This document is a specification for the replacement of the central AC system at a U.S. government-owned residence in Vienna, Austria. The project involves decommissioning and dismantling the existing indoor and outdoor units, executing the design plans, installing a new VRF AC system including electrical work, commissioning the system, and providing documentation. Key details include an estimated project size of $25,000 to $100,000, a planned execution date of November/December 2024, and requirements such as providing performance bonds, adhering to U.S. government contract terms, and ensuring proper security clearances for personnel. The specification also outlines technical requirements for the new AC system components, installation, and testing. The related federal contract opportunity has a solicitation number of 19AU9024Q0016 and is being issued by the U.S. Department of State.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19AU9024Q0016_Cover Letter.pdf | ||
| 19AU9024Q0016_SF1442_Central AC Replacement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
American Embassy Vienna Bauvorhaben/Construction project: US- Botschaftsresidenz- Tuerkenschanzstrasse 22, 1180 Wien
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Leistungsverzeichnis / Specification
Page | 1 Facility Management/FAC June, 2024
ALLGEMEINE BESTIMMUNGEN
GENERAL REMARKS
Allgemeine Vorbemerkungen
General preliminary comments
1. Leistungsumfang
Dieses Leistungsverzeichnis umfasst die Sanierung der VRF-Klimaanlage der US- Botschaftsresidenz-
Tuerkenschanzstrasse 22, 1180 Wien fuer folgende Bereiche / Leistungsgruppen:
- Ausserbetriebnahme, Demontage und Entsorgung Bestandsanlagen und Anlagenteilen
- Ausfuehrungsplanung
- Montage VRF Anlage
- Elektroarbeiten
- Inbetriebnahme
- Dokumentation
Scope of work
This tender specification covers the AC replacement for the US- Embassy residence, Tuerkenschanzstrasse
22, 1180 Vienna for following areas:
- Decommissioning, dismantling and disposal existing indoor- & outdoor units
- Execution planning
- Installation VRF- AC system
- Electrical work
- Commissioning
- Documentation
2. Reihenfolge der Gültigkeit
Die Vertragsunterlagen gelten in folgender Reihenfolge:
• Auftragsschreiben
• Text des Leistungsverzeichnisses (Allgemeine und technische Bestimmungen vor
Leistungsbeschreibung)
• Projektspläne, Berechnungsunterlagen, Baubeschreibung und der Bauzeitplan
Sequence of Applicability
Contract documents apply in the following sequence:
• Written order (purchase order or contract)
• Text of the Tender Specifications (General remarks and technical comments before specifications)
• Project drawings, Technical specifications and Project time-schedule
3. Gültigkeit der Normen
Für dieses Projekt gelten die fachtechnischen ÖNORMEN und Gesetze in der zum Zeitpunkt der
Auftragserteilung gültigen Fassung.
Validity of the standards
For this project the specialist technical AUSTRIAN STANDARDS are applicable in the version stated at the time of awarding the contract.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 2 Facility Management/FAC June, 2024
4. Vorbehalte – Änderungen – Alternativen
Insoferne der Bieter Vorbehalte, Änderungen oder Alternativen zum Leistungsverzeichnis vorbringen möchte, sind diese in einem Begleitschreiben zum Angebot beizulegen. Die neue Schlusssumme muss sich aus dem begleitenden Schreiben bei der Eröffnung sofort erkennen lassen.
Für gleichartige Anlegenteile, bei denen Fabrikat und Type freigestellt sind, sind einheitliche Fabrikate anzubieten um die Ersatzteilhaltung und Wartung zu vereinfachen.
Reservations – Modifications – Alternatives
Insofar as the bidder wishes to present reservations, modifications or alternatives to the performance specification, these are to be enclosed in an accompanying letter to the quotation.
The new final sum must be immediately evident on opening the enclosed letter.
For similar type plant parts, for which brand and type are optional, uniform brands are to be offered in order to simplify the storage of spare parts and maintenance.
