RFP Painting.pdf
PDF 882 KB Posted
- Attached to
- Painting Services Federal contract opportunity
- Solicitation number
- 19FR6321R0004
- Issued by
- Department of State US Embassy Paris
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Cover letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
19FR6321R0004
2. TYPE OF SOLICITATION
SEALED BID (IFB)
[x] NEGOTIATED (RFP)
3. DATE
ISSUED
April 15, 2021
PAGE OF
PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
PR9768646
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
Contracts Office, AM 8
American Embassy
2 Avenue Gabriel
75008 Paris, France
Phone: (33) 1 43 12 24 87 Fax: (33) 1 42 66 11 94
9. FOR INFORMATION
CALL:
A. NAME
Ms. Dominique MAZIER
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
01 43 12 24 87
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Painting Services for the U.S. Mission in Paris.
11. The Contractor shall begin performance within 7 calendar days and complete it within 365 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _______________.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT
BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
10 days
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __1__ copies to perform the work required are due at the place specified in Item 8 by 16 h 00 local time on May 14, 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
Computer Generated STANDARD FORM 1442
BACK (REV. 4-85)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within _____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS
SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT
TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of
(a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
Scott M. SIMPSON
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
RFP #19FR6321R0004
SECTION B - SUPPLIES OR SERVICES
AND PRICES/COSTS
B.1 SCOPE
The Contractor shall provide painting, drywall/plaster repair, and related services for real property owned or managed by the U.S. Government at the Embassy in Paris, France. The
Contractor shall furnish services under task orders issued by the Contracting Officer.
B.2 TYPE OF CONTRACT
This contract is an indefinite-delivery indefinite-quantity contract with firm-fixed prices.
Task orders will be priced and payable entirely in the currency indicated in the SF1442. The
Government will not pay any additional sums due to any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. Nor will the contract price be adjusted due to fluctuations in the currency exchange rates. The Government will make changes in the contract price or time to complete only due to changes made by the
Government in the work to be performed, or by delays caused by the Government.
The Government will make payments based on quantities and unit prices only to the extent specifically provided in the contract. The estimated quantities listed in B.1 above are estimates only and the Government does not guarantee that such quantities will be ordered.
B.3 CONTRACT PRICE
B.3.1 General. The Contractor shall complete all work, including furnishing all labor, material, equipment and services, required under this contract, for painting services. The price listed below shall include all labor, materials, overhead (including cost of Workers’
Compensation and War-Hazard Insurance, which shall not be a direct reimbursement) and profit.
The US Government intends to award to between two and three vendors and therefore it should be noted that the estimated amount of work awarded under task orders to any single contractor will be less than the amounts shown in Section B.4
B.3.2 Payment. The Government will make payment in local currency.
B.3.3 VALUE ADDED TAX (VAT). Value Added Tax (VAT) is not included in the
CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices.
The amount of VAT to be charged is 20% for office buildings and a reduced VAT rate of 10% for residential buildings that fall under the regulation of reduced Value Added Tax. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The 20% VAT will be used in this solicitation for the purposes of evaluation.
B.3.3 Pricing - Base Period:
The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months.
The fixed unit prices, estimated quantities, and ceiling for each category are:
Unit Price/ Est. Qty/ Total, Excl. VAT
CLIN Description Sqm1, € Sqm1. €
0001 Washing walls/ceilings with detergent 1000
Preparation works (washing, filling and sanding)
Painting one coat of satin or mat finish (no preparation necessary) 5000
Painting two coats of satin finish (no preparation necessary) 5000
Painting two coats of mat finish (no preparation necessary) 5000
On damaged surfaces, apply two coats of satin finish paint following surface preparation 5000
On damaged surfaces, apply two coats of mat finish paint following surface preparation 5000
0008 Removal of wallpaper and surface preparation 500
Removal and disposal of old floor covering and prepare the floor to receive wall-to-wall carpet or carpet tiles 2000
Wall to wall carpet laying with Contractor furnished carpet, Classe U3P3 Vélour 1,200 Gm/Sq. Meter) 1000
Wall to wall laying of contractor furnished underlayment for carpet 2000
Contractor furnished carpet tiles laying, size: 50-cm x
50-cm 1000
Varnished woodwork to be revarnished by two coats following surface preparation 1000
On damaged wall surfaces, apply texture (scrim/cloth gauze) to entire damaged surface and preparation of surface for paint 1000
On metal surfaces apply two coats of outdoor gloss paint following surface prepation (balcony railings, grilles and doors) 1000
Wall and ceiling touch-up paint/repair work
ESTIMATED GRAND TOTAL FOR BASE YEAR IN € EXCL. VAT2
BREAKDOWN OF PRICE PROPOSAL, BASE YEAR
1Sqm = square meter 2This estimated amount is based on total estimated Government requirements for this period of performance. If more than one award is made, the estimated amount of work awarded under task order(s) to any single Contractor will be less than the amount shown.
