Summary

This is a Request for Proposals (RFP) issued by the U.S. Embassy Paris for household appliance repair technician services. The solicitation number is 19FR6326R0007, issued July 31, 2026, with a proposal deadline of August 14, 2026 at 2:00 PM CET. The Government intends to award a fixed-price contract to the lowest-priced, technically acceptable, responsible offeror based on initial proposals without discussions.

The contract requires one household appliance repair technician to provide services at the U.S. Embassy Paris facilities for a six-month base period from September 1, 2026 through February 28, 2027, with an option to extend for an additional six months through August 31, 2027. The technician must be qualified at OHQ B1 level (per French labor standards) with a minimum vocational diploma in electrotechnics and 3-5 years of experience. Services include repair, installation, and replacement of washing machines, dryers, dishwashers, cookers, microwaves, refrigerators, and freezers. The work schedule is 35 hours per week (9:00 AM to 12:00 PM and 1:00 PM to 5:00 PM Monday-Friday), excluding American and French holidays. All pricing shall be submitted in Euros with 20 percent VAT applied separately. The base period estimated cost for 847 regular hours plus 56 holiday hours must be provided, along with separate hourly rates for overtime at 100 percent, 125 percent, and 200 percent multipliers. The Government estimates minimum orders of EUR 2,000 and maximum orders not to exceed EUR 110,000 for the entire contract period. Offerors must be registered in SAM.gov, demonstrate prior experience providing household appliance repair services with references, maintain all required French licenses and permits, provide proof of required insurance coverage (EUR 7,500,000 bodily injury and property damage per occurrence), and meet all local labor law requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Embassy of the United States of America

U.S. Embassy Paris Date: July 31, 2026

Dear Prospective Offeror:

Subject: Request for Proposals number 19FR6326R0007

Enclosed is a Request for Proposals (RFP) for the services of one (1) Household appliance repair Technician. If you would like to submit a quotation, follow the instructions in Section L of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

Proposals are due by Friday August 14th, 2026 at 2:00PM CET (Central European Time). No proposals will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted.

Your proposal must be submitted electronically to ParisContracting@state.gov . It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format.

The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-33

2. Section B, Pricing

3. Section K Representations and Certifications

4. Additional information as required in Section L

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

Sincerely, Craig N. Deatrick

Contracting Officer mailto:ParisContracting@state.gov https://www.sam.gov/

RFP 19FR6326R0007- Household Appliance Repair Technician Services 1 | P a g e 6 8

NSN 7540-01-152-8064 STANDARD FORM 33 (REV 9-97)

PREVIOUS EDITION NOT USABLE Prescribed by GSA

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING PAGE OF PAGES

1 | 68

2. CONTRACT (Proc. Inst. Ident.) NO.

3. SOLICITATION NO.

19FR6326R0007

4. TYPE OF SOLICITATION

[ ] SEALED BID (IFB)

[x] NEGOTIATED (RFP)

5. DATE ISSUED

July 31, 2026

6. REQUISITION/PURCHASE NO.

PR16096598

7. ISSUED BY

CODE 8. ADDRESS OFFER TO (If other than item 7) American Embassy Paris Procurement Office 2 Avenue Gabriel 75008 Paris - France

NOTE: In sealed bid solicitation "offer" and "offeror” mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified, in the depository located in until Friday August 14, 2026 – at 14:00 CET.

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L. Provision No. 52.215-1. All offers are subject to all tems and conditions contained in this solicitation.

10. FOR INFORMATION CALL:

A. NAME

B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXT

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(x) SEC. DESCRIPTION PAGE(S) (x) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 1 X I CONTRACT CLAUSES 23-34

X B SUPPLIES OR SERVICE AND PRICES/COSTS 2-6 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.

