This document contains a bidding chart and related solicitation notice for a construction project. The bidding chart provides line item details for the construction of a new lodging building and refurbishment of existing buildings at the Colombian National Police Aviation School in Mariquita, Colombia. The solicitation notice seeks proposals for the construction of one new lodging building with an estimated budget between $500,000 and $1,000,000 and a period of performance of 210 calendar days. Key dates include the pre-proposal conference on January 27, 2020, site visit on January 28, 2020, question deadline of February 14, 2020, and proposal due date of March 13, 2020. The Department of State Office of Acquisition Management is the contracting agency.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WBS
| -8 | X | X | X | x | OFFICIAL BIDDING CHART | |||||||||||||
| -7 | X | X | X | x | PROJECT: | Lodging Building | ||||||||||||
| -6 | X | X | X | x | Place: | CNP Aviation School, Mariquita, Colombia | ||||||||||||
| -5 | X | X | X | x | Solicitation: | 19AQMM20R0061 | ||||||||||||
| -4 | X | X | X | x | ||||||||||||||
| -3 | X | X | X | x | ||||||||||||||
| -2 | X | X | X | x | BASE BID | |||||||||||||
| -1 | X | X | X | x | ||||||||||||||
| Status | Line | PHASE | DIV | SUBDIV | SUBDIV ITEM | ITEM | DESCRIPTION | MATERIAL UNIT | MATERIAL QUANTITY | MATERIAL UNIT COST | LABOR UNIT | LABOR QUANTITY | LABOR UNIT COST | EQUIPMENT UNIT | EQUIPMENT QUANTITY | EQUIPMENT UNIT COST | TOTAL COST | TOTAL COST BY CHAPTER |
| x | 1 | A | A. GENERAL REQUIREMENTS | $ 0.00 | ||||||||||||||
| x | 33 | A | 1 | 1 | GENERAL REQUIREMENTS | $ 0.00 | ||||||||||||
| P | 43 | A | 1 | 01 30 00 | 01 32 16 00 20 | Construction Progress Documentation | $ 0.00 | |||||||||||
| x | 44 | A | 1 | 01 30 00 | l | $ 0.00 | ||||||||||||
| x | 45 | A | 1 | 01 30 00 | l | |||||||||||||
| P | 43 | A | 1 | 01 30 00 | 01 33 00 | Submittal Procedures | $ 0.00 | |||||||||||
| x | 44 | A | 1 | 01 30 00 | l | $ 0.00 | ||||||||||||
| x | 45 | A | 1 | 01 30 00 | l | |||||||||||||
| P | 49 | A | 1 | 01 50 00 | 01 50 00 | Temporary Construction Facilities and Controls | $ 0.00 | |||||||||||
| x | 50 | A | 1 | 01 50 00 | l | $ 0.00 | ||||||||||||
| x | 51 | A | 1 | 01 50 00 | l | |||||||||||||
| P | 61 | A | 1 | 01 70 00 | 01 78 00 | Execution and Closeout Submittals | $ 0.00 | |||||||||||
| x | 62 | A | 1 | 01 70 00 | l | $ 0.00 | ||||||||||||
| x | 63 | A | 1 | 01 70 00 | l | |||||||||||||
| x | 70 | B | B. LODGING BUILDING | $ 0.00 | ||||||||||||||
| x | 71 | B | 2 | 2 | EXISTING CONDITIONS | $ 0.00 | ||||||||||||
| D | 72 | B | 2 | 02 41 00 | 02 41 00 | Demolition and Deconstruction | $ 0.00 | |||||||||||
| x | 73 | B | 2 | 02 41 00 | l | $ 0.00 | ||||||||||||
| x | 74 | B | 2 | 02 41 00 | l | |||||||||||||
| x | 75 | B | 3 | 3 | CONCRETE | $ 0.00 | ||||||||||||
| D | 76 | B | 3 | 03 11 13.00 10 | 03 11 13.00 10 | Structural cast-in-place concrete forming | $ 0.00 | |||||||||||
| x | 77 | B | 3 | 03 11 13.00 10 | l | $ 0.00 | ||||||||||||
| x | 78 | B | 3 | 03 11 13.00 10 | l | |||||||||||||
| D | 79 | B | 3 | 03 20 00.00 10 | 03 15 00.00 10 | Concrete accesssories | $ 0.00 | |||||||||||
| x | 80 | B | 3 | 03 20 00.00 10 | l | $ 0.00 | ||||||||||||
| x | 81 | B | 3 | 03 20 00.00 10 | l | |||||||||||||
| D | 79 | B | 3 | 03 20 00.00 10 | 03 20 00.00 10 | Concrete Reinforcing | $ 0.00 | |||||||||||
| x | 80 | B | 3 | 03 20 00.00 10 | l | $ 0.00 | ||||||||||||
| x | 81 | B | 3 | 03 20 00.00 10 | l | |||||||||||||
| D | 82 | B | 3 | 03 30 00 | 03 31 01.00 10 | Cast-in-Place Structural Concrete for Civil Works | $ 0.00 | |||||||||||
| x | 83 | B | 3 | 03 30 00 | l | $ 0.00 | ||||||||||||
| x | 84 | B | 3 | 03 30 00 | l | |||||||||||||
| x | 85 | B | 4 | 4 | MASONRY | $ 0.00 | ||||||||||||
| D | 86 | B | 4 | 04 20 00 | 04 20 00 | Masonry | $ 0.00 | |||||||||||
| x | 87 | B | 4 | 04 20 00 | l | $ 0.00 | ||||||||||||
| x | 88 | B | 4 | 04 20 00 | l | |||||||||||||
| x | 89 | B | 5 | 5 | METALS | $ 0.00 | ||||||||||||
| D | 90 | B | 5 | 05 05 23 | 05 05 23 | Welding, Structural | $ 0.00 | |||||||||||
| x | 91 | B | 5 | 05 05 23 | l | $ 0.00 | ||||||||||||
| x | 92 | B | 5 | 05 05 23 | l | |||||||||||||
| D | 93 | B | 5 | 05 12 00 | 05 12 00 | Structural Steel | $ 0.00 | |||||||||||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | ||||||||||||
| x | 95 | B | 5 | 05 12 00 | l | |||||||||||||
| D | 93 | B | 5 | 05 12 00 | 05 50 13 | Miscelaneous metal fabrications | $ 0.00 | |||||||||||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 |
| x | 89 | B | 5 | 6 | WOOD, PLASTICS, AND COMPOSITES | $ 0.00 | |||
| D | 90 | B | 5 | 05 05 23 | 06 10 00 | Rough carpentry | $ 0.00 | ||
| x | 91 | B | 5 | 05 05 23 | l | $ 0.00 | |||
| x | 92 | B | 5 | 05 05 23 | l | ||||
| D | 93 | B | 5 | 05 12 00 | 06 20 00 | Finish carpentry | $ 0.00 | ||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | |||
| x | 95 | B | 5 | 05 12 00 | l | ||||
| x | 109 | B | 7 | 7 | THERMAL AND MOISTURE PROTECTION | $ 0.00 | |||
| D | 110 | B | 7 | 07 21 16 | 07 41 63 | Fabricated roof panels assemblies | $ 0.00 | ||
| x | 111 | B | 7 | 07 21 16 | l | $ 0.00 | |||
| x | 112 | B | 7 | 07 21 16 | l | ||||
| D | 113 | B | 7 | 07 41 63 | 07 44 56 | Fiber reinforced cementitiuos panels | $ 0.00 | ||
| x | 114 | B | 7 | 07 41 63 | l | $ 0.00 | |||
| x | 115 | B | 7 | 07 41 63 | l | ||||
| D | 113 | B | 7 | 07 41 63 | 07 60 00 | Flashing and Sheet Metal | $ 0.00 | ||
| x | 114 | B | 7 | 07 41 63 | l | $ 0.00 | |||
| x | 115 | B | 7 | 07 41 63 | l | ||||
| D | 113 | B | 7 | 07 41 63 | 07 92 00 | Joint Sealants | $ 0.00 | ||
| x | 114 | B | 7 | 07 41 63 | l | $ 0.00 | |||
| x | 115 | B | 7 | 07 41 63 | l | ||||
| x | 125 | B | 8 | 8 | OPENINGS | $ 0.00 | |||
| D | 126 | B | 8 | 08 11 13 | 08 11 16 | Aluminium Doors and Frames | $ 0.00 | ||
| x | 127 | B | 8 | 08 11 13 | l | $ 0.00 | |||
| x | 128 | B | 8 | 08 11 13 | l | ||||
| D | 135 | B | 8 | 08 71 00 | 08 51 13 | Aluminum Windows | $ 0.00 | ||
| x | 136 | B | 8 | 08 71 00 | l | $ 0.00 | |||
| x | 137 | B | 8 | 08 71 00 | l | ||||
| D | 138 | B | 8 | 08 81 00 | 08 71 00 | Door Hardware | $ 0.00 | ||
| x | 139 | B | 8 | 08 81 00 | l | $ 0.00 | |||
| x | 140 | B | 8 | 08 81 00 | l | ||||
| D | 141 | B | 8 | 08 91 00 | 08 81 00 | Glazing | $ 0.00 | ||
| x | 142 | B | 8 | 08 91 00 | l | $ 0.00 | |||
| x | 143 | B | 8 | 08 91 00 | l | ||||
| x | 144 | B | 9 | 9 | FINISHES | $ 0.00 | |||
| D | 145 | B | 9 | 09 06 90 | 09 06 90 | Color Schedule | $ 0.00 | ||
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| x | 147 | B | 9 | 09 06 90 | l | ||||
| D | 145 | B | 9 | 09 06 90 | 09 06 90 | Stucco | $ 0.00 | ||
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| x | 147 | B | 9 | 09 06 90 | l | ||||
| D | 145 | B | 9 | 09 06 90 | 09 06 90 | Veneer plaster | $ 0.00 | ||
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| x | 147 | B | 9 | 09 06 90 | l | ||||
| D | 145 | B | 9 | 09 06 90 | 09 30 00 | Ceramic tile, quarry tile, and paver tile | $ 0.00 | ||
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| x | 147 | B | 9 | 09 06 90 | l | ||||
| D | 157 | B | 9 | 09 51 00 | 09 51 00 | Acoustical Ceilings | $ 0.00 | ||
| x | 158 | B | 9 | 09 51 00 | l | $ 0.00 | |||
| x | 159 | B | 9 | 09 51 00 | l | ||||
| D | 160 | B | 9 | 09 90 00 | 09 90 00 | Paints and Coatings | $ 0.00 | ||
| x | 161 | B | 9 | 09 90 00 | l | $ 0.00 | |||
| x | 162 | B | 9 | 09 90 00 | l | ||||
| D | 160 | B | 9 | 09 90 00 | 09 96 00 | High-Performance Coatings | $ 0.00 | ||
| x | 161 | B | 9 | 09 90 00 | l | $ 0.00 | |||
| x | 162 | B | 9 | 09 90 00 | l | ||||
| x | 163 | B | 10 | 10 | SPECIALTIES | $ 0.00 | |||
| D | 167 | B | 10 | 10 28 13 | 10 14 00.20 | Interior Signage | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| D | 167 | B | 10 | 10 28 13 | 10 28 13 | Toilet Accessories | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| D | 170 | B | 10 | 10 44 16 | 10 44 16 | Fire Extinguishers | $ 0.00 | ||
| x | 194 | B | 13 | 13 48 00 | l | $ 0.00 | |||
| x | 195 | B | 13 | 13 48 00 | l | ||||
| x | 163 | B | 10 | 12 | FURNISHINGS | $ 0.00 | |||
| D | 167 | B | 10 | 10 28 13 | 12 36 00 | Countertops | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| x | 163 | B | 10 | 13 | SPECIAL CONSTRUCTION | $ 0.00 | |||
| D | 167 | B | 10 | 10 28 13 | 12 36 00 | Seismic protection for miscellaneous equipment | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| x | 196 | B | 22 | 22 | PLUMBING | $ 0.00 | |||
| D | 197 | B | 22 | 22 00 00 | 22 00 00 | Plumbing, General Purpose | $ 0.00 | ||
| x | 198 | B | 22 | 22 00 00 | l | $ 0.00 | |||
| x | 199 | B | 22 | 22 00 00 | l | ||||
| x | 200 | B | 23 | 23 | HEATING, VENTILATING, AND AIR CONDITIONING | $ 0.00 | |||
| D | 201 | B | 23 | 23 00 00 | 23 00 00 | Air Supply, Distribution, Ventilation and Exhaust Systems | $ 0.00 | ||
| x | 202 | B | 23 | 23 00 00 | l | $ 0.00 | |||
| x | 203 | B | 23 | 23 00 00 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 03 00.00 20 | Basic Mechanical Materials and Methods | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 05 48.00 40 | Vibration and seismic controls for HVAC piping and equipment | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 07 00 | Thermal insulation for mechanical systems | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 23 00 | Refrigerant Piping | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 81 00.00 20 | Unitary Air Conditioning Equipment | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| x | 225 | B | 26 | 26 | ELECTRICAL | $ 0.00 | |||
| D | 226 | B | 26 | 26 20 00 | 26 00 00.00 20 | Basic Electrical Materials and Methods | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 05 00.00 40 | Common Work Results for Electrical | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 05 19.00 10 | Insulated Wire and Cable | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 05 71.00 40 | Low Voltage Overcurrent Protective Devices | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 08 00 | Apparatus Inspection and Testing | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 |
| D | 226 | B | 26 | 26 20 00 | 26 09 23.00 40 | Lighting Control Devices | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 20 00 | Interior Distribution System | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 |
| D | 226 | B | 26 | 26 20 00 | 26 24 16.00 40 | Pannelboards | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 28 01.00 10 | Coordinated Power System Protection | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 235 | B | 26 | 26 32 33.00 10 | 26 41 01.00 40 | Lightning Protection System | $ 0.00 | ||
| x | 236 | B | 26 | 26 32 33.00 10 | l | $ 0.00 | |||
| x | 237 | B | 26 | 26 32 33.00 10 | l | ||||
| D | 238 | B | 26 | 26 51 00.00 40 | 26 51 00 | Lighting | $ 0.00 | ||
| x | 239 | B | 26 | 26 51 00.00 40 | l | $ 0.00 | |||
| x | 240 | B | 26 | 26 51 00.00 40 | l | ||||
| x | 244 | B | 27 | 27 | COMMUNICATIONS | $ 0.00 | |||
| P | 245 | B | 27 | 27 10 00 | 27 10 00 | Building Telecommunications Cabling System | $ 0.00 | ||
| x | 246 | B | 27 | 27 10 00 | l | $ 0.00 | |||
| x | 247 | B | 27 | 27 10 00 | l | ||||
| x | 71 | B | 2 | 28 | ELECTRONIC SAFETY AND SECURITY | $ 0.00 | |||
| D | 72 | B | 2 | 02 41 00 | 28 31 74.00 20 | Interior fire detection and alarm system | $ 0.00 | ||
| x | 62 | A | 1 | 01 70 00 | l | $ 0.00 | |||
| x | 63 | A | 1 | 01 70 00 | l | ||||
| x | 70 | B | C. EXISTING LODGING BUILDINGS | $ 0.00 | |||||
| x | 89 | B | 5 | 5 | METALS | $ 0.00 | |||
| D | 93 | B | 5 | 05 12 00 | 05 12 00 | Structural Steel and handrails painting | $ 0.00 | ||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | |||
| x | 95 | B | 5 | 05 12 00 | l | ||||
| x | 89 | B | 5 | 6 | WOOD, PLASTICS, AND COMPOSITES | $ 0.00 | |||
| D | 93 | B | 5 | 05 12 00 | 06 20 00 | Finish carpentry Painting | $ 0.00 | ||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | |||
| x | 95 | B | 5 | 05 12 00 | l | ||||
| x | 109 | B | 7 | 7 | THERMAL AND MOISTURE PROTECTION | $ 0.00 | |||
| D | 113 | B | 7 | 07 41 63 | 07 60 00 | Policabonate roofing replacement | $ 0.00 | ||
| x | 114 | B | 7 | 07 41 63 | l | $ 0.00 | |||
| x | 115 | B | 7 | 07 41 63 | l | ||||
| x | 144 | B | 9 | 9 | FINISHES | $ 0.00 | |||
| D | 160 | B | 9 | 09 90 00 | 09 90 00 | Paints and Coatings | $ 0.00 | ||
| x | 161 | B | 9 | 09 90 00 | l | $ 0.00 | |||
| x | 162 | B | 9 | 09 90 00 | l | ||||
| D | 160 | B | 9 | 09 90 00 | 09 96 00 | High-Performance Coatings | $ 0.00 | ||
| x | 161 | B | 9 | 09 90 00 | l | $ 0.00 | |||
| x | 162 | B | 9 | 09 90 00 | l | ||||
| x | 125 | B | 8 | 8 | OPENINGS | $ 0.00 | |||