B.4 MINIMUM AND MAXIMUM AMOUNTS
During the Base Year of the contract, and during the option year that might be exercised, the
United States Government (USG) shall place orders totaling a minimum of 300.00 € incl. the
20% VAT. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed 1,960,764.30 € incl. the
20%VAT. This reflects the contract maximum.
B.4.1 Contract Minimum
During the contract period, the Government shall place orders for a minimum of 300.00 € incl.
the 20% VAT. This is the contract minimum for this period of performance.
B.4.2 Contract Maximum
During the contract period, the amount of all orders shall not exceed 1,960,764.30 € incl. the
20%VAT. This is the contract maximum for this period of performance.
B.5 Pricing – First Option Year:
The Contractor shall provide the services shown below for First Option Year, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are:
0001 Washing walls/ceilings with detergent 1000
Preparation works (washing, filling and sanding)
Painting one coat of satin or mat finish (no preparation necessary) 5000
Painting two coats of satin finish (no preparation necessary) 5000
Painting two coats of mat finish (no preparation necessary) 5000
On damaged surfaces, apply two coats of satin finish paint following surface preparation 5000
On damaged surfaces, apply two coats of mat finish paint following surface preparation 5000
0008 Removal of wallpaper and surface preparation 500
Removal and disposal of old floor covering and prepare the floor to receive wall-to-wall carpet or carpet tiles 2000
Wall to wall carpet laying with Contractor furnished carpet, Classe U3P3 Vélour 1,200 Gm/Sq. Meter) 1000
Wall to wall laying of contractor furnished underlayment for carpet 2000
Contractor furnished carpet tiles laying, size: 50-cm x
50-cm 1000
Varnished woodwork to be revarnished by two coats following surface preparation 1000
On damaged wall surfaces, apply texture (scrim/cloth gauze) to entire damaged surface and preparation of surface for paint 1000
On metal surfaces apply two coats of outdoor gloss paint following surface prepation (balcony railings, grilles and doors) 1000
Wall and ceiling touch-up paint/repair work
ESTIMATED GRAND TOTAL FOR OPTION YEAR ONE IN € EXCL. VAT2
BREAKDOWN OF PRICE PROPOSAL, OPTION YEAR ONE
B.6 MINIMUM AND MAXIMUM AMOUNTS
20% VAT. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed 1,960,764.30 € incl. the 20%
VAT. This reflects the contract maximum.
B.6.1 Contract Minimum
B.6.2 Contract Maximum
20% VAT. This is the contract maximum for this period of performance.
B.7 Pricing – Second Option Year:
The Contractor shall provide the services shown below for Second Option Year, starting two years after the date stated in the Notice to Proceed and continuing for a period of 12 months.
0001 Washing walls/ceilings with detergent 1000
Preparation works (washing, filling and sanding)
Painting one coat of satin or mat finish (no preparation necessary) 5000
Painting two coats of satin finish (no preparation necessary) 5000
Painting two coats of mat finish (no preparation necessary) 5000
On damaged surfaces, apply two coats of satin finish paint following surface preparation 5000
On damaged surfaces, apply two coats of mat finish paint following surface preparation 5000
0008 Removal of wallpaper and surface preparation 500
Removal and disposal of old floor covering and prepare the floor to receive wall-to-wall carpet or carpet tiles 2000
Wall to wall carpet laying with Contractor furnished carpet, Classe U3P3 Vélour 1,200 Gm/Sq. Meter) 1000
Wall to wall laying of contractor furnished underlayment for carpet 2000
Contractor furnished carpet tiles laying, size: 50-cm x
50-cm 1000
Varnished woodwork to be revarnished by two coats following surface preparation 1000
On damaged wall surfaces, apply texture (scrim/cloth gauze) to entire damaged surface and preparation of surface for paint 1000
On metal surfaces apply two coats of outdoor gloss paint following surface prepation (balcony railings, grilles and doors) 1000
Wall and ceiling touch-up paint/repair work
ESTIMATED GRAND TOTAL FOR OPTION YEAR TWO IN € EXCL. VAT2
BREAKDOWN OF PRICE PROPOSAL, OPTION YEAR TWO
B.8 MINIMUM AND MAXIMUM AMOUNTS
20% VAT. This reflects the contract minimum guarantee for each period of performance. The
B.8.1 Contract Minimum
B.8.2 Contract Maximum
B.9 Pricing – Third Option Year:
The Contractor shall provide the services shown below for Third Option Year, starting three
0001 Washing walls/ceilings with detergent 1000
Preparation works (washing, filling and sanding)