5. Ausführungsfristen / Termine
Für die Erbringung der dem Auftragnehmer übertragenen Leistungen gelten die vereinbarten
Ausführungsfristen.
Geplanter Ausfuehrungstermin: November/Dezember 2024
Sollten sich aus Gründen, die der Auftragnehmer zu vertreten hat, Verschiebungen von Terminen ergeben, so ist ein neuer Terminplan zu erstellen. Die neuen Fristen erlangen nach ihrer Bekanntgabe durch den
Auftraggeber die gleiche Rechtswirksamkeit wie die ursprünglich vereinbarten Termine.
Execution periods
For completion of the work given to the contractor, the agreed execution periods apply.
If, for reasons which the contractor has to justify - deadlines are postponed then a new schedule is to be drawn up. After their announcement these new periods acquire the same legal effectiveness as the originally agreed deadlines.
Execution date: November/December 2024
6. Vertragsgrundlagen
Im Falle einer Beauftragung finden die vertragsrechtlichen Bedingungen der U.S. Regierung Anwendung.
Im Detail können diese Bestimmungen ueber den Internet- link: http:// www.acquisition.gov/far abgerufen werden.
Etwaige eigene Lieferbedingungen des Bieters werden für die Erfüllung des Vertrages nicht anerkannt.
Basics of contract
In the event of being appointed to do the work, the legal contract provisions of the U.S. Government apply.
In detail these provisions can be reviewed in detail under the following internet link: http:// www.acquisition.gov/far
Any terms and conditions of the bidder himself are not recognized for the fulfillment of this contract.
7. Schadenersatz
Bei Nichteinhaltung der vereinbarten Termine ist der Auftraggeber berechtigt, Schadenersatzansprüche
(“Liquidated Damages”) entsprechend den vertragsrechtlichen Bestimmungen geltend zu machen.
Compensation, Liquidated damages
If the agreed deadlines are not met, the client is entitled to enforce compensation claims (“Liquidated
Damages”) in accordance with the legal contractual requirements.
http://www.acquisition.gov/far http://www.acquisition.gov/far
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 3 Facility Management/FAC June, 2024
8. Sicherstellungen
Bei Aufträgen mit einer Vertragssumme von US$ 30.000 (Netto-Herstellungssumme) oder darüber ist vom
Auftraggeber eine Sicherstellung in Höhe von 20% der Vertragssumme in Form einer abstrakten
Bankgarantie eines anerkannten in- oder ausländischen Bankinstitutes zu legen.
Bonds
For orders with a contractual Total of US$ 30,000 (excl. VAT) or above, a bond in the amount of 20% of the contractual total is to be deposited by the contractor in form of an abstract bank guarantee letter of a recognized local or foreign banking institute.
9. Zahlung
Die Leistungen sind nach Fertigstellung der Leistung und mängelfreier Übernahme mit Schlussrechnung abzurechnen.
Vorrangig gelten die Zahlungsbedingungen laut Auftragsschreiben.
Payment
The entire work is to be invoiced for by means of a final invoice after completion of the work and fault-free acceptance.
The payment conditions apply in priority as in the written order.
10. Preisbildung
Der Bieterpreis gilt fuer die vollstaendige, richtige, angemessene und professionelle, fertige Verarbeitung einschliesslich Material, wenn auch nicht ausdruecklich erwaehnt und darueber hinaus damit verbundene
Dienstleistungen, wie folgt:
Alle Maschinen, Werkzeuge, Geraete, Gerueste, Hebewerkzeuge, Krane, Sicherung und
Schutzmassnahmen, alle Verpackungen, Transporte, Lagerungen und Manipulationen und Entsorgungen.
Schutz von Bauteilen, Verkehrsanlagen, Geraeten um Bauschaeden oder Verletzungen zu vermeiden.
