Attachment__3_-_Bid_Chart.xlsx
XLSX spreadsheet 49 KB Posted
- Attached to
- Facatativa Warehouse Construction Federal contract opportunity
- Solicitation number
- 19AQMM19R0146
About this file
Attachment #3 - Bid Chart
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM19R0146_0002_-_Questions_and_Answers.pdf | ||
| SF30_19AQMM19R0146_0002.pdf | ||
| Attachment__2.1_-_Faca_-Mansilla_WH_Drawings.pdf | ||
| Attachment__9_-_WH_Faca_Mancilla_Soils_Studies_and_Topogrphy.pdf | ||
| Attachment__1_-_19AQMM19R0146_Specifications.pdf | ||
| Sections_B-M_19AQMM19R0146_0002_(with_track_changes).pdf | ||
| Sections_B-M_19AQMM19R0146_0002_(without_track_changes).pdf | ||
| 19AQMM19R0146_0001.pdf | ||
| Attachment__2_-_Drawings.pdf | ||
| Attachment__6_-_Firm_and_Project_Information.pdf | ||
| Attachment__1_-_19AQMM19R0146_Specifications.pdf | ||
| Attachment__5_-_Submittal_Register.pdf | ||
| 19AQMM19R0146_SF1442.pdf | ||
| 19AQMM19R0146_Sections_B-M.pdf | ||
| Attachment__7_-_Offeror_Experience.docx | DOCX document | |
| Attachment__4_-_Insurance.pdf | ||
| Attachment__8_-_Past_Performance_Questionnaire_(PPQ).docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Warehouse
| -8 | X | X | X | x | OFFICIAL BIDDING CHART | ||
| -7 | X | X | X | x | PROJECT: | Two WAREHOUSES | |
| -6 | X | X | X | x | Place: | Facatativa-Mansilla, COLOMBIA | |
| Rural Security | |||||||
| -5 | X | X | X | x | Date: | 3/22/19 | |
| -4 | X | X | X | x | |||
| -3 | X | X | X | x | |||
| -2 | X | X | X | x | BASE BID | ||
| -1 | X | X | X | x |
| Status | Line | PHASE | DIV | SUBDIV | SUBDIV ITEM | ITEM | DESCRIPTION | MATERIAL UNIT | MATERIAL QUANTITY | MATERIAL UNIT COST | LABOR UNIT | LABOR QUANTITY | LABOR UNIT COST | EQUIPMENT UNIT | EQUIPMENT QUANTITY | EQUIPMENT UNIT COST | TOTAL COST | TOTAL COST BY CHAPTER |
| x | 1 | A | A. GENERAL REQUIREMENTS | $ 0.00 | ||||||||||||||
| x | 33 | A | 1 | 1 | GENERAL REQUIREMENTS | $ 0.00 | ||||||||||||
| P | 43 | A | 1 | 01 30 00 | 01 32 16 00 20 | Construction Progress Documentation | $ 0.00 | |||||||||||
| x | 44 | A | 1 | 01 30 00 | l | $ 0.00 | ||||||||||||
| x | 45 | A | 1 | 01 30 00 | l | |||||||||||||
| P | 43 | A | 1 | 01 30 00 | 01 33 00 | Submittal Procedures | $ 0.00 | |||||||||||
| x | 44 | A | 1 | 01 30 00 | l | $ 0.00 | ||||||||||||
| x | 45 | A | 1 | 01 30 00 | l | |||||||||||||
| P | 49 | A | 1 | 01 50 00 | 01 50 00 | Temporary Construction Facilities and Controls | $ 0.00 | |||||||||||
| x | 50 | A | 1 | 01 50 00 | l | $ 0.00 | ||||||||||||
| x | 51 | A | 1 | 01 50 00 | l | |||||||||||||
| P | 61 | A | 1 | 01 70 00 | 01 78 00 | Closeout Submittals | $ 0.00 | |||||||||||
| x | 62 | A | 1 | 01 70 00 | l | $ 0.00 | ||||||||||||
| x | 63 | A | 1 | 01 70 00 | l | |||||||||||||
| P | 61 | A | 1 | 01 70 00 | 01 78 23 | Operation and Maintenance Data | $ 0.00 | |||||||||||
| x | 62 | A | 1 | 01 70 00 | l | $ 0.00 | ||||||||||||
| x | 63 | A | 1 | 01 70 00 | l | |||||||||||||
| x | 70 | B | B. WAREHOUSE MANUAL ERADICATION | $ 0.00 | ||||||||||||||
