19AU9021D0002_Technical Specs_Att. 1_MS.pdf

PDF 11 MB Posted

Attached to
Painting Services Federal contract opportunity
Solicitation number
19AU90-21-R-0001
Issued by
Department of State

View the file

Other files for this federal contract opportunity

Other files attached to Painting Services, newest first.
File Type Posted
19AU9021D0001_painting IDIQ_Denner.pdf PDF
Maler Schmeid Painting SF-1442.pdf PDF
DENNER Painting SF-1442.pdf PDF
19AU9021D0002_painting IDIQ_Maler Schmied.pdf PDF
19AU9021D0001_Technical Specs_Att. 1_Denner.pdf PDF
19AU9021R0001_A001_painting.PDF PDF
SF1442_painting_FY2021.doc DOC document
Painting CL.pdf PDF
OF-347.pdf PDF
Painting solicitation_FY2021.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number: 19AU9021D0002

Other: ,,oG

Unit price (ni2):_______2g :JZ c; Ob Other: '

Unit price (m2): JeJ :J1, 482103D Z Renovation - cover coating

Solicitation Number: l 9AU902 l R000 l

Other: G, A'f. Other: b, 31

Unit price (m2): Jq fl Unit price: (m2): 14.✓✓

Top coat - 1 x final layer on wood surfaces with varnish (gloss level to be determined by the customer), including grinding and puttying.

Base Year Wage: /\ 8/it't Other: 4, 1-4 Unit price (m2): ?:l;tf r/

Option Year 1 A q Wage: /,8, V

Other: y)--4 Unit price (m2): ZJ,l'r/

Option Year 2 Option Year 3 ..,,....,_ Wage: -1E?,3Lwage: A'l, rv Other: 4, �3 Other: 4, q 3 Unit price (m2): lf,1/unit price: (m2): f�/;

482103F Z Renovation - cover coating moulded components

Topcoat - final layer on wood surfaces with varnish (gloss level to be determined by the customer), including grinding and puttying. Any difficulties for preparatory work and coating of moulded components are to be included in the unit price.

Base Year Wage:

Other: 5,C?'i Unit price (m2): 2{ f;J

Option Year 1 i3, 9 � Wage:

Other: 5, Gq

Unit price (m2): ?ff f1

Option Year 2 Option Year 3 Wage: d-�1'12' Wage: 2,4, q,1 Other: to,11 Other: 6'23

Unit price (m2): JqJ'J Unit price: (m2): ✓� tf

482105 Z Non-covering final coatings (glaze) without clear lacquer top coat on wood or wooden materials.

482105B Z Basic wood glaze (ONORM B3430-l/2014) Basic execution.

Base Year Wage: A4,2k Other: 3, 57- Unit price (m2): /11 /IJ

Option Year 1 .14, 2,C:, Wage:

'5"J. Other: .3, Unit price (m2): /1,r, l'J

4822 Z Coatings on metal

482203 Z Cover coating on steel.

482203A Z Basic steel coating (ONORM) Basic execution

Base Year Wage: .,13

,123

Option Year 1 Wage: A31 .1S

Option Year 2 _Option Year 3 Wage: /14/5':> Wage: A4JJ4 Other: 3,- (.,4 Other: 3, t1 Unit price (m2): //r/ff Unit price: (m2): /f'v;.; ✓

Option Year 2 Wage: _113,44

Option Year 3 Wage: 113, 1-Z, Other: '!), bO

Unit price (m2): /f!; fcl

482203B Z Renovation

Other: 3, 3o Unit price (m2): ,4� �r/

Solicitation Number: 19AU9021R0001

Top coat- Ix final layer on steel surfaces with varnish (gloss level to be determined by the customer), including grinding and puttying.

Base Year

Wage: 9,10 Other: 2,2 'l Unit price (m2): ,4{J1

Option Year I

Wage:

Other:

Unit price (m2): /,{J1

Option Year 2 Option Year 3

Wage: q,zg Wage: ct,'-tb Other: 2, 32 Other: fi.1

3 7-- Unit price (m2): 416'0 Unit price: (m2): /11 /J,;

482205 Z Cover coatings on galvanized steel surfaces or on zinc surfaces with an appropriate coating substance, including prior cleaning and grinding (ammonia cleaning).

482205B Z Galvanized steel coating, 3x

Execution with three cover coatings (zinc-based coating)

Base Year Wage: /19,?0 Other: 4, �l,, Unit price (m2): 1�12

Option Year I

Wage: AC/, tO Other: 4, � 2 Unit price (m2): 2� le

Option Year 2 Option Year 3

Wage: 2O, 0'fwage: ,20149 Other: &I 02other: 5t--12,.

Unit price (m2): t{41 Unit price: (m2): ?..({,1

482209 Z Standard cover coatings without smoothing with appropriate coating substances, on free routed pipelines, including pipe saddles. For heating-pipes suitable up to an operating temperature of 95 degrees.

482209A Z Pipecoating standard up to 30 mm

Priming and final coatings with an outer diameter up to 30 mm to include any potential preparatory work.

Base Year

Wage: 3/f'i_ Other: q95 Unit price (m2):_i/r

Option Year I

Wage: � 7-'?

Other: qqy- Unit price (m2):____itf

Option Year 2 Option Year 3

Wage: 3,&f, Wage: 3,q4 Other: °' q 7- Other: q q 9 Unit price (m2): f,IJ Unit price: (m2): f fJ

File details come from the government source that posted it. Updated .