X C DESCRIPTION/SPECS/WORK STATEMENT 7-8 X J LIST OF ATTACHMENTS 35-36

X D PACKAGING AND MARKETING 9 PART IV - REPRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 10-11 X K REPRESENTATIONS, CERTIFICATIONS, AND 37-61

X F DELIVERIES OR PERFORMANCE 12 OTHER STATEMENTS OF OFFERORS

X G CONTRACT ADMINISTRATION 13-14 X L INSTRS., COND., AND NOTICES TO OFFERORS 62-66

X H SPECIAL CONTRACT REQUIREMENTS 15-22 X M EVALUATION FACTORS FOR AWARD 67-68

OFFER (Must be fully completed by offeror) NOTE: ITEM 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (120 calendar days unless a different period is inseted by the offer) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

SEE 14 (See section I, Clause No 52.232-8)

10 CALENDAR

DAYS

20 CALENDAR DAYS

30 CALENDAR DAYS

CALENDAR DAYS

14. ACKNOWLEDGMENT OF

AMENDMENTS

AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amendments to the solicitation and related documents ) numbered and dated:

15A. NAME AND ADDRESS

OF OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

15B. TELEPHONE NO.

(Include area code)

15C. CHECK IF REMITTANCE ADDRESS [ ] IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEM NUMBERED

20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION:

[ ] 10 U.S.C. 2304(c)( ) [ ] 41 U.S.C. 253(c)( )

23. SUBMIT INVOICES TO ADDRESS SHOWN

IN

(4 copies unless otherwise specified)

ITEM

24. ADMINISTRATION BY (If other than Item 7)

CODE

25. PAYMENT WILL BE MADE BY

CODE

26. NAME OF CONTRACTING OFFICER (Type or print)

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT - Award will be made on this form, or on the Standard Form 26, or by other authorized official written notice.

2 | P a g e 6 8

SECTION B –

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCOPE OF SERVICES

The Contractor shall provide personnel, as identified in this solicitation, to provide HOUSEHOLD APPLIANCE REPAIR TECHNICIAN services in the US Embassy Paris buildings in Paris vicinity for a period of six (6) months and an option to extend the services for an additional six-month period as described in Section C, DESCRIPTION/ SPECIFICATIONS/ WORK STATEMENT, of this contract.

B.2 TYPE OF CONTRACT

This is an indefinite delivery/indefinite quantity type contract. This unit prices shall be fully loaded and include all fees and contributions as required by French law. The Government shall issue a six-months period scheduled task order.

Labor hours for these delivery orders shall be negotiated into a firm-fixed-priced delivery order using the standards identified in the Scope of work- Section C. The actual amount of work to be performed and the estimate of the overtime required shall be authorized by delivery orders issued by the Contracting Officer.

B.3 VALUE ADDED TAX

The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section B.

A 20% VAT shall be applied to this contract.

B.4 CURRENCY

All prices shall be submitted in Euros (€)

3 | P a g e 6 8

B.5- ORDERING

(a) All supplies or services to be furnished under this contract shall be ordered by the issuance of delivery orders by the Department of State. Orders may be issued from the date of the Contracting Officer's signature until the end of the "Period of Performance" applicable to this contract.

(b) All delivery/Task orders are subject to the terms and conditions of this contract. This contract shall take precedence in the event of conflict with any order.

(c) Contractor will be asked to submit a price proposal when given a draft scope of work for an unscheduled task.

(d) Contracting Officer will negotiate and develop firm-fixed-priced delivery/task orders for each unscheduled or emergency task that needs to be performed.

The Contractor shall provide the following services for the prices as stated below. All prices are in Euros. The prices include all direct and indirect costs. No other charges will be accepted.

4 | P a g e 6 8

B.6 PRICE SCHEDULE

B.6.1- Base period – From September 1, 2026 through February 28, 2027

CLIN Description Qualification

Quantity/

Duty hours

Unit Price/Gross

Hourly Rate in € w/o VAT

Rate amount applied

(coefficient)

Total estimated number

Total est. Cost in Euros Excluding VAT

Fixed Scheduled Services

Services of a Household appliance repair Technician as specified in Section C

OHQ B1

hours/wk

= 847 hours

0002 HOLIDAYS (US

& French) 8 days N/A 56 hours 56

CLIN Description of services Estimated

Quantity Unit

Hourly rate in euros Excluding

VAT*

Total estimated Cost in Euros Excluding VAT

Possible overtime

Overtime work -

100% 1 hour

125% 1 hour

0005 Overtime work- 200%

1 hour

Total estimate in Euros Excluding VAT

20% VAT

Total estimate in Euros VAT Including

* Cost shall include the gross salary for regular hours, meal allowance, transportation allowance, administrative fees, and any related costs.

** Overtime is an estimate and shall apply on a as needed basis and invoiced on effective performed hours.

5 | P a g e 6 8 sB.6.2- Optional period – From March 1, 2027 through August 31, 2027

CLIN Description Qualification Quantity/

Duty hours

Unit Price/Gross

Hourly Rate in € w/o VAT

Rate amount applied

(coefficient)

Total estimated number

Total est. Cost in Euros Excluding VAT

Fixed Scheduled Services

Services of a Household appliance repair Technician as specified in Section C

OHQ B1

hours/wk

= 875 hours

0002 HOLIDAYS (US

& French) 7 days N/A 49 hours 49

CLIN Description of services Estimated

Quantity Unit

Hourly rate in euros Excluding

VAT*

Total estimated Cost in Euros Excluding VAT

Possible overtime

100% 1 hour

125% 1 hour

0005 Overtime work- 200%

1 hour

Total estimate in Euros Excluding VAT

20% VAT

Total estimate in Euros VAT Including

* Cost shall include the gross salary for regular hours, meal allowance, transportation allowance, administrative fees, and any related costs.

** Overtime is an estimate and shall apply on a as needed basis and invoiced on effective performed hours.

6 | P a g e 6 8

B.6.3 Estimated Grand Total

B.6.4 Minimum and Maximum Amounts for the overtime

During this contract period, the Government will place orders totaling a minimum of EUR2,000.00. The maximum quantity of all orders shall not exceed EUR110,000.00 for this period of performance.

B.6.5 Contract Line Items

The hourly rates listed in CLIN 0001 shall be fully loaded hourly rates including meal allowances (based on €8.25 ht/day), transportation costs and any other elements required under French Labor laws. The overtime hours listed from CLINS 0003 to 0005 shall be applied at the various percentage rates mandated by French law and shall also be fully loaded. It should be noted that the US Embassy observes both French and American national holidays (CLIN 0002), but no overtime shall be applied for any work performed during normal working hours on American holidays.

Price in Euro VAT Included

B.6.1 Base Period

EUR TTC

B.6.2 Optional Period EUR TTC

GRAND TOTAL ESTIMATED PRICE EUR TTC

7 | P a g e 6 8

SECTION C –

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 GENERAL

The U.S. Embassy, Paris, France requires the services of one (1) household appliance repair Technician for a six-month period from September 1st,, 2026 thru February 28th, 2027 plus an additional six-month period as an optional extension.

C.1.2 Duties and responsibilities

• Must repair appliances already installed (washing machine, dryer, dishwasher, electric and gas cooker, microwave, fridge, freezer).

• Must install and replace these same appliances in case of exchange (electrical and water connections if necessary)

• Make-ready (= rotation apt / Diplomat), must carry out all checks so that these devices work correctly for the next Diplomat.

C.1.3 Skills and Abilities

Candidates must have their own hand tools. Candidates must be rated OHQ B1 for this service. The minimum qualification required is a vocational diploma "CAP Electro technique" with a minimum of 3/5 years’ experience and hold a BR (Chargé d’Intervention Générale) certification.

The technician shall be familiar with the safe working procedures of their trade and shall ensure, continually:

- Their own safety;

- The safety of their working colleagues;

- The safety of those around them;

- The technician shall be required to work either independently or as part of a multi-trades team.

Although based at 2 avenue Gabriel, 75008 Paris, the work to be carried out will be at various locations in and around Paris primarily in the Neuilly sur Seine and Boulogne-Billancourt compounds.

