J-2-5_Submittal_Form.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 19AQMM19R0255
About this file
J-2-5 Submittal Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA's_19AQMM19R0255_Final.pdf | ||
| J-3-1_Drawings.zip | ZIP file | |
| J-1-1_TECH_SPECIFICATIONS.pdf | ||
| J-2-2_Firm_&_Proj_Info.docx | DOCX document | |
| J-2-3_IncidentReports.docx | DOCX document | |
| J-2-1_Mat_Prod_Sub_Form.doc | DOC document | |
| 19AQMM19R0255_Sections_B-M.pdf | ||
| J-1-2_Past_Perf_Ques_(PPQ).docx | DOCX document | |
| J-3-2_Location_MC_MAG.pdf | ||
| J-2-6_BID_CHART_MAG.xlsx | XLSX spreadsheet | |
| 19AQMM19R0255_.pdf | ||
| J-2-7_SAMS_Registration.pdf | ||
| J-1-3_Past_Perf_and_Ref.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Form
| TRANSMITAL OF SHOP DRAWING, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTUR'S CERTIFICATE, COMPLIANCE | TRANSMITTAL #: | 1 | ||
| # OF PAGES: | 2 | |||
| # OF COPIES: | 3 | |||
| DATE: 00/MONTH/0000 | ||||
| PROJECT: | MAG Monitoring Building Center | CONTRACT #: | ######## | |
| COSTA RICA | ||||
| FROM: | ||||
| TO: | ||||
| TRANSMITTAL SUMMARY: | CHECK ONE | |||
| In this cell provide a short description of the purpose of the transmittal. Include informtion about the use of the items, for what type of work is going to be used, etc. | THIS IS A NEW TRANSMITTAL | |||
| THIS IS A RESUBMITTAL | ||||
| OF TRANSMITTAL #: | ## |
| ITEM # | DESCRIPTION ITEM SUBMITTED | CONTRACT REFERENCE DOCUMENT | CHECK ON THIS ITEM FOR | OBSERVATIONS | APPROVAL | |||
| SPEC # | DRAWING # | INFORM. ONLY | GOV. APPROV | Y | N |
| PRESENTATION DATE: 00/MONTH/0000 | PROCESS DATE: | APPROVING DATE: |
| I certify that the submitted items have been reviewed in detail and are correct in strict conformance with the contract drawings and specifications, except as otherwise stated. | I recommend the approval of the items listed and appointed with "Y", while items appointed with "N" the contractor shall submit new transmittals. Items for "information only" do not require approval. | I approve the items listed and appointed with "Y", while items appointed with "N" are not approved and the contractor shall submit new transmittals. The approval of these items does not means the acceptance of the works. Items for "information only" do not require approval. |
| CONTRACTOR | TECHNICAL ADVISOR | CONTRACTING OFFICER'S REPRESENTATIVE |
| NAME | NAME |
File details come from the government source that posted it.