PAVANA

IMPROVEMENT OF EXISTING FACILITIES FOR THE
BORDER POLICE OF HONDURAS AT LA PAVANA
CHOLUTECA- HONDURASTEGUCIGALPA - HONDURAS
INDEPENDENT GOVERNMENT COST ESTIMATE
CLNDescriptionUnit PriceUnit of IssueQTYTotal
1Preliminary Work in accordance with the Statement of Work C.1.1LS1
2Construction of building # 1 (Inspection Site for trucks) in accordance with the Statement of Work C.1.2LS1
3Construction of building # 2 (Inspection Site for trucks) in accordance with the Statement of Work C.1.3LS1
4Remodel and extension of building # 3 (Inspection Site for trucks) in accordance with the Statement of Work C.1.4LS1
5Hydraulic and Sanitary Systems in accordance with the Statement of Work C.1.5LS1
6Construction of the Electric System in accordance with the Statement of Work Work C.1.6LS1
7Construction of Special Systems in accordance with the Statement of Work C.1.7LS1
SUB TOTAL (Direct Cost)- 0
DBA COST
OVERHEAD- 0
PROFIT- 0
TOTAL ESTIMATED COST- 0

BREAKDOWN

IMPROVEMENT OF EXISTING FACILITIES FOR THE
BORDER POLICE OF HONDURAS AT LA PAVANA
CHOLUTECA- HONDURASTEGUCIGALPA - HONDURAS
INDEPENDENT GOVERNMENT COST ESTIMATE
CLNDescriptionQTYUNITUnit PriceTotal
1Preliminary Work in accordance with the Statement of Work C.1.1- 0
1.01Implementation of temporary facilities1.00Global- 0
1.02Structural Designs381.89m2- 0
1.03Designs for the sewage and water systems88.33m2- 0
1.04Designs for the electric system381.89m2- 0
1.05Nationalize of the designs381.89m2- 0
1.06Demolition of the existing walls5.00m2- 0
1.07Demolition of the existing ramp38.19m2- 0
1.08Salaries for Project manager, QQA, Technical support1.00Global- 0
2Construction of building # 1 (Inspection Site for trucks) in accordance with the Statement of Work C.1.2- 00
2.01Demolition of concrete floor20.62m2- 0
2.02Excavation trench19.96m- 0
2.03Excavations30.92m3- 0
2.04Compacted backfilling with natural soil6.48m3- 0
2.05Compacted backfilling with granular material soil6.48m3- 0
2.06Concrete for foudations4.76m3- 0
2.07Steel reinforcement for foundations463.58kg- 0
2.08Main metallic structure421.02ml- 0
2.09Metallic Structure for roof198.10m2- 0
2.10Thermal and acoustic roof198.10m2- 0
2.11Metalic Gutter24.76m2- 0
2.12PVC down spout20.52m- 0
2.13Salaries for Project manager, QQA, Technical support1.00Global- 0
3Construction of building # 2 (Inspection Site for trucks) in accordance with the Statement of Work C.1.3- 0
3.01Excavation trench33.46m- 0
3.02Excavations12.00m2- 0
3.03Compacted backfilling with natural soil6.00m3- 0
3.04Compacted backfilling with granular material soil74.50m3- 0
3.05Concrete for foudations5.00m3- 0
3.06Steel reinforcement for foundations630.85kg- 0
3.07Main metallic structure47.76m- 0
3.08Metallic Structure for roof105.99m2- 0
3.09Thermal and acoustic roof105.99m2- 0
3.10Metalic Gutter18.53m2- 0
3.11PVC down spout13.50m- 0
3.12Concrete floor25.69m3- 0
3.13Joints45.77m- 0
3.14Salaries for Project manager, QQA, Technical support1.00Global- 0
4Remodel and extension of building # 3 (Inspection Site for trucks) in accordance with the Statement of Work C.1.4- 0
4.01Excavation trench76.82m- 0
4.02Excavations19.20m2- 0
4.03Panel W wall415.73m2- 0
4.04Bond beam280.02m- 0
4.05Compacted backfilling with natural soil9.60m3- 0
4.06Compacted backfilling with granular material soil30.75m3- 0
4.07Concrete for foudations11.35m3- 0
4.08Concrete floor5.73m3- 0
4.09Concrete for stairs1.96m3- 0
4.10Concrete for slab5.68m3- 0
4.11Metllic columns for access12.00Unit- 0
4.12Steel reinforcement1,813.93kg- 0
4.13Metallic Structure110.32m2- 0
4.14Thermal and acoustic roof110.32m2- 0
4.15Metalic Gutter25.42m2- 0
4.16PVC down spout18.00m- 0
4.17New ceramic wall bathroom186.56m2- 0
4.18Non-skit ceramic floor tiles98.38m2- 0
4.19Non-skit ceramic exterior46.12m2- 0
4.20Porcelain floor tiles59.43m3- 0
4.21Epoxy treatment for floor229.68m2- 0
4.22Mop boards184.64m- 0
4.23Acrylic paint1,128.23m2- 0
4.24Concrete block walls stucco415.73m2- 0
4.25Counter tops manufactured at the factory8.76m- 0
4.26Ceiling type fiber mineral59.43m2- 0
4.27Bathroom divisions32.63m2- 0
4.28Mirrors5.40m2- 0
4.29Doors ADR06510.00Unit- 0
4.30Doors MD1205.00Unit- 0
4.31Doors MD2001.00Unit- 0
4.32Windows23.38m2- 0
4.33Metallic protection for window7.30m3- 0
4.34Concrete sidewalks36.92m2- 0
4.34Concrete borders58.00m- 0
4.35native grass47.25m2- 0
4.35Salaries for Project manager, QQA, Technical support1.00Global- 0
5Hydraulic and Sanitary Systems in accordance with the Statement of Work C.1.5- 0
Construction of a potable water system
5.01Toilet connection10.00Unit- 0
5.02Wash basin connection10.00Unit- 0
5.03Urinal connection6.00Unit- 0
5.04Laundry conection5.00Unit- 0
5.05Water system 3/4" PVC pipe23.04m- 0
5.06Water system 2" PVC pipe30.50m- 0
5.07Water system 1" PVC pipe6.00m- 0
5.08Excavation trench59.54m- 0
5.09Water outlet 1/2"36.00Unit- 0
5.102" Gate valve2.00Unit- 0
5.113/4" Gate valve2.00Unit- 0
5.12Steel reiforcement1,749.50kg- 0
5.13Concrete for Cistern14.87m3- 0
5.14Pump house6.45m2- 0
5.15Hydraulic pump2.00Units- 0
5.16Hydro-pneumatic tank2.00Units- 0
5.17Water system 1-1/2" fire pipe30.40m- 0
5.18Fire house and boxes2.00Unit- 0
Construction of a sewer system
5.19Excavation trench for pipes115.20m- 0
5.20back filling for trenches115.20m- 0
5.21Sewage pipe 2"19.60m- 0
5.22Sewage pipe 4"66.40m- 0
5.23Sewage pipe 3"29.20m- 0
5.24Sewage pipe 200mm6.00m- 0
5.25Sewage system down spot pipe 4"12.00m- 0
5.26Sewage system ventilation 2"9.00m- 0
5.27back filling for trenches of sewage system125.00m- 0
5.28Inspection box2.00Unit- 0
5.294" sewage outlet10.00Unit- 0
5.303" sewage outlet17.00Unit- 0
5.312" sewage outlet10.00Unit- 0
5.32Steel reiforcement1,354.37kg- 0
5.33Concrete for septic tank11.51m3- 0
5.34Sewage pipe 4" for filtration field450m- 0
5.35Salaries for Project manager, QQA, Technical support1.00Global- 0
6Construction of the Electric System in accordance with the Statement of Work Work C.1.6- 0
6.01Ceiling lamp conection66.00Unit- 0
6.02Spot light11.00Unit- 0
6.03Pendant light11.00Unit- 0
6.04Wall mounted lamp31.00Unit- 0
6.052X32W fluorescent light9.00Unit- 0
6.06Industrial pendant lamp4.00Unit- 0
6.07Light switch8.00Unit- 0
6.08Duble Light switch (vaiven)27.00Unit- 0
6.09Double light switch2.00Unit- 0
6.10Movement sensors7.00Unit- 0
6.11Double polarized outlet 110v40.00Unit- 0
6.12Drayer outlet 220v2.00Unit- 0
6.13Main distribution board2.00Unit- 0
6.14main wiring for electric connection70.00m- 0
6.15Salaries for Project manager, QQA, Technical support1.00Global- 0
7Construction of Special Systems in accordance with the Statement of Work C.1.7- 0
7.01Emergency light10.00Unit- 0
7.02Fire sensors6.00Unit- 0
7.03Fire Alarm Panel1.00Global- 0
7.04Extinger CO21.00Unit- 0
7.05Electrical line to AC main board20.00m- 0
7.06Split system1.00Unit- 0
7.07dainage for AC10.00m- 0
7.08Salaries for Project manager, QQA, Technical support1.00Global- 0
SUB TOTAL (DIRECT COST)- 0