system.

Fuel Storage Tanks (Day Tanks)

A. Annual:

• Inspect tank for corrosion.

• Check for signs of tank leakage.

• Inspect all piping runs for damage and leakage

• Sample fuel and test quality.

• Check floats and leveling devices in tank. Check float adjustment with depth level indicators.

• Inspect fuel tank fire protection devices.

• Inspect berms around fuel storage tank for erosion.

• Clean breather vents, conservation vents, vacuum vents, pressure vents, non-freeze draw valves and flame arrestors where appropriate.

• Inspect vapor recovery line for deterioration.

• Verify all locking devices are in place.

• Run pump and check operation.

• Calibrate and adjust fuel oil pressure.

• Inspect fuel strainer and clean as needed.

• Inspect tank electrical grounds for breaks and loose fittings.

• Validate operation of automatic controls including leak and level detection.

B. 5 Years:

• Pump out tank to within 6-10 inches of the bottom of the tank.

• Pump out or otherwise remove sludge from the bottom of the tank and flush.

• Inspect tank, pipes and all connections for signs of leaks.

• Clean and adjust oil transfer pumps.

• Examine, clean and check for proper operation of the strainers, traps, control valves, flow meters, temperature and pressure gauges.

• Inspect floats and leveling devices in tank for proper operation.

Fuel Storage Tanks (Under Ground)

• Inspect all piping runs for damage and leakage.

• Inspect manhole gaskets.

• Sample fuel and test quality.

• Check floats and leveling devices in tank. Check float adjustment with depth level indicators.

• Inspect fuel tank fire protection devices.

• Clean breather vents, conservation vents, vacuum vents, pressure vents, non-freeze draw valves and flame arrestors where appropriate.

• Inspect for residual buildup; ensure floats move freely.

• Check float adjustment with depth level indicators.

• Verify all locking devices are in place.

• Run pump and check operation.

• Calibrate and adjust fuel oil pressure.

• Validate operation of automatic controls including leak and level detection.

• Compare inventory probe readings against stick measurements.

• Clean sensors if possible.

B. 5 Year:

• Lockout/tagout electrical connections all connected equipment.

• Isolate the tank from the system by draining down the lines, removing the valves, and installing appropriately sized blind flanges on tank nozzles and pipeline flanges.

• Pump out tank to within 6-10 inches of the bottom of the tank.

• Pump out or otherwise remove sludge from the bottom of the tank and flush.

• Mechanically vent the tank and perform gas freeing to get rid of dangerous vapors, ideally to a lower explosive limit (LEL) of 10 of less.

• Make confined space entry (comply with OSHA’s regulations and API standards) to clean the tank’s interior.

• Remove final product puddles via vacuum truck by squeegeeing the tank floor.

• Inspect for cleanliness and the presence of hidden vapors to confirm your tank is clean and vapor free.

Fuel Pumps

• Check for leaks on discharge piping and seals, etc.

• Inspect electrical wiring for damage.

• Check pump and motor operation for vibration, noise, overheating, etc.

• Check alignment and clearances of shaft and coupler.

• Tighten or replace loose, missing, or damaged nuts, bolts and screws.

• Lubricate pump and motor as required.

• Clean pump, motor and surrounding area.

• Verify pump is pumping at capacity by measuring the time required to transfer a specific volume of fuel.

• Measure and record voltage at the pump and actual current draw and compare to nameplate readings.

Fuel Panel Control

• Power down unit.

• Inspect panel components and relays for damaged wires, frayed insulation or signs of overheating.

• Tighten loose connections as required.

• Clean out dust and debris from inside the control panel and reassemble.

• Test all sensors. Test discriminating sensors with both water and fuel. Clean all sensors.

• Pull probes and inspect for damage.

• Clean probe shaft.

• Test and recalibrate probes as necessary in comparison with manual gauging on the tank with the tank calibration chart.

• Check that Fuel Pump Controller levels match those of the Leak and Level

Monitoring System.

• Perform operational test of control panel functions.

• Test remote alarm panels at remote fill.

• Ensure proper operation of remote displays.

• Test operation of all inputs and outputs.

• Verify system configuration and test battery backup.

• Verify that all alarm, control and communication circuits operate correctly.

• Record all results.

Local Personnel training:

A. The contractor shall provide the post with a minimum of 8 hours of training, covering at least the following topics:

• Evaluate U.S. Embassy Personnel qualifications to maintain the NEC fuel tanks.

• Overview of Systems: Principles and components

• Importance of Safety and Compliance

• Tank Design and Installation

• Leak Detection Systems

• Fuel Monitoring devices, software and communication network.

• Spill Prevention and Containment

• Operation, maintenance and Inspection per each system

• Practical exercises for each applicable topic.

Additional:

The contractor shall supply to post:

Troubleshooting and repair manuals for included equipment.

Spare Parts and Expendables Inventory.

Tegucigalpa post will keep parts per manufacturer recommendations.

13. DESCRIPTION OF EQUIPMENT

Please see attachment A — Equipment List at the end of this solicitation document (page 75) for more details

14. TRANSITIONS/CONTACTS

Within 30 days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services.

The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract.

The plan shall assign priority to the selection of all supervisors to be used under the contract.

14.1 On site contact. The following are the designated contact personnel between the US Embassy and the Contractor

COR

Electrical Engineer Supervisor

The Post Control Officer (PCO) will be the contractor’s point of contact at the U.S. Embassy, Tegucigalpa. All questions concerning coordination of service activities while at post shall be directed to the Post Control Officer, with weekly reporting to the COR:

PCO

Post Control Officer (PCO)

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(NOV 2023) IS INCORPORATED BY REFERENCE.

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act

(31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

https://www.acquisition.gov/far/52.233-1#FAR_52_233_1 https://www.acquisition.gov/far/52.202-1#FAR_52_202_1

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices.

An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice;

and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-

33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-34#FAR_52_232_34 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.-

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt

Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting

Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the

Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://www.acquisition.gov/far/52.212-5#FAR_52_212_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section7109&num=0&edition=prelim

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting

Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such https://www.acquisition.gov/far/33.211#FAR_33_211 https://www.acquisition.gov/far/32.607-2#FAR_32_607_2 https://www.acquisition.gov/far/32.608-2#FAR_32_608_2 termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the

Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the

Contractor shall be liable to the Government for any and all rights and remedies provided by law.

If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .