SF-30 Amendment- 0001 - 19FR6324Q0041.pdf
PDF 823 KB Posted
- Solicitation number
- 19FR6324Q0041
- Issued by
-
Department of State US Embassy Paris
About this file
This document is an SF-30 Amendment for Solicitation Number 19FR6324Q0041, which is for the renovation of the attics insulation at the Consul General Residence and guest house in Strasbourg, France.
The amendment modifies the specifications and requirements in the scope of work and provides answers to questions received from bidders. The key details are:
The U.S. Embassy in Paris, France requires an experienced contractor to furnish and install new circular windows, roof windows, fireproof systems, insulation, vapor barriers, and other related work at the Consul General Residence and guest house in Strasbourg. Contractors are advised to visit the site and submit detailed drawings and product data for approval prior to starting work. The contractor shall complete the work within 90 calendar days after the contract is awarded. The solicitation will be released on the SAM.gov website, and the Government intends to award the contract to the lowest priced technically acceptable offeror. Offers must be submitted electronically to the ParisContracting@state.gov address.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 6
2. AMENDMENT/MODIFICATION NO.
A0001
3. EFFECTIVE DATE
June 5, 2024
4. REQUISITION/PURCHASE REQ. NO.
PR#12431241
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
Department of State American Embassy Contracts Office – AM8 2 avenue Gabriel 75382 Paris Cedex 08
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
9a. AMENDMENT OF SOLICITATION NO.
19FR6324Q0041
X
9b. DATED (SEE ITEM 11) April 23, 2024
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended until [X] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ____1__ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return ___ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
a) modify specifications and requirements in the scope of work as shown highlighted in yellow in pages 2 to 4 below
b) Answer Questions received from bidders in page 5 and 6 of this document
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
Prashant R. Hemady
15B. NAME OF CONTRACTOR/OFFEROR
BY
(Signature of person authorized to sign)
15C.DATE
SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 Standard Form 30 (revised 10/83) Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
R F Q 1 9 F R 6 3 2 4 Q 0 0 4 1 - R e n o v a t i o n o f t h e a t t i c s i n s u l a t i o n i n S t r a s b o u r g C G P a g e | 2
SPECIFICATIONS UPDATE of Attachment 1- Scope of work
I – General
The US Embassy, Paris-France (USG) requires windows replacement, insulation and ventilation in the attics of the Consul General Residence and guest house, located in Strasbourg. The works shall be done as per drawings, scope of work, specifications and general contract conditions. This project requires an experienced contractor to execute the works.
The Contractor shall provide all labor, material, tools, equipment, supervision and other related items required to complete the works as per scope of work, specifications and attached drawings. Contractors are advised to visit the site and verify the existing site conditions to develop their proposal.
Prior to any work, the Contractor shall submit for approval all detailed drawings and products data requested by the Contracting Officer Representative (COR).
For all kind of work, a “Safety and health protection plan” (or PP SPS – Plan particulier de sécurité et de protection de la santé -) shall be provided.
The working hours shall be from 9:00 to 12:00 and from 13:00 to 17:00 Monday to Friday. During American and French holidays, the U.S. Government Property shall be closed. The U.S. Government Property shall be occupied during the works and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants.
All work shall comply with all applicable French and European building regulations.
All work shall be performed in accordance with:
A. The safety requirements of the EM-385-1-1 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf;
B. The safety requirements within the Occupational Safety and Health Standards https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_numb er=1910;
C. Local French occupational safety and health requirement laws and regulations;
D. When there is a difference with the minimum requirements the more stringent requirement shall be followed.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910 https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910
R e n o v a t i o n o f t h e a t t i c s i n s u l a t i o n i n S t r a s b o u r g C G P a g e | 3
II – Consul General Residence attic
2.1 Demolition
The contractor shall:
Furnish and install floor protection between 3rd floor and ground floor, in service stairwell
Note: every Friday, the contractor shall clean the work site and service stairwell Remove existing insulation including supports and dispose debris away from Property Remove entirely 5 roof windows and 2 circular windows and dispose debris away from Property
Note: Debris shall be disposed away appropriately according to French regulations. The Contractor shall provide certificate of disposal to the COR.