Pricing
The bidders price is for the complete, proper, appropriate and professional, ready to use workmanship, including all material, even if not specifically mentioned and beyond basics, manpower and associated services, in particular the following:
All machinery, tools, equipment, scaffolding, lifting gear, cranes, safeguarding and protection measure, all packaging, transportation, storage, manipulation and disposal
Protection of already built elements from dirt and damage until acceptance, the establishment, maintenance, opening and closing and dismateling of transport routes and openings, all connection and adapting work to adjacent components, regardless of the execution time inclusive all waste and material consumption and all appropriate action needed to prevent harassment of e.g. neighbors.
11. Leistungserbringung
Der Auftragnehmer bestätigt durch die Unterfertigung des Anbotes, dass er über alle erforderlichen
Materialien, Arbeitskräfte, Geräte und Einrichtungen sowie über die erforderlichen Erkenntnisse verfügt, um die bedungenen Leistungen fach- und termingerecht ausführen zu können.
Der Einsatz der Arbeitskräfte und Maschinen hat sich den jeweiligen Erfordernissen des Baufortschrittes anzupassen.
Jegliche Abdeck- und Reinigungsarbeiten sind in die Einheitspreise einzurechnen
Performance of work
By signing the offer, the contractor confirms that he has all the required materials, manpower, devices and equipment – as well as the required knowledge and skills-, in order to be able to carry out the stipulated work expertly and on schedule.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 4 Facility Management/FAC June, 2024
12. Zusammenwirken mehrerer Auftragnehmer
Jeder Auftragnehmer ist verpflichtet, von sich aus Koordination und Absprache mit den anderen auf der
Baustelle beschäftigten Auftragnehmern zu suchen.
Collaboration of several contractors
Each contractor is obliged to seek coordination and agreement with the other contractors working on the construction site.
13. Prüfpflicht, Naturmasse
Der Auftragnehmer hat Vorgewerke hinsichtlich termingerechter Erbringung von Vorleistungen und
Qualität zu prüfen und den Auftraggeber rechtzeitig über etwaige Probleme zu informieren.
Duty of checking on-site conditions
The contractor has to check on-site conditions and advanced work from other contractors in regard of scheduled completion and quality and in case of problems has to inform the client timely.
Before starting production or the work, on-site measurements have to be taken in good time.
14. Recht, Vertragsstreitigkeiten
Für die Erfüllung dieses Vertrages gilt amerikanisches Recht. Vertragsstreitigkeiten werden nach dem
U.S.”Contract Disputes Act of 1978, as amended (U.S.C.601-613) abgehandelt.
Law, Contract disputes
For the fulfilling of this contract, U.S. law applies.
Contract disputes will be dealt with in accordance with the U.S. “Contract Disputes Act of 1987, as amended (U.S.C. 601-613)”.
15. Teilvergaben
Es ist möglich, dass verschiedene ausgeschriebene Teilleistungen auf Entscheid des Auftraggebers nicht ausgeführt warden.
Der Auftragnehmer kann daraus keinerlei Mehrforderungen ableiten und hat die verbleibenden Leistungen zu den auf Grund der Ausschreibung gültigen Einheitspreisen zu erbringen.
Partial allocation
It is possible that various tendered sub-tasks are, at the decision of the client, not executed. The contractor cannot make any additional demands, whatsoever from this and has to complete the remaining work at the unit prices which apply, based on the tender.
16. Gewährleistung, Mängel
Der Auftragnehmer haftet für die einwandfreie Ausführung der gewöhnlich vorausgesetzten und vertraglich bedungenen Leistungserbringung sowie für die einwandfreie Beschaffenheit aller von ihm verwendeten
Baustoffe und Materialien.
Werden vom Auftraggeber Materialien beigestellt, so hat der Auftragnehmer sie auf ihre Tauglichkeit zu überprüfen.
Die Gewährleistungsfrist beträgt drei Jahre und beginnt mit dem Tag der Übernahme der Leistung durch den
Auftraggeber.
Innerhalb dieser Gewährleistungfrist sind auftretende Mängel sowie etwaige Mängelfolgeschäden unverzüglich, längstens jedoch 14 Tage nach Aufforderung zu beheben. Bei Gefahr in Verzug, ist die
Mängelbehebung sofort durchzuführen.
Wird einer diesbezüglichen Aufforderung nicht Folge geleistet, steht dem Auftraggeber das Recht zu, diese
Mängel durch Dritte auf Kosten und Gefahr des Auftragnehmers beheben zu lassen.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 5 Facility Management/FAC June, 2024
Warranty, defects
The contractor is liable for perfect execution of the normal presupposed and contractually necessitated work as well as for the perfect quality of all constructional substances and materials which are used by him.
If materials are provided by the client, the contractor has to check then for suitability.
The warranty period is 3 years and begins with the day of final acceptance of work by the COR.
Within the guarantee period, faults which arise – as well as any consequential damages due to faults – are to be corrected immediately and, at the latest, 14 days after request. If danger is imminent, the fault correction is to be carried out immediately.
If such a request is not complied with, the client is entitled to have these faults corrected by a third party at the cost and risk of the contractor.
17. Weitergabe des Auftrages – Subunternehmer
Die Weitergabe des Gesamtauftrages ist nicht gestattet.
Die Übertragung von Teilen des Auftrages an Subunternehmer ist zulässig, soweit dies branchenüblich ist und die Zustimmung des Auftraggebers vorher in jedem Fall eingeholt wurde.
In jedem Fall bleibt der Ersteher gegenüber dem Auftraggeber allein verantwortlich und haftet für seine
Subunternehmer.
Passing on of the contract – Subcontractors
The passing on of the complete contract is not permitted:
The transfer of parts of the contract to subcontractors is permitted, insofar as this is common in the branch and the consent of the ordering party has in all casee been obtained beforehand.
In all cases, the purchaser remains solely responsibly towards the ordering party and is liable for his subcontractors.
18. Baustellenbesichtigung
Vor Ausarbeitung des Angebotes muss sich der Bieter über den Zustand der Baustelle, die Zufahrts- und
Lagermöglichkeiten sowie sonstige örtliche Besonderheiten ausreichend informieren.
Building site inspection
Before formulating the quotation, the bidder must obtain adequate information about the condition of the building site, the access and storage possibilities as well as other local peculiarities.
19. Sicherheitsbestimmungen
Es wird auf die besonderen Sicherheitsbestimmungen bei Arbeiten in Gebäuden der Botschaft der
Vereinigten Staaten hingewiesen.
Das für den Arbeitseinsatz vorgesehene Personal ist einer Sicherheitsüberprüfung durch die
Sicherheitsabteilung der Botschaft zu unterziehen. Dazu ist es notwendig, die entsprechenden Formblätter mit den Personalien spätestens eine Woche vor Arbeitsbeginn einzusenden.
Der Auftraggeber behält sich vor, Personal des Auftragnehmers ohne Angabe von Gründen abzulehnen, ohne dass daraus dem Auftragnehmer irgendwelche Rechte erwachsen.
Security Regulations
Reference is made to the special security regulations for work to be done in buildings of the Embassy of the
United States of America.
Personnel, intended for employment in the work are to be subjected to a security check by the Embassy’s
Security Department. For this, it is necessary to send in the appropriate forms with the personal details two weeks before the start of the work at the latest. The client reserves the right to reject personnel of the contractor without giving reasons and without any rights accruing to the contractor from this.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 6 Facility Management/FAC June, 2024
20. Geheimhaltung
Der Auftragnehmer verpflichtet sich, Informationen, welche er im Zusammenhang mit der Durchführung des Projektes erhält, geheimzuhalten und wird seine Mitarbeiter, Subunternehmer und Erfüllungsgehilfen verpflichten, sämtliche ihnen zukommenden Informationen vertraulich zu behandeln.
Der Auftraggeber behält sich rechtliche Schritte und Schadenersatzforderungen im Falle des Verstosses gegen diese Vertragsbestimmungen vor.
Secrecy
The contractor commits himself to keep information which he receives in connection with the carrying out of the project and will commit his employees, subcontractors and people employed in performance of his obligations, to handle all informations which come to them as strictly confidential.
The client retains the right to legal action and claims for compensation in the event of a breach of this condition of contract.
21. Personalbeaufsichtigung durch AG
Der Auftraggeber beaufsichtigt ständing das Personal des Auftragnehmers. Arbeitsgruppen, welche unter der Aufsicht eines Sicherheitsorganes der US-Botschaft arbeiten, können sich nur insoweit im
Arbeitsbereich frei bewegen, als jederzeit der Überblick über die gesamte Arbeitsgruppe gegeben sein muss.
Sicherheitsanweisungen des Aufsichtspersonals ist sofort Folge zu leisten.
Die Anzahl der gleichzeitig am Projekt beschäftigbaren Arbeitskräfte ist abhängig von der Anzahl der
Aufsichtsorgane und wird vom Auftraggeber festgelegt.
Erschwernisse infolge der vorstehenden Sicherheitsbestimmungen sind in die Einheitspreise einzurechnen.
Ausser vom Auftraggeber angeordneten Arbeitsunterbrechungen sind Mehrforderungen aufgrund
Behinderungen ausgeschlossen.
Escorting of personnel by the client
The client continuously escorts the personal of the contractor. Work groups which work under the attendance of a security escort of the U.S. Embassy can only move freely in the work area in this respect as at all times there must be an overview over the entire work group.
Security instructions of the supervisory personal must be obeyed immediately.
The number of workers which can work at one time on the project is dependent on the number of supervisory agents and laid down by the client.
Difficulties as a consequence of these security regulations are to be calculated into the unit prices. Except for work interruptions ordered by the client, additional demands due to hindrances are excluded.
22. SAM - Registrierung Bei Aufgrägen mit einer Brutto-Vertragssumme von US$ 30,000 oder darüber, ist eine Registrierung in SAM (Vergabeverwaltungssystem = Auftragskataster) vor der Bauftragung erforderlich.
SAM registration For orders with a contractual total amount of US$ 30,000 including Value Added Tax or above, registration in SAM (System for Award Management) is required prior to contract award.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 7 Facility Management/FAC June, 2024
TECHNISCHE VORBEMERKUNGEN HAUSTECHNIK
TECHNICAL COMMENTS BUILDING EQUIPMENT
Alle Anlagenteile sind in höchstmöglicher Qualitàt nach dem Ietzten Stand der Technik zu liefern und zu montieren.
Alle Geräte und Anlagenteile sind mit dem für einen klaglosen Dauerbetrieb nötigen Zubehör auszustatten.
Ein einwandfreier Korrosionsschutz aller Anlagenteile muss gewährleistet sein.
Bauteile und Werkstoffe, die der Auftragnehmer entweder nur zu liefern oder auch in das Gewerk einzubauen hat, müssen neu und dürfen zum Zeitpunkt der Endabnahme auch nicht beschädigt sein.
Alle Lieferungen müssen uneingeschränkt für die vorgesehene Verwendung geeignet sein.
Behördliche Auflagen sind bei der Verwendung von Werkstoffen und Installationsmaterial zu beachten.
Baustoffe, die zerstörend auf Anlageteile wirken können, z.B. Gips in Verbindung mit Stahl- und
Gussteilen oder chlorhaltige Schnellbinder dürfen nicht verwendet werden.
Während der Lagerung und Montagezeit müssen Leitungen, Dosen und Offnungen in Anlageteilen vor
Verschmutzung gesichert werden. Verschmutzte oder beschädigte Anlagenteile werden nicht übernommen.
Auf einwandfreie Zugänglichkeit der Armaturen ist zu achten. Beim Einbau dürfen keine mechanischen
Spannungen auftreten. Alle lösbaren Teile sind so auszuführen, dass diese auch nach längerer Zeit ohne
Zerstörung gelöst werden können.
Alle Zubehörteile, welche aus Kunststoff bzw. aus Kunststoffteilen gefertigt sind, müssen durchgefärbt u.
lichtecht sein (keine Aufspritzung). Verzinkte Metallteile für Konstruktionen müssen gemäss Vorschriften an allen Stellen feuerverzinkt sein. An verzinkten Metallteilen darf nicht geschweisst werden. Bei allen
Bauteilen, bei weichen mit Taupunktunterschreitung zu rechnen ist, sind mit Vorrichtungen zur
Tauwasserableitung zu versehen, wenn in der Leistungsbeschreibung nicht anders vorgeschrieben ist.
Anlagenteile müssen in Bezug auf ihre endgültigen Leistungsdaten genau abgestimmt warden. Durch
Missachtung dieser Vorschrift falsch bestellte Anlagenteile werden nicht übernommen und sind kostenlos umzutauschen.
Auf allen Geräten bzw. Anlagen müssen Leistungsschilder mit eingeprägten Daten zugänglich und gut lesbar angebracht werden.
Vorschriften:
Es gelten die Wiener-Bauordnung, alle einschlägigen Österreichischen Richtlinien, sowie die
ÖNORMEN, bzw. in Ermangelung solcher die betreffenden DIN-Normen und VDI-Richtlinien.
Kaeltetechnische Anlagen:
Es gilt insbesondere die oesterreichische Kaelteanlagenverordnung und Ihre Erlaeuterungen.
Körperschalldämmung:
Auf besonders sorgfaltige Ausführung geeigneter körper- und Iuftschalldämmender Massnahmen ist zu achten. Befestigungen und Aufhängungen von Rohrleitungen sind mit Körperschallfutter auszuführen.
Rohrleitungen:
Alle Rohrleitungen sind mittels Bezeichnungsschilder ca. 100x50 mm dauerhaft zu beschriften.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 8 Facility Management/FAC June, 2024
Das verwendete Rohrmaterial muss für den Verwendungszweck geeignet und falls erforderlich, widerstandsfähig gegen aggressive Medien sein. Bei der Verarbeitung sind die Herstellerangaben zu berücksichtigen. Durch richtige Materialfolge ist eine elektrochemische Korrosion zu vermeiden. Auf strömungstechnisch beste Formgebung, besonders in den Hauptleitungen ist unbedingt zu achten.
Die Rohrleitungen sind mit abschnittsweisem Gefälle zu verlegen, sodass jeder Rohrabschnitt gut entleert und auch entlüftet werden kann. Die Rohrleitungen sind in regelmässigen Abstãnden zu unterstützen, wobei der Abstand der Unterstutzungen so zu wählen ist, dass das Gefälle der Leitung durch die Durchbiegung der einzelnen Abschnitte bei vollem Betriebsgewicht nicht unterbrochen wird.
Die Rohrbefestigungen sind so auszuführen, dass sie die Vorschriften über Schallschutz im Hochbau erfüllen. Bei gedammten Leitungen müssen alle Unterstutzungen einen durchlaufenden Wärmeschutz gewahrleisten und eine Beschadigung der Damrnung durch die Rohrdehnung ausschliel3en.
Die Stärke der Dämmung ist bei der Herstellung der Unterstützungen zu berücksichtigen. Die Dämmung darf die beweglichen Teile der Auflagerung nicht berühren.
Im Bereich von Dehnungsfugen sind die Rohrleitungen so anzuordnen, dass bei unterschiedlichem ,,Setzen” der Gebäudeteile kein Abknicken oder Absichern erfolgen kann.
