Exhibit C (revised).pdf
PDF 442 KB Posted
- Solicitation number
- 19GE5023R0059
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cover Letter 23R0059 0002.pdf | ||
| 19GE5023R0059 0002.pdf | ||
| Exhibit A (revised).pdf | ||
| Cover Letter 23R0059 0001.pdf | ||
| 19GE5023R0059 0001.pdf | ||
| Exhibit A.pdf | ||
| Exhibit B.pdf | ||
| Exhibit C.pdf | ||
| Attachment 1 W-14.pdf | ||
| Attachment 2 SAM.pdf | ||
| Cover Letter 23R0059.pdf | ||
| 19GE5023R0059.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Embassy, London UNCLASSIFIED U.S. Department of State
EXHIBIT C
Statement of Work
Water Treatment Systems for the Exterior Pond and
Potomac Water Feature in 8th floor
1. The Contactor’s service proposal shall include, at a minimum, the following service visits:
a) Weekly (52 times per year):
• TVC’s check for the Potomac water feature.
• Check the chemical pot of the Potomac water feature.
• Record temperature, PH, Conductivity & Bromine, visual contamination, conductivity for the Potomac Water Feature.
b) Quarterly (four times per year):
• Legionella water sampling ( Pond and Potomac water feature).
• Check the Chlorine Residual in the Potomac water feature.
c) Annual (one time per year):
• Clean and Chlorination of the Potomac water feature in accordance with British Standards.
• In the Base Year ONLY: Clean and Chlorination of the Non-potable storage tank of the Pond make-up water in accordance with British standards. It is a 96 cubic meter concrete tank. It shall be cleaned during working days (8:00am - 5:00pm).
File details come from the government source that posted it. Updated .