The working hours shall be 35 per week (09:00am to 12:00pm and 13:00pm to 17:00pm Monday to Friday) excluding American and French holidays.

The Embassy shall provide relevant power tools to the technician who shall be responsible for their correct and safe utilization, safe keeping and return to the U.S. Government at the end of the employment period. The technician must be equipped with safety shoes as well as his portable equipment (electric controller, cutting pliers, screwdriver…).

The Technician shall bring their own tools and equipment. Additionally, the contractor shall provide the technician a smartphone OR the Escort (Embassy’s personnel staff) should take photos with an official and not personal smartphone.

Occasional overtime work shall be required.

Bidders shall indicate in their offer:

- The hourly and weekly rate;

- The hourly overtime rate [evenings, Saturdays and Sundays];

All proposals shall be submitted in English.

8 | P a g e 6 8

C.1.4. Contractor Requirements

Any sub-contractors shall have at least three years of prior contractual agreement with the prime contractor.

C.1.5 Price Adjustment

In consideration of satisfactory performance of all the scheduled services required under this contract, the Contractor shall be paid a fixed price per hour. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor (unless mandated by French local law), or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by the maintenance plan is. Nor will the contract price be adjusted on account of fluctuations in the currency exchange rate.

9 | P a g e 6 8

SECTION D –

PACKAGING AND MARKING

RESERVED

10 | P a g e 6 8

SECTION E –

INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.

If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.

FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)

CLAUSE TITLE AND DATE

52.246-4 INSPECTION OF SERVICES – FIXED PRICE (AUG 1996)

E.2 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan is designed to provide an effective surveillance method to promote effective Contractor performance.

The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to conduct quality assurance to ensure that contract standards are achieved.

PERFORMANCE OBJECTIVE

PWS

PARAGRAPH

PERFORMANCE

THRESHOLD

Performs all services set forth in the Performance Work Statement (PWS)

C.1 thru C.1.5

All required services are performed and no more than one

(1) customer complaint is received per month

E.2.1. Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

E.2.2. Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.246-4, Inspection of Services – Fixed Price (AUG 1996)), if any of the services exceed the standard.

https://acquisition.gov/browse/index/far https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl

11 | P a g e 6 8

E.2.3. Procedures

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

12 | P a g e 6 8

SECTION F –

DELIVERIES OR PERFORMANCE

F.1. 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.

If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine”

FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)

52.242-14 SUSPENSION OF WORK (APR 1984)

52.242-15 STOP-WORK ORDER (AUG 1989)

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

F.2. PERIOD OF PERFORMANCE

The performance period of this contract is twenty-six (26) weeks from date of contract award.

F.2.1 The Government may extend this contract for up twenty-six (26) weeks in accordance with the option clause in Section I. 52.217-9, Option to Extend the Term of the Contract, which also specifies the total duration of this contract. See also Section I, FAR 52.217-8, Option to Extend Services, for up to an additional twenty-six (26) weeks of optional performance, not to exceed 52 weeks, if required by the Government https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl

13 | P a g e 6 8

SECTION G -

CONTRACT ADMINISTRATION DATA

G.1 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.

(b) The COR for this contract is the GSO PROPERTY MANAGER

G.1.1 Duties

The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract. The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract.

G.2. PAYMENT

G.2.1. General.

652.232-70 – Payment schedule and invoice submission (fixed-price) (Aug 1999)

(a) General. The Government shall pay the contractor as full compensation for all work required, performed, and accepted under this contract the firm fixed price stated in this contract.

(b) Invoice Submission. The contractor shall submit invoices preferably by email to:

ParisFMCDBO1@state.gov or in an original and 1 (one) copy to:

AMERICAN EMBASSY PARIS

A l’attention de : FMO VOUCHER / DBO 2, avenue Gabriel 75382 PARIS Cedex 08 Tél. : 01.43.12.22.22

To constitute a proper invoice, the invoice shall include all the items required by FAR 32.905(e).

The contractor shall show Value Added Tax (VAT) as a separate item on invoices submitted for payment.

G.2.2. Detail of Payment Requests

Each application for payment, which shall be made no more frequently than monthly, unless otherwise provided herein, shall cover the fixed price for the regular scheduled services completed and in place for individual delivery orders.

14 | P a g e 6 8

In addition, the Contractor shall provide the following support for each request for payment for any overtime:

- Time sheets to support the number of hours worked for potential overtime for each day and signed by the COR that work has been completed.

G.2.3. Payments to Subcontractors

The Contractor shall make timely payment from the proceeds of the progress or final payment for which request is being made, to his subcontractors and suppliers in accordance with the Contractor's contractual arrangements with them.

G.2.4. Evaluation by the Contracting Officer

Following receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall make a determination as to the amount which, in his/her opinion, is then due. In the event the Contracting Officer does not approve payment of the full amount applied for, less the retainage addressed in 52.232-5, the Contracting Officer shall advise the Contractor of the reasons therefore.

G.2.5 Payment

In accordance with FAR 52.232-27(a) the 14 day period identified in FAR 52.232-27(a)(1)(i)(A) is hereby changed to 30 days.

G.3 VALUE ADDED TAX

The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section B.

G.4 Recordkeeping Requirements

G.4.1 The Contractor and the COR shall both maintain a complete and accurate management file. The file shall contain as a minimum, the following items:

(a) The Government's copies of all task orders issued under this contract, and all reports completed by the COR (OF-127). These forms will be supplied to advise the Contractor of service requests and to document the performance of all work.

(b) Contractor's Service Report forms, documenting arrival and departure time of the Contractor's representative performing the service.

(c) Documentation of any complaints from Post personnel or unusual incidents which may have taken place during the visit to the site.

15 | P a g e 6 8

SECTION H –

SPECIAL CONTRACT REQUIREMENTS

H.1 ISSUANCE OF TASK ORDERS FOR OVERTIME

(a) Overtime work shall be authorized only through the issuance of task orders executed by the Contracting Officer. Task orders shall be established on a firm fixed-price basis (using the hourly rates identified in Section B and negotiated hours) and shall be modified solely by a written modification executed by the Contracting Officer. Overtime services may require the use of oral orders however a written order shall be provided within 3 business days of the verbal authorization.

(b) The Contractor shall perform only those overtime services specifically authorized in the individual delivery orders issued under this contract. The Contractor shall complete all work and services under this contract within the period of performance specified in the delivery orders except that no delivery order shall be issued hereunder after the expiration of this contract.

H.2 ORDERING OFFICIAL

In accordance with FAR 52.216-18 ORDERING (OCT 1995), the designated ordering individual for this contract is the Contracting Officer.

H.3 BOND REQUIREMENTS - RESERVED

H.4 CERTIFICATE OF INSURANCE

The Contractor shall furnish to the Contracting Officer a current certificate of insurance as evidence of the insurance required. In addition, the Contractor shall furnish evidence of a commitment by the insurance carrier to notify the Contracting Officer in writing of any material change, expiration or cancellation of any of the insurance policies required not less than thirty (30) days before such change, expiration or cancellation is effective. When coverage is provided by self-insurer, the Contractor shall not change or decrease the coverage without the Contracting Officer's approval. If the Contractor intends to use any subcontractors under this contract, the Contractor must ensure that the subcontractor carries the types and amounts of insurance as identified below.

The Contractor's attention is directed to Section I, 52.228-5, "Insurance - Work on a Government Installation".

As required by this clause, the Contractor is required to provide whatever insurance is legally necessary. The Contractor, shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:

16 | P a g e 6 8

General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)

1. Bodily Injury, On or Off the Site, in Euros

Per Occurrence 7,500,000 euros

2. Property Damage, On or Off the Site, in Euros

Per Occurrence 7,500,000 euros

The foregoing types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work.

The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising therefrom, except in the instance of gross negligence on the part of the Government.

The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

H.4.1 Government as Additional Insured

The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.

H.4.2 Insurance-Related Disputes

Failure to agree to any adjustment contemplated under this contract regarding insurance shall be a dispute within the meaning of the clause in Section I, 52.233-1, Alternate I, "Disputes". However, nothing in this clause shall excuse the Contractor from proceeding with the work.

H.4.3 Time for Submission of Evidence of Insurance

The Contractor shall provide evidence of the insurance required under this contract at time of bidding. Failure to timely submit this evidence, in a form acceptable to the Contracting Officer, may result in rescinding the Contractor offer by the Government.

H.5 GOVERNING LAW

The contract and the interpretation thereof shall be governed by the laws of the United States.

17 | P a g e 6 8

H.6 LANGUAGE PROFICIENCY

The manager assigned by the contractor to superintend the work on-site, as required by Section I, 52.236-6, "Superintendence by the Contractor", shall be competent in written and spoken English.

H.7 LAWS AND REGULATIONS

H.7.1 Compliance Required

The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the facilities without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations, and orders and of the contract. In the event of a conflict among the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.

The Contractor shall provide on a monthly basis an environmental waste report which describes any occurrence of and disposal of hazardous waste encountered during performance of this contract and any resulting delivery orders issued herein.

H.7.2 Labor, Health and Safety Laws and Customs

The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.

H.7.3 Subcontractors

The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.

H.7.4 Evidence of Compliance

Proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause shall be submitted by the Contractor at such times as directed by the Contracting Officer.

H.8 RESPONSIBILITY OF CONTRACTOR

H.8.1 Damage to Persons or Property

The Contractor shall be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence, and shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others.

18 | P a g e 6 8

H.8.2 Responsibility for Work Performed

The Contractor shall be responsible for all materials delivered and work performed, except for any completed unit of work which may have been accepted in writing under individual delivery orders.

H.9 OPERATIONS

H.9.1 Operations and Storage Areas

(a) Confinement to Authorized Areas. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer.

(b) Vehicular Access. The Contractor shall, and in accordance with any regulations prescribed by the Contracting Officer, use only established site entrances and roadways.

H.9.2 Use of Premises

(a) Occupied Premises. If the premises are occupied, the Contractor, its subcontractors, and their employees shall comply with the regulations promulgated by the Government governing access to, operation of, and conduct while in or on the premises and shall perform the work required under this contract in such a manner as not to unreasonably interrupt or interfere with the conduct of Government business.

(b) Requests from occupants. Any request received by the Contractor from occupants of existing buildings to change the sequence of work shall be referred to the Contracting Officer for determination.

(c) Access limited. The Contractor, its subcontractors and their employees shall not have access to or be admitted into any building or portion of the site outside the areas designated in this contract except with the permission of the Contracting Officer.

H.10 SAFETY

H.10.1 Accident Prevision

(a) General. The Contractor shall provide and maintain work environments and procedures which will (1) safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; (2) avoid interruptions of Government operations and delays in project completion dates; and (3) control costs in the performance of this contract. For these purposes, the Contractor shall--

(1) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and

(2) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for this purpose are taken.

19 | P a g e 6 8

(b) Records. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft or loss of property, materials, supplies, or equipment. The Contractor shall report this data in the manner prescribed by the Contracting Officer.

(c) Subcontracts. The Contractor shall be responsible for its subcontractors' compliance with this clause.

(d) Written Program. Before commencing the work, the Contractor shall--

(1) Submit a written proposal for implementing this clause; and

(2) Meet with the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

(e) The Contracting Officer shall notify the Contractor of any non-compliance with these requirements and the corrective actions required. This notice, when delivered to the Contractor or the Contractor's representative at site, shall be deemed sufficient notice of the non-compliance and corrective action required. After receiving the notice, the Contractor shall immediately take correction action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

H.11 SUBCONTRACTORS AND SUPPLIERS

H.11.1 Claims and Encumbrances

The Contractor shall satisfy as due all lawful claims of any persons or entities employed by the Contractor, including subcontractors, for all labor performed under this contract, including the applicable warranty or correction period, unless the Government shall be directly liable therefor by contract. The Contractor shall not at any time permit any lien, attachment, or other encumbrance to be entered against or to remain on the building(s), or the premises, whether public or private, or any portion thereof, as a result of nonperformance of any part of this contract.