| x | 74 | B | 2 | 02 41 00 | l | |||||||||||||
| x | 75 | B | 3 | 3 | CONCRETE | $ 0.00 | ||||||||||||
| D | 76 | B | 3 | 03 11 13.00 10 | 03 11 13.00 10 | Structural cast in place concrete forming | $ 0.00 | |||||||||||
| x | 77 | B | 3 | 03 11 13.00 10 | l | $ 0.00 | ||||||||||||
| x | 78 | B | 3 | 03 11 13.00 10 | l | |||||||||||||
| D | 76 | B | 3 | 03 11 13.00 10 | 03 15 00.00 10 | Concrete accessories | $ 0.00 | |||||||||||
| x | 77 | B | 3 | 03 11 13.00 10 | l | $ 0.00 | ||||||||||||
| x | 78 | B | 3 | 03 11 13.00 10 | l | |||||||||||||
| D | 79 | B | 3 | 03 20 00.00 10 | 03 20 00.00 10 | Concrete Reinforcing | $ 0.00 | |||||||||||
| x | 80 | B | 3 | 03 20 00.00 10 | l | $ 0.00 | ||||||||||||
| x | 81 | B | 3 | 03 20 00.00 10 | l | |||||||||||||
| D | 82 | B | 3 | 03 30 00 | 03 30 00 | Cast-in-Place Concrete | $ 0.00 |
| x | 85 | B | 4 | 4 | MASONRY | $ 0.00 | |||
| D | 86 | B | 4 | 04 20 00 | 04 20 00 | Masonry | $ 0.00 | ||
| x | 87 | B | 4 | 04 20 00 | l | $ 0.00 | |||
| x | 88 | B | 4 | 04 20 00 | l | ||||
| x | 89 | B | 5 | 5 | METALS | $ 0.00 | |||
| D | 90 | B | 5 | 05 05 23 | 05 05 23.16 | Welding, Structural | $ 0.00 | ||
| x | 91 | B | 5 | 05 05 23 | l | $ 0.00 | |||
| x | 92 | B | 5 | 05 05 23 | l | ||||
| D | 93 | B | 5 | 05 12 00 | 05 12 00 | Structural Steel | $ 0.00 | ||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | |||
| x | 95 | B | 5 | 05 12 00 | l | ||||
| D | 93 | B | 5 | 05 12 00 | 05 50 13 | Miscellaneous Metal fabrications | $ 0.00 | ||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | |||
| x | 95 | B | 5 | 05 12 00 | l | ||||
| D | 93 | B | 5 | 05 12 00 | 05 50 14 | Structural Metal fabrications | $ 0.00 | ||
| x | 94 | B | 5 | 05 12 00 | l | $ 0.00 | |||
| x | 95 | B | 5 | 05 12 00 | l | ||||
| x | 85 | B | 4 | 6 | WOOD PLASTIC AND COMPOSITES | $ 0.00 | |||
| D | 86 | B | 4 | 04 20 00 | 06 10 00 | Rough Carpentry | $ 0.00 | ||
| x | 87 | B | 4 | 04 20 00 | l | $ 0.00 | |||
| x | 88 | B | 4 | 04 20 00 | l | ||||
| D | 86 | B | 4 | 04 20 00 | 06 20 00 | Finish Carpentry | $ 0.00 | ||
| x | 87 | B | 4 | 04 20 00 | l | $ 0.00 | |||
| x | 88 | B | 4 | 04 20 00 | l | ||||
| x | 109 | B | 7 | 7 | THERMAL AND MOISTURE PROTECTION | $ 0.00 | |||
| 07 21 00 | Mineral Blanket Fiber Insulation |
| D | 110 | B | 7 | 07 21 16 | 07 41 63 | Fabricated roof panels assemblies | $ 0.00 | ||
| x | 111 | B | 7 | 07 21 16 | l | $ 0.00 | |||
| x | 112 | B | 7 | 07 21 16 | l | ||||
| D | 110 | B | 7 | 07 21 16 | 07 44 56 | Fiber reinforced cementitious panels | $ 0.00 | ||
| x | 111 | B | 7 | 07 21 16 | l | $ 0.00 | |||
| x | 112 | B | 7 | 07 21 16 | l | ||||
| D | 113 | B | 7 | 07 41 63 | 07 60 00 | Flashing and Sheet Metal | $ 0.00 | ||
| x | 114 | B | 7 | 07 41 63 | l | $ 0.00 | |||
| x | 115 | B | 7 | 07 41 63 | l | ||||
| D | 113 | B | 7 | 07 41 63 | 07 92 00 | Joint Sealants | $ 0.00 | ||
| x | 114 | B | 7 | 07 41 63 | l | $ 0.00 | |||
| x | 115 | B | 7 | 07 41 63 | l | ||||
| x | 125 | B | 8 | 8 | OPENINGS | $ 0.00 | |||
| D | 126 | B | 8 | 08 11 13 | 08 11 13 | Steel doors and frames | $ 0.00 | ||