| D | 126 | B | 8 | 08 11 13 | 08 11 16 | Aluminium Doors and Frames refurbish | $ 0.00 | ||
| x | 127 | B | 8 | 08 11 13 | l | $ 0.00 | |||
| x | 128 | B | 8 | 08 11 13 | l | ||||
| x | 252 | C | E. EXTERIOR WORKS | $ 0.00 | |||||
| x | 253 | C | 31 | 31 | EARTHWORK | $ 0.00 | |||
| D | 254 | C | 31 | 31 00 00 | 31 00 00 | Earthwork | $ 0.00 | ||
| x | 255 | C | 31 | 31 00 00 | l | $ 0.00 | |||
| x | 256 | C | 31 | 31 00 00 | l | ||||
| D | 257 | C | 31 | 31 11 00 | 31 11 00 | Clearing and Grubbing | $ 0.00 | ||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | |||
| x | 259 | C | 31 | 31 11 00 | l | ||||
| D | 260 | C | 31 | 31 23 00.00 20 | 31 23 00.00 20 | Excavation and Fill | $ 0.00 | ||
| x | 261 | C | 31 | 31 23 00.00 20 | l | $ 0.00 | |||
| x | 262 | C | 31 | 31 23 00.00 20 | l | ||||
| D | 257 | C | 31 | 31 11 00 | 31 60 00 | Foundation Preparation | $ 0.00 | ||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | |||
| x | 259 | C | 31 | 31 11 00 | l | ||||
| x | 270 | C | 32 | 32 | EXTERIOR IMPROVEMENTS | $ 0.00 | |||
| D | 257 | C | 31 | 31 11 00 | 32 16 13 | Concrete Sidewalks and Curbs and Gutters | $ 0.00 | ||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | |||
| x | 259 | C | 31 | 31 11 00 | l | ||||
| D | 271 | C | 32 | 32 92 23 | 32 92 23 | Sodding | $ 0.00 | ||
| x | 272 | C | 32 | 32 92 23 | l | $ 0.00 |
| D | 271 | C | 32 | 32 92 23 | 32 92 23 | Existing tree removal | $ 0.00 | ||
| x | 272 | C | 32 | 32 92 23 | l | $ 0.00 |
| x | 274 | C | 33 | 33 | UTILITIES | $ 0.00 | ||||
| P | 275 | C | 33 | 33 11 00 | 33 11 00 | Water Distribution | $ 0.00 | |||
| x | 276 | C | 33 | 33 11 00 | l | $ 0.00 | ||||
| x | 277 | C | 33 | 33 11 00 | l | |||||
| P | 278 | C | 33 | 33 30 00 | 33 30 00 | Sanitary Sewer | $ 0.00 | |||
| x | 279 | C | 33 | 33 30 00 | l | $ 0.00 | ||||
| x | 280 | C | 33 | 33 30 00 | l | |||||
| P | 278 | C | 33 | 33 30 00 | 33 40 00 | Storm drainage utilities | $ 0.00 | |||
| x | 279 | C | 33 | 33 30 00 | l | $ 0.00 | ||||
| x | 280 | C | 33 | 33 30 00 | l | |||||
| D | 287 | C | 33 | 33 71 01.00 40 | 33 70 02.00 10 | Electrical distribution system, underground | $ 0.00 | |||
| x | 288 | C | 33 | 33 71 01.00 40 | l | $ 0.00 | ||||
| x | 289 | C | 33 | 33 71 01.00 40 | l | |||||
| D | 287 | C | 33 | 33 71 01.00 40 | 33 71 02 | Underground Electrical and Telecomunications Distribution | $ 0.00 | |||
| x | 288 | C | 33 | 33 71 01.00 40 | l | $ 0.00 | ||||
| x | 289 | C | 33 | 33 71 01.00 40 | l | |||||
| x | 290 | D | F. MARKUPS | |||||||
| x | 291 | D | D | D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | |||||
| x | 292 | D | D | D | Administration | % | ||||
| x | 293 | D | D | D | Unforenseens | % | ||||
| x | 294 | D | D | D | Profit | % | ||||
| x | 295 | D | D | D | DBA Insurance | Unit | ||||
| x | 296 | D | T | TOTAL COSTS (BASE BID) $ |
NEW LODGING BUILDING &"Calibri"&11&K000000Page &P of &N_x000D_&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED MARIQUITA, COLOMBIA
Sheet2
&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED
Sheet3
&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED image1.emf
File details come from the government source that posted it. Updated .