This is a procurement document from the Iowa Department of Public Defense (DPD) seeking professional services for the turnkey installation of a commercial-grade emergency standby diesel generator at the Fairfield Armory located at 1501 W Stone Avenue, Fairfield, Iowa 52556. The scope of work encompasses delivery, on-site installation, and commissioning of the generator. A mandatory site visit is scheduled for August 18, 2026, at 10:00 a.m., with proposals due by September 1, 2026. The project involves the Fairfield Armory facility, a two-story building with multiple operational spaces including drill halls, classrooms, offices, storage areas, and support facilities totaling thousands of square feet across both floors.

The facility currently operates with a maximum electric demand of approximately 90.996 kW based on recent utility data. The contract will be managed by Philip Payton, the issuing officer, who can be reached at 515-975-6211 or philip.payton@dpd.iowa.gov. Additional details regarding specifications, technical requirements, and pricing terms are available through IMPACS. The place of performance is Jasper County, Fairfield, Iowa, with the project supporting critical infrastructure needs at this Iowa Army National Guard installation.

View the file

Other files

File Type Posted
1429061-event.pdf PDF
Fairfield RC Generation SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

ARMORY

FIRST FLOOR

FAIRFIELD

DATE:

SCALE:

AR

MY

NAT

IONALGUARD

IOWA

IOWA ARMY NATIONAL GUARD

INSTALLATION GEOSPATIAL INFORMATION & SERVICES

CAMP DODGE JOINT MANEUVER TRAINING CENTER

NGIA-CFM NOTE:

TO SCALE ONLY WHEN

PRINTED AT 11"X17"

1/32" = 1'-0

06 FEB 2026

N

S

EW

AutoCAD SHX Text

FAIRFIELD

AutoCAD SHX Text

ARMORY

AutoCAD SHX Text

SEE ADDITIONAL SHEET FOR

AutoCAD SHX Text

SECOND FLOOR

AutoCAD SHX Text

UPDATED: 8 OCTOBER 2020

AutoCAD SHX Text 129-2

AutoCAD SHX Text 115-1

AutoCAD SHX Text 109-1

AutoCAD SHX Text 109-2

AutoCAD SHX Text 110-2

AutoCAD SHX Text 120-4

AutoCAD SHX Text 134A

AutoCAD SHX Text 118B

AutoCAD SHX Text 131A

AutoCAD SHX Text

AutoCAD SHX Text 121A

AutoCAD SHX Text 133-2

AutoCAD SHX Text 124-1

AutoCAD SHX Text 120-3

AutoCAD SHX Text 110-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 121-1

AutoCAD SHX Text 129-1

AutoCAD SHX Text 126-4

AutoCAD SHX Text 120-1

AutoCAD SHX Text 121-2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 115-2

AutoCAD SHX Text

AutoCAD SHX Text 126-1

AutoCAD SHX Text 124-C

AutoCAD SHX Text 126A

AutoCAD SHX Text 120-2

AutoCAD SHX Text

AutoCAD SHX Text 121B

AutoCAD SHX Text

AutoCAD SHX Text 105-1

AutoCAD SHX Text 105-2

AutoCAD SHX Text 104B

AutoCAD SHX Text 104A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 133-1

AutoCAD SHX Text 131-1

AutoCAD SHX Text

AutoCAD SHX Text 126-3

AutoCAD SHX Text

AutoCAD SHX Text 101-2

AutoCAD SHX Text 100-2

AutoCAD SHX Text 100-1

AutoCAD SHX Text 101-1

AutoCAD SHX Text

AutoCAD SHX Text 112-1

AutoCAD SHX Text 101-3

AutoCAD SHX Text

AutoCAD SHX Text 127A

AutoCAD SHX Text 127B

AutoCAD SHX Text 102A

AutoCAD SHX Text

AutoCAD SHX Text 124-2

AutoCAD SHX Text 126-2

AutoCAD SHX Text 124-3

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TROOP

AutoCAD SHX Text

AutoCAD SHX Text

591 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TROOP

AutoCAD SHX Text 111B

AutoCAD SHX Text

79 SF

AutoCAD SHX Text

RECRUITING

AutoCAD SHX Text

AutoCAD SHX Text

231 SF

AutoCAD SHX Text

BREAK

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

322 SF

AutoCAD SHX Text

PHYSICAL

AutoCAD SHX Text

FITNESS

AutoCAD SHX Text

AutoCAD SHX Text

1065 SF

AutoCAD SHX Text

FOTS

AutoCAD SHX Text

AutoCAD SHX Text

172 SF

AutoCAD SHX Text

MOTHER'S

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

247 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 134A

AutoCAD SHX Text

51 SF

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

1068 SF

AutoCAD SHX Text

LATRINE

AutoCAD SHX Text

MALE

AutoCAD SHX Text

AutoCAD SHX Text

592 SF

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

AutoCAD SHX Text

277 SF

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

AutoCAD SHX Text

742 SF

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

287 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 127B

AutoCAD SHX Text

142 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

929 SF

AutoCAD SHX Text

VAULT

AutoCAD SHX Text 124C

AutoCAD SHX Text

181 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TROOP

AutoCAD SHX Text 124B

AutoCAD SHX Text

280 SF

AutoCAD SHX Text

AUDITORIUM

AutoCAD SHX Text

AutoCAD SHX Text

1399 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

904 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

410 SF

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

AutoCAD SHX Text

232 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

922 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

241 SF

AutoCAD SHX Text

WORK

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

298 SF

AutoCAD SHX Text

REHEARSAL

AutoCAD SHX Text

AutoCAD SHX Text

763 SF

AutoCAD SHX Text

REHEARSAL

AutoCAD SHX Text

AutoCAD SHX Text

436 SF

AutoCAD SHX Text

REHEARSAL

AutoCAD SHX Text

AutoCAD SHX Text

949 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 127A

AutoCAD SHX Text

142 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

646 SF

AutoCAD SHX Text

VAULT

AutoCAD SHX Text 126A

AutoCAD SHX Text

182 SF

AutoCAD SHX Text

NBC

AutoCAD SHX Text 126B

AutoCAD SHX Text

51 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

AutoCAD SHX Text

438 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TROOP

AutoCAD SHX Text 124A

AutoCAD SHX Text

299 SF

AutoCAD SHX Text 101-5

AutoCAD SHX Text 111-1

AutoCAD SHX Text 126-5

AutoCAD SHX Text 124-4

AutoCAD SHX Text 124-5

AutoCAD SHX Text

CO

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 102A

AutoCAD SHX Text

110 SF

AutoCAD SHX Text

DRILL

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

7190 SF

AutoCAD SHX Text

MAIL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

30 SF

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 129A

AutoCAD SHX Text

413 SF

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 129B

AutoCAD SHX Text

213 SF

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

124 SF

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

1753 SF

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

2926 SF

AutoCAD SHX Text

LATRINE

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

AutoCAD SHX Text

320 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text 121B

AutoCAD SHX Text

240 SF

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text 104A

AutoCAD SHX Text

102 SF

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text 104B

AutoCAD SHX Text

101 SF

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

116 SF

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text 129C

AutoCAD SHX Text

82 SF

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

129 SF

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text 118B

AutoCAD SHX Text

221 SF

ARMORY

SECOND FLOOR

FAIRFIELD

DATE:

SCALE:

AR

MY

NAT

IONALGUARD

IOWA

IOWA ARMY NATIONAL GUARD

INSTALLATION GEOSPATIAL INFORMATION & SERVICES

CAMP DODGE JOINT MANEUVER TRAINING CENTER

NGIA-CFM NOTE:

TO SCALE ONLY WHEN

PRINTED AT 11"X17"

1/8" = 1'-0

06 FEB 2026

N

S

EW

AutoCAD SHX Text

FAIRFIELD

AutoCAD SHX Text

ARMORY

AutoCAD SHX Text

UPDATED: 8 OCTOBER 2020

AutoCAD SHX Text 201-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 202-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 200-1

AutoCAD SHX Text

AutoCAD SHX Text 205A

AutoCAD SHX Text 205B

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

937 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

590 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 205A

AutoCAD SHX Text

113 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 205B

AutoCAD SHX Text

115 SF

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

675 SF

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

AutoCAD SHX Text

92 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

FACILITY

AutoCAD SHX Text

AutoCAD SHX Text

127 SF

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

358 SF

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

397 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

357 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

459 SF

AutoCAD SHX Text 202-2 n n n r r r

Ñ

O

O

O

O

O

O

O

O O

O

O

O

O

O

O

O

AUSB1

ARMRY

MVSB1

O Electrical Light

")G Electrical Generator

1 Electrical Transformer dR Electrical Meter

Ñ Electrical Switch

!j Communication Vault

Î YP Communication Pedestal èÅ Natural Gas Valve

&. Water Valve

Ñ Water Hydrant

!( Storm Sewer Manhole

!( Wastewater Manhole

!< Oil Water Separator

Fuel Tank

Utility Pole

Fiber Optic

Phone (Underground)

Phone (Overhead)

Electrical (Overhead)

Electrical (Underground)

Cable TV

Natural Gas

Water Line

Storm Sewer

Sanitary Sewer 11x17 Site Plan with Utilities v2.1

1501 W STONE AVE

Fairfield, IA 52556-2147 Lat: 41.01406 Lon: -91.98054 Site Number: 19B45

FAIRFIELD ARMORY

08 Mar 2022│Iowa Army National Guard│Installation Geospatial Information & Services │NGIA-DIM-P

1:1,110 Rotation: 0.9

0 100 20050 Feet

Name Fairfield RC

Filtered Largest to smallest for Demand Type Meter Date Start Time Demand Unit

Electric Max Demand 502029409-1 1/30/2026 14:00 90.996 kW Electric Max Demand 502029409-1 1/30/2026 17:00 84.132 kW Electric Max Demand 502029409-1 1/29/2026 10:00 83.7 kW Electric Max Demand 502029409-1 1/24/2026 8:00 82.548 kW Electric Max Demand 502029409-1 1/26/2026 9:00 81.336 kW Electric Max Demand 502029409-1 1/24/2026 22:00 81.336 kW Electric Max Demand 502029409-1 1/30/2026 21:00 80.7 kW Electric Max Demand 502029409-1 1/28/2026 8:00 79.788 kW Electric Max Demand 502029409-1 1/25/2026 2:00 79.716 kW Electric Max Demand 502029409-1 1/23/2026 23:00 79.368 kW Electric Max Demand 502029409-1 12/15/2025 5:00 78.696 kW Electric Max Demand 502029409-1 1/30/2026 15:00 78.504 kW Electric Max Demand 502029409-1 1/26/2026 8:00 78.312 kW Electric Max Demand 502029409-1 1/30/2026 9:00 78.252 kW Electric Max Demand 502029409-1 1/29/2026 21:00 78.228 kW Electric Max Demand 502029409-1 1/26/2026 17:00 78 kW Electric Max Demand 502029409-1 1/24/2026 4:00 77.892 kW Electric Max Demand 502029409-1 1/30/2026 22:00 77.832 kW Electric Max Demand 502029409-1 12/14/2025 7:00 77.832 kW Electric Max Demand 502029409-1 1/23/2026 15:00 77.688 kW Electric Max Demand 502029409-1 1/24/2026 12:00 77.316 kW Electric Max Demand 502029409-1 1/24/2026 0:00 77.112 kW Electric Max Demand 502029409-1 1/30/2026 23:00 77.064 kW Electric Max Demand 502029409-1 1/23/2026 18:00 76.92 kW Electric Max Demand 502029409-1 1/23/2026 12:00 76.872 kW Electric Max Demand 502029409-1 1/23/2026 22:00 76.812 kW Electric Max Demand 502029409-1 1/24/2026 23:00 76.764 kW Electric Max Demand 502029409-1 12/14/2025 23:00 76.728 kW Electric Max Demand 502029409-1 1/24/2026 19:00 76.716 kW Electric Max Demand 502029409-1 12/14/2025 21:00 76.692 kW Electric Max Demand 502029409-1 1/31/2026 2:00 76.608 kW Electric Max Demand 502029409-1 12/15/2025 8:00 76.584 kW Electric Max Demand 502029409-1 1/26/2026 20:00 76.176 kW Electric Max Demand 502029409-1 1/24/2026 1:00 76.032 kW Electric Max Demand 502029409-1 1/24/2026 7:00 76.032 kW Electric Max Demand 502029409-1 1/25/2026 8:00 76.02 kW Electric Max Demand 502029409-1 1/26/2026 4:00 75.948 kW Electric Max Demand 502029409-1 1/25/2026 3:00 75.888 kW Electric Max Demand 502029409-1 1/26/2026 10:00 75.864 kW Electric Max Demand 502029409-1 1/19/2026 19:00 75.852 kW

1501 W STONE AVE FAIRFIELD IA 52556

Account Number 5849011000

Electric Max Demand 502029409-1 1/19/2026 6:00 75.72 kW Electric Max Demand 502029409-1 1/30/2026 18:00 75.576 kW Electric Max Demand 502029409-1 12/19/2025 9:00 75.336 kW Electric Max Demand 502029409-1 1/27/2026 11:00 75.288 kW Electric Max Demand 502029409-1 1/23/2026 5:00 75.252 kW Electric Max Demand 502029409-1 1/25/2026 0:00 75.156 kW Electric Max Demand 502029409-1 1/31/2026 8:00 75.132 kW Electric Max Demand 502029409-1 1/25/2026 22:00 74.976 kW Electric Max Demand 502029409-1 1/24/2026 18:00 74.94 kW Electric Max Demand 502029409-1 9/14/2025 10:00 74.928 kW Electric Max Demand 502029409-1 1/18/2026 5:00 74.868 kW Electric Max Demand 502029409-1 1/30/2026 7:00 74.436 kW Electric Max Demand 502029409-1 1/30/2026 8:00 74.364 kW Electric Max Demand 502029409-1 1/27/2026 20:00 74.34 kW Electric Max Demand 502029409-1 1/24/2026 13:00 74.316 kW Electric Max Demand 502029409-1 1/25/2026 19:00 74.304 kW Electric Max Demand 502029409-1 12/4/2025 10:00 74.292 kW Electric Max Demand 502029409-1 1/31/2026 7:00 74.16 kW Electric Max Demand 502029409-1 1/31/2026 5:00 74.148 kW Electric Max Demand 502029409-1 1/25/2026 1:00 74.064 kW Electric Max Demand 502029409-1 1/27/2026 8:00 74.04 kW Electric Max Demand 502029409-1 12/4/2025 11:00 74.028 kW Electric Max Demand 502029409-1 1/26/2026 19:00 74.016 kW Electric Max Demand 502029409-1 1/26/2026 2:00 73.956 kW Electric Max Demand 502029409-1 1/26/2026 11:00 73.956 kW Electric Max Demand 502029409-1 1/30/2026 16:00 73.932 kW Electric Max Demand 502029409-1 7/27/2026 15:00 73.8 kW Electric Max Demand 502029409-1 12/15/2025 1:00 73.8 kW Electric Max Demand 502029409-1 12/14/2025 22:00 73.8 kW Electric Max Demand 502029409-1 1/25/2026 13:00 73.536 kW Electric Max Demand 502029409-1 1/28/2026 6:00 73.392 kW Electric Max Demand 502029409-1 1/23/2026 14:00 73.368 kW Electric Max Demand 502029409-1 1/26/2026 6:00 73.356 kW Electric Max Demand 502029409-1 12/14/2025 5:00 73.32 kW Electric Max Demand 502029409-1 1/30/2026 6:00 73.308 kW Electric Max Demand 502029409-1 12/4/2025 21:00 73.284 kW Electric Max Demand 502029409-1 1/20/2026 0:00 73.26 kW Electric Max Demand 502029409-1 1/25/2026 4:00 73.224 kW Electric Max Demand 502029409-1 12/14/2025 20:00 73.08 kW Electric Max Demand 502029409-1 1/29/2026 19:00 73.068 kW Electric Max Demand 502029409-1 12/29/2025 13:00 73.056 kW Electric Max Demand 502029409-1 1/19/2026 21:00 73.008 kW Electric Max Demand 502029409-1 1/26/2026 13:00 72.984 kW Electric Max Demand 502029409-1 2/1/2026 6:00 72.972 kW

Electric Max Demand 502029409-1 9/14/2025 11:00 72.948 kW Electric Max Demand 502029409-1 1/27/2026 23:00 72.888 kW Electric Max Demand 502029409-1 1/23/2026 13:00 72.864 kW Electric Max Demand 502029409-1 12/15/2025 2:00 72.864 kW Electric Max Demand 502029409-1 1/24/2026 14:00 72.852 kW Electric Max Demand 502029409-1 1/20/2026 6:00 72.756 kW Electric Max Demand 502029409-1 2/1/2026 5:00 72.744 kW Electric Max Demand 502029409-1 1/26/2026 12:00 72.684 kW Electric Max Demand 502029409-1 1/29/2026 8:00 72.672 kW Electric Max Demand 502029409-1 1/25/2026 23:00 72.672 kW Electric Max Demand 502029409-1 1/18/2026 23:00 72.648 kW Electric Max Demand 502029409-1 1/24/2026 5:00 72.612 kW Electric Max Demand 502029409-1 1/19/2026 5:00 72.6 kW Electric Max Demand 502029409-1 1/24/2026 3:00 72.576 kW Electric Max Demand 502029409-1 1/23/2026 21:00 72.504 kW Electric Max Demand 502029409-1 12/15/2025 7:00 72.432 kW Electric Max Demand 502029409-1 1/25/2026 20:00 72.396 kW Electric Max Demand 502029409-1 12/14/2025 0:00 72.36 kW Electric Max Demand 502029409-1 1/30/2026 20:00 72.348 kW Electric Max Demand 502029409-1 1/31/2026 9:00 72.3 kW Electric Max Demand 502029409-1 1/25/2026 6:00 72.24 kW Electric Max Demand 502029409-1 12/13/2025 20:00 72.216 kW Electric Max Demand 502029409-1 7/1/2026 10:00 72.192 kW Electric Max Demand 502029409-1 1/29/2026 7:00 72.144 kW Electric Max Demand 502029409-1 1/25/2026 18:00 72.12 kW Electric Max Demand 502029409-1 1/24/2026 2:00 72.06 kW Electric Max Demand 502029409-1 1/28/2026 9:00 72.024 kW Electric Max Demand 502029409-1 12/4/2025 9:00 72.012 kW Electric Max Demand 502029409-1 2/7/2026 7:00 71.988 kW Electric Max Demand 502029409-1 1/25/2026 7:00 71.964 kW Electric Max Demand 502029409-1 1/11/2026 7:00 71.964 kW Electric Max Demand 502029409-1 12/14/2025 9:00 71.952 kW Electric Max Demand 502029409-1 1/18/2026 4:00 71.928 kW Electric Max Demand 502029409-1 7/3/2026 16:00 71.916 kW Electric Max Demand 502029409-1 7/27/2026 16:00 71.88 kW Electric Max Demand 502029409-1 1/24/2026 6:00 71.796 kW Electric Max Demand 502029409-1 1/26/2026 21:00 71.7 kW Electric Max Demand 502029409-1 1/18/2026 6:00 71.7 kW Electric Max Demand 502029409-1 1/20/2026 4:00 71.676 kW Electric Max Demand 502029409-1 1/26/2026 7:00 71.664 kW Electric Max Demand 502029409-1 1/27/2026 9:00 71.628 kW Electric Max Demand 502029409-1 12/29/2025 8:00 71.412 kW Electric Max Demand 502029409-1 7/1/2026 11:00 71.328 kW Electric Max Demand 502029409-1 1/19/2026 1:00 71.316 kW

Electric Max Demand 502029409-1 3/14/2026 9:00 71.304 kW Electric Max Demand 502029409-1 7/27/2026 13:00 71.268 kW Electric Max Demand 502029409-1 12/4/2025 18:00 71.268 kW Electric Max Demand 502029409-1 12/4/2025 8:00 71.256 kW Electric Max Demand 502029409-1 12/29/2025 5:00 71.232 kW Electric Max Demand 502029409-1 1/25/2026 9:00 71.124 kW Electric Max Demand 502029409-1 1/31/2026 6:00 71.052 kW Electric Max Demand 502029409-1 12/15/2025 0:00 71.04 kW Electric Max Demand 502029409-1 1/27/2026 21:00 71.004 kW Electric Max Demand 502029409-1 1/26/2026 1:00 71.004 kW Electric Max Demand 502029409-1 1/23/2026 16:00 70.992 kW Electric Max Demand 502029409-1 3/17/2026 8:00 70.944 kW Electric Max Demand 502029409-1 7/27/2026 14:00 70.92 kW Electric Max Demand 502029409-1 12/8/2025 9:00 70.908 kW Electric Max Demand 502029409-1 12/7/2025 23:00 70.716 kW Electric Max Demand 502029409-1 1/24/2026 16:00 70.68 kW Electric Max Demand 502029409-1 12/29/2025 12:00 70.68 kW Electric Max Demand 502029409-1 1/19/2026 22:00 70.632 kW Electric Max Demand 502029409-1 12/14/2025 17:00 70.632 kW Electric Max Demand 502029409-1 1/29/2026 2:00 70.596 kW Electric Max Demand 502029409-1 12/14/2025 19:00 70.596 kW Electric Max Demand 502029409-1 1/30/2026 1:00 70.572 kW Electric Max Demand 502029409-1 1/26/2026 0:00 70.56 kW Electric Max Demand 502029409-1 1/26/2026 14:00 70.56 kW Electric Max Demand 502029409-1 12/5/2025 8:00 70.44 kW Electric Max Demand 502029409-1 1/28/2026 10:00 70.428 kW Electric Max Demand 502029409-1 1/23/2026 6:00 70.404 kW Electric Max Demand 502029409-1 7/1/2026 14:00 70.392 kW Electric Max Demand 502029409-1 12/30/2025 1:00 70.38 kW Electric Max Demand 502029409-1 12/13/2025 22:00 70.284 kW Electric Max Demand 502029409-1 12/8/2025 7:00 70.284 kW Electric Max Demand 502029409-1 12/14/2025 14:00 70.272 kW Electric Max Demand 502029409-1 1/30/2026 19:00 70.152 kW Electric Max Demand 502029409-1 1/29/2026 9:00 70.044 kW Electric Max Demand 502029409-1 1/23/2026 10:00 70.02 kW Electric Max Demand 502029409-1 1/17/2026 8:00 69.996 kW Electric Max Demand 502029409-1 1/26/2026 18:00 69.876 kW Electric Max Demand 502029409-1 2/1/2026 4:00 69.864 kW Electric Max Demand 502029409-1 1/26/2026 23:00 69.852 kW Electric Max Demand 502029409-1 7/3/2026 17:00 69.84 kW Electric Max Demand 502029409-1 1/28/2026 22:00 69.84 kW Electric Max Demand 502029409-1 1/24/2026 11:00 69.816 kW Electric Max Demand 502029409-1 1/18/2026 8:00 69.804 kW Electric Max Demand 502029409-1 1/23/2026 9:00 69.768 kW

Electric Max Demand 502029409-1 1/28/2026 2:00 69.756 kW Electric Max Demand 502029409-1 1/20/2026 2:00 69.696 kW Electric Max Demand 502029409-1 1/15/2026 10:00 69.684 kW Electric Max Demand 502029409-1 1/19/2026 7:00 69.66 kW Electric Max Demand 502029409-1 7/1/2026 13:00 69.636 kW Electric Max Demand 502029409-1 1/19/2026 8:00 69.624 kW Electric Max Demand 502029409-1 12/29/2025 9:00 69.624 kW Electric Max Demand 502029409-1 1/24/2026 21:00 69.612 kW Electric Max Demand 502029409-1 1/27/2026 7:00 69.552 kW Electric Max Demand 502029409-1 1/20/2026 9:00 69.528 kW Electric Max Demand 502029409-1 1/17/2026 20:00 69.504 kW Electric Max Demand 502029409-1 12/14/2025 3:00 69.492 kW Electric Max Demand 502029409-1 1/27/2026 13:00 69.444 kW Electric Max Demand 502029409-1 12/14/2025 6:00 69.444 kW Electric Max Demand 502029409-1 7/3/2026 15:00 69.324 kW Electric Max Demand 502029409-1 1/26/2026 22:00 69.324 kW Electric Max Demand 502029409-1 1/25/2026 10:00 69.324 kW Electric Max Demand 502029409-1 1/31/2026 4:00 69.312 kW Electric Max Demand 502029409-1 1/25/2026 12:00 69.276 kW Electric Max Demand 502029409-1 1/20/2026 3:00 69.24 kW Electric Max Demand 502029409-1 1/27/2026 18:00 69.12 kW Electric Max Demand 502029409-1 2/23/2026 7:00 69.096 kW Electric Max Demand 502029409-1 2/6/2026 10:00 69.084 kW Electric Max Demand 502029409-1 12/4/2025 22:00 69.084 kW Electric Max Demand 502029409-1 1/23/2026 3:00 69.06 kW Electric Max Demand 502029409-1 7/27/2026 17:00 69 kW Electric Max Demand 502029409-1 2/4/2026 9:00 68.988 kW Electric Max Demand 502029409-1 1/24/2026 10:00 68.988 kW Electric Max Demand 502029409-1 1/19/2026 4:00 68.988 kW Electric Max Demand 502029409-1 12/8/2025 5:00 68.964 kW Electric Max Demand 502029409-1 1/24/2026 17:00 68.94 kW Electric Max Demand 502029409-1 12/15/2025 3:00 68.94 kW Electric Max Demand 502029409-1 1/24/2026 20:00 68.928 kW Electric Max Demand 502029409-1 1/19/2026 14:00 68.928 kW Electric Max Demand 502029409-1 1/27/2026 10:00 68.904 kW Electric Max Demand 502029409-1 1/30/2026 0:00 68.868 kW Electric Max Demand 502029409-1 12/15/2025 4:00 68.844 kW Electric Max Demand 502029409-1 1/28/2026 20:00 68.76 kW Electric Max Demand 502029409-1 2/1/2026 10:00 68.748 kW Electric Max Demand 502029409-1 1/27/2026 14:00 68.748 kW Electric Max Demand 502029409-1 2/23/2026 4:00 68.724 kW Electric Max Demand 502029409-1 1/23/2026 17:00 68.604 kW Electric Max Demand 502029409-1 12/14/2025 8:00 68.604 kW Electric Max Demand 502029409-1 7/1/2026 15:00 68.532 kW

Electric Max Demand 502029409-1 1/23/2026 19:00 68.52 kW Electric Max Demand 502029409-1 12/4/2025 12:00 68.508 kW Electric Max Demand 502029409-1 12/13/2025 17:00 68.472 kW Electric Max Demand 502029409-1 7/27/2026 12:00 68.448 kW Electric Max Demand 502029409-1 2/3/2026 22:00 68.448 kW Electric Max Demand 502029409-1 12/13/2025 16:00 68.376 kW Electric Max Demand 502029409-1 1/19/2026 12:00 68.364 kW Electric Max Demand 502029409-1 2/23/2026 8:00 68.304 kW Electric Max Demand 502029409-1 12/14/2025 18:00 68.268 kW Electric Max Demand 502029409-1 1/17/2026 22:00 68.244 kW Electric Max Demand 502029409-1 12/12/2025 9:00 68.196 kW Electric Max Demand 502029409-1 1/19/2026 23:00 68.184 kW Electric Max Demand 502029409-1 1/24/2026 15:00 68.16 kW Electric Max Demand 502029409-1 1/25/2026 5:00 68.124 kW Electric Max Demand 502029409-1 12/13/2025 14:00 68.088 kW Electric Max Demand 502029409-1 12/8/2025 0:00 68.076 kW Electric Max Demand 502029409-1 7/1/2026 12:00 68.04 kW Electric Max Demand 502029409-1 1/19/2026 10:00 68.016 kW Electric Max Demand 502029409-1 7/3/2026 18:00 67.968 kW Electric Max Demand 502029409-1 12/14/2025 1:00 67.944 kW Electric Max Demand 502029409-1 12/29/2025 0:00 67.932 kW Electric Max Demand 502029409-1 12/13/2025 12:00 67.932 kW Electric Max Demand 502029409-1 1/19/2026 3:00 67.896 kW Electric Max Demand 502029409-1 1/17/2026 18:00 67.872 kW Electric Max Demand 502029409-1 1/28/2026 4:00 67.86 kW Electric Max Demand 502029409-1 2/4/2026 8:00 67.836 kW Electric Max Demand 502029409-1 1/11/2026 8:00 67.836 kW Electric Max Demand 502029409-1 1/25/2026 15:00 67.824 kW Electric Max Demand 502029409-1 1/29/2026 11:00 67.8 kW Electric Max Demand 502029409-1 12/28/2025 23:00 67.8 kW Electric Max Demand 502029409-1 1/20/2026 7:00 67.752 kW Electric Max Demand 502029409-1 1/15/2026 9:00 67.74 kW Electric Max Demand 502029409-1 1/18/2026 3:00 67.728 kW Electric Max Demand 502029409-1 12/29/2025 10:00 67.728 kW Electric Max Demand 502029409-1 12/15/2025 9:00 67.692 kW Electric Max Demand 502029409-1 1/31/2026 0:00 67.62 kW Electric Max Demand 502029409-1 2/23/2026 0:00 67.584 kW Electric Max Demand 502029409-1 1/25/2026 21:00 67.5 kW Electric Max Demand 502029409-1 12/15/2025 12:00 67.476 kW Electric Max Demand 502029409-1 7/1/2026 16:00 67.392 kW Electric Max Demand 502029409-1 12/14/2025 12:00 67.392 kW Electric Max Demand 502029409-1 1/19/2026 18:00 67.356 kW Electric Max Demand 502029409-1 2/23/2026 2:00 67.344 kW Electric Max Demand 502029409-1 2/8/2026 7:00 67.32 kW

Electric Max Demand 502029409-1 1/29/2026 4:00 67.308 kW Electric Max Demand 502029409-1 1/26/2026 5:00 67.188 kW Electric Max Demand 502029409-1 1/26/2026 3:00 67.164 kW Electric Max Demand 502029409-1 1/28/2026 12:00 67.152 kW Electric Max Demand 502029409-1 1/25/2026 14:00 67.104 kW Electric Max Demand 502029409-1 1/18/2026 2:00 67.104 kW Electric Max Demand 502029409-1 1/29/2026 17:00 67.092 kW Electric Max Demand 502029409-1 12/4/2025 17:00 67.092 kW Electric Max Demand 502029409-1 1/18/2026 22:00 67.032 kW Electric Max Demand 502029409-1 1/23/2026 20:00 67.02 kW Electric Max Demand 502029409-1 12/29/2025 1:00 67.02 kW Electric Max Demand 502029409-1 1/30/2026 4:00 66.984 kW Electric Max Demand 502029409-1 7/1/2026 17:00 66.912 kW Electric Max Demand 502029409-1 1/29/2026 6:00 66.9 kW Electric Max Demand 502029409-1 1/29/2026 18:00 66.888 kW Electric Max Demand 502029409-1 1/18/2026 9:00 66.888 kW Electric Max Demand 502029409-1 12/29/2025 11:00 66.876 kW Electric Max Demand 502029409-1 12/30/2025 4:00 66.864 kW Electric Max Demand 502029409-1 2/22/2026 8:00 66.768 kW Electric Max Demand 502029409-1 1/31/2026 3:00 66.744 kW Electric Max Demand 502029409-1 12/14/2025 2:00 66.744 kW Electric Max Demand 502029409-1 1/19/2026 13:00 66.672 kW Electric Max Demand 502029409-1 1/17/2026 4:00 66.648 kW Electric Max Demand 502029409-1 12/13/2025 7:00 66.648 kW Electric Max Demand 502029409-1 1/20/2026 1:00 66.612 kW Electric Max Demand 502029409-1 12/13/2025 23:00 66.576 kW Electric Max Demand 502029409-1 1/29/2026 23:00 66.552 kW Electric Max Demand 502029409-1 1/23/2026 8:00 66.54 kW Electric Max Demand 502029409-1 12/15/2025 6:00 66.54 kW Electric Max Demand 502029409-1 1/22/2026 22:00 66.516 kW Electric Max Demand 502029409-1 12/8/2025 8:00 66.516 kW Electric Max Demand 502029409-1 1/28/2026 3:00 66.492 kW Electric Max Demand 502029409-1 12/13/2025 18:00 66.48 kW Electric Max Demand 502029409-1 2/3/2026 21:00 66.456 kW Electric Max Demand 502029409-1 3/16/2026 12:00 66.432 kW Electric Max Demand 502029409-1 1/27/2026 19:00 66.432 kW Electric Max Demand 502029409-1 1/27/2026 12:00 66.42 kW Electric Max Demand 502029409-1 12/7/2025 20:00 66.384 kW Electric Max Demand 502029409-1 1/24/2026 9:00 66.372 kW Electric Max Demand 502029409-1 1/21/2026 8:00 66.372 kW Electric Max Demand 502029409-1 2/1/2026 3:00 66.336 kW Electric Max Demand 502029409-1 1/27/2026 1:00 66.324 kW Electric Max Demand 502029409-1 12/13/2025 10:00 66.324 kW Electric Max Demand 502029409-1 12/8/2025 6:00 66.324 kW

Electric Max Demand 502029409-1 12/30/2025 6:00 66.312 kW Electric Max Demand 502029409-1 12/1/2025 19:00 66.312 kW Electric Max Demand 502029409-1 1/25/2026 17:00 66.3 kW Electric Max Demand 502029409-1 1/28/2026 11:00 66.288 kW Electric Max Demand 502029409-1 12/4/2025 20:00 66.288 kW Electric Max Demand 502029409-1 1/22/2026 21:00 66.276 kW Electric Max Demand 502029409-1 1/19/2026 2:00 66.252 kW Electric Max Demand 502029409-1 12/6/2025 7:00 66.252 kW Electric Max Demand 502029409-1 2/3/2026 23:00 66.216 kW Electric Max Demand 502029409-1 12/14/2025 11:00 66.204 kW Electric Max Demand 502029409-1 1/31/2026 10:00 66.18 kW Electric Max Demand 502029409-1 1/20/2026 8:00 66.12 kW Electric Max Demand 502029409-1 2/1/2026 1:00 66.108 kW Electric Max Demand 502029409-1 1/19/2026 16:00 66.096 kW Electric Max Demand 502029409-1 2/4/2026 3:00 66.084 kW Electric Max Demand 502029409-1 2/1/2026 7:00 66.072 kW Electric Max Demand 502029409-1 12/29/2025 6:00 66.048 kW Electric Max Demand 502029409-1 1/18/2026 0:00 66.024 kW Electric Max Demand 502029409-1 12/30/2025 7:00 65.976 kW Electric Max Demand 502029409-1 1/28/2026 23:00 65.916 kW Electric Max Demand 502029409-1 1/18/2026 20:00 65.916 kW Electric Max Demand 502029409-1 12/14/2025 16:00 65.904 kW Electric Max Demand 502029409-1 12/30/2025 3:00 65.868 kW Electric Max Demand 502029409-1 1/30/2026 2:00 65.844 kW Electric Max Demand 502029409-1 1/18/2026 1:00 65.832 kW Electric Max Demand 502029409-1 12/19/2025 8:00 65.748 kW Electric Max Demand 502029409-1 12/29/2025 7:00 65.736 kW Electric Max Demand 502029409-1 2/1/2026 2:00 65.724 kW Electric Max Demand 502029409-1 12/13/2025 5:00 65.592 kW Electric Max Demand 502029409-1 1/28/2026 5:00 65.58 kW Electric Max Demand 502029409-1 1/27/2026 2:00 65.58 kW Electric Max Demand 502029409-1 2/22/2026 22:00 65.568 kW Electric Max Demand 502029409-1 12/1/2025 9:00 65.544 kW Electric Max Demand 502029409-1 12/19/2025 7:00 65.52 kW Electric Max Demand 502029409-1 1/17/2026 16:00 65.508 kW Electric Max Demand 502029409-1 1/26/2026 16:00 65.496 kW Electric Max Demand 502029409-1 1/17/2026 21:00 65.496 kW Electric Max Demand 502029409-1 1/29/2026 16:00 65.484 kW Electric Max Demand 502029409-1 1/27/2026 5:00 65.484 kW Electric Max Demand 502029409-1 12/30/2025 9:00 65.484 kW Electric Max Demand 502029409-1 1/28/2026 15:00 65.472 kW Electric Max Demand 502029409-1 2/22/2026 6:00 65.46 kW Electric Max Demand 502029409-1 1/20/2026 11:00 65.46 kW Electric Max Demand 502029409-1 1/23/2026 2:00 65.436 kW

Electric Max Demand 502029409-1 1/17/2026 15:00 65.436 kW Electric Max Demand 502029409-1 1/30/2026 5:00 65.412 kW Electric Max Demand 502029409-1 3/17/2026 6:00 65.376 kW Electric Max Demand 502029409-1 1/31/2026 20:00 65.376 kW Electric Max Demand 502029409-1 2/1/2026 8:00 65.364 kW Electric Max Demand 502029409-1 12/4/2025 19:00 65.34 kW Electric Max Demand 502029409-1 1/11/2026 9:00 65.304 kW Electric Max Demand 502029409-1 12/29/2025 16:00 65.268 kW Electric Max Demand 502029409-1 12/4/2025 3:00 65.22 kW Electric Max Demand 502029409-1 12/4/2025 6:00 65.22 kW Electric Max Demand 502029409-1 12/29/2025 4:00 65.208 kW Electric Max Demand 502029409-1 12/3/2025 23:00 65.112 kW Electric Max Demand 502029409-1 7/1/2026 18:00 65.1 kW Electric Max Demand 502029409-1 2/23/2026 5:00 65.1 kW Electric Max Demand 502029409-1 1/30/2026 10:00 65.088 kW Electric Max Demand 502029409-1 12/1/2025 22:00 65.088 kW Electric Max Demand 502029409-1 1/18/2026 7:00 65.076 kW Electric Max Demand 502029409-1 1/19/2026 0:00 65.04 kW Electric Max Demand 502029409-1 1/29/2026 0:00 65.028 kW Electric Max Demand 502029409-1 2/4/2026 5:00 65.016 kW Electric Max Demand 502029409-1 1/15/2026 11:00 65.004 kW Electric Max Demand 502029409-1 1/19/2026 20:00 64.992 kW Electric Max Demand 502029409-1 1/22/2026 23:00 64.98 kW Electric Max Demand 502029409-1 12/29/2025 19:00 64.932 kW Electric Max Demand 502029409-1 1/19/2026 9:00 64.896 kW Electric Max Demand 502029409-1 12/15/2025 11:00 64.896 kW Electric Max Demand 502029409-1 2/7/2026 8:00 64.872 kW Electric Max Demand 502029409-1 2/3/2026 20:00 64.848 kW Electric Max Demand 502029409-1 12/29/2025 2:00 64.836 kW Electric Max Demand 502029409-1 12/13/2025 19:00 64.8 kW Electric Max Demand 502029409-1 12/15/2025 13:00 64.764 kW Electric Max Demand 502029409-1 12/29/2025 20:00 64.74 kW Electric Max Demand 502029409-1 1/23/2026 0:00 64.68 kW Electric Max Demand 502029409-1 1/25/2026 11:00 64.668 kW Electric Max Demand 502029409-1 1/14/2026 21:00 64.656 kW Electric Max Demand 502029409-1 1/29/2026 14:00 64.584 kW Electric Max Demand 502029409-1 1/27/2026 0:00 64.584 kW Electric Max Demand 502029409-1 12/7/2025 14:00 64.584 kW Electric Max Demand 502029409-1 12/1/2025 12:00 64.548 kW Electric Max Demand 502029409-1 2/23/2026 9:00 64.536 kW Electric Max Demand 502029409-1 1/15/2026 8:00 64.536 kW Electric Max Demand 502029409-1 1/29/2026 22:00 64.512 kW Electric Max Demand 502029409-1 12/7/2025 7:00 64.5 kW Electric Max Demand 502029409-1 1/17/2026 19:00 64.488 kW

Electric Max Demand 502029409-1 2/23/2026 3:00 64.428 kW Electric Max Demand 502029409-1 1/17/2026 6:00 64.416 kW Electric Max Demand 502029409-1 12/18/2025 22:00 64.416 kW Electric Max Demand 502029409-1 1/17/2026 23:00 64.404 kW Electric Max Demand 502029409-1 12/14/2025 15:00 64.332 kW Electric Max Demand 502029409-1 1/20/2026 5:00 64.308 kW Electric Max Demand 502029409-1 12/14/2025 13:00 64.236 kW Electric Max Demand 502029409-1 12/8/2025 3:00 64.224 kW Electric Max Demand 502029409-1 12/3/2025 21:00 64.212 kW Electric Max Demand 502029409-1 7/17/2026 12:00 64.152 kW Electric Max Demand 502029409-1 2/23/2026 6:00 64.152 kW Electric Max Demand 502029409-1 12/6/2025 17:00 64.116 kW Electric Max Demand 502029409-1 12/8/2025 2:00 64.092 kW Electric Max Demand 502029409-1 12/5/2025 5:00 64.092 kW Electric Max Demand 502029409-1 1/29/2026 20:00 64.068 kW Electric Max Demand 502029409-1 12/4/2025 23:00 64.032 kW Electric Max Demand 502029409-1 2/1/2026 15:00 64.02 kW Electric Max Demand 502029409-1 2/4/2026 7:00 63.984 kW Electric Max Demand 502029409-1 1/18/2026 12:00 63.984 kW Electric Max Demand 502029409-1 12/5/2025 6:00 63.972 kW Electric Max Demand 502029409-1 1/27/2026 17:00 63.912 kW Electric Max Demand 502029409-1 12/30/2025 5:00 63.912 kW Electric Max Demand 502029409-1 1/15/2026 5:00 63.888 kW Electric Max Demand 502029409-1 12/4/2025 4:00 63.888 kW Electric Max Demand 502029409-1 1/15/2026 1:00 63.864 kW Electric Max Demand 502029409-1 2/3/2026 10:00 63.792 kW Electric Max Demand 502029409-1 1/22/2026 20:00 63.792 kW Electric Max Demand 502029409-1 9/13/2025 10:00 63.78 kW Electric Max Demand 502029409-1 2/1/2026 0:00 63.768 kW Electric Max Demand 502029409-1 12/19/2025 10:00 63.72 kW Electric Max Demand 502029409-1 12/4/2025 16:00 63.72 kW Electric Max Demand 502029409-1 7/20/2026 12:00 63.696 kW Electric Max Demand 502029409-1 1/23/2026 11:00 63.672 kW Electric Max Demand 502029409-1 1/22/2026 8:00 63.648 kW Electric Max Demand 502029409-1 12/29/2025 22:00 63.648 kW Electric Max Demand 502029409-1 1/29/2026 12:00 63.6 kW Electric Max Demand 502029409-1 1/21/2026 7:00 63.588 kW Electric Max Demand 502029409-1 1/29/2026 5:00 63.564 kW Electric Max Demand 502029409-1 12/29/2025 18:00 63.504 kW Electric Max Demand 502029409-1 12/5/2025 0:00 63.492 kW Electric Max Demand 502029409-1 12/8/2025 11:00 63.468 kW Electric Max Demand 502029409-1 12/7/2025 18:00 63.456 kW Electric Max Demand 502029409-1 2/23/2026 10:00 63.444 kW Electric Max Demand 502029409-1 1/29/2026 3:00 63.432 kW

Sheets and Views
19B45-ARMRY-001-11x17

File details come from the government source that posted it. Updated .