| x | 127 | B | 8 | 08 11 13 | l | $ 0.00 | |||
| x | 128 | B | 8 | 08 11 13 | l | ||||
| D | 126 | B | 8 | 08 11 13 | 08 11 16 | Aluminum doors and frames | $ 0.00 | ||
| x | 127 | B | 8 | 08 11 13 | l | $ 0.00 | |||
| x | 128 | B | 8 | 08 11 13 | l | ||||
| D | 135 | B | 8 | 08 71 00 | 08 36 19 | Vertical Lift Doors | $ 0.00 | ||
| x | 136 | B | 8 | 08 71 00 | l | $ 0.00 | |||
| x | 137 | B | 8 | 08 71 00 | l | ||||
| D | 135 | B | 8 | 08 71 00 | 08 51 13 | Aluminium Windows | $ 0.00 | ||
| x | 136 | B | 8 | 08 71 00 | l | $ 0.00 | |||
| x | 137 | B | 8 | 08 71 00 | l | ||||
| D | 138 | B | 8 | 08 81 00 | 08 71 00 | Door Hardware | $ 0.00 | ||
| x | 139 | B | 8 | 08 81 00 | l | $ 0.00 | |||
| x | 140 | B | 8 | 08 81 00 | l | ||||
| D | 141 | B | 8 | 08 91 00 | 08 81 00 | Glazing | $ 0.00 | ||
| x | 142 | B | 8 | 08 91 00 | l | $ 0.00 | |||
| x | 143 | B | 8 | 08 91 00 | l | ||||
| x | 144 | B | 9 | 9 | FINISHES | $ 0.00 | |||
| D | 145 | B | 9 | 09 06 90 | 09 06 90 | Color Schedule | $ 0.00 | ||
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| x | 147 | B | 9 | 09 06 90 | l | ||||
| D | 145 | B | 9 | 09 06 90 | 09 06 90 | Stucco | $ 0.00 | ||
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| x | 147 | B | 9 | 09 06 90 | l | ||||
| D | 145 | B | 9 | 09 06 90 | 09 06 90 | Veneer plaster | $ 0.00 |
| x | 146 | B | 9 | 09 06 90 | l | $ 0.00 | |||
| PU | 154 | B | 9 | 09 30 00 | 09 29 00 | Gypsum Board | $ 0.00 | ||
| x | 155 | B | 9 | 09 30 00 | l | $ 0.00 | |||
| x | 156 | B | 9 | 09 30 00 | l | ||||
| PU | 154 | B | 9 | 09 30 00 | 09 30 13 | Ceramic Tiling | $ 0.00 | ||
| x | 155 | B | 9 | 09 30 00 | l | $ 0.00 | |||
| x | 156 | B | 9 | 09 30 00 | l | ||||
| PU | 154 | B | 9 | 09 30 00 | 09 51 00 | Acoustical ceilngs | $ 0.00 | ||
| x | 155 | B | 9 | 09 30 00 | l | $ 0.00 | |||
| x | 156 | B | 9 | 09 30 00 | l | ||||
| D | 160 | B | 9 | 09 90 00 | 09 90 00 | Paints and Coatings | $ 0.00 | ||
| x | 161 | B | 9 | 09 90 00 | l | $ 0.00 | |||
| x | 162 | B | 9 | 09 90 00 | l | ||||
| x | 163 | B | 10 | 10 | SPECIALTIES | $ 0.00 | |||
| D | 167 | B | 10 | 10 28 13 | 10 14 00.20 | Interior Signage | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| D | 167 | B | 10 | 10 28 13 | 10 28 13 | Toilet Accessories | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| D | 170 | B | 10 | 10 44 16 | 10 44 16 | Fire Extinguishers | $ 0.00 | ||
| x | 194 | B | 13 | 13 48 00 | l | $ 0.00 | |||
| x | 195 | B | 13 | 13 48 00 | l | ||||
| x | 163 | B | 10 | 12 | FURNISHINGS | $ 0.00 | |||
| D | 167 | B | 10 | 10 28 13 | 12 36 00 | Countertops | $ 0.00 | ||
| x | 168 | B | 10 | 10 28 13 | l | $ 0.00 | |||
| x | 169 | B | 10 | 10 28 13 | l | ||||
| x | 196 | B | 22 | 22 | PLUMBING | $ 0.00 | |||
| D | 197 | B | 22 | 22 00 00 | 22 00 00 | Plumbing, General Purpose | $ 0.00 | ||
| x | 198 | B | 22 | 22 00 00 | l | $ 0.00 | |||
| x | 199 | B | 22 | 22 00 00 | l | ||||
| x | 200 | B | 23 | 23 | HEATING, VENTILATING, AND AIR CONDITIONING | $ 0.00 | |||