H.11.2 Approval of Subcontractors

(a) Review and approval. The Government reserves the right to review proposed subcontractors for a period of five (5) calendar days before providing notice of approval or rejection of any or all subcontractors.

(b) Rejection of subcontractors. The Government reserves the right to reject any or all subcontractors proposed if their participation in the project, as determined by the Contracting Officer, may cause damage to the national security interests of the United States. The Contractor agrees to promptly replace any subcontractor rejected by the Government under this clause.

20 | P a g e 6 8

H.12 CONTRACTOR PERSONNEL

H.12.1 Removal of Personnel

The Contractor shall maintain discipline at the site and at all times take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by or amongst those employed at the site and for the preservation of peace and protection of persons and property in the neighborhood of the project against the same. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.

H.12.2 Personnel Security

After award of the contract, the Contractor has ten calendar days to submit to the Contracting Officer the information of the Cook assigned to this project for the Government to conduct all necessary security checks. The information shall include:

Full Name:

Place and Date of Birth:

Current Address:

Identification Number:

Failure to provide any of the above information may be considered grounds for rejections and/or resubmittal of the application. Once the Government has completed the security screening and approved the applicants a badge will be provided to the individual for access to the site. This badge may be revoked at any time due to the falsification of data, or misconduct on site.

H.12.3. Standards of Conduct

(a) General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee is expected to adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

(b) Protective Personal Equipment (PPE). The Contractor 's employee shall wear appropriate PPE including security shoes when on duty and at all times in the Embassy premises or apartments. The Contractor 's employee shall wear PPE approved by the Contracting Officer's Representative (COR).

(c) Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays, or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

21 | P a g e 6 8

(d) Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words, actions, or fighting shall not be condoned. Also included is participation in disruptive activities which interfere with normal and efficient Government operations.

(e) Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

(f) Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

(g) Key Control. The Contractor shall receive, secure, issue and account for any keys issued for access to buildings, offices, equipment, gates, etc., for the purposes of this contract. Keys shall not be duplicated without the COR's approval. Where it is determined that the Contractor or its agents have duplicated a key without permission of the COR, the Contractor shall remove the individual(s) responsible from performing work under the contract.

If the Contractor has lost any such keys, the Contractor shall immediately notify the COR. In either event, the Contractor shall reimburse the Government for the cost of rekeying that portion of the system so compromised.

H.12.4- Employee safety Requirements

Contractor shall ensure that employees are supplied with and use proper safety personal protective equipment (PPE) such as aprons and potholders.

Contractor employees shall follow signed safety work procedures, which protect the Contractor employees and DOS personnel in proximity to work site.

H.12.5- Substitutions or replacement

During the performance of the contract, the Contractor shall make no substitutions of key personnel unless the substitution is required due to vacation, illness, death, or termination of employment. The Contractor shall provide notice at least 45 days prior to diverting any of the specified individuals to other programs or contracts (or as soon as possible, if an individual must be replaced, for example, as a result of leaving the employ of the Contractor).

The Contractor will notify the CO and shall submit comprehensive justification for the diversion or replacement request (including proposed substitutions for key personnel) to permit evaluation by the Government of the impact on performance under this contract. The proposed substitute shall possess qualifications comparable to the original key person and meet the minimum standards set forth in the contract.

The Contractor shall not divert or otherwise replace any key personnel without the written consent of the CO.

The Government will modify the contract to reflect any changes in key personnel.

22 | P a g e 6 8

H.13 GOVERNMENT FURNISHED PROPERTY/ EQUIPMENT

The Contractor has the option to reject any or all Government furnished property or items (see Attachment 2 - GOVERNMENT FURNISHED PROPERTY). However, if rejected, the Contractor shall provide all necessary property, equipment or items, adequate in quantity and suitable for the intended purpose, to perform all work and provide all services at no additional cost to the Government. All Government furnished property or items are provided in an "as is" condition and shall be used only in connection with performance under this contract. The Contractor is responsible for the proper care, maintenance and use of Government property in its possession or control from time of receipt until properly relieved of responsibility in accordance with the terms of the contract.

