RFP Questions for 19AQMM21R0041.pdf
PDF 182 KB Posted
- Solicitation number
- 19AQMM22R0041
About this file
This document contains questions and answers regarding solicitation number 19AQMM22R0041 from the Department of State for Specialized Iterative Software Development and Support Services. Key details include the solicitation requests proposals to provide software development and support services for an existing geospatial software platform known as ArrisFederal. The questions and answers provide clarification around key personnel qualifications, past performance examples, proposal submission requirements, and the incumbent contractor transition. Notable details include confirmation that key personnel, past performance, technical approach, and price proposal should be separate documents; definitions for required key personnel positions including a Solution Architect; an extended proposal deadline of January 4, 2022; and clarification that the awarded vendor will be responsible for transitioning the existing software platform support from the incumbent contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A Statement of Work.docx | DOCX document | |
| Appendix C Bidders DD254.pdf | ||
| Appendix B Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| 19AQMM21R0041.pdf | ||
| Appendix D - Danger Pay.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Questions
Department of State
Bureau of Diplomatic Security
Specialized Iterative Software Development and Support Services
19AQMM22R0041
Question # RFP Section #, Title
& Page
Vendor Question &
Recommendation
Response
1 52.212-1 Instruction to
Offerors - Submission of Offer
Can the Government confirm that Key Personnel, Past
Performance, Technical
Approach, and Price Proposal will each be submitted as separate documents?
They just need to be separate like tabs.
2 H-016, Key Personnel, Pages 10-11, Appendix B, SOW
Section 5, Page 14
Can the government clarify the
Solution Architect position?
It is included in the RFP but not listed in the SOW as a
Part-time Key Personnel
Position. In Appendix B, it’s listed as “Project Manager/Sol
Architect.”
The Solutions
Architect position provides expertise
(detailed in question
3) to the development team and the USG.
3 H-016, Key Personnel, Pages 10-11
Can the government provide qualifications for the Solution
Architect position?
BA/BS + 7YRS:
Level - Establish system information requirements using analysis of the information in the development of enterprise-wide or large-scale information systems.
Design architecture to include the software, hardware, and communications to support the total requirements as well as provide for present and future cross-functional requirements and interfaces. Ensure these systems are compatible and in compliance with the standards for open systems architectures, Bureau of Diplomatic Security
Specialized Iterative Software Development and Support Services
19AQMM22R0041
the OSI and ISO reference models, as they apply to the implementation and specification of information management solution of the application platform, across the
API, and the external environment/software application. Ensure that the common operating environment is compliant with the
Agency enterprise architecture and applicable reference models. Evaluate analytically and systematically problems of workflows, organization, and planning and develop appropriate corrective action. Provide direction to staff.
4 52.212-3 Offeror
Representations and
Certifications. Page
24.
Instructions state that Offeror should complete Paragraph B of the provision. Where in the proposal would the government like offeror’s response to Paragraph B to appear?
Anywhere in the pricing proposal.
5 52.212.-1 Instructions to Offerors. Past
Performance. Page 40.
Can the government provide a list of places (Besides this contract) within the
Department of State where
ArrisFederal Software is used?
No response.
6. SAM.gov December
10 Overview Update.
Can the government elaborate on how the awardee will be expected to work with the
The vendor is responsible for detailing a transition
Bureau of Diplomatic Security
Specialized Iterative Software Development and Support Services
19AQMM22R0041
incumbent? Is the awardee expected to capture the incumbents as part of its team or will the incumbent have its own separate contract and maintain its current staff?
plan to allow them to perform the SOW.
7. SOW 2.3.1 - Activity
1: Information
Discovery, Analytics, And Batch Data
Processing, page 8
“Building initial analytics capabilities utilizing the newly created data processing environment”
Can the government identify what system the newly created database processing environment is? Meaning
Arris Federal as a whole or a separate analytics system.
The intent here is to ensure that the contractor has to capabilities to enhance the system to provide more reporting and data analytics work for
PSS going forward. It could in theory be done in a custom manner within the current codebase (i.e.
.NET / ArrisFederal) or through something like PowerBI /
PowerAutomate or one of the analytics tools being looked at.
8 SOW 2.1.6 – Subtask
6 Update Quality
Control Plan (QCP), This SOW section states the following: “The Contractor shall update the QCP submitted with their quote and provide a final
QCP as specified in Section 5. The
Contractor shall periodically update the QCP, as specified in
Section 5, as changes in program processes are identified.”
There is no reference to the QCP in Section 5. Can the government provide clarification?
The vendor should follow the schedule in SOW Section 3.4
Schedule and
Milestone Dates
9. RFP 52.212-1,
Instructions to
Offerors, Technical
Approach, Page 41
The technical approach has a 20 page limit but is supposed to include a description of the offeror’s approach to the SOW tasks, project management
The Project
Management Plan and Quality Control
Plan to be separate and limited to 4 pages each. The Transition
Bureau of Diplomatic Security
Specialized Iterative Software Development and Support Services
19AQMM22R0041
plan, quality control plan, and
Transition plan. The page limit is too low to include all of this information. Can the government increase the page limit or allow the plans to be included as Appendices that don’t count towards the page count?
plan should not be separate.
10. RFP 52.212-1,
Instructions to
Offerors, Technical
Approach, Page 41.
SOW 3.4 Schedule and Delivery
Milestones, Pages 11 -
Instructions for the technical approach say that a project management plan and quality control plan are required.
According to the SOW, the draft of those plans aren’t due until the KickOff meeting after award. Can the government clarify?
The Project
Management Plan should be part of the vendors proposal.
The awarded vendor will also present the
Project Management
Plan at the kick off as a standalone item for review and comment by the USG.
Question # RFP Section No., Title and Page
Vendor Question Response
11. Section H-016, Key Personnel, Page 10
Page 10 states there are three key personnel. These include
• Subject Matter Expert- Technical Lead/Lead Software Engineer - 2 positions
• Solutions Architect - part time;
However, Appendix B only lists the two engineering positions as Key Personnel. Which is correct?
Section H-016 is correct See Response to Questions 2 & 3
12.
52.212-1 -
Instructions to
Offerors-
Commercial Items
(Sep 2021), Submission of
Offer, pages 40-41
The RFP is requiring 3 past performances using
ArrisFederal. While we, and our other teaming partners, have extensive experience using similar Geospatial tools, finding companies with specific ArrisFederal past performance that are not attached to the related
The vendor can provide information that represents their past performance. The requirements are not changed.
Bureau of Diplomatic Security
Specialized Iterative Software Development and Support Services
19AQMM22R0041
opportunity fulfilled by DCS, has been a challenge.
Would the government accept past performances utilizing similar Geospatial tools in place of ArrisFederal experience?
13.
52.212-1 -
Instructions to
Offerors-
Commercial Items
(Sep 2021), General
Information, Due to the proximity to the holidays, would the Agency consider granting a two-week extension for proposal responses?
The Government will extend the proposal response deadline until
4 p.m. January 4, 2022.
File details come from the government source that posted it. Updated .