Attachment_5-Submittal_Register_Ramps_Tumaco-Sta_Marta.pdf

PDF 28 KB Posted

Attached to
Concrete Boat Ramps at Tumaco and Santa Marta, Colombia.
Solicitation number
19C01518R0001
Issued by

About this file

Attachment#5-Submittal_Register_Ramps_Tumaco-Sta_Marta

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

BOATRAMPTUMSANT

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Policy (Poliza de Cumplimiento):

Payment Policy (Poliza de Pagos de Salarios y Prestaciones Sociales:

Liability Policy (Poliza de Responsabilidad Civil Extra-Contractual)

Stability Policy (Poliza de Estabilidad)

Elements Quality Policy (Poliza de Calidad de Elementos)

Correct Equipment Functioning Policy (Poliza de Correcto funcionamiento de los Equipos)

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products

01 32 16.00 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

01 32 16.00 20 1.3Construction schedule Submittal Register

01 33 00 SD-01 Preconstruction Submittals 1.8Submittal Register

01 50 00 SD-01 Preconstruction Submittals 1.3Construction site plan

01 78 00 SD-03 Product Data As-Built Record of Equipment and Materials

1.6.1Warranty Management Plan 1.6.4Warranty Tags

Spare Parts Data SD-08 Manufacturer’s Instructions

1.5Preventative Maintenance 1.5Condition Monitoring (Predictive

Testing) 1.5Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.7Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.4.1Record Drawings

03 11 13.00 10 SD-03 Product Data Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

03 11 13.00 10 2.1Form Materials 2.1.5Form Releasing Agents

SD-04 Samples Sample Panels

SD-06 Test Reports 3.5Inspection

SD-07 Certificates Fiber Voids

03 20 00.00 10 SD-03 Product Data Welding

3.1.4.1Butt-Splices Material

SD-06 Test Reports Material Tests, Inspections, and Verifications

SD-07 Certificates 2.3Reinforcing Steel

Qualification of Steel Bar Butt-Splicers

03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction 1.6.2.3Reinforcing steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

03 30 00 SD-03 Product Data 2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

31 00 00 SD-01 Preconstruction Submittals 3.5Shoring

Dewatering Work Plan Blasting

SD-03 Product Data 3.9Utilization of Excavated Materials

Rock Excavation 3.4Opening of any Excavation or

Borrow Pit Shoulder Construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

31 00 00 SD-06 Test Reports 3.17Testing 2.1Borrow Site Testing

SD-07 Certificates 3.17Testing

31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials

31 62 13.13 SD-02 Shop Drawings 2.1.2Piles

SD-04 Samples Test piles

SD-06 Test Reports Test pile data

SD-07 Certificates 2.1.1.3Pipe piles 3.2.1Concrete testing

SD-11 Closeout Submittals records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .