19BY7026Q0010_StatementOfWork.pdf

PDF 393 KB Posted

Attached to
WATER SYSTEM FAULTY PROGRAMMABLE LOGIC CONTROLER REPLACEMENT
Solicitation number
19BY7026Q0010PR16053183
Issued by

About this file

This is a Statement of Work (SOW) for the replacement of a faulty Domestic Water Treatment Plant (DWTP) Programmable Logic Controller (PLC) and upgrade of the Building Automation System (BAS) integration at the U.S. Embassy in Bujumbura, located at the NEC Utility Building. The project reference is 2026 – NEC Water Treatment Sym – V.02, dated April 22, 2026.

The contractor must provide two new unlocked Allen-Bradley PLCs with HMIs, all hardware and software equipment including laptops with carrying cases, programming cables, and support connections. The work includes replacement of the failed main cabinet PLC and non-functioning RS232 port, re-wiring of the main panel with labeled cables, and verification that the new PLC and I/O cards fit within the existing cabinet or identification of need for additional cabinet space. For BAS integration, the contractor must perform conduit work between pump cabinets and the upgraded BAS module, install Cat 5/6 ethernet cabling from the pump panel to the BAS system, add an ethernet switch, and capture all points from the potable plant and pump panels (Booster and Triplex pumps) into the BACnet system. Additional requirements include providing Ladder Diagram programming for the ultrasonic level sensor, upgrading input/output cards and ethernet cables, supplying a recommended water tank production and level management software system with installation labor, and delivering a minimum of eight hours of hands-on training to facility personnel covering software operations, system monitoring, alarm management, and troubleshooting. The contractor must supply two Allen-Bradley PLCs, one BACnet converter, one ethernet switch, installation materials, logistics/freight, site training, and reports and documentation. The service contractor is responsible for all labor, supervision, equipment, and tools; must provide a project manager on-site; and must submit a Project Safety Plan complying with EM 385-1-1 safety standards before project commencement. Work shall be performed during normal business hours (0730-1715 Monday-Thursday, 0730-1215 Friday), with prior approval required for work outside these hours. The U.S. Embassy will provide water, power, storage areas, and reasonable access to the compound, with the Contracting Officer (Elizabeth Al Sulaimani, +25722207234) and Contracting Officer Representative (Isaac Kenneth Andebe, +25722207038) serving as primary contacts. No subcontracting is permitted without prior written authorization from the Contracting Officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT TITLE: NEC DWTP PLC REPLACEMENT.

LOCATION: NEC UTILITY BLDG. 50 AV DES ETATS UNIS

REFERENCE:2026 – NEC WATER TREATEMENT SYM – V.02

DATE:22-APR-2026

1. Project Statement

Post Bujumbura has a need to replace a faulty domestic water treatment plant (DWTP) Programmable Logic Controller (PLC) and add BACnet to it to upgrade communication to Building Automation System (BAS) of which FAC team will be able to monitor real time levels, production and water distribution to the buildings.

The current PLC Model Allen-Bradely MicroLogix 1200 has suffered from a fatal internal failure.

1.1 Work Description

Post wants the service of a contractor who can.

1.1.1 Provide new unlocked Programmable Logic Controller (PLC) and HMIs for the controller.

1.1.2 Provide all hardware and software equipment (Laptop with carrying case, software loaded on PC, programming cable, and support connections to the installed Allen Bradley PLC.)

1.1.3 The PLC ultrasonic level sensor hardware shall be Ladder Diagram (LD), also known as Ladder Logic.

1.1.4 Provide and upgrade any input/output cards and new ethernet cables for the PLCs.

1.1.5 Provide all parts and materials associated with BAS interface with the new

BACnet converter.

1.1.6 Provide the recommended software for the water tank production and level management system and include the labor required to install.

1.1.7 Provide a minimum of eight (8) hours of hands-on training for Facility personnel.

Training shall cover software, system operations including system monitoring and alarm management, and basic troubleshooting procedures

1.2 Project Description:

1.2.1 For the PLC Work:

1.2.1.1 The contractor must replace and repair

• the main cabinet PLC that has suffered from a fatal internal failure.

• the RS232 port that is not functioning. This resulted in not being able to pull the current PLC program off for replacement.

• Power to the input/output cards not functioning.

• The built-in screen on the PLC is not functioning. The PLC goes immediately into a fault state upon power cycle, indicating an internal PLC error on the board/power distribution rail of the PLC.

1.2.1.2 Perform re-wiring in the main panel and label all the cables.

1.2.1.3 Contractors must ensure footprint of the new PLC, along with all of it’s I/O cards will fit into the existing cabinet or if there will be need to have an additional cabinet.

1.2.2 For the BAS Integration:

1.2.2.1 Main cabinet does not have enough room to mount the BAS module. The contractor will perform conduit work between one of the pump cabinets and the upgraded BAS module in order to utilize it. Cat 5/6 would need to be run from the pump panel to the BAS system, and 5 conductors ran from the main plc to the new BAS module.

1.2.2.2 The contractor must capture all points from the potable plant into the BAS system with the current design.

1.2.2.3 The contractor must capture all points from the pump panels (Booster and Triplex pumps) and relay to BAS system through upgraded BAS Module (BACnet).

1.2.2.4 The contractor will add an ethernet switch to make sure both points for Potable panel and pump panel are relayed to BACnet for BAS system.

1.2.2.5 Note that certain points are already hardwired from the RO plc’s to the main PLC, the contractor must confirm if the wiring is still usable and in good condition.

1.2.2.6 The PLC sourcing and sinking points are detailed in wiring diagram from page 12 to 30.

2.0 System Overview

2.1 System Description

This system is designed as five skids including bag filters and chlorination skid, media and carbon filters skid, two RO skids and PH adjustment skid.

The complete treatment system is designed to provide up to 9000 gallons per day of potable quality water. Using city water or well water as the feed source. See system P&I Diagram in figure 1.0.

2.2 Sequence of Operation

Feed water is supplied to the RO unit at dynamic pressure. Feed water enters the system through an Inlet valve. Next, the feed water passes through a pre-filter for removal of suspended particles 5 microns or larger.

The filtered water enters a high-pressure pump which increases the water pressure to RO operating levels.

Inside the membrane assembly, a portion of the feed water, referred to as product, passes through a membrane barrier that rejects suspended and dissolved solids. The remaining portion of feed water, referred to as reject, carries concentrated contaminants out of the membrane assembly.

The product water from the membrane assembly is monitored for conductivity. A Programmable Logic Controller (PLC) controls the RO functions to maintain most efficient operation within the design parameters of the system.

Recovery, an important operating parameter, is the ratio of the product water to the feed water flow. Designed recovery rate for this system is 52%. See the System Specifications section 2.2 of this SOW for details.

2.2 System Specifications

6.25 GPM

These specifications are based upon computer generated projections. The projections are determined by feed water chemistry, temperature, predicted capacity and anticipated 3-year flows.

Supply to Reverse Osmosis Unit (1”)......................................................................... 12 GPM (45.4 LPM) RO Product to Service/Storage (3/4”) ...................................................................... 6.25 GPM (23.7 LPM) RO Reject to Drain (3/4”) ......................................................................................... 5.75 GPM (21.7 LPM) Daily Total Permeate Production ...............................................................................................9,000 GPD Expected Feedwater TDS ..........................................................................................................................1000 MG/L RO Product Water TDS ...............................................................................................................<35 MG/L

Temperature.........................................................................................................................................25°C Recovery .............................................................................................................................................. 52% Membrane Feed Pressure ...............................................................................................................94 PSI

Membrane Feed Pressure (MAXIMUM) 300 PSI Exceeding this pressure may cause catastrophic vessel failure.

Membrane Differential Pressure (ΔP MAXIMUM) <60 PSID Exceeding this pressure may cause membrane failure.

Mains Supply............................................................................................................400 VAC, 50 Hz, 3 PH Main Circuit Breaker........................................................................................................................15 AMP RO Pump ..............................................................................................................................................3HP Pre-flush Time Setpoint...................................................................................................................... 3 MIN Post-flush Time Setpoint .................................................................................................................... 5 MIN

RO Pump Suction Low Pressure Switch Setpoint ............................................................................20 PSI

RO Pump Discharge High Pressure Switch Setpoint. ..................................................................~108 PSI

3.0 Terms

3.1 The contractor shall make arrangements for one full time project manager at the site who will inspect the quality of work and the conduct of the workers.

3.2 The Contracting Officer (CO) reserves the right to reject any of the contractor’s employee for security, safety, or performance reasons.

3.3 The contractor should strictly adhere to all instructions from the Contracting Officer’s Representative (COR) during progress of the project. All instruction will be provided in writing. Any instruction that causes a change to the SOW must be cleared and approved in writing by the CO first, and then signed by the contractor if they are in agreement.

3.4 The U.S. Embassy agrees to furnish water, power, and any storage areas needed for the execution of this project.

3.5 The U.S. Embassy reserves the right to open and search all containers or materials brought onto the site by the contractor or its employees.`

3.6 The contractor will make all effort to minimize damage to the existing work area and fuel control panel during the project. Any damage done will be repaired by the contractor to match pre-existing conditions at no cost to the U.S. Embassy Burundi.

3.7 No subcontracting will be permitted without prior authorization and written permission from the CO.

3.8 The contractor must follow all security and safety requirements as instructed by the U.S.

Embassy.

3.9 The contractor shall restrict the movement of its workers to the project area only. No workers will be allowed to move freely inside the property.

4.0 Safety

4.1 The contractor will be required to adhere to the safety standards found in the Safety and Health Requirements Manual, EM 385-1-1, dated 30 November 2014.

4.2 The contractor is required to submit a Project Safety Plan as part of their proposal. The safety plan should list all significant safety risks associated with the project and how the contractor plans to minimize each.

4.3 The project may not start until the COR has reviewed the safety plan and has inspected the contractor’s safety equipment that will be used on the project.

4.4 The contractor is responsible for providing adequate Personal Protective Equipment (PPE) for each task that is performed. Adequate PPE in this case indicates that there is enough for every employee and that it is in good condition. PPE must be worn at all times while on the job site.

4.5 The U.S. Embassy reserves the right to issue a “Stop Work” order at any point if there are safety violations or unsafe work practices. The contractor must promptly correct the deficiency and receive authorization from the COR before they resume work. Any time lost due to a “Stop Work” order will not be added to the project schedule.

Exhibit A - - STATEMENT OF WORK

1. SCOPE

The Replacement of Main Faulty PLC and Upgrade of BAS Module to BACnet with addition of ethernet switch.

1.1 Performance of Services

The service contractor shall perform is replacement of faulty Main PLC and upgrade BAS Integration module to BACnet to pool all the points from Potable and Pump system from the main PLC, Triplex pump PLC and Booster pump PLC:

• Replacing existing Main PLCs and BAS Module.

• The existing potable system controllers must be able to work with the new PLCs and HMIs.

• Introduce BACnet to pool all the points from PLC and associated devices to the existing BAS System.

• With care and diligence expected of a professional experienced service contractor to provide service of this type.

• In every respect to the reasonable satisfaction of the US Embassy Bujumbura.

• In conformity with all directions and requirements of US Embassy Bujumbura.

• Must provide information to the US Embassy as to the manner and timing of the performance of the service, on request.

The giving of any approval, direction, instruction or information by the US Embassy Bujumbura and compliance with the same by the Service Contractor will not relive or reduce the service contractor’s sole responsibility for the performance of the services in accordance with this contract.

1.2 General Requirements

The contractor shall provide labor, resources and support and shall complete all its obligation and responsibilities in respect of this contract to perform replacement of faulty Main PLC and upgrade BAS Integration module to BACnet to pool all the points from Potable and Pump systems from the main PLC, Triplex pump PLC and Booster pump PLC or any other associated devices.

The US Embassy requires the Contractor to maintain the replaced PLCs, BACnet modules and ethernet switch, in reliable and efficient operating condition. The contractor shall provide all necessary managerial, administrative and direct labor personnel, and as well as all necessary transportation, equipment, tools to perform inspection and upgrade of fuel distribution system in accordance with the manufacturer’s specification.

The contractor will not use any other method or substances which may cause damage to the system. Any damage or loss through negligence by the service contractor, sub-contractor, or service contractors’ staff shall be the whole responsibility of the service contractor. The US Embassy Bujumbura may require the service contractor to make good the damage or pay for the cost of rectification.

All processes should include the use of suitable method, equipment, or substance in accordance with manufacturer’s recommendations.

1.3 Purpose

This Scope of Work (SOW) define contract details and requirements for replacement of faulty Main PLC and upgrade BAS Integration module to BACnet to pool all the points from Potable and Pump system from the main PLC, Triplex pump PLC and Booster pump PLC, and a Certified Water system Technician/Engineer onsite to perform the replacement and upgrade services in Utility Building.

In addition, the application engineer will provide onsite training of new PLC and its level and production management software.

1.4 Background

US EMBASSY Bujumbura has an existing Domestic water treatment plant (DWTP) System located at Utility Building.

2. PERFORMAMNCE CRITERIA

2.1 Performance Objective

The objective of this agreement is to provide, within the Terms of contract, a professional level of service which provides:

• US Embassy Bujumbura satisfaction in respect to the replacement of faulty Main PLC and upgrade BAS Integration module to BACnet to pool all the points from Potable and Pump system from the main PLC, Triplex pump PLC and Booster pump PLC Prompt reaction to any change in arrangements or operational requirements of US Embassy Bujumbura.

• Compliance with statutory and regulatory provisions of the laws of the jurisdiction.

• Best in class practices within the industry. This includes:

The replacement of faulty Main PLC and upgrade BAS Integration module to BACnet to pool all the points from Potable and Pump system from the main PLC, Triplex pump PLC and Booster pump PLC which will be fully integrated the existing BAS System to monitor water levels, production, chemical dosing, water distribution, pump status, and various alarms associated with potable water production and pump distribution:

Capable of water tank level and pump control to monitor water levels and distribution in real time.

Programming/configuration can be saved to a SD-Card so when replacing the PLC or HMI, it’s a simple import from your card.

With the touch screen and graphic display navigating through the programming configuration via the PLC, HMI Configuration Software must be more user friendly.

With the graphic display of different sensor alarms, it makes it easier to pinpoint and troubleshoot.

Risk reduction for the US Embassy Bujumbura, Preservation of asset value, and Reduction in operating costs.

The contractor agrees that its performance under the contract shall be measured against performance criteria specified in this document or otherwise agreed at the time of commencement.

2.2 Performance Benchmarks

The Contractor must, for the duration of the contracted services, provide an onsite assessment of the facility for the PLC replacement and BAS upgrade to BACnet. The assessment will provide a basic design document with points list, topology and scope to provide the Embassy with the desired usage reporting which has been agreed by the US Embassy Bujumbura and the Contractor.

The Contractor must allow US Embassy Bujumbura access to the quality control system as well as relevant quality systems of its subcontractors so as to enable monitoring and quality auditing of the Upgraded system.

The US Embassy Bujumbura may reject any aspect of services that fails to comply with the requirements of the contract, or its quality system at any time.

2.3 Performance Monitoring and Reporting

The service contractor shall monitor its own performance against the criteria and benchmarks identified in this document and shall provide reports when reasonably required by the US Embassy Bujumbura.

2.4 Material and Workmanship

The supply of any spare part/replacement and materials for system upgrade such as input modules, output modules, communication modules, programming and display consoles etc.

of the PLC/HMI Modernization Upgrade are covered in this agreement. Therefore, the contractor is required to quote the spare part, repair service or materials to US Embassy Bujumbura for approval before commencing any upgrading task or repair which requires spare parts, repair service, or consumable materials. All potential or known failures should be brought to the attention of the Facility Manger US Embassy Bujumbura or the authorized Contracting Officer.

Submittal per design and installation of this Upgrade system are added as an addendum.

Use this information as reference to obtain needed Upgrading instructions from the manufacturers and as familiarization for the PM tickets that will be received throughout the performance of this contract. The contractor is also required to maintain logs of performance and records of manuals or any other required maintenance documentation that is recommended by the manufacturer to include record keeping using a Global Maintenance Management System (GMMS) as well as other administrative functions.

Additional services may be ordered at the discretion of the government for work relating to the operations, maintenance and repair or upgrade of the covered facilities, but not covered in the basic services of the contract, as described in this document.

Excluding from this scope of work are:

• Security systems

• Telecommunication systems

• Equipment owned and operated by tenant agencies

• Furnishings (not installed as fixtures)

• Paper and soap dispensing equipment in restroom.

The contractor shall supply the following:

INSTALLATION PARTS QTY ea.

Allen Bradley PLC 2 BACNet Converter 1 Ethernet Switch 1 Site Training 1 Installation Materials 1 Logistics - Freight 1 Reports and Documentation 1

2.5 US Embassy Bujumbura Obligations

The US Embassy Bujumbura shall provide the Service Contractor with and make available to the service contractor such as reasonable access to US Embassy Bujumbura Compound, electricity and other utilities as reasonable required for the provision of these services.

The contracting officer will be the contractor’s contact at Bujumbura US Embassy. The officer will assist and direct the contractor when scheduling work and answer all questions concerning the contract terms.

Post Contracting Officer (CO)

Name Elizabeth Al Sulaimani

Phone number +25722207234

Post Contracting Officer representative (COR)

Name Isaac Kenneth Andebe

Phone number +25722207038

2.6 Service Contractor Obligations

The Service Contractor shall:

• Provide adequately supervised employees as required by the law of the jurisdiction to carry out the services.

• Execute, perform and provide services in every respect to the reasonable satisfaction of the US Consulate and in conformity with all reasonable directions and requirements of the US Embassy Bujumbura.

• Ensure approximately qualified and experienced persons, who shall be properly supervised or directed by the service contractor.

• Cease any action at the direction of US Embassy Bujumbura.

• Make good any damage to the equipment or any part thereof caused by any act or omission of the service contractor.

• Obey all rules and instructions in force with the US Embassy Bujumbura Compound

(including any non-smoking policy, etc.).

• Immediately notify the US Embassy Bujumbura in writing all matters affecting its responsibility.

• Obtain US Embassy Bujumbura’s approval for any services to be undertaken outside the usual scheduled times for provision of the services.

• Provide evidence of qualifications and job history of the service contractor’s personnel if required by the US Embassy Bujumbura.

• Ensure that any lost or unclaimed property found by the contractor is passed to the

US Embassy at the first practicable opportunity.

• At the direction of US Embassy Bujumbura, remove from US Embassy Bujumbura compound any of the service contractor’s personnel who misconduct themselves or are incompetent or negligent in performing their duties or who US Embassy Bujumbura considers undesirable to perform the services and

• Provide the US Embassy Bujumbura with 15 days of commencement of the contract, a schedule specifying the nature and timing of all the work to be completed.

• The contractor will supply all items mentioned for the completion of the specified works.

• Post to provide minimal manpower assistance if needed.

• The contractor shall bare all cost associated to damages done by his staff during the contract period.

• Post will provide escort to the contractor once access is cleared and approved by the regional security officer (RSO).

• Contractor personnel travelling to post shall provide travel info to post CO for generation of country clearance cable. The information shall be provided at least 30 days prior to the day of travel as follows:

1. Full names

2. Dates of Visit

3. Flight Itinerary

4. Name of company for third party contractors

5. States whether meet and assist at airport is needed

6. State whether post is requested to help to arrange accommodation

7. State whether laptops, digital cameras or other electronics is needed for the task

8. Burundian visa.

9. Certificate of high threat security overseas seminar (HTSOS CLASS) may be required.

10. Yellow fever card.

3. UPGRADING SPECIFICATION DETAILS

3.1 Precedence of Specifications

If and to the extent that there is an inconsistency between this system upgrade specification and any manufacturer’s system upgrade specification, the manufacturer’s system upgrade specification will prevail.

3.2 Hours of Work

The service contractor shall schedule all preventive maintenance during normal working hours which are defined as 0730 to 1715 Monday to Thursday and 0730 to 1215H on Fridays, inclusive of periodic maintenance which may be required on Saturdays, with the exception of any regular or special public holidays on which US Embassy Bujumbura Compound is not open, or as agreed with the US Embassy Bujumbura prior to commencement of the contract. Working beyond these hours and days shall need prior approval from the Contracting Officer or the contracting officer representative.

4. DESCRIPTION OF THE WORKS

The service contractor must upgrade the performance and service of the Domestic Water Treatment Plant (DWTP) system in accordance with the minimum standard stated in the relevant Standards, unless stated otherwise and confirmed in writing by the US Embassy Bujumbura at the time of commencement of contract.

The works comprise of:

• Perform replacement of Domestic Water Treatment Plant (DWTP) and BAS Upgrade

• Provide an onsite assessment of the facility for modernization of the domestic water distribution system to pump, monitor, log and report production and usage at the site.

The assessment will provide a basic design document with points list, topology and scope to provide the US Embassy Bujumbura with desired usage reporting.

• Installation Checklist:

• The following points should be reviewed in preparation for installation, and again when installation is complete.

i. Review wiring diagram to ensure that all of the safety/wiring requirements have been met.

ii. Check that all equipment at job site matches the DESIGN DRAWING

SPECIFICATIONS for the tank sizes and control features required.

iii. The console should be located as close as possible to the demarcation point of the hazardous area. Never mount inside the hazardous area.

iv. POWER to the console should be properly wired to a DEDICATED

120/240 VAC CIRCUIT BREAKER. No other equipment can be powered from the same circuit breaker as the PLC/HMI panel.

v. System cannot be connected to equipment that uses or generates more than 250 volts with respect to earth.

vi. All PLC/HMI control panel grounds must be terminated at the GND BUSS BAR in the same service panel as fuel distribution power. A grounding rod, Coldwater pipe or other connection should not be used.

vii. The probe inputs and the sensor inputs are two different intrinsically safe circuits and must be installed in separate cables or in one cable which has suitable insulation. Refer to NEC Article 504-30 (b) for additional information.

viii. Do not drill or modify enclosure. Use only knockouts provided. Failure to comply will void warranty and may present a safety hazard.

ix. I.S. cabling should be selected from the Cable Selection Chart. Each probe or sensor wire/cable run SHOULD NOT EXCEED THE MAXIMUM DISTANCE RATING ON THE CABLE SELECTION CHART. Color-coding or numbering is highly recommended.

x. WATERPROOFING FIELD WIRE SPLICES using factory supplied splice kits is required for proper system operation.

5. BAS SYSTEM UPGRADE

The Contractor shall conduct the upgrade which will include but not limited to the following tasks to the existing Embassy Fuel monitoring system.

5.1 Installation, Upgrade & Training of the Domestic water treatment plant new PLC Setup.

5.2 Installation of PLC, HMIs, BACnet Converter and integration to BAS System.

6 PERFORMANCE INSPECTION AND REPORTS

6.1 Inspection

The Contractor shall complete a detailed inspection report (Exhibit A) following a detailed walk-thru inspection on the yearly PM or as agreed with US Embassy Bujumbura at the time of commencement of the contract. This report shall be submitted electronically in a form suitable to the US Embassy Bujumbura addressing, as a minimum, the criteria identified in the report template.

The Contractor will undertake the inspection with a representative of the US Embassy Bujumbura and report any incidents that have the potential to cause damage to the system.

7 PHOTOS AND CONTROL DIAGRAMS

Following are the photos of the system and control diagrams.

7.1 CONTROL DIAGRAMS

Figure 1.0 System P & I Diagram

END OF SOW

2. PERFORMAMNCE CRITERIA
3. UPGRADING SPECIFICATION DETAILS
4. DESCRIPTION OF THE WORKS
5. BAS SYSTEM UPGRADE
6 PERFORMANCE INSPECTION AND REPORTS
7 PHOTOS AND CONTROL DIAGRAMS

File details come from the government source that posted it. Updated .