This is an Addendum #1 issued by the Palm Beach County Board of County Commissioners, Facilities Development and Operations Department, for Project 19331, Jim Brandon Equestrian Center - Microphone System Replacement. The addendum, issued on March 19, 2019, modifies the original bid documents and extends the bid due date from March 21, 2019 to March 28, 2019 at 2:00 PM. The project scope includes replacing the wireless microphone system, installing a user interface touchscreen allowing microphone input assignment to speaker zones, installing microphone input receptacles at each arena, and replacing speakers in the covered arena. The work is divided into two primary lots: Lot 1 covers the wireless microphone system installation requiring a Level 2 Shure Integrated Systems Certification, and Lot 2 covers the QSC Q-SYS Core processor and touchscreen controller installation. Work must be completed within sixty days of permit issuance during standard business hours (7:00 AM to 5:00 PM, Monday through Friday). The project is located at 7500 Forest Hill Blvd., West Palm Beach, Florida.
The bid package requires submission of the completed bid form, Schedules 1 and 2, and bid security for bids of $200,000 or more. Liquidated damages accrue at $80 per day for schedule delays. The addendum deletes Lot 3 (120 VAC Service Bid Price) from the bid form and replaces the Project Requirements document dated February 15, 2019 with the updated version dated March 18, 2019, which includes Exhibit 7 defining required coverage areas. Bidders must acknowledge receipt of this addendum and all previously issued addenda and attach them to bid forms as binding contract documents. The work is subject to Critical Facilities Background Check requirements for all badged employees. All materials must meet or exceed Florida Building Code standards, and the contractor provides a twelve-month warranty on all equipment, materials, and labor from substantial completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19331 IFQ Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADD1-1
BOARD OF COUNTY COMMISSIONERS
PALM BEACH COUNTY, FLORIDA
FACILITIES DEVELOPMENT AND OPERATIONS DEPARTMENT
PROCUREMENT & PROJECT IMPLEMENTATION GROUP
PROJECT NAME: Jim Brandon Equestrian Center – Microphone System Replacement
PROJECT NUMBER: 19331
ADDENDUM NUMBER: ONE
DATE OF ISSUANCE: March 19, 2019
TO: Prospective Bidders
This addendum forms a part of the contract documents, modifies the original bid documents and shall be as binding as if contained therein.
This Addendum consists of one (1) page and two (2) attachments.
CHANGE TO BID/QUOTATION FORM:
Change bid due date from “March 21, 2019 by 2:00 PM” to read “March 28, 2019 by
2:00 PM”.
CHANGE TO BID FORM:
Delete the Bid Form in its entirety and replace with the attached Bid Form, excluding Lot 3 – 120 VAC Service Bid Price.
CHANGE TO ATTACHMENT D - PROJECT REQUIREMENTS:
Delete Attachment D – Project Requirements dated February 15, 2019 in its entirety and replace with Attachment D – Project Requirements dated March 18, 2019.
Insert Exhibit “7”.
IT IS REQUIRED THAT THIS ADDENDUM NO. ONE (1), AND ANY PREVIOUSLY
ISSUED ADDENDUM(S), BE SIGNED IN THE ACKNOWLEDGMENT OF RECEIPT
BELOW, AND ATTACHED TO THE BID FORMS AND BECOMES PART OF BID
FORMS AND CONTRACT DOCUMENTS.
ACKNOWLEDGMENT OF RECEIPT: _____________________________________
END OF ADDENDUM
Form Rev. 01/23/19 Invitation for Quote – Non-federal
BID FORM
IN ORDER TO BE DEEMED RESPONSIVE TO THIS INVITATION TO QUOTE/BID, THE QUOTE/BID
PACKAGE MUST CONTAIN:
a) This Quote/Bid Form completed and executed.
b) Schedules 1 and 2.
c) Bid Security. (If the bid/quote is $200,000 or more).
THE FOLLOWING MUST BE COMPLETED AND SIGNED BY CONTRACTOR
Lot 1 - Wireless Microphone System
Price:
(written out) (written out) (numeric)
Lot 2 – QSC Q-SYS Core and Touchscreen
Price:
(written out) (written out) (numeric)
Total Bid
Price:
(written out)
TOTAL BID/QUOTE AMOUNT $
Written amount
2. Bidder commits to achieving the APIs applicable to this solicitation as designated on Attachment B and as submitted on its Schedules 1 and 2.