| D | 201 | B | 23 | 23 00 00 | 23 00 00 | Air Supply, Distribution, Ventilation and Exhaust Systems | $ 0.00 | ||
| x | 202 | B | 23 | 23 00 00 | l | $ 0.00 | |||
| x | 203 | B | 23 | 23 00 00 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 03 00.00 20 | Basic Mechanical Materials and Methods | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 07 00 | Thermal insulation for Mechanical Systems | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 23 00 | Refrigerant Piping | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 81 00.00 20 | Unitary Air Conditioning Equipment | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| D | 216 | B | 23 | 23 34 23.00 40 | 23 82 02.00.10 | Unitary Heating and Cooling Equipment | $ 0.00 | ||
| x | 217 | B | 23 | 23 34 23.00 40 | l | $ 0.00 | |||
| x | 218 | B | 23 | 23 34 23.00 40 | l | ||||
| x | 225 | B | 26 | 26 | ELECTRICAL | $ 0.00 | |||
| D | 226 | B | 26 | 26 20 00 | 26 00 00.00 20 | Basic Electrical Materials and Methods | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 05 00.00 40 | Common Work Results for Electrical | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 05 19.10.10 | Insulated Wire and Cable | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 12 19. 10 | Three Phase Pad Mounted Transformers | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 226 | B | 26 | 26 20 00 | 26 36 00.00. 10 | Automatic Transfer Switch and BY-PASS / Isolation Switch | $ 0.00 | ||
| x | 227 | B | 26 | 26 20 00 | l | $ 0.00 | |||
| x | 228 | B | 26 | 26 20 00 | l | ||||
| D | 235 | B | 26 | 26 32 33.00 10 | 26 41 01.00 40 | Lightning Protection System | $ 0.00 | ||
| x | 236 | B | 26 | 26 32 33.00 10 | l | $ 0.00 | |||
| x | 237 | B | 26 | 26 32 33.00 10 | l | ||||
| D | 238 | B | 26 | 26 51 00.00 40 | 26 51 00 | Lighting | $ 0.00 | ||
| x | 239 | B | 26 | 26 51 00.00 40 | l | $ 0.00 | |||
| x | 240 | B | 26 | 26 51 00.00 40 | l | ||||
| x | 244 | B | 27 | 27 | COMMUNICATIONS | $ 0.00 | |||
| P | 245 | B | 27 | 27 10 00 | 27 10 00 | Building Telecommunications Cabling System | $ 0.00 |
| x | 246 | B | 27 | 27 10 00 | l | $ 0.00 | ||||
| x | 248 | B | 28 | 28 | Electronic Safety and Security | $ 0.00 | ||||
| P | 245 | B | 27 | 27 10 00 | 28 10 05 | Electronic Security Systems(ESS) | $ 0.00 | |||
| x | 246 | B | 27 | 27 10 00 | l | $ 0.00 | ||||
| x | 247 | B | 27 | 27 10 00 | l | |||||
| P | 245 | B | 27 | 27 10 00 | 28 23 23.00 10 | Closed Circuit Television Systems | $ 0.00 | |||
| x | 246 | B | 27 | 27 10 00 | l | $ 0.00 | ||||
| x | 247 | B | 27 | 27 10 00 | l | |||||
| P | 245 | B | 27 | 27 10 00 | 28 31 64.00 10 | Fire detection and Alarm System Addresable | $ 0.00 | |||
| x | 246 | B | 27 | 27 10 00 | l | $ 0.00 | ||||
| x | 247 | B | 27 | 27 10 00 | l | |||||
| x | 252 | C | C. EXTERIOR WORKS | $ 0.00 | ||||||
| x | 253 | C | 31 | 31 | EARTHWORK | $ 0.00 | ||||
| D | 254 | C | 31 | 31 00 00 | 31 00 00 | Earthwork | $ 0.00 | |||
| x | 255 | C | 31 | 31 00 00 | l | $ 0.00 | ||||
| x | 256 | C | 31 | 31 00 00 | l | |||||