2.2 – Renovation work
The contractor shall:
Furnish and install new circular windows in wood (oak) and with double glazing 4/8/4
Note: the new windows shall have the same design and color of existing windows Furnish and install 5 new roof windows in wood/aluminum with double glazing 4/8/4
Note: the new windows shall have the same design and color of existing windows Furnish and install a fire proof system around the 3 chimney flues constituted with fire proof plaster sheetrock at 15 cm from exterior sides of ducts, including fire proof access traps Furnish and install a screen under roof model HPV model Stratec 2F from Soprema OR EQUAL Furnish and install hangers from Soprema OR EQUAL
Note: they will be calculated according to the thickness of the insulation Furnish and install insulation between rafters, model Pavaflex confort (wood fibers) from Soprema OR
EQUAL
Furnish and install insulation from the previous insulation to the exterior side of the beams, model
Praflex confort from Soprema OR EQUAL Furnish and install lock washers on each hanger to hold the insulation plates in place Furnish and install vapor barrier model Sopravap Visio from Soprema OR EQUAL Furnish and install adhesive model Pavafix from Soprema OR EQUAL between each layer of vapor barrier Furnish and install horizontal metal profiles every 60 cm in order to maintain the insulation, as aluminum profile for partition Remove the floor protection Clean
R e n o v a t i o n o f t h e a t t i c s i n s u l a t i o n i n S t r a s b o u r g C G P a g e | 4
III – Guest house attic
3.1 Demolition
The contractor shall:
Furnish and install floor protection between 3rd floor and ground floor, in service stairwell
Note: every Friday, the contraction shall clean the work site and service stairwell Remove existing insulation including supports and dispose debris away from Property Remove entirely 1 roof window and dispose debris away from Property
Note: Debris shall be disposed away appropriately according to French regulations. The Contractor shall provide certificate of disposal to the COR.
3.2 – Renovation work
The contractor shall:
Furnish and install 1 new roof window in wood/aluminum with double glazing 4/8/4
Note: the new windows shall have the same design and color of existing windows Furnish and install a fire proof system around the 1 chimney flue constituted with fire proof plaster sheetrock at 15 cm from exterior sides of ducts, including fire proof access traps Furnish and install a screen under roof model HPV model Stratec 2F from Soprema OR EQUAL Furnish and install hangers from Soprema OR EQUAL
Note: they will be calculated according to the thickness of the insulation Furnish and install insulation between rafters model Pavaflex confort (wood fibers) from Soprema OR
EQUAL
Furnish and install insulation from the previous insulation to the exterior side of the beams model
Praflex confort from Soprema OR EQUAL Furnish and install lock washers on each hanger to hold the insulation plates in place Furnish and install vapor barrier, model Sopravap Visio from Soprema OR EQUAL Furnish and install adhesive model Pavafix from Soprema OR EQUAL between each layer of vapor barrier Furnish and install horizontal metal profiles every 60 cm in order to maintain the insulation, as aluminum profile for partition Remove the floor protection Clean
IV- Period of performance
The contractor shall submit a detailed schedule five (5) calendar days after contract is awarded.
The contractor shall start the works twenty (20) calendar days after contract is awarded.
The contractor shall complete the works within ninety (90) calendar days after the work has started.
R e n o v a t i o n o f t h e a t t i c s i n s u l a t i o n i n S t r a s b o u r g C G P a g e | 5
Questions and Answers -
1/ In order to install the rain screen (“pare pluie”) in the “regles de l’art”, we need to remove roof tiles and lathing. Installation from the inside is not the most appropriate for an installation in the “regles de l’art”. Can you confirm how you wish to proceed for this?
According to the DTU 31.2, removal of the roof tiles and lathing is not required to install the rain rain screen (‘pare pluie”).
2/ Could you please provide pictures of the roof windows and the circular windows.
Please find below pictures.
R e n o v a t i o n o f t h e a t t i c s i n s u l a t i o n i n S t r a s b o u r g C G P a g e | 6