3. Is the Bidder a Palm Beach County Registered S/M/WBE? Yes_____ No_____
4. Commercial Non-Discrimination Certification. The undersigned Bidder hereby certifies and agrees that the following information is correct: In preparing its response to this Solicitation, the Bidder has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial Nondiscrimination Policy as set forth in Resolution 2017-1770 as amended, to wit: discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, gender identity or expression, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination that have occurred or are occurring in the County’s relevant marketplace of Palm Beach County. Without
Form Rev. 01/23/19 Invitation for Quote – Non-federal limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the bid submitted by the Bidder for this Solicitation, and to terminate any contract awarded based on the response. As part of its bid, the Bidder shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Bidder discriminated against its Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a bid to the County, the Bidder agrees to comply with the County’s Commercial Nondiscrimination Policy as described in Resolution 2017-1770 as amended.
BID/QUOTE PROVIDED BY:
Contractor Name
Date Signature
Title
Bid/Quotes Must Contain Original Signatures. No Copies or Faxed Quotes Will Be Accepted
Jim Brandon Equestrian Center - Proj. Req. Page 1 of 8 Microphone System Replacement Project No. 19331
ATTACHMENT D
PROJECT REQUIREMENTS
Annual Contract – Low Voltage
Date: March 18, 2019 Contact: Andrew Gamble, Capital Improvements Division Phone: (561) 233- 2055 Project Title: Jim Brandon Equestrian Center - Microphone System Replacement Project #: 19331 Project Location: 7500 Forest Hill Blvd., West Palm Beach, FL
1. GENERAL
a. The work covered by this Request for Quote consists of, but is not limited to, the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work.
b. Please reference the Annual Contract – Low Voltage for additional requirements.
c. Work to be completed during the hours of 7:00 am to 5:00 pm, Monday through
Friday.
d. Contractor shall contact the Project Manager, within seventy-two (72) hours of
Notice to Proceed to establish scheduling etc. required for project implementation.
e. Work to be completed within sixty (60) days of permit issuance. Permit application, if required, is to be submitted by Contractor within five (5) days of Notice to Proceed and due diligence exercised to address all Building Department comments.
f. Liquidated damages will accrue in the amount of $80 per day.
g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment.
h. Contractor is responsible for obtaining all measurements during the site inspection.
2. SCOPE OF WORK
The purpose of this project is to replace the wireless microphone system, provide the customer with a user interface allowing each microphone input to be assigned to one or all speaker zones, install microphone input receptacles at each arena and replace the speakers in the covered arena. Please refer to the following:
Exhibit “1” Section 270640 PBC Multimedia Equipment Guidelines
Exhibit “2” Section 275116 PBC Public Address Equipment Guidelines
Exhibit “3” Axient Digital Wireless System
Jim Brandon Equestrian Center - Proj. Req. Page 2 of 8
Project No. 19331
Exhibit “4” Wireless Microphone Installation Layout (Lot 1)
Exhibit “5” Touch Panel Screen Example (Lot 2)
Exhibit “6” 120VAC Service Outlets (Lot 3)
Exhibit “7” Required Coverage Area
a. All work, when applicable, shall comply with ESS multimedia specification 270640, revision 04/25/17 (Exhibit “1”) and ESS public address specification 275116, revision 04/25/17 (Exhibit “2”). All substitutions must be approved in writing prior to procurement.
b. Data sheets for all equipment and cabling shall be submitted to ESS for review and approval.
c. Purchase and install all equipment, wiring, and infrastructure. This is a turnkey project.
d. It is the responsibility of the installer to identify the exact location of each antenna to achieve the best reception in the required area of coverage defined in Exhibit 7.
No antenna shall be mounted below 15 foot. All cabling, antenna and electronics shall be encased in non-metal material sealed in such a way as to provide protection from the weather.
e. Notify Project Manager at least a week in advance of work so site visits may be scheduled for inspections and acceptance testing of the installation.
LOT 1 WIRELESS MICROPHONE SYSTEM
a. Installer must have level 2 Shure Integrated Systems Certification and provide references of similar installations of a wireless microphone system of this quality and cost.
b. The installer shall configure 2 AD4Q receivers in quadversity mode sharing the six antennas amongst the three receivers listed