Period_Prices_Mission_Wide_Transportation.docx

DOCX document 27 KB Posted

Attached to
U. S. Consulate SP Mission Wide Transportation Service
Solicitation number
19BR9318Q0033
Issued by

About this file

New period prices

View the file

Other files

File Type Posted
RFQ_Mission_Wide_Transportation_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.5 Base Period Prices

Unit of Measure
Rate per Unit
Estimated Quantity*
Total Est. Amount

(a) Packing Services

(1) Packaging

(i) Origin
Cubic meter (m3)
(ii) Destination
Cubic meter (m3)

(b) Unpacking Services

(1)Unpacking and removal of packaging materials
Cubic meter (m3)

(d) Freight Handling

Transportation between:

(1) Sao Paulo/Brasilia

0 – 10 Cubic meter (m3)
Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(2) Sao Paulo/Rio de Janeiro
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(3) Sao Paulo/Recife
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(4) Sao Paulo/Porto Allegre
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(5) Sao Paulo/Belo Horizonte
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(6) Sao Paulo/Sao Paulo
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(e) Manpower

(1) Day labor
Day

TOTAL:

B.6 First Option Year Prices Option Term: Twelve (12) Months

Unit of Measure
Rate per Unit
Estimated Quantity*
Total Est. Amount

(a) Packing Services

(1) Packaging

(i) Origin
Cubic meter (m3)
(ii) Destination
Cubic meter (m3)

(b) Unpacking Services

(1)Unpackaging and removal of packaging materials
Cubic meter (m3)

(d) Freight Handling

Transportation between:

(1) Sao Paulo/Brasilia

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(2) Sao Paulo/Rio de Janeiro
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(3) Sao Paulo/Recife
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(4) Sao Paulo/Porto Allegre
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(5) Sao Paulo/Belo Horizonte
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(6) Sao Paulo/Sao Paulo
Cubic meter (m3)

0 – 10 Cubic meter (m3)

11 – 20 Cubic meter (m3)

21 + Cubic meter (m3)

(e) Manpower

(1) Day labor
Day

TOTAL:

B.7 B.10 Grand Total

Base Year:

FIRST Option Year:

File details come from the government source that posted it.