Bei Durchführung der Rohre durch Brandabschnitte sind die dafür erforderlichen Sicherheitsbestimmungen, Verordnungen und Behördenauflagen einzuhalten.
Freiliegende Rohrleitungen sind übersichtlich, geradlinig und zu den Wandflächen parallel zu verlegen. Der
Abstand zwischen den Rohrleitungen ist so zu wählen, dass eine Einzeldämmung der Rohre möglich ist.
Alle Steigstränge sind mit Absperrventilen und Entleerungen auszurüsten. Bei Unter-Putz verlegten
Leitungen ist besonders auf die Ausdehnung der Rohre zu achten. Druck-Leitungen sind abschnittsweise einer Wasserdruckprobe zu unterziehen. Die Druckprobe ist vor dem Aufbringen der Wärmedämmung bzw.
vor dern Verdecken der Rohrleitungen (in Mauerschlitzen, Zwischendecken, etc.) vorzunehmen.
Der Probedruck muss an der höchsten Stelle den Betriebsdruck urn 1,5 bar übersteigen. Bei Kalt- und
Warmwasser-Verbrauchsleitungen ist die Druckprobe mit einern Druck, der urn 5 kp/crn2 (5 bar) über dem
Ruhenetzdruck, bei Pumpenanlagen urn 5 kp/crn2 über dem Betriebsdruck liegt, mindestens aber mit einem
Druck von 10 kp/cm2 (10 bar) durchzuführen.
Der Prüfdruck muss mindestens 1,5 Stunden gehalten werden. Armaturen und Geräte dürfen in eingebautem
Zustand nur mit dem für sie zulassigen max. Betriebsdruck abgedruckt werden.
Nach Fertigstellung der Anlagen und erfolgreich abgeschlossener Druckprobe ist das Rohrleitungssystem vor der Inbetriebnahme kräftig durchzuspülen. Allenfalls eingebaute Schmutzfänger sind mehrmals zu reinigen.
Wärme,-und Kältedämmung sowie Schallschutz:
Die Bestimmungen der einschlägigen Vorschrifften oder die betreffenden ÖNORMEN über Kälte- und
Wärmeschutzanlagen sind einzuhalten. Die Dämmungen sind in höchstmöglicher Qualität nach dem letzten
Stand der Technik zu liefern und zu montieren. Rohrleitungen und Luftkanäle, allenfalls auch andere
Anlagenteile, sind wärmetechnisch zu dämmen, wenn mit (positiven oder negativen) Wärmeverlusten zu rechnen ist. Ausnahmen sind in der Regel dann gegeben, wenn Wärmeverluste dem zu versorgenden Raum zugute kommen. Eine wärmetechnische Dämmung ist auch dann anzubringen, wenn mit der Möglichkeit einer Schwitzwasserbildung zu rechnen ist (Achtung bei fallweise öffenbaren Fenstern in klimatisierten
Räumen). Dabei ist eine ausreichend dimensionierte und vor mechanischen Beschädigungen geschützte Dampfsperre anzubringen.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 9 Facility Management/FAC June, 2024
Bei Reinigungs- und lnspektionsöffnungen ist ein Ausschnitt in der Dämmung anzufertigen und mit einem leicht isobaren, zweischaligen Dämmteil zu schliessen.
In die Preise sind sämtliche, auch nicht besonders erwähnte und über die Bestimmungen der ÖNORMen hinausgehende Lieferungen und Leistungen eingerechnet, welche üblicherweise zur sach- und fachgerechten, vollständigen und benützungsfertigen Ausführung erforderlich sind.
Baustrom und Bauwasser können den hauseigenen Versorgungsleitungen für den Auftragnehmer kostenfrei entnommen werden.
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 10 Facility Management/FAC June, 2024
LEISTUNGSBESCHREIBUNG
SPECIFICATION
Pos1) Sanierung zentrales VRF-Klimasystem
Replacement central VRF- air conditioning system
1.1) Baustelleneinrichtung
Site installation
Einrichten, reinigen und raeumen der Baustelle
1 PA EHP……………… Gesamt/ Total …………….
1.2) Demontage Bestand
Removal and disposal of existing VRF- system- 1 outdoor unit and 13 indoor units.
Demontage, Verbringung und fachgerechte Entsorgung der VRF- Bestandsanlage (1 Ausseneinheit und
13 Inneneinheiten).
1.3) Installation VRF- Klimasystem
Delivery, installation and commissioning VRF- air conditioning system incl. adaption of existing cooling- and condensing pipes, and adaption of existing pipe insulation and cabling/wiring.
Lieferung, Montage und Inbetriebnahme eines kompletten VRF- Klimasystems inkl. Adaptierung der bestehenden Kaelte- / Kondensat- und Elektroleitungen.
-1x Aussengeraet/outdoor unit ~45kW (LG ARUM160LTE6)
-3x Wandinnengerät/indoor unit 2,20kW (LG ARNU07GSJC4)
-4x Wandinnengerät/indoor unit 2,8kW (LG ARNU09GSJC4)
-1x Wandinnengerät/indoor unit 5,6kW (LG ARNU18GSJC4)
-1x Kanalgeraet/indoor unit 3,6kW (LG ARNU12GM1A4)
-1x Kanalgeraet/indoor unit 7,1kW (LG ARNU24GM1A4)
-3x Konsolengeraete/indoor unit 2,8kW (LG ARNU09GQAA4)
-11x IR Fernbedienung/remote control
-1 x Zentralsteuerung/central touchscreen control unit (PAC55A000)
Fabrikat: LG-VRF System oder gleichwertig
Product: LG-VRF system or equal
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 11 Facility Management/FAC June, 2024
1.4) Erstellung VRF- System Anlagendokumentation
VRF-system documentation
Lieferung und Uebergabe einer Anlagendokumenation samt Anlagenschema in 2-facher
Papierausfertigung und 1x digital, inkl. Kundeneinschulung
Delivery VRF- system documentation- 2x paper files and 1x digital incl. customer training.
2) DIENSTLEISTUNGEN/SERVICES
Pos2.1) Regieleistungen
Die angebotenen Stundensätze sind für kollektivvertragliche Normalstunden berechnet.
The offered hourly rates are calculated for the regular working time.
2.1.1) Facharbeiter / Skilled worker
15 HR EHP……………… Gesamt/total…………….
2.1.2) Hilfsarbeiter / Unskilled worker
15 HR EHP……………… Gesamt/total…………….
Sanierung VRF- Klimaanlage / Replacement AC- VRF system
Page | 12 Facility Management/FAC June, 2024
Pos2.2) Regieleistungen Materialbeistellung
Beistellung von Materialien aller Art nach Verrechnungseinheiten.
Fuer die Beistellung mit den nachzuweisenden Listenpreisen, in der vorerst angenommen Hoehe von
3.000 € wird ein Abschlag von x% verrechnet. Als Einheitspreis ist der Abschlag als Faktor einzusetzen.
(zB 3.000 VE*EHP 0,80 = Gesamt 2.400 € und entspricht einem 20%igen Abschlag)
Provison of materials of all kinds
For the provision of material based on the catalog price, initially presumed in the amount of 3,000 € a premium of discount of x% will be charged. As a unit price use the discount as a factor (eg 0.80 for
20 % discount)
3000 VE EHP……………… Gesamt/total…………….
GESAMTPREIS ohne USt. / EUR (total, net) …………………….
20% Umsatzsteuer / EUR (VAT) …………………….
GESAMTPREIS inkl. USt. / EUR (total, gross) …………………….
Rechtsgueltige Unterschrift / Legally valid signature