19GE5018R0050_Painting_Services_US_Consulate_Frankfurt.pdf

PDF 256 KB Posted

Attached to
Painting Services US Consulate General Housing Area Frankfurt am Main, Germany
Solicitation number
19GE5018R0050
Issued by

About this file

Solicitation 19GE5018R0050 for Painting Services in Frankfurt, Germany

View the file

Other files

File Type Posted
19GE5018R0050_Amendment_0001.pdf PDF
Letter_19GE5018R0050.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION

DOCUMENT

Painting services for American Consulate Housing Area in Frankfurt am Main, Germany

Solicitation No. 19GE5018R0050 American Consulate General Regional Procurement Support Office (RPSO) Giessener Strasse 30 D-60435 Frankfurt am Main Germany

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30

1. REQUISITION NUMBER

5. SOLICITATION NUMBER

19GE5018R0050

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

06/25/2018

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Wilhelm Fleming

b. TELEPHONE NUMBER (No collect calls)

c. EMAIL flemingwm@state.gov

8. OFFER DUE DATE / LOCAL

TIME

07/24/2018 14:00:00

CODE FRANK

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, 60435

GERMANY

9. ISSUED BY X UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

10. THE ACQUISITION IS

SEE

SCHEDULE

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS

RATED ORDER UNDER DPAS

13b. RATING

RFQ IFB X RFP

14. METHOD OF SOLICITATION

FRANKCODE15. DELIVER TO

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: MAINTENANCE SECTION

FRANKFURT, 60435

GERMANY

CODE FRANK16. ADMINISTERED BY

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, 60435

GERMANY

FACILITY

CODE

CODE

Contact Duns Telephone No.

17a. CONTRACTOR/OFFEROR FRANKCODE18a. PAYMENT WILL BE MADE BY

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: MAINTENANCE SECTION

FRANKFURT, 60435

GERMANY

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/SERVICES

(Use Reverse and/or Attach Additional Sheets as Necessary)

21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT

See Line Items Section

25. ACCOUNTING AND APPROPRIATION DATA

See Line Item Detail

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

X 27a. SOLICITATION INCORPORATES BY REFERENCES FAR 52.212-1, 52.212-4, FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA X ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN __1__ COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR OFFER ON

SOLICITATION (BLOCK 5) INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT)

Fabiola A. Bellevue 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 02/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

19GE5018R0050

Table of Contents

Section Description Page Number

1 Solicitation/Contract Form

1.1. DESCRIPTION OF SERVICES

1.2 LOCATION

1.3. GENERAL

1.4. WORK LIMITS AND WORK HOURS

1.5. PRODUCTS

1.6. TYPE OF CONTRACT

1.7. VALUE ADDED TAX (VAT)

1.8. CONTRACT MINIMUM AND MAXIMUM AMOUNTS

1.9. ABBREVIATIONS

2.0. CONTRACT PRICE

3.0. WORKMANSHIP

3.1. PREPARATION/PROTECTION OF WORK AREA

3.2. EQUIPMENT

52.246-12 Inspection of Construction (Aug 1996)

652.237-72 OBSERVANCE OF LEGAL HOLIDAYS AND ADMINISTRATIVE LEAVE (FEB

2015)

4.0. PERFORMANCE

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

5.0. SUBMISSION OF INVOICES

5.1. CONTRACT ADMINISTRATION DATA

10.0. DELIVERABLES

11.0. INSURANCE REQUIREMENTS

12.0. LOCAL LAW REGISTRATION

13.0. QUALITY ASSURANCE PLAN (QAP)

6.1. CONTRACTOR IDENTIFICATION

6.2. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

14.0. LIST OF ATTACHMENTS

2 Contract Clauses 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-13 System for Award Management Maintenance (Oct 2016) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.228-5 Insurance - Work on a Government Installation (Jan 1997) 52.229-6 Taxes - Foreign Fixed-Price Contracts (Feb 2013) 52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (May 2014) 52.212-4 Contract Terms and Conditions--Commercial Items (Jan 2017) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders--Commercial Items (Jan 2018) 52.217-8 Option to Extend Services (Nov 1999) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.216-18 Ordering (Oct 1995) 52.216-19 Order Limitations (Oct 1995) 52.216-22 Indefinite Quantity (Oct 1995) 52.242-14 Suspension of Work (Apr 1984)

652.204-70 DEPARTMENT OF STATE PERSONAL IDENTIFICATION CARD POLICY AND

PROCEDURES (FEB 2015)

652.225-71 SECTION 8(a) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED

(AUG 1999)

652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE

UNITED STATES (JUL 1988)

652.232-70 Payment Schedule and Invoice Submission (Fixed-Price)(Aug 1999)

652.236-70 ACCIDENT PREVENTION (APR 2004)

652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)

3 Solicitation Provisions 52.204-7 System for Award Management (Oct 2016) 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016) 52.212-1 Instructions to Offerors--Commercial Items (Jan 2017) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.237-1 Site Visit (Apr 1984) 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)

15.0. PRE-PROPOSAL CONFERENCE

16.0. QUALIFICATION OF OFFERORS

17.0. SUMMARY OF PROPOSAL INSTRUCTIONS

18.0. PROPOSAL DUE DATE

4 Evaluation Factors 52.217-5 Evaluation of Options (July 1990) 52.225-17 Evaluation of Foreign Currency Offers (Feb 2000)

19.0. GENERAL

19.1. BASIS FOR AWARD

19.2 AWARD SELECTION

19.3 AWARD WITHOUT DISCUSSIONS

19.4. CONTRACT AWARD

5 Representations and Certifications 52.212-3 Offeror Representations and Certifications--Commercial Items (Nov 2017) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certifications (Oct 2015)

21.0. AUTHORIZED CONTRACT ADMINISTRATOR

001 BASE YEAR CLINs 001 through 036 September 01, 2018 through August 31, 2019

Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1

In:

25,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STORAGE ROOMS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

002 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces

In:

11,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

003 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

48,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

004 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces

In:

24,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

005 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

8,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

Line Item No. Description Quantity Unit Unit Price Total Cost

006 BUILT-IN-CABINETS:

Wash wooden shelves and inside of door, sand and coat with clear lacquer

In:

400.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

007 BUILT-IN-CABINETS:

Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN

EN 13300 NA1, DK 2

In:

500.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

008 DOORS:

Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.

Prime surfaces and paint with white silk gloss synthetic enamel paint.

2,000.00 SM

Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

009 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.

18,000.00 MR

Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

010 RADIATORS:

Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

7,000.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

011 RADIATOR HEATING PIPES:

Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

1,500.00 MR

In:

APARTMENTS

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

012 WATER,GAS, DRAIN PIPES:

Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.

2,000.00 MR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

013 GENERAL:

Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.

175.00 JB

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

014 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.

Transitions to the old plaster shall be absolutly smooth.

6,000.00 SM

In:

APARTMENTS

STORAGE ROOMS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

015 Apply latex plastic on the entire surface with a textured roll brush

5,200.00 SM

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

016 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.

2,500.00 SM

In:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

017 PAINTER-HOURLY CHARGE

Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.

Contractor shall furnish tools and equipment.

800.00 HR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

018 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032

1,000.00 SM

In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

019 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

5,500.00 SM

In:

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

020 Insulate painting of water spots on ceilings and walls 500.00 SM In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

021 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

1,200.00 MR

In:

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

022 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.

240.00 SM

In:

STAIRWELLS

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

023 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.

400.00 MR

In:

STAIRWELL

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

024 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.

400.00 MR

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

025 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area

10.00 JB

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

026 Protective covering of floor surfaces, made of plastic floor covering or masking felt.

450.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

027 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.

120.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

028 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.

75.00 MR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

09/01/2018 to 08/31/2019

029 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN

13300 NA 1, DK 1

1,400.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

030 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.

2,800.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

031 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler

240.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

032 Stucco work damaged walls plaster, patches to match surrounding surfaces

45.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

033 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items

10.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

034 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items

20.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

035 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items

40.00 HR

In:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

ADDITIONAL WORK THROUGHOUT THE BUILDING

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

036 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2018 to 08/31/2019

101 FIRST OPTION YEAR CLINs 101 through 136 September 01, 2019 through August 31, 2020

Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1

In:

25,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STORAGE ROOMS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

102 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces

In:

11,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

103 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

48,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

104 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces

In:

24,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

105 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

8,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

106 BUILT-IN-CABINETS:

Wash wooden shelves and inside of door, sand and coat with clear lacquer

In:

400.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

107 BUILT-IN-CABINETS:

Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN

EN 13300 NA1, DK 2

In:

500.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

108 DOORS:

Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.

Prime surfaces and paint with white silk gloss synthetic enamel paint.

2,000.00 SM

Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

109 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.

18,000.00 MR

Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

110 RADIATORS:

Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

7,000.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

111 RADIATOR HEATING PIPES:

Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

1,500.00 MR

In:

APARTMENTS

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

112 WATER,GAS, DRAIN PIPES:

Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.

2,000.00 MR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

113 GENERAL:

Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.

175.00 JB

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

114 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.

Transitions to the old plaster shall be absolutly smooth.

6,000.00 SM

In:

APARTMENTS

STORAGE ROOMS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

115 Apply latex plastic on the entire surface with a textured roll brush

5,200.00 SM

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

In:

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

116 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.

2,500.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

117 PAINTER-HOURLY CHARGE

Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.

Contractor shall furnish tools and equipment.

800.00 HR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

118 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032

1,000.00 SM

In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

119 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

5,500.00 SM

In:

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

120 Insulate painting of water spots on ceilings and walls 500.00 SM In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

121 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

1,200.00 MR

In:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

BASEMENT HALLWAYS

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

122 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.

240.00 SM

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

123 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.

400.00 MR

In:

STAIRWELL

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

124 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.

400.00 MR

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

125 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area

10.00 JB

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

126 Protective covering of floor surfaces, made of plastic floor covering or masking felt.

450.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

127 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.

120.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

09/01/2019 to 08/31/2020

128 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.

75.00 MR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

129 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN

13300 NA 1, DK 1

1,400.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

130 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.

2,800.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

131 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler

240.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

132 Stucco work damaged walls plaster, patches to match surrounding surfaces

45.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

133 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items

10.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

134 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items

20.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

135 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items

40.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

136 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2019 to 08/31/2020

201 SECOND OPTION YEAR CLINs 201 through 236 September 01, 2020 through August 31, 2021

Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1

In:

25,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STORAGE ROOMS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

202 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces

In:

11,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

203 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

48,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

204 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces

In:

24,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

205 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

8,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

206 BUILT-IN-CABINETS:

Wash wooden shelves and inside of door, sand and coat with clear lacquer

In:

400.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

207 BUILT-IN-CABINETS:

Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN

EN 13300 NA1, DK 2

In:

500.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

208 DOORS:

Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.

Prime surfaces and paint with white silk gloss synthetic enamel paint.

2,000.00 SM

Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

209 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint

18,000.00 MR

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018 with white, high gloss, enamel paint.

Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

210 RADIATORS:

Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

7,000.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

211 RADIATOR HEATING PIPES:

Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

1,500.00 MR

In:

APARTMENTS

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

212 WATER,GAS, DRAIN PIPES:

Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.

2,000.00 MR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

213 GENERAL:

Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.

175.00 JB

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

214 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.

6,000.00 SM

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

Transitions to the old plaster shall be absolutly smooth.

APARTMENTS

STORAGE ROOMS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

215 Apply latex plastic on the entire surface with a textured roll brush

5,200.00 SM

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

216 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.

2,500.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

217 PAINTER-HOURLY CHARGE

Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.

Contractor shall furnish tools and equipment.

800.00 HR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

218 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032

1,000.00 SM

In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

219 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

5,500.00 SM

In:

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

220 Insulate painting of water spots on ceilings and walls 500.00 SM

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

221 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

1,200.00 MR

In:

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

222 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.

240.00 SM

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

223 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.

400.00 MR

In:

STAIRWELL

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

224 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.

400.00 MR

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

225 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area

10.00 JB

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

226 Protective covering of floor surfaces, made of plastic floor covering or masking felt.

450.00 SM

In:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

227 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.

120.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

228 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.

75.00 MR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

229 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN

13300 NA 1, DK 1

1,400.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

230 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.

2,800.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

231 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler

240.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

232 Stucco work damaged walls plaster, patches to match surrounding surfaces

45.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

09/01/2020 to 08/31/2021

233 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items

10.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

234 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items

20.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

235 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items

40.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

236 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2020 to 08/31/2021

301 THIRD OPTION YEAR CLINs 301 through 336 September 01, 2021 through August 31, 2022

Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1

In:

25,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STORAGE ROOMS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

302 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces

In:

11,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

303 Painting of wall with prime and paint surfaces with white or 48,000.00 SM

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018 grey semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

304 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces

In:

24,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

305 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

8,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

306 BUILT-IN-CABINETS:

Wash wooden shelves and inside of door, sand and coat with clear lacquer

In:

400.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

307 BUILT-IN-CABINETS:

Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN

EN 13300 NA1, DK 2

In:

500.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

308 DOORS:

Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.

Prime surfaces and paint with white silk gloss synthetic enamel paint.

2,000.00 SM

Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

309 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.

18,000.00 MR

Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

310 RADIATORS:

Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

7,000.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

311 RADIATOR HEATING PIPES:

Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

1,500.00 MR

In:

APARTMENTS

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

312 WATER,GAS, DRAIN PIPES:

Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.

2,000.00 MR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

313 GENERAL:

Occupied or vacant, when completely furnished, require

175.00 JB

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018 additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

314 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.

Transitions to the old plaster shall be absolutly smooth.

6,000.00 SM

In:

APARTMENTS

STORAGE ROOMS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

315 Apply latex plastic on the entire surface with a textured roll brush

5,200.00 SM

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

316 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.

2,500.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

317 PAINTER-HOURLY CHARGE

Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.

Contractor shall furnish tools and equipment.

800.00 HR

In:

APARTMENTS

STORAGE ROOMS

BASEMENT HALLWAYS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

318 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032

1,000.00 SM

In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

319 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

5,500.00 SM

In:

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

320 Insulate painting of water spots on ceilings and walls 500.00 SM In:

STORAGE ROOMS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

321 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"

1,200.00 MR

In:

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

322 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.

240.00 SM

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

323 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.

400.00 MR

In:

STAIRWELL

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

324 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.

400.00 MR

In:

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

325 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area

10.00 JB

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

326 Protective covering of floor surfaces, made of plastic floor covering or masking felt.

450.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

327 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.

120.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

328 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.

75.00 MR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

329 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN

13300 NA 1, DK 1

1,400.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

330 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.

2,800.00 SM

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

331 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler

240.00 SM

In:

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

332 Stucco work damaged walls plaster, patches to match surrounding surfaces

45.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

333 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items

10.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

334 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items

20.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

335 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items

40.00 HR

In:

ADDITIONAL WORK THROUGHOUT THE BUILDING

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

336 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2021 to 08/31/2022

401 FOURTH OPTION YEAR CLINs 401 through 436 September 01, 2022 through August 31, 2023

Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1

In:

25,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STORAGE ROOMS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

402 Repair, prime, and smooth damaged ceiling plaster, 11,000.00 SM

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018 patches to match surrounding surfaces

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

403 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

48,000.00 SM

APARTMENTS

BASEMENT HALLWAYS

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

404 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces

In:

24,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

STAIRWELLS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

405 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300

NA1, DK 2

In:

8,000.00 SM

APARTMENTS

KITCHEN & BATHROOM

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

406 BUILT-IN-CABINETS:

Wash wooden shelves and inside of door, sand and coat with clear lacquer

In:

400.00 SM

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

407 BUILT-IN-CABINETS:

Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN

EN 13300 NA1, DK 2

In:

500.00 SM

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

408 DOORS:

Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.

Prime surfaces and paint with white silk gloss synthetic enamel paint.

2,000.00 SM

Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

409 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.

18,000.00 MR

Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.

In:

APARTMENTS

ATTIC HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

410 RADIATORS:

Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

7,000.00 SM

In:

APARTMENTS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

411 RADIATOR HEATING PIPES:

Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.

1,500.00 MR

In:

APARTMENTS

STAIRWELLS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

412 WATER,GAS, DRAIN PIPES:

Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.

2,000.00 MR

19GE5018R0050

Line Item Summary

Solicitation Number:

19GE5018R0050

Contract Number: Title: Painting requirement for US Consulate Frankfurt

Date of Solicitation:

06/25/2018

STORAGE ROOMS

BASEMENT HALLWAYS

Doc Ref No:

Delivery Date (Start to End) Date FOB:

09/01/2022 to 08/31/2023

413 GENERAL:

Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .