This is Amendment A0001 to Solicitation 19FR6326Q0074 issued by the Department of State, American Embassy Contracts Office in Paris, France. The amendment extends the bid due date to September 21, 2026 at 18:00 local time and modifies the scope of work for apartment renovation at Embassy compounds. Offerors must acknowledge receipt of this amendment prior to the extended deadline through submission of completed amendment forms, acknowledgment on offer copies, or separate written correspondence referencing the solicitation and amendment numbers.
The scope of work involves comprehensive renovation of apartments joined by kitchens, including demolition of existing partition walls, kitchen cabinets, radiators, and doors; masonry work including installation of lightweight concrete blocks, sheetrock partitions, and ceramic tile flooring (59.7-cm x 59.7-cm Gres Porcelamico Technico Baunilha from Pavrigres or equal); plumbing installation of new radiators, pipes, and drainage systems; electrical work with switches, fixtures, and outlets; and kitchen cabinet installation using model Breval Sable Mat from Howdens or equal with 10-year warranty, featuring 16-mm melamine panels, 85-cm high low-level cabinets, 70-cm high wall-mounted cabinets, stainless steel backsplash, and specified hardware. The contractor is responsible for execution drawings, shutoff and restoration of water supply to radiators, electrical panel connections (subject to FAC inspection), and compliance with French and European building regulations, EM-385-1-1 safety requirements, and applicable local occupational safety laws. Working hours are 9:00-12:00 and 13:00-17:00 Monday through Friday, and the property will remain occupied during construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 / 5
2. AMENDMENT/MODIFICATION NO.
A0001
3. EFFECTIVE DATE
September 17, 2025
4. REQUISITION/PURCHASE REQ. NO.
PR15913651
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
Department of State
American Embassy
Contracts Office – AM8
2 avenue Gabriel
75382 Paris Cedex 08
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
9a. AMENDMENT OF SOLICITATION NO.
19FR6326Q0074
X
9b. DATED (SEE ITEM 11)
September 2, 2026
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
[X] is extended until September 21, 2026 at 18:00 [] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ____1__ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF
OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ X] is required to sign this document and return _1__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is:
- to provide answers to questions asked by offerors;
- Extend the bid due date to Monday, September 21, 2026 at 18:00 (local time);
- Modify the scope of work.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
Craig N. Deatrick
15B. NAME OF CONTRACTOR/OFFEROR
BY
(Signature of person authorized to sign)
15C.DATE
SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 Standard Form 30 (revised 10/83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
P a g e | 2
Questions and answers
• Material hoist: Is it possible to install a material hoist for transporting materials to the site as well as removing debris?
Yes, the location and placement must be verified with the COR in Facilities section beforehand.
• Water shutoff: Are the shutoff and restoration of water supply to the radiators the contractor's responsibility, or must they be carried out by the US Embassy’s technical team?
The shutoff and restoration of service are the contractor's responsibility. Consequently, the contractor must submit a prior request to our Facilities (FAC) section with one week's notice so that we can inform the building occupants.
• Electrical supply: Should the connection of our installation to the existing electrical panel be performed by our electrician, or by your technical teams?
The connection must be performed by the contractor, but the installation must be inspected by our FAC electricians both before and after the installation.
• Can you confirm whether the technical studies and execution drawings required to carry out the work are the contractor's responsibility, or whether they are provided by the project owner?
We can provide the base plans/existing layout templates, but the execution drawings necessary to carry out the work are indeed the contractor's responsibility.
P a g e | 3
Scope of work (Pages 1 to 3)
I – General
The US Embassy, Paris-France (USG) requires renovation in apartments joined by kitchens at Compounds. The works shall be done as per drawings, scope of work, specifications and general contract conditions. This project requires an experienced contractor to execute the works.
The Contractor shall provide all labor, material, tools, equipment, supervision and other related items required to complete the works as per scope of work, specifications and attached drawings. Contractors are advised to visit the site and verify the existing site conditions to develop their proposal.
The Contractor is responsible for the execution drawings necessary to carry out the work.
Prior to any work, the Contractor shall submit for approval all detailed drawings and products data requested by the Contracting Officer Representative (COR).
The working hours shall be from 9:00 to 12:00 and from 13:00 to 17:00 Monday to Friday. During American and
French holidays the Property shall be closed. The Property shall be occupied during the works and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants.
All work shall comply with all applicable French and European building regulations, type DTU, NF or Regles de
L’Art.
All work shall be performed in accordance with:
A. The safety requirements of the EM-385-1-1:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf;
B. Local French occupational safety and health requirement laws and regulations;
C. When there is a difference with the minimum requirements the more stringent requirement shall be followed.
II – Demolition
The Contractor shall:
- Turn off water supply pipes
- Turn off circuit breakers
- Remove the kitchen cabinets and dispose debris away from Property
- Demolish the partition between the 2 kitchens and dispose debris away from Property
- Remove the accordion shutters, including counter top and dispose away from Property
- Remove the two doors and dispose away from Property
- Demolish partially the partition between kitchen and living in one apartment and dispose away from
Property
- Turn off heating system, remove 2 radiators and store properly on designated room
- Remove all baseboards in the kitchen and dispose debris away from property
III – Masonry work
The Contractor shall:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
P a g e | 4
- Repair ceilings/walls after demolition of partitions and removal doors/frames
- Fill in hole in partition between living room and kitchen (location of previous accordion shutter)
- Remove the existing wooden floor, from the existing ceramic floor and the new limit between dining room and kitchen
- Furnish and install lightweight concrete blocks (20cm thick) as showed on attached drawing
- Create a beam on the top of the new partition in sheetrock panels and aluminum studs
- Furnish and install sheetrock panel for the connection of the two drop ceilings
- Furnish and install a new partition between the kitchen and storage, constituted with aluminum studs and waterproofing sheetrock panel (13mm thick) and insulation
- Create a hole in the wall between storage room and ventilation duct in order to install a ventilation grille
40X20cm
- Furnish and install a ventilation grille 40x20cm
- Furnish and install a 19mm thick white melamine removable panel with a 40x20cm grille on the top
- Furnish and install ceramic tiles in Kitchen and 2 storages, 59.7-cm x 59.7-cm Gres Porcelamico Technico
Baunilha from Pavrigres or equal
Note: between wooden floor and new floor ceramic tiles, the Contractor shall furnish and install aluminum strips type Schiene AE100 from Schluter or equal
The thickness of joint shall be 2mm and the color will be selected by Post
- Furnish and install baseboards type Gres Porcelamico Technico Baunilha from Pavrigres or equal
Note: The thickness of joint shall be 2mm and the color will be selected by Post
IV – Plumbing work
The contractor shall:
- Furnish and install pipes for the new radiators
- Furnish and install 2 radiators
- Furnish and install pipes/cut off valves/drainage for dishwasher and sink
- Furnish and install pipes/cut off valves/drainage for washer in storage
Note: the cut off valves will be accessible. The Contractor is responsible for the shutoff and restoration of the water supply to the radiators
V – Electrical work
The contractor shall:
- Furnish and install switches/light fixtures and outlets as specified on the drawing
- The contractor is responsible for the connection of their installation to the electrical panel. The installation must be inspected by Facilities section’s electricians before and after the connection.
Note: all wirings will be recessed in walls and ceiling. The contractor shall repair the walls and ceiling after electrical work.
VI – kitchen cabinets
6.1 specifications of kitchen cabinets
Specifications of kitchen cabinets: model Breval Sable Mat from Howdens or equal
10 years warranty
• kitchen cabinets:
P a g e | 5
The kitchen cabinets shall be constituted of white high density melamine panels 16-mm thick, PEFC label
Low-level cabinets: 85-cm high x 60-cm deep
Wall mounted cabinets with handles: 35-cm deep x 70-cm high
• doors/drawers:
The doors/drawers shall be constituted of 8-mm thick melamine panels
• counter top: type “Noir paillete” from Howdens or equal 38-mm thick x 61.6-cm
Waterproof
Backsplash:
- 600-mm high x 7-mm thick: type “Noir paillete” from Howdens or equal
- 900-mm x 600-mm x 7-mm: high density melamine panel covered with stainless steel (0.8-mm thick)
- Junction piece between countertop: shall be in aluminum
• hardware:
- Handles: type “Carre droite” from Howdens or equal
- Adjustable feet: 15-cm high, adjustable between -5-mm to +15-mm
- baseboard: 15-cm high, 18-mm thick, model Breval Sable mat from Howdens or equal
• Plastic joint between baseboard and floor; baseboards shall be attached to the feet of the cabinets with suitable clips