J-3-5_ARCH_K9_OIJ_AD-04.pdf

PDF 217 KB Posted

Attached to
Costa Rica OIJ Canine Unit Infrastructure Improvement
Solicitation number
19AQMM18R0060
Issued by

About this file

J-3-5_ARCH K9 OIJ AD-04

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lv.+ 100.25

UP

Lv.+ 101.70

Lv.+ 100.50

Lv.+ 100.25

UP

UP

Lv.+ 99.45

Lv.+ 99.86

UP

UP

MEN'S DRESSING ROOM

CODE AREA

BATHROOM

103 STEPS

INSPECTION

ACCESSES HALL 2

WATCHING ROOM

ACCESSES HALL 1

107 MONITORING ROOM

108 LABORATORY

WOMEN'S DRESSING ROOM

DRESSING ROOM HALL

112 DOGS' TRAINING ROOM

113 STORAGE ROOM

PEDESTRIAN ACCESSES

AREA

BAÑO

GRADAS ACCESO

INSPECCION

HALL ACCESO 2

SALA DE OBSERVACION

HALL ACCESO 1

SALA DE MONITOREO

LABORATORIO

VESTIDOR MUJERES

HALL VESTIDORES

VESTIDOR NOMBRES

ENTRENAMIENTO CANES

BODEGA

ACCESO PEATONAL

115 VEHICULAR PLATFORM PLATAFORMA VEHICULAR

116 VEHICULAR RAMP RAMPA VEHICULAR

IN

TE

RN

A

TIO

N

A L

N A

RC

O

TIC

S

A N

D L

A W

RE

M

O D

EL

IN

G A

N D

E

XT

EN

SI

O N

O F

TH

E

IN

SP

EC

TIO

N

SI

TE

F

O R

TH

E

C A

N N

IN

E

UN

IT

O F

TH

E

O

IJ

EN

FO

RC

EM

EN

T

A

FF

A

IR

S

- I

N L

C O

ST

A

R

IC

A

FLOOR PLAN (PLANTA ARQUITECTONICA)

SIMBOLOGY

Measures for windows stated in this plan are for reference, Average 1.56

2.00 the contractor shall take the measures in site.

WINDOWS SCHEDULE

NOTE:

SCHEDULE OF DOORS (RESUMEN DE PUERTAS)

.90

1.36

.90

TIMBER DOORS (PUERTAS DE MADERA)

.95

METALLIC DOORS (PUERTAS METALICAS)

1.00

1.00

1.20

4.50

ROLING UP DOOR (PUERTA ENRROLLABLE)

CODE AREA FIRST FLOOR

101 INSPECCION

INSPECTION

BAÑO

103 STEPS

GRADAS ACCESO

104 WATCHING ROOM

SALA DE OBSERVACION

105 ACCESSES HALL 1

HALL ACCESO 1

107 MONITORING ROOM

SALA DE MONITOREO

110 DRESSING ROOM HALL

HALL VESTIDORES

ACCESSES HALL 2

HALL ACCESO 2

LABORATORY

LABORATORIO

111 MEN'S DRESSING ROOM

VESTIDOR NOMBRES

112 DOGS' TRAINING ROOM

ENTRENAMIENTO CANES

113 STORAGE ROOM

BODEGA

116 VEHICULAR RAMP

RAMPA VEHICULAR

PEDESTRIAN ACCESS

ACCESO PEATONAL

VEHICULAR PLATFORM

PLATAFORMA VEHICULAR

SM

O

O

TH

P

LA

ST

ER

S

TU

C

C O

109 WOMEN'S DRESSING ROOM

VESTIDOR MUJERES

FINISHING SCHEDULE

C

ER

A M

IC

A

D E

PA

RE

D O

EP

O

XY

F

LO

O

RI

N

G S

YS

TE

M

TR

A

TA

M

IE

N

TO

E

PO

XI

C

O P

A

RA

P

IS

O

C

ER

A M

IC

T

IL

E

FLOOR

PL

A

IN

C

O N

C

RE

TE

B

LO

C

K

WALLS CEILING

EN

LU

SI

D

O L

IS

O

E

ST

UC

A D

O

MOPBOARD

PO

RC

EL

A

IN

F

LO

O

R

TIL

E

PO

RC

EL

A N

A

TO

D E

PI

SO

C O

N C

RE

TE

C

O N

C

RE

TO

PI

N

TU

RA

A C

RI

LI

C A

A C

RY

LI

C P

A

IN

T

BL

O

Q

UE

R

EV

O C

A D

O

(PISOS) (PAREDES) (C. RASO) (ZOCALO)

C

IE

LO

R

A

SO

T

IP

O A

RM

ST

RO

N

G

RM

ST

RO

N G

C

EI

LI

N

G

M

D

ER

A T

RA

TA

D A (H

=1 cm m ín im o)

TIM

BE

R (H cm m in im um

BATHROOM

4.50

EXTERIOR SLIDING DOOR (PUERTA EXTERIOR CORREDISA)

113112

A N

TIS

KI

D C

ER

A

M

IC

F

LO

O R

TIL

E

C

ER

A M

IC

A

D E

PI

SO

FLOOR DETAIL #1 FOR EXTENSION AREA

(DETALLE DE PISO #1 PARA AREA DE EXTENSION)

c m c m

WITH GRANULAS MATERIAL

MESH 150x150x6.35mm

ELECTROWELDED

CONCRETE

SOIL IMPROVEMENT

File details come from the government source that posted it.