Painting one coat of satin or mat finish (no preparation necessary) 5000
Painting two coats of satin finish (no preparation necessary) 5000
Painting two coats of mat finish (no preparation necessary) 5000
On damaged surfaces, apply two coats of satin finish paint following surface preparation 5000
On damaged surfaces, apply two coats of mat finish paint following surface preparation 5000
0008 Removal of wallpaper and surface preparation 500
Removal and disposal of old floor covering and prepare the floor to receive wall-to-wall carpet or carpet tiles 2000
Wall to wall carpet laying with Contractor furnished carpet, Classe U3P3 Vélour 1,200 Gm/Sq. Meter) 1000
Wall to wall laying of contractor furnished underlayment for carpet 2000
Contractor furnished carpet tiles laying, size: 50-cm x
50-cm 1000
Varnished woodwork to be revarnished by two coats following surface preparation 1000
On damaged wall surfaces, apply texture (scrim/cloth gauze) to entire damaged surface and preparation of surface for paint 1000
On metal surfaces apply two coats of outdoor gloss paint following surface prepation (balcony railings, grilles and doors) 1000
Wall and ceiling touch-up paint/repair work
ESTIMATED GRAND TOTAL FOR OPTION YEAR THREE IN € EXCL. VAT2
BREAKDOWN OF PRICE PROPOSAL, OPTION YEAR THREE
B.10 MINIMUM AND MAXIMUM AMOUNTS
20% VAT. This reflects the contract minimum guarantee for each period of performance. The
B.10.1 Contract Minimum
B.10.2 Contract Maximum
B.11 Pricing – Fourth Option Year:
The Contractor shall provide the services shown below for Fourth Option Year, starting four
0001 Washing walls/ceilings with detergent 1000
Preparation works (washing, filling and sanding)
Painting one coat of satin or mat finish (no preparation necessary) 5000
Painting two coats of satin finish (no preparation necessary) 5000
Painting two coats of mat finish (no preparation necessary) 5000
On damaged surfaces, apply two coats of satin finish paint following surface preparation 5000
On damaged surfaces, apply two coats of mat finish paint following surface preparation 5000
0008 Removal of wallpaper and surface preparation 500
Removal and disposal of old floor covering and prepare the floor to receive wall-to-wall carpet or carpet tiles 2000
Wall to wall carpet laying with Contractor furnished carpet, Classe U3P3 Vélour 1,200 Gm/Sq. Meter) 1000
Wall to wall laying of contractor furnished underlayment for carpet 2000
Contractor furnished carpet tiles laying, size: 50-cm x
50-cm 1000
Varnished woodwork to be revarnished by two coats following surface preparation 1000
On damaged wall surfaces, apply texture (scrim/cloth gauze) to entire damaged surface and preparation of surface for paint 1000
On metal surfaces apply two coats of outdoor gloss paint following surface prepation (balcony railings, grilles and doors) 1000
Wall and ceiling touch-up paint/repair work
ESTIMATED GRAND TOTAL FOR OPTION YEAR FOUR IN € EXCL. VAT2
BREAKDOWN OF PRICE PROPOSAL, OPTION YEAR FOUR
B.12 MINIMUM AND MAXIMUM AMOUNTS
20% VAT. This reflects the contract minimum guarantee for each period of performance. The
B.12.1 Contract Minimum
B.12.2 Contract Maximum
B.13 Grand Total Estimated Contract Amount
Contract Period Total Amount in € incl. 20%VAT
Base Year
Option Year One
Option Year Two
Option Year Three
Option Year Four
GRAND TOTAL AMOUNT
SECTION C - DESCRIPTION/SPECIFICATIONS
STATEMENT OF WORK
C.1 CHARACTER AND SCOPE OF WORK
The Contractor shall furnish and apply all materials required by this contract, unless the contract states that materials and equipment will be provided by or work performed by the Government or by others under separate contracts.
C.2 SURVEY
The Contractor shall survey the property and verify the work required against the task order before beginning work, to determine if any discrepancies exist. The Contractor shall be responsible for any errors that might have been avoided by such a survey/review. The
Contractor shall immediately report any discrepancies to the COR or the Contracting Officer and shall not begin work until such matters are resolved.
C.3 APPLICABLE PAINTING STANDARDS/PAINT SPECIFICATIONS
Painting and preparatory work shall European Union (EU) and French (NF) Standards.
Paint used shall be in conformance with EU Standards and Directives and shall hold the logo of
Ecolabel. Directive 2004/42/CE of ‘Journal official de l’Union européenne’ shall also be applicable.
Unless otherwise specified for a particular site, colors of paints shall be off-white for walls and white for ceilings.
C.4 PREPARATION/PROTECTION OF WORK AREA
Painting shall not disturb or damage any fixed property (including light fixtures, floors, carpets, or windows). The Contractor shall move, protect and return such property to its original position upon completion of work in that area.
The Contractor shall first remove or protect furnishings (such as furniture and rugs) by appropriate covering. The Contractor shall protect floors from soiling and paint spills. Wooden floors shall not be washed under any circumstances. To protect floors (of all types) from damage, the Contractor shall use a suitable protective cover. The Contractor shall also equip ladders and scaffolding with clean rubber shoes or similar protection devices.
If the Contractor spills any paint, or in any way soils the floors, the Contractor shall clean up using a specialist floor finishing company at the Contractor's expense. After completion of the painting work, the Contractor shall return all furnishings to their original position, and clean the work area free of litter and debris.
C.5 UTILITIES
The Government cannot ensure that utilities will be available at all properties at all times. The
Contractor shall have an alternate source of power (generator) available if needed to ensure that paint will be applied following the manufacturer's specifications. The Contractor shall not adjust the heating or air conditioning controls in properties with utilities turned on to maintain temperature. The Contractor shall have its own source of water available for clean up if water has been turned off in the property for winterization of the plumbing system.
C.6 EQUIPMENT
The Contractor shall provide all necessary painting supplies and equipment, including brushes, rollers, buckets, mixers, space heaters, drop cloths, scrapers, sanding gear, electric sprayers, and texture sprayers if necessary to perform the work. The Government will not furnish any materials.
C.7 WARRANTY
The warranty shall be valid for 1 year after the final inspection. During the warranty period, the
Contractor shall repair or replace, free of charge, any occurring defects or ensuing damages. If the Contractor fails to do so after receipt of a written request to that effect, the Government may have such discrepancies remedied at the Contractor's expense.
C.8 TECHNICAL SPECIFICATIONS FOR PAINTING WORK
a. Interior and Exterior Painting
Paint surfaces as directed by the task order. Match paint to similar adjacent materials or surfaces.
(1) Paint: This category includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats.
(2) Product Data: The Contractor shall submit manufacturer's technical information, label analysis, and application instructions to the COR for each paint material proposed for use, prior to starting work. The Contractor shall list each material and cross-reference specific coating and finish system and application as an attachment to the above submittal. The Contractor shall identify each material by the manufacturer's catalog number and general classification.
(3) Single Source Responsibility: The Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats.
(4) Material Quality: The Contractor shall provide the manufacturer's best quality trade sale type paint material. Paint material containers not displaying manufacturer's product identification are not acceptable.
(5) Material Delivery: The Contractor shall deliver materials to the job site in manufacturer's original, unopened packages and the containers shall bear the manufacturer's name and label with trade name and manufacturer's instructions.
(6) Material Storage: The Contractor shall store materials not in use in tightly covered containers in a well ventilated area at a minimum ambient temperature of
45 degrees F (7 degrees C). The Contractor shall protect materials from freezing and keep storage area neat and orderly. Contractor shall remove oily rags and waste daily.
(7) Project Conditions: The Contractor shall not apply paint when the relative humidity exceeds 85 percent, or at temperatures less than 37.4 degrees F (3 degrees C) above the dew point, or to damp or wet surfaces. The Contractor shall apply paint only in temperatures that comply with the manufacturer's specifications.
(8) Preliminary Examination: The Contractor shall examine substrates and conditions under which painting will be performed for compliance with requirements and shall not begin application until unsatisfactory conditions have been corrected.
(9) Preliminary Examination: The Contractor shall examine substrates and conditions under which painting will be performed for compliance with requirements and shall not begin application until unsatisfactory conditions have been corrected.
(10) Preparation:
(i) The Contractor shall remove hardware and hardware accessories, plates, light fixtures, and items in place that are not to be painted, or provide protection such as taping, prior to surface preparation and painting. (Taping includes windows, door jams, etc.)
(ii) The Contractor shall clean and prepare surfaces to be painted following the manufacturer's instructions before applying paint or surface treatments. This preparation includes removal of oil, dust, direct, loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, the Contractor may be requested to remove all existing coats of paint and sealers if prior paint application is showing signs of improper adhesion, such as peeling, chipping, etc.
All surfaces must be clean and dry. The Contractor shall schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted surfaces.
(iii) The Contractor shall notify the Contracting Officer or COR of problems anticipated for any minor preparatory work required, such as but not limited to, filling nail holes, cleaning surfaces to be painted, and priming any requisite areas.
Plan preparatory work as most units in residential areas will have nail holes or areas that will need to be primed or sealed. Replace all electrical covers with new covers after painting.
(11) Materials Preparation: The Contractor shall mix and prepare paint following the manufacturer's directions.
(12) Application: The Contractor shall apply paint following the manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.
(i) Unless otherwise specified, the Contractor shall use a high quality semi-gloss latex paint (containing no lead or mercury) for all kitchens, baths, laundry areas, door frames, and window frames. The Contractor shall use a flat or satin flat latex base paint (containing no lead or mercury) in the remainder of the unit. The color shall be consistent with the balance of the room, which will normally be an off-white. The Contractor shall provide samples of the color on sample of the type of material to be painted before actual paint date is scheduled.
(ii) On exterior surfaces, the Contractor shall apply a high quality exterior grade latex base paint that matches as closely as possible the existing color on the exterior of the property, or a color as otherwise specified by the COR. Prior to painting, the Contractor shall scrape, sand, fill, and prime the surface with a latex base primer. The Contractor should plan on extensive preparatory work prior to painting. The Contractor shall not apply exterior paint in snow, rain, fog or mist, or when the relative humidity exceeds 85 percent; or to damp or wet surfaces.
(iii) The Contractor shall provide finish coats that are compatible with primers used.
(iv) The number of coats and film thickness required is the same regardless of application method. The Contractor shall not apply succeeding coats until previous coat has cured. The Contractor shall sand between applications where required to produce a smooth, even surface.
(v) The Contractor shall apply additional coats when undercoats or other conditions show through final coat, until paint film is of uniform finish, color, and appearance.
(13) Scheduling Painting: The Contractor shall apply the first coat to surfaces that have been cleaned, pretreated or otherwise prepared for painting as soon as practicable, and before subsequent surface deterioration. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried.
(14) Minimum Coating Thickness: The Contractor shall apply materials at the manufacturer's recommended spreading rate. The Contractor shall provide a total dry film thickness of the system as recommended by the manufacturer.
(15) Prime Coats: Before application of finish coats, the Contractor shall apply a prime coat as recommended by the manufacturer to material required to be painted or finished, and which has not been prime coated.
(16) Brush Application: The Contractor shall brush-out and work brush coats into surfaces in an even film. The Contractor shall eliminate cloudiness, spotting, lap marks, brush marks (ropiness), runs, sags, or other surface imperfections. The
Contractor shall draw neat glass lines and color breaks.
The Contractor shall apply primers and first coats by brush unless manufacturer's instructions permit use of mechanical applicators.
(17) Mechanical Applications: The Contractor shall use mechanical methods for paint application when permitted by manufacturer's recommendations, governing ordinances, and trade union regulations.
Wherever spray application is used, the Contractor shall apply each coat to provide the equivalent hiding of brush-applied coats. The Contractor shall not double-back with spray equipment building-up film thickness of two coats in one pass, unless recommended by the manufacturer.
(18) Upon completion of painting, the Contractor shall clean the glass and paint-spattered surfaces. The Contractor shall remove spattered paint by washing, scraping or other proper methods using care not to scratch or damage adjacent finished surfaces.
(19) The Contractor shall remove temporary protective wrappings after completion of painting operations.
(20) The contractor shall not dispose of the remaining/excess paint through any drainage of an apartment (kitchen or bathroom sink, shower).
b. Drywall/Plaster Repair
The Contractor shall patch defective drywall with a similar thickness and fire-rated drywall. Joints shall be taped in a manner so they are not readily visible. The patch shall be textured with a texture consistent with the rest of the surface being patched. The
Contractor shall set and spackle all nail heads. The Contractor shall tape joints and cover them with a joint compound. The Contractor shall sand smooth spackled nail heads and tape joints and remove all dust prior to painting. The Contractor shall spackle exterior surfaces with exterior grade compounds.
c. Texture Only - Walls
Occasionally, the Government may require a wall to be textured that has not previously been textured. The Contractor shall prepare the wall by filling and sanding any small holes or cracks with a suitable "non-shrinking" material. After preparatory work, the
Contractor shall furnish and apply a texture type material. If any other walls within that room are textured, the texture material shall closely match the texture of any other existing textured walls in that room. The Contractor shall not be required to do less than one room on any individual task order.
d. Texture Only - Ceiling
Occasionally the Government may require a ceiling to be textured that has not previously been textured. The Contractor shall prepare the ceiling by filling and sanding any small holes or cracks with a suitable "non-shrinking" material. After preparatory work, the
Contractor shall furnish and apply an "Acoustic" type texture.
e. Paint Exterior Trim - Balcony railings, grilles and doors
The Contractor shall apply a high quality exterior grade latex base paint that matches as closely as possible the existing color on the exterior trim of the property, or a color as specified by the Contracting Officer. The Contractor shall scrap, sand, fill, and prime the trim with a latex base primer, prior to painting. The Contractor shall plan on extensive preparatory work prior to painting. The specifications for exterior paint apply, unless otherwise specified in the task order.
f. Remove Wall Covering
Upon assignment by task order, the Contractor shall remove the designated wall covering
(wallpaper, cork, mirror, tile, etc.). After removing the wall covering, the Contractor shall clean and make ready for painting the area. The Contractor shall remove and properly dispose of the old wall covering.
g. Plaster
The Contractor shall repair any damaged interior or exterior plaster as directed by the
COR. The plaster material shall be of a similar material that matches as closely as possible the existing plaster in texture and color.
h. Carpeting
(i) The existing floor covering which may consist of carpet, carpet tiles, plastic floor tiles, etc. shall be removed and disposed of by the Contractor. The contractor shall scrape the surface to remove existing glue, remnants of existing floor covering, clean the surface, apply a levelling compound as necessary; sand the entire surface, clean and leave ready for the installation of new carpeting. After floor preparation work new carpet floor covering shall be laid.
(ii) For wall to wall carpet the type of the carpet shall be velour 1,200gm/SQM, class U3P3 and the color shall be a light brown shade.
(iii) If needed, a carpet underlay equivalent to carpeting surfaces for each location may be requested.
(iv) For carpet tile flooring the tiles shall be 50-cm x 50-cm, 7.7-mm thick, medium duty, type ‘Impression’ from “Balsan” Or Equal. The color of carpet tiles shall a light brown shade.
The specifications of the ‘Impression’ from Balsan are as follows:
Structure: Carpet in Tiles, Cross-Over Cut pile, 100% polyamide, 830 gm/sqm
Total weight: 4340 gm/sqm – Total thickness: 7,7 mm – Pile height: 4,4 mm
Gauge – Rows (points) – Tufts: 1/10th – 53 p – 209 350 p/sqm
Backing: Bitumen
Fire resistance: Bfl-S1 – free floating on cement
Wear Classification: Class 23/32 LC2
Dimensional stability: ≤ 0.20%
Impact sound insulation: ΔLw 24 dB – Sound absorption: αω 0.15
Width: 50 x 50 cm
i. Woodwork Varnishing
The woodwork surface shall be prepared to receive varnish. The surfaces will then be sanded and oil filler applied. The surfaces will again be sanded and two coats of oil based gloss varnish applied.
SECTION D - PACKAGING AND MARKING
N/A
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
The following Federal Acquisition Regulation clause(s) is/are incorporated by reference (48 CFR
Chapter 1):
CLAUSE TITLE AND DATE
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
https://acquisition.gov/browse/index/far https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl
SECTION F - DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
The following Federal Acquisition Regulation clause(s) is/are incorporated by reference (48 CFR
52.242-14 SUSPENSION OF WORK (APR 1984)
F.2 EFFECTIVE ORDERING PERIOD
F.2.1 After contract award and submission of acceptable insurance certificates, the
Contracting Officer shall issue a Notice to Proceed. The Notice to Proceed will establish a date
(a minimum of ten (10) days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall start.
F.2.2 The Government may extend this contract under FAR 52.217-9, “Option to
Extend the Term of the Contract” and 52.217-8, “Option to Extend Services”.
https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl
F.3 COMPLETION DATES UNDER TASK ORDERS
F.3.1 The Contractor shall have a minimum of three (3) days in order to commence work under each task order issued.
F.3.2 The following are minimum completion times that will be included in individual task orders, dependent upon the type and amount of work to be done:
Painting Interior Walls, up to 1000 square meters – 14 calendar days
Painting Interior Walls, 1001 to 2000 square meters – 28 calendar days
Carpeting up to 100 square meters – 7 calendar days
Carpeting, 101 to 400 square meters – 14 calendar days
F.4 ACCEPTANCE OF SCHEDULE
When the Government has accepted any time schedule, this acceptance shall be binding on the Contractor. The completion date is fixed and may be extended only by a written contract modification signed by the Contracting Officer. Acceptance or approval of any schedule or revision by the Government shall not:
(1) extend the completion date or obligate the Government to do so;
(2) constitute acceptance or approval of any delay, or;
(3) excuse or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.
F.5 NOTICE OF DELAY
In the event the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are actually causing delays which the Contractor believes may result in completion of the project after the completion date, the Contractor shall:
(1) notify the Government of such change or other conditions upon the approved schedule, and;
(2) shall state in what respects, if any, the relevant schedule or the completion date should be revised.
The Contractor shall give notice to the Contracting Officer promptly, within one (1) day following the first occurrence of event giving rise to the delay or prospective delay. Only the
Contracting Officer may approve revisions to the approved time schedule.
F.6 WORKING HOURS
The Contractor shall perform all work during working hours (from 9:00 to 17:00) from
Monday through Friday except for the holidays identified in Section I, DOSAR 652.237-82, “Observance of Legal Holidays and Administrative Leave. The Contracting Officer may approve other hours, if the Contractor gives at least 24 hours advance notice. Contractor initiated changes in work hours will not be a cause for a price increase.
F.7 EXCUSABLE DELAYS
The Contractor shall be allowed time, not money, for excusable delays as defined in FAR
52.249-10, “Default”. Examples of such cases include:
(l) acts of God or of the public enemy;
(2) acts of the United States Government in either its sovereign or contractual capacity;
(3) acts of the government of the host country in its sovereign capacity;
(4) acts of another contractor in the performance of a contract with the Government;
(5) fires;
(6) floods;
(7) epidemics;
(8) quarantine restrictions;
(9) strikes;
(10) freight embargoes;
(11) delays in delivery of Government furnished equipment, and;
(12) unusually severe weather.
In each instance, the failure to perform shall be beyond the control and without the fault or negligence of the Contractor, and the failure to perform furthermore:
(1) shall be one that the Contractor could not have reasonably anticipated and taken adequate measures to protect against;
(2) cannot be overcome by reasonable efforts to reschedule the work, and;
(3) directly and materially affects the date of final completion of the project.
F.8 DELIVERABLES
The Contractor shall delivery the following items under this contract:
Description Quantity Delivery Date Deliver to:
H.1.1 Insurance 1 10 days after award Contracting Officer
H.8.1 Safety Plan 1 10 days after award COR
H.10.3 List of Personnel 1 10 days after award COR
H.9.2 Identification of Subs 1 5 days before use Contracting Officer
F.4 Construction Schedule 1 Identified in each task order COR
G.2 Payment Request 1 Completion of each
(invoices/task order)
COR
I.1 Updates to Construction
Schedule (52.236-15)
1 Last calendar day of each month
COR
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)
(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR).
Such designation(s) shall specify the scope and limitations of the authority so delegated;
provided, that the designee shall not change the terms or conditions of the contract, unless the
COR is a warranted Contracting Officer and this authority is delegated in the designation.
(b) The COR for this contract is the PWC Make-Ready Coordinator.
G.1.1 Duties
The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract. The
COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract.
G.2 PAYMENT
(a) General. The Government shall pay the Contractor as full compensation for all work required, performed, and accepted under this contract the firm fixed-prices stated in this contract.
(b) Invoice Submission. The Contractor shall submit invoices by email to
ParisFMCDBO1@state.gov and copy the COR. To constitute a proper invoice, the invoice shall include all the items required by FAR 32.905(e).
PROGRESSIVE PARTIAL PAYMENTS ARE AUTHORIZED.
The billing address is the following:
Ambassade des Etats Unis D’Amérique
Service FMC Voucher / DBO
2 avenue Gabriel, 75382 Paris cedex 08
The Contractor shall show taxes (VAT) as a separate item on invoices submitted for payment.
G.2.1 General
The Contractor shall follow Section I, 52.232-5, "Payments Under Fixed-Price
Construction Contracts.” The following subsections elaborate upon the information contained in that clause mailto:ParisFMCDBO1@state.gov
G.2.2 Detail of Payment Requests/Invoices
The Contractor shall request payment no more frequently than monthly and shall cover the value of labor and materials completed and in place, including a prorated portion of overhead and profit.
G.2.3 Payments to Subcontractors
The Contractor shall make timely payment to his subcontractors and suppliers from the proceeds of the progress or final payment for which request is being made, following the
Contractor's contractual arrangements with them.
G.2.4 Evaluation by the Contracting Officer
Following receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer will make a determination as to the amount that is then due. If the Contracting Officer does not approve payment of the full amount applied for, less the retainage addressed in FAR 52.232-5, the Contracting Officer shall advise the Contractor of the reasons for the reduction.
G.2.5 Additional Withholding
Independently of monies under FAR 52.232-5, the Government may withhold from payments due the Contractor any amounts as may be considered necessary to cover –
(1) Wages or other amounts due the Contractor's employees on this project;
(2) Wages or other amounts due employees of subcontractors on this project;
(3) Amounts due suppliers of materials or equipment for this project; and
(4) Any other amounts for which the Contractor may be held liable under this contract, including but not limited to the actual or prospective costs of correction of defective work and prospective liquidated damage when the Contractor has failed to make adequate progress.
G.2.6. Payment
The 14-day period identified in FAR 52.232-27(a)(1)(i)(A) is changed to 30 days.
G.3 TASK ORDERS
G.3.1 General. The Government will order all services under this contract on a Delivery
Task Order OF-347 Form, issued by the Contracting Officer, as the need arises.
G.3.2 Content. Task orders shall include:
Date of order
Contract number
Task Order number
Location of property
Amount of work (square meters)
Required completion date
G.3.3 Procedures
G.3.3.1 Before issuing a task order, the Government may issue a written request for quotation that includes the work to be performed and the required completion date.
The Contractor shall respond to that request for quotation in writing within three working days.
Alternatively, the Government may simply issue a firm-fixed price task order, if it has the measurements of the work to be performed.
G.3.3.2 If requested to submit a firm-fixed price quotation for a task order, the
Contractor shall compute a price for the required work by multiplying the unit prices in
Section B by the amount of work required.
G.4 SELECTION OF AWARDEE FOR INDIVIDUAL TASK ORDERS
(a) If more than one Contractor receives an award for these services, the following procedures shall govern the issuance of individual task orders. The Contractor shall perform no work without a task order issued by the Contracting Officer.
(b) As the need for services arises, the Government will develop a price estimate.
If the estimate does not exceed US$10,000, the Government will follow the procedures in paragraph (c) below. If the estimate exceeds US$10,000, the Government will follow the procedures in paragraph (d) below.
(c) Orders not exceeding US$10,000 - The Government will select a Contractor for the task order. This decision will be based on the Government's best interests, which may include factors such as estimated price; past performance record; need to meet contractual minimums; or desire to avoid exceeding task order limitations set forth in Section I, FAR 52.216-19, "Order
Limitations".
(d) Orders exceeding US$10,000
(1) Unless one of the exceptions in paragraph (e) below applies, the Government will make its award selection based on the prices in the contract and past performance information gained as a result of Contractor performance under this contract.
(2) Selection of Contractors shall not be protestable to GAO under Subpart 33.1 of the Federal Acquisition Regulation, except on the grounds that the order increases the scope, period, or maximum value of the contract. The Department of State has an
Acquisition Ombudsman who will review complaints by Contractors to ensure that all
Contractors are afforded a fair opportunity to be considered for these task orders under the terms of this contract.
(e) Exceptions to the procedures in paragraph (d) above:
(1) The order should be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order; or
(2) It is necessary to place an order to satisfy a minimum guarantee.
G.5 VALUE ADDED TAX
VALUE ADDED TAX (VAT). Value Added Tax (VAT) is not included in the CLIN rates.
Instead, it will be priced as a separate Line Item in the contract and on Invoices. The amount of
VAT to be charged is 20% for office buildings and a reduced VAT rate of 10% for residential buildings that fall under the regulation of reduced Value Added Tax. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 INSURANCE
H.1.1 Amount of Insurance
The Contractor is required to provide whatever insurance is legally necessary under
Section I, 52.228-5, "Insurance - Work on a Government Installation.” The Contractor shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:
General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury):
1. Bodily injury on or off the site (stated in Euros):
Cumulative 4,570,000.00 €
2. Property Damage on or off the site (stated in Euros):
Cumulative 4,570,000.00 €
The types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to:
(a) any property of the Contractor,
(b) its officers,
(c) agents,
(d) servants,
(e) employees, or
(f) any other person, arising from and incident to the Contractor's performance of this contract.
The Contractor shall hold harmless and indemnify the Government from any and all claims arising, except in the instance of gross negligence on the part of the Government.
The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
H.1.2 Government as Additional Insured
The general liability policy required of the Contractor shall name "the United States of
America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
H.1.3 Insurance-Related Disputes
Failure to agree to any adjustment contemplated under this contract regarding insurance shall be a dispute within the meaning of FAR 52.233-1, Alternate I, "Disputes". Nothing in this clause shall excuse the Contractor from proceeding with the work, including the repair and/or replacement as herein above provided.
H.1.4 Time for Submission of Evidence of Insurance
The Contractor shall provide evidence of the insurance required under this contract within ten (10) calendar days after contract award. Failure to timely submit this evidence, in a form acceptable to the Contracting Officer, may result in rescinding or termination of the contract by the Government.
H.2 DEFINITIONS
In addition to the definitions provided in Section I, FAR 52.202-1 and DOSAR 652.202-
70, the following definitions shall apply:
(a) Day means a calendar day unless otherwise specifically indicated.
(b) Host Country means the country in which the project is located.
(c) Material means all materials, fixtures and other articles incorporated in, or which are intended to remain with, the project.
(d) Task Order means a written notice to the Contractor from the Contracting Officer authorizing the Contractor to incur obligations and proceed with the work under individual orders as of a date stated in the order.
(e) Samples are physical examples that illustrate materials, equipment or workmanship and establish standards by which the work will be judged.
(f) Separate Contractor means a contractor, other than the Contractor or any of its…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .