This document appears to be a Statement of Work (SOW) for the repair and modification of an air-cooled packaged chiller system located at the U.S. Embassy Chancery building in Vienna, Austria. The scope of work includes the replacement and modification of the hot gas line between the compressor and condenser, replacement of expansion valves, installation of shut-off valves and sight glasses in the liquid line, and replacement of the data interface cable between the control units. The work also involves system decommissioning, vacuuming, leak testing, evacuation, refrigerant recharging, and commissioning. The SOW provides a detailed list of the specific materials and labor required. The related federal contract opportunity has a solicitation number of 19AU9024Q0024 and is being issued by the U.S. Department of State for the chiller repairs at the Vienna Chancery facility. The contract is a lump-sum award with a net price listed.

View the file

Other files

File Type Posted
19AU9024Q0024_SF1449_Chiller_Repair.docx DOCX document
19AU9024Q0024_Solicitation_Chiller_Repair.docx DOCX document
19AU9024Q0024_Cover Letter_Chiller_Repair.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SOW_Chancery (1090 Vienna, Boltzmanngasse 16) Chiller repairs
LV_Chancery_ Boltzmanngasse 16, 1090 Wien- Instandsetzung Kaeltemaschine (Danfoss Turbocor)
ItemScope of work/LeistungsbeschreibungLump sum /€ net
Air cooled AIRSTACK packaged chiller (2 modules) with Danfoss TT300- twin turbine centrifugal compressor and Beckhoff control unit
Luftgekühlte AIRSTACK-Paketkältemaschine (2 Module) mit Danfoss TT300-Doppelturbinen-Radialverdichter und Beckhoff-Steuerung
1 (english)The scope of the offer is the replacement and modification of the hot gas line between compressor and condensor
in circuits 1 & 2 and the replacement of the expansion valves, installation of shut- off valves and sight glasses
in the liquid line for circuits 1 & 2 and the data interface cable replacment btw. FlexSys control unit and Turbocor 2.
Task list:
System decommissioning
System vacuuming
Installation and replacement of all components listed below
Leak test using technical nitrogen
Evacuation of the circuits
Filling the system using the refrigerant provided
Commissioning the system
Function & running check
Creation of a commissioning report
Entry in the test logbook
Documentation- R&I diagram in CAD
Labor:
System decommissioning, system vacuuming, installation 2 sight glasses, 8 Alco filter driers, 2 Danfoss check valves CHV-X 40D,
2 Danfoss shut-off valves SVA-S 40D, 4 Danfoss ball shut-off valves 35mm, leak testing, commissioning and function test together
with BAS technician, R&I diagram in CAD
Material:
2 liquid sight glasses DN32, 8 Alco filter driers/cores H48006969 for 2 systems, 2 Danfoss check valves CHV-X 40D,
2 Danfoss shut-off valves SVA-S 40D, 2 Danfoss ball shut-off valves 35mm 1-3/8", 2m copper pipes 35mm and 54mm incl. all
necessary incidentals and data interface cable Turbocor I/O modul
1(german)Gegenstand des Angebotes ist der Austausch und die Adaptierung der Heißgasleitung zwischen Verdichter und
und Verflüssiger in den Kreisläufen 1 & 2 und der Austausch der Expansionsventile, Einbau von Absperrventilen und Schaugläsern
in der Flüssigkeitsleitung für die Kreisläufe 1 & 2 und das Datenschnittstellenkabel btw. FlexSys-Steuereinheit und Turbocor 2.
Aufgabenliste:
Außerbetriebnahme der Anlage
Absaugen des Systems
Einbau und Austausch aller unten aufgeführten Komponenten
Dichtheitsprüfung mit technischem Stickstoff
Evakuierung der Kreisläufe
Befüllung der Anlage mit dem mitgelieferten Kältemittel
Inbetriebsetzung der Anlage
Funktions- und Laufkontrolle
Erstellung eines Inbetriebnahmeprotokolls
Eintrag in das Prüfbuch
Dokumentation - R&I-Schema in CAD
Arbeitsaufwand:
Außerbetriebnahme der Anlage, Absaugen der Anlage, Einbau von 2 Schaugläsern, 8 Alco Filtertrocknern, 2 Danfoss Rückschlagventilen
CHV-X40D, 2 Danfoss Absperrventile SVA-S 40D, 4 Danfoss Kugelabsperrventile 35mm, Dichtheitspruefung, Inbetriebnahme und
und Funktionstest mit MSR Techniker, R&I Schema in CAD
Material:
2 Flüssigkeitsschaugläser DN32, 8 Alco Filtertrockner/Kerne H48006969 für 2 Systeme, 2 Danfoss Rückschlagventile CHV-X 40D,
2 Danfoss Absperrventile SVA-S 40D, 2 Danfoss Kugelabsperrventile 35mm 1-3/8“, 2m Kupferrohre 35mm und 54mm inkl. allem
notwendigem Zubehör und Datenschnittstellenkabel Turbocor I/O modul

Lump sum €, net/Gesamtpreis € netto:

&P Facility Management/FAC July 2024