19GE5018R0050_Painting_Services_US_Consulate_Frankfurt.pdf
PDF 256 KB Posted
- Solicitation number
- 19GE5018R0050
About this file
Solicitation 19GE5018R0050 for Painting Services in Frankfurt, Germany
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19GE5018R0050_Amendment_0001.pdf | ||
| Letter_19GE5018R0050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
DOCUMENT
Painting services for American Consulate Housing Area in Frankfurt am Main, Germany
Solicitation No. 19GE5018R0050 American Consulate General Regional Procurement Support Office (RPSO) Giessener Strasse 30 D-60435 Frankfurt am Main Germany
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30
1. REQUISITION NUMBER
5. SOLICITATION NUMBER
19GE5018R0050
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE
DATE
06/25/2018
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
Wilhelm Fleming
b. TELEPHONE NUMBER (No collect calls)
c. EMAIL flemingwm@state.gov
8. OFFER DUE DATE / LOCAL
TIME
07/24/2018 14:00:00
CODE FRANK
AMERICAN CONSULATE GENERAL FRANKFURT
GIESSENER STRASSE 30
ATTN: RPSO
FRANKFURT, 60435
GERMANY
9. ISSUED BY X UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
10. THE ACQUISITION IS
SEE
SCHEDULE
11. DELIVERY FOR FOB DESTINATION
UNLESS BLOCK IS MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS
RATED ORDER UNDER DPAS
13b. RATING
RFQ IFB X RFP
14. METHOD OF SOLICITATION
FRANKCODE15. DELIVER TO
AMERICAN CONSULATE GENERAL FRANKFURT
GIESSENER STRASSE 30
ATTN: MAINTENANCE SECTION
FRANKFURT, 60435
GERMANY
CODE FRANK16. ADMINISTERED BY
AMERICAN CONSULATE GENERAL FRANKFURT
GIESSENER STRASSE 30
ATTN: RPSO
FRANKFURT, 60435
GERMANY
FACILITY
CODE
CODE
Contact Duns Telephone No.
17a. CONTRACTOR/OFFEROR FRANKCODE18a. PAYMENT WILL BE MADE BY
AMERICAN CONSULATE GENERAL FRANKFURT
GIESSENER STRASSE 30
ATTN: MAINTENANCE SECTION
FRANKFURT, 60435
GERMANY
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER SEE ADDENDUM
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/SERVICES
(Use Reverse and/or Attach Additional Sheets as Necessary)
21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT
See Line Items Section
25. ACCOUNTING AND APPROPRIATION DATA
See Line Item Detail
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
X 27a. SOLICITATION INCORPORATES BY REFERENCES FAR 52.212-1, 52.212-4, FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA X ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN __1__ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR OFFER ON
SOLICITATION (BLOCK 5) INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT)
Fabiola A. Bellevue 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 02/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
19GE5018R0050
Table of Contents
Section Description Page Number
1 Solicitation/Contract Form
1.1. DESCRIPTION OF SERVICES
1.2 LOCATION
1.3. GENERAL
1.4. WORK LIMITS AND WORK HOURS
1.5. PRODUCTS
1.6. TYPE OF CONTRACT
1.7. VALUE ADDED TAX (VAT)
1.8. CONTRACT MINIMUM AND MAXIMUM AMOUNTS
1.9. ABBREVIATIONS
2.0. CONTRACT PRICE
3.0. WORKMANSHIP
3.1. PREPARATION/PROTECTION OF WORK AREA
3.2. EQUIPMENT
52.246-12 Inspection of Construction (Aug 1996)
652.237-72 OBSERVANCE OF LEGAL HOLIDAYS AND ADMINISTRATIVE LEAVE (FEB
2015)
4.0. PERFORMANCE
652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)
5.0. SUBMISSION OF INVOICES
5.1. CONTRACT ADMINISTRATION DATA
10.0. DELIVERABLES
11.0. INSURANCE REQUIREMENTS
12.0. LOCAL LAW REGISTRATION
13.0. QUALITY ASSURANCE PLAN (QAP)
6.1. CONTRACTOR IDENTIFICATION
6.2. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
14.0. LIST OF ATTACHMENTS
2 Contract Clauses 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-13 System for Award Management Maintenance (Oct 2016) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.228-5 Insurance - Work on a Government Installation (Jan 1997) 52.229-6 Taxes - Foreign Fixed-Price Contracts (Feb 2013) 52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (May 2014) 52.212-4 Contract Terms and Conditions--Commercial Items (Jan 2017) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders--Commercial Items (Jan 2018) 52.217-8 Option to Extend Services (Nov 1999) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.216-18 Ordering (Oct 1995) 52.216-19 Order Limitations (Oct 1995) 52.216-22 Indefinite Quantity (Oct 1995) 52.242-14 Suspension of Work (Apr 1984)
652.204-70 DEPARTMENT OF STATE PERSONAL IDENTIFICATION CARD POLICY AND
PROCEDURES (FEB 2015)
652.225-71 SECTION 8(a) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED
(AUG 1999)
652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE
UNITED STATES (JUL 1988)
652.232-70 Payment Schedule and Invoice Submission (Fixed-Price)(Aug 1999)
652.236-70 ACCIDENT PREVENTION (APR 2004)
652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)
3 Solicitation Provisions 52.204-7 System for Award Management (Oct 2016) 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016) 52.212-1 Instructions to Offerors--Commercial Items (Jan 2017) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.237-1 Site Visit (Apr 1984) 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)
15.0. PRE-PROPOSAL CONFERENCE
16.0. QUALIFICATION OF OFFERORS
17.0. SUMMARY OF PROPOSAL INSTRUCTIONS
18.0. PROPOSAL DUE DATE
4 Evaluation Factors 52.217-5 Evaluation of Options (July 1990) 52.225-17 Evaluation of Foreign Currency Offers (Feb 2000)
19.0. GENERAL
19.1. BASIS FOR AWARD
19.2 AWARD SELECTION
19.3 AWARD WITHOUT DISCUSSIONS
19.4. CONTRACT AWARD
5 Representations and Certifications 52.212-3 Offeror Representations and Certifications--Commercial Items (Nov 2017) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certifications (Oct 2015)
21.0. AUTHORIZED CONTRACT ADMINISTRATOR
001 BASE YEAR CLINs 001 through 036 September 01, 2018 through August 31, 2019
Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1
In:
25,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STORAGE ROOMS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
002 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces
In:
11,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
003 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
48,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
004 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces
In:
24,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
005 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
8,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
Line Item No. Description Quantity Unit Unit Price Total Cost
006 BUILT-IN-CABINETS:
Wash wooden shelves and inside of door, sand and coat with clear lacquer
In:
400.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
007 BUILT-IN-CABINETS:
Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN
EN 13300 NA1, DK 2
In:
500.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
008 DOORS:
Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.
Prime surfaces and paint with white silk gloss synthetic enamel paint.
2,000.00 SM
Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
009 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.
18,000.00 MR
Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
010 RADIATORS:
Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
7,000.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
011 RADIATOR HEATING PIPES:
Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
1,500.00 MR
In:
APARTMENTS
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
012 WATER,GAS, DRAIN PIPES:
Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.
2,000.00 MR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
013 GENERAL:
Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.
175.00 JB
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
014 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.
Transitions to the old plaster shall be absolutly smooth.
6,000.00 SM
In:
APARTMENTS
STORAGE ROOMS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
015 Apply latex plastic on the entire surface with a textured roll brush
5,200.00 SM
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
016 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.
2,500.00 SM
In:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
017 PAINTER-HOURLY CHARGE
Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.
Contractor shall furnish tools and equipment.
800.00 HR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
018 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032
1,000.00 SM
In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
019 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
5,500.00 SM
In:
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
020 Insulate painting of water spots on ceilings and walls 500.00 SM In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
021 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
1,200.00 MR
In:
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
022 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.
240.00 SM
In:
STAIRWELLS
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
023 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.
400.00 MR
In:
STAIRWELL
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
024 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.
400.00 MR
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
025 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area
10.00 JB
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
026 Protective covering of floor surfaces, made of plastic floor covering or masking felt.
450.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
027 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.
120.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
028 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.
75.00 MR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
09/01/2018 to 08/31/2019
029 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN
13300 NA 1, DK 1
1,400.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
030 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.
2,800.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
031 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler
240.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
032 Stucco work damaged walls plaster, patches to match surrounding surfaces
45.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
033 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items
10.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
034 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items
20.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
035 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items
40.00 HR
In:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
ADDITIONAL WORK THROUGHOUT THE BUILDING
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
036 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2018 to 08/31/2019
101 FIRST OPTION YEAR CLINs 101 through 136 September 01, 2019 through August 31, 2020
Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1
In:
25,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STORAGE ROOMS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
102 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces
In:
11,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
103 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
48,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
104 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces
In:
24,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
105 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
8,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
106 BUILT-IN-CABINETS:
Wash wooden shelves and inside of door, sand and coat with clear lacquer
In:
400.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
107 BUILT-IN-CABINETS:
Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN
EN 13300 NA1, DK 2
In:
500.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
108 DOORS:
Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.
Prime surfaces and paint with white silk gloss synthetic enamel paint.
2,000.00 SM
Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
109 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.
18,000.00 MR
Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
110 RADIATORS:
Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
7,000.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
111 RADIATOR HEATING PIPES:
Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
1,500.00 MR
In:
APARTMENTS
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
112 WATER,GAS, DRAIN PIPES:
Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.
2,000.00 MR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
113 GENERAL:
Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.
175.00 JB
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
114 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.
Transitions to the old plaster shall be absolutly smooth.
6,000.00 SM
In:
APARTMENTS
STORAGE ROOMS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
115 Apply latex plastic on the entire surface with a textured roll brush
5,200.00 SM
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
In:
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
116 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.
2,500.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
117 PAINTER-HOURLY CHARGE
Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.
Contractor shall furnish tools and equipment.
800.00 HR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
118 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032
1,000.00 SM
In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
119 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
5,500.00 SM
In:
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
120 Insulate painting of water spots on ceilings and walls 500.00 SM In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
121 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
1,200.00 MR
In:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
BASEMENT HALLWAYS
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
122 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.
240.00 SM
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
123 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.
400.00 MR
In:
STAIRWELL
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
124 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.
400.00 MR
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
125 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area
10.00 JB
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
126 Protective covering of floor surfaces, made of plastic floor covering or masking felt.
450.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
127 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.
120.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
09/01/2019 to 08/31/2020
128 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.
75.00 MR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
129 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN
13300 NA 1, DK 1
1,400.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
130 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.
2,800.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
131 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler
240.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
132 Stucco work damaged walls plaster, patches to match surrounding surfaces
45.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
133 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items
10.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
134 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items
20.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
135 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items
40.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
136 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2019 to 08/31/2020
201 SECOND OPTION YEAR CLINs 201 through 236 September 01, 2020 through August 31, 2021
Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1
In:
25,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STORAGE ROOMS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
202 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces
In:
11,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
203 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
48,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
204 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces
In:
24,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
205 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
8,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
206 BUILT-IN-CABINETS:
Wash wooden shelves and inside of door, sand and coat with clear lacquer
In:
400.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
207 BUILT-IN-CABINETS:
Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN
EN 13300 NA1, DK 2
In:
500.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
208 DOORS:
Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.
Prime surfaces and paint with white silk gloss synthetic enamel paint.
2,000.00 SM
Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
209 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint
18,000.00 MR
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018 with white, high gloss, enamel paint.
Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
210 RADIATORS:
Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
7,000.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
211 RADIATOR HEATING PIPES:
Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
1,500.00 MR
In:
APARTMENTS
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
212 WATER,GAS, DRAIN PIPES:
Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.
2,000.00 MR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
213 GENERAL:
Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.
175.00 JB
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
214 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.
6,000.00 SM
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
Transitions to the old plaster shall be absolutly smooth.
APARTMENTS
STORAGE ROOMS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
215 Apply latex plastic on the entire surface with a textured roll brush
5,200.00 SM
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
216 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.
2,500.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
217 PAINTER-HOURLY CHARGE
Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.
Contractor shall furnish tools and equipment.
800.00 HR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
218 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032
1,000.00 SM
In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
219 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
5,500.00 SM
In:
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
220 Insulate painting of water spots on ceilings and walls 500.00 SM
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
221 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
1,200.00 MR
In:
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
222 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.
240.00 SM
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
223 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.
400.00 MR
In:
STAIRWELL
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
224 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.
400.00 MR
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
225 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area
10.00 JB
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
226 Protective covering of floor surfaces, made of plastic floor covering or masking felt.
450.00 SM
In:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
227 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.
120.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
228 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.
75.00 MR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
229 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN
13300 NA 1, DK 1
1,400.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
230 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.
2,800.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
231 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler
240.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
232 Stucco work damaged walls plaster, patches to match surrounding surfaces
45.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
09/01/2020 to 08/31/2021
233 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items
10.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
234 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items
20.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
235 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items
40.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
236 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2020 to 08/31/2021
301 THIRD OPTION YEAR CLINs 301 through 336 September 01, 2021 through August 31, 2022
Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1
In:
25,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STORAGE ROOMS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
302 Repair, prime, and smooth damaged ceiling plaster, patches to match surrounding surfaces
In:
11,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
303 Painting of wall with prime and paint surfaces with white or 48,000.00 SM
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018 grey semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
304 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces
In:
24,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
305 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
8,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
306 BUILT-IN-CABINETS:
Wash wooden shelves and inside of door, sand and coat with clear lacquer
In:
400.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
307 BUILT-IN-CABINETS:
Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN
EN 13300 NA1, DK 2
In:
500.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
308 DOORS:
Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.
Prime surfaces and paint with white silk gloss synthetic enamel paint.
2,000.00 SM
Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
309 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.
18,000.00 MR
Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
310 RADIATORS:
Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
7,000.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
311 RADIATOR HEATING PIPES:
Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
1,500.00 MR
In:
APARTMENTS
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
312 WATER,GAS, DRAIN PIPES:
Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.
2,000.00 MR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
313 GENERAL:
Occupied or vacant, when completely furnished, require
175.00 JB
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018 additional work such as removing furniture and rugs or protecting furnishings from damage including returning the apartments to their original condition.
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
314 Remove damaged plaster (rough and fine), repair spots, seal and smooth, and prepare surface for final painting.
Transitions to the old plaster shall be absolutly smooth.
6,000.00 SM
In:
APARTMENTS
STORAGE ROOMS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
315 Apply latex plastic on the entire surface with a textured roll brush
5,200.00 SM
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
316 Apply rough pigmented "Doppelkette" Glass Fiber wall covering.
2,500.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
317 PAINTER-HOURLY CHARGE
Painters and plasterers on an hourly rate for small repair work that cannot be performed on a unit price basis.
Contractor shall furnish tools and equipment.
800.00 HR
In:
APARTMENTS
STORAGE ROOMS
BASEMENT HALLWAYS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
318 Painting of metal doors including frames with silk gloss synthetic enamel paint RAL 7032
1,000.00 SM
In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
319 Coating of floor surfaces with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
5,500.00 SM
In:
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
320 Insulate painting of water spots on ceilings and walls 500.00 SM In:
STORAGE ROOMS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
321 Baseboards 12cm high, to be painted with acryl floor paint RAL 7032 "Caparol Disbon 404 or equal"
1,200.00 MR
In:
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
322 Prime and paint of metal frames with silk gloss synthetic enamel paint RAL 8007.
240.00 SM
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
323 Clean iron railing in staircases, approximately 100 cm high, prime damaged spots and paint with white silk gloss synthetic enamel paint.
400.00 MR
In:
STAIRWELL
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
324 Sand wooden handrails in staircases of apartment/office buildings and seal with two coats of high gloss enamel paint, RAL 8007.
400.00 MR
In:
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
325 Installation/set up of a scaffolding for ceiling work according to German labor law up to 5m ceiling height dependent on ground area
10.00 JB
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
326 Protective covering of floor surfaces, made of plastic floor covering or masking felt.
450.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
327 Demolition and removal of Rabitz or GK ceilings in containers provided by the builders.
120.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
328 In accordance with German industry standards, clean water, gas, and drain pipes of various diameters and wash with caustic solution, one coat of primer, then paint with white, high gloss, enamel paint.