| D | 257 | C | 31 | 31 11 00 | 31 10 00 | Clearing for Civil Works | $ 0.00 | |||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | ||||
| x | 259 | C | 31 | 31 11 00 | l | |||||
| D | 257 | C | 31 | 31 11 00 | 31 11 00 | Clearing and Grubbing | $ 0.00 | |||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | ||||
| x | 259 | C | 31 | 31 11 00 | l | |||||
| D | 260 | C | 31 | 31 23 00.00 20 | 31 23 00.00 20 | Excavation and Fill | $ 0.00 | |||
| x | 261 | C | 31 | 31 23 00.00 20 | l | $ 0.00 | ||||
| x | 262 | C | 31 | 31 23 00.00 20 | l | |||||
| D | 257 | C | 31 | 31 11 00 | 31 60 00 | Foundation Preparation | $ 0.00 | |||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | ||||
| x | 259 | C | 31 | 31 11 00 | l | |||||
| x | 270 | C | 32 | 32 | EXTERIOR IMPROVEMENTS | $ 0.00 | ||||
| D | 257 | C | 31 | 31 11 00 | 32 16 13 | Concrete Sidewalks and Curbs and Gutters | $ 0.00 | |||
| x | 258 | C | 31 | 31 11 00 | l | $ 0.00 | ||||
| x | 259 | C | 31 | 31 11 00 | l | |||||
| D | 271 | C | 32 | 32 92 23 | 32 31 13 | Chain Link Fences and Gates | $ 0.00 | |||
| x | 272 | C | 32 | 32 92 23 | l | $ 0.00 | ||||
| x | 273 | C | 32 | 32 92 23 | l | |||||
| D | 271 | C | 32 | 32 92 23 | 32 92 23 | Sodding | $ 0.00 | |||
| x | 272 | C | 32 | 32 92 23 | l | $ 0.00 | ||||
| x | 273 | C | 32 | 32 92 23 | l | |||||
| x | 274 | C | 33 | 33 | UTILITIES | $ 0.00 | ||||
| P | 275 | C | 33 | 33 11 00 | 33 11 00 | Water Distribution | $ 0.00 | |||
| x | 276 | C | 33 | 33 11 00 | l | $ 0.00 | ||||
| x | 277 | C | 33 | 33 11 00 | l | |||||
| P | 278 | C | 33 | 33 30 00 | 33 30 00 | Sanitary Sewer | $ 0.00 | |||
| x | 279 | C | 33 | 33 30 00 | l | $ 0.00 | ||||
| x | 280 | C | 33 | 33 30 00 | l | |||||
| P | 278 | C | 33 | 33 30 00 | 33 40 00 | Storm Drainage Utilities | $ 0.00 | |||
| x | 279 | C | 33 | 33 30 00 | l | $ 0.00 | ||||
| x | 280 | C | 33 | 33 30 00 | l | |||||
| P | 278 | C | 33 | 33 30 00 | 33 70 02.00 10 | Electrical Distribution System Underground | $ 0.00 | |||
| x | 279 | C | 33 | 33 30 00 | l | $ 0.00 | ||||
| x | 280 | C | 33 | 33 30 00 | l | |||||
| D | 287 | C | 33 | 33 71 01.00 40 | 33 71 02 | Underground Electrical and Telecomunications Distribution | $ 0.00 | |||
| x | 288 | C | 33 | 33 71 01.00 40 | l | $ 0.00 | ||||
| x | 289 | C | 33 | 33 71 01.00 40 | l | |||||
| D | 287 | C | 33 | 33 71 01.00 40 | 33 82 00 | Telecomunications and Exterior Plant (OSP) | $ 0.00 | |||
| x | 288 | C | 33 | 33 71 01.00 40 | l | $ 0.00 | ||||
| x | 289 | C | 33 | 33 71 01.00 40 | l | |||||
| x | 290 | D | D. MARKUPS | $ 0.00 | ||||||
| x | 291 | D | D | D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 | ||||
| x | 292 | D | D | D | Administration | % | $ 0.00 | |||
| x | 293 | D | D | D | Unforeseens | % | $ 0.00 | |||
| x | 294 | D | D | D | Profit | % | $ 0.00 | |||
| x | 295 | D | D | D | TAX(Over the profit value) | % | $ 0.00 | |||
| x | 296 | D | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Two Warehouses Manual Eradication and Rural Security Page &P of &N CENOP - CNP San Luis Tolima, COLOMBIA
Sheet2
Sheet3 image1.emf