The Contractor shall pay all costs for repair or replacement of Government furnished property that is damaged or destroyed due to Contractor negligence.

The Contractor shall maintain written records of work performed, and report the need for major repair, replacement and other work for Government property in its control.

23 | P a g e 6 8

SECTION I

CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.

If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine”

FEDERAL ACQUISITION REGULATION (48 CFR CH. 1):

52.203-3 GRATUITIES (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (DEVIATION JAN 2026)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (DEVIATION JAN 2026)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (DEVIATION JAN 2026)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(DEVIATION JAN 2026)

https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl

24 | P a g e 6 8

52.215-2 AUDIT AND RECORDS – NEGOTIATION (DEVIATION FEB 2026)

52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT

(DEVIATION FEB 2026)

52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA –

MODIFICATIONS (DEVIATION FEB 2026)

52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA – MODIFICATIONS

(DEVIATION FEB 2026)

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER

THAN CERTIFICIED COST OR PRICING DATA-MODIFICATIONS

(DEVIATION FEB 2026)

52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018) (DEVIATION FEB 2026)

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

52.222-19 CHILD LABOR – COOPERATION WITH AUTHORITIES AND REMEDIES

(DEVIATION FEB 2026)

52.222-50 COMBATTING TRAFFICKING IN PERSONS (DEVIATION FEB 2026)

52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT

(FEB 2000)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (MAY 2024)

52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)

52.228-13 ALTERNATIVE PAYMENT PROTECTION (JUL 2000)

52.229-6 TAXES - FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)

52.229-7 TAXES- FIXED PRICE CONTRACTS WITH FOREIGN GOVERNMENTS (FEB 2013)

52.232-1 PAYMENTS (APR 1984)

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

52.232-17 INTEREST (MAY 2014)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

25 | P a g e 6 8

52.232-22 LIMITATIONS OF FUNDS (DEVIATION FEB 20262)

52.232-25 PROMPT PAYMENT (JAN 2017)

52.232-32 PERFORMANCE-BASED PAYMENTS (APR 2012)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER -SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER -OTHER SYSTEM FOR AWARD

MANAGEMENT (JULY 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS

(MAR 2023)

52.233-1 DISPUTES (DEVIATION JAN 2026)

52.233-3 PROTEST AFTER AWARD (DEVIATION JAN 2026)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (DEVIATION JAN 2026)

52.236-2 DIFFERING SITE CONDITIONS (DEVIATION AUG 2025)

52.236-10 OPERATIONS AND STORAGE (DEVIATION AUG 2025)

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (DEVIATION AUG 2025)

52.236-12 CLEANING UP (DEVIATION AUG 2025)

52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (DEVIATION AUG 2025)

52.237-3 CONTINUITY OF SERVICES (JAN 1991)

52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (DEVIATION JAN 2026)

52.242-13 BANKRUPTCY (JULY 1995)

52.243-1 CHANGES - FIXED-PRICE (DEVIATION JULY 2025)

52.245-1 GOVERNMENT PROPERTY (SEP 2021)

52.245-2 GOVERNMENT PROPERTY (APR 2012)

52.245-9 USE AND CHARGES (APR 2012)

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)

(APR 2012)

26 | P a g e 6 8

52.249-4 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (SERVICES) (SHORT

FORM) (APR 1984)

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

52.249-14 EXCUSABLE DELAYS (APR 1984)

I.2 FAR CLAUSES INCLUDED IN FULL TEXT.

52.213-4 TERMS AND CONDITIONS-SIMPLIFIED ACQUISITIONS (OTHER THAN

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (DEVIATION JAN 2026)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers.

When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(c) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work.

This is the start of the file's text. The full file is on GovTribe.