75.00 MR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
329 Painting of ceiling and walls surfaces with primer and paint medium tone with mat latex paint according to DIN EN
13300 NA 1, DK 1
1,400.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
330 Paint ceiling and wall with medium tone, for the separating, that is offsetting of wall surfaces from different colored ceilings.
2,800.00 SM
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
331 Prepare surface for final painting. Transitions to the old plaster shall be absolutely smooth executed as a double layered, full surface spackling with dispensions filler
240.00 SM
In:
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
332 Stucco work damaged walls plaster, patches to match surrounding surfaces
45.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
333 Meister (Skilled master / Supervisor) hours for unforeseen work not included in the standard line items
10.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
334 Maler Geselle (Journeyman Painter) hours for unforeseen work not included in the standard line items
20.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
335 Hilfsarbeiter (Laborer) hours for unforeseen work not included in the standard line items
40.00 HR
In:
ADDITIONAL WORK THROUGHOUT THE BUILDING
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
336 19% Value Added Tax (VAT) 1.00 LT Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2021 to 08/31/2022
401 FOURTH OPTION YEAR CLINs 401 through 436 September 01, 2022 through August 31, 2023
Painting of ceiling surfaces with primer and paint with mat white latex paint according to DIN EN 13300 NA 1, DK 1
In:
25,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STORAGE ROOMS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
402 Repair, prime, and smooth damaged ceiling plaster, 11,000.00 SM
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018 patches to match surrounding surfaces
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
403 Painting of wall with prime and paint surfaces with white or grey semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
48,000.00 SM
APARTMENTS
BASEMENT HALLWAYS
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
404 Repair, prime, and smooth damaged wall plaster, patches to match surrounding surfaces
In:
24,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
STAIRWELLS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
405 Painting of ceiling and walls prime and paint surfaces with white semi gloss latex paint according to DIN EN 13300
NA1, DK 2
In:
8,000.00 SM
APARTMENTS
KITCHEN & BATHROOM
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
406 BUILT-IN-CABINETS:
Wash wooden shelves and inside of door, sand and coat with clear lacquer
In:
400.00 SM
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
407 BUILT-IN-CABINETS:
Clean and paint inner walls with prime and paint surfaces with white or grey semi gloss latex paint according to DIN
EN 13300 NA1, DK 2
In:
500.00 SM
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
408 DOORS:
Wash doors, including frames with caustic solution, repair joints, remove excess caulking and sand.
Prime surfaces and paint with white silk gloss synthetic enamel paint.
2,000.00 SM
Remove all paint spills and spots from fittings immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
409 Baseboards 12cm high, to be cleaned with caustic solution in according with German industry standards, removing all excess caulking and sand surface. Prime surface and paint with white, high gloss, enamel paint.
18,000.00 MR
Remove all paint spills and spots from baseboards immediately and clean thoroughly after completion of work.
In:
APARTMENTS
ATTIC HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
410 RADIATORS:
Wash radiators with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
7,000.00 SM
In:
APARTMENTS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
411 RADIATOR HEATING PIPES:
Wash heating pipes of various diameter with caustic solutions and paint with white silk gloss synthetic radiator enamel paint.
1,500.00 MR
In:
APARTMENTS
STAIRWELLS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
412 WATER,GAS, DRAIN PIPES:
Clean water, gas, and drain pipes of various diameter and wash with caustic, solution, one coat of primer, then paint with red, blue and yellow silk gloss synthetic enamel paint.
2,000.00 MR
19GE5018R0050
Line Item Summary
Solicitation Number:
19GE5018R0050
Contract Number: Title: Painting requirement for US Consulate Frankfurt
Date of Solicitation:
06/25/2018
STORAGE ROOMS
BASEMENT HALLWAYS
Doc Ref No:
Delivery Date (Start to End) Date FOB:
09/01/2022 to 08/31/2023
413 GENERAL:
Occupied or vacant, when completely furnished, require additional work such as removing furniture and rugs or protecting furnishings from damage including returning the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .