19GT5026Q0023 - Amendment 0001.pdf
PDF 185 KB Posted
- Solicitation number
- 19GT5026Q0023
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the American Embassy Guatemala City's GSO Procurement Section for RFQ 19GT5026Q0023 regarding bathroom repairs at an official residence.
The amendment extends the quotation due date to Tuesday, April 21, 2026, and incorporates a Questions and Answers document as Attachment 1. The Questions and Answers clarifies project scope for two bathroom areas: the guard booth service bathroom and the apartment bathroom. Key clarifications exclude the supply cabinet and shelving from the guard booth bathroom scope. For the apartment bathroom, the leveling area is limited to showers, toilets, washer, and sink areas only, excluding the closet. Regarding filling material for the PNC bathroom, contractors may propose either infill using pumice stone or EPS filler blocks (accounting for floor drain and slope), or reinforcement with mesh and lightweight mortar (accounting for Class A ceramic flooring level and adhesive). All other terms and conditions of the original solicitation dated March 18, 2026, remain unchanged and in full force and effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 19GT5026Q0023 - Bathroom Repairs at Official Residence.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE OF PAGESAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE 1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
04/09/2026
4. REQUISITION/PURCHASE REQ. NO.
PR15893362-0001
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE GT500 7. ADMINISTERED BY (If other than Item 6) CODE
AMERICAN EMBASSY GUATEMALA CITY
Boulevard Austriaco 11-51, Zona 16, ATTN: GSO - PROCUREMENT SECTION Guatemala
GUATEMALA
AMERICAN EMBASSY GUATEMALA CITY
Boulevard Austriaco 11-51, Zona 16, ATTN: GSO - PROCUREMENT SECTION Guatemala
GUATEMALA
(X) 9A. AMENDMENT OF SOLICITATION
NO.
19GT5026Q0023
x
9B. DATED (SEE ITEM 11)
03/18/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers x is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to:, 1) Extend the due date for quotations to Tuesday, April 21, 2026. , 2) Incorporate the Questions and Answers as official attachment. This document is hereby added as: *Attachment 1: Questions and Answers.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
RFQ 19GT5026Q0023 – BATHROOM REPAIRS AT OFFICIAL RESIDENCE
ATTACHMENT 1 - QUESTIONS AND ANSWERS
Guard booth service bathroom
Q1. Could you provide us with the depth measurement of the supply cabinet located in the guard booth service bathroom?
R1. Please note the supply cabinet is not part of the project and should not be included in your proposal.
Q2. The shelving shown in the drawings is not included in the quote; please confirm whether it should be included.
R2. Please note the shelving is not part of the project and should not be included in your proposal.
Apartment bathroom
Q3. Please confirm whether the leveling area covers only the bathroom or if it extends to the closet area.
R3. Leveling area only covers the showers, toilets, washer, and sink area.
Q4. During the site visit, it was mentioned that the filling material for the PNC bathroom must be lightweight material. Could you tell us what the proposed material is so that all parties can quote the same specifications?
R4. The following materials can be considered for your proposals:
a. Infill using pumice stone or EPS filler blocks. Proposal must consider the floor drain and connections, and ensure the infill is sloped.
b. Reinforcement with mesh and lightweight mortar, Proposal must consider the level of the Class A ceramic flooring and its adhesive.
END OF QUESTIONS AND ANSWERS
| SF30+Cover+Page+-+Changed+Line+Items (5) |
| RFQ+19GT5026Q0023++BATHROOM+REPAIRS+AT+OFFICIAL+RESIDENCE+-+QUESTIONS+AND+ANSWERS |
File details come from the government source that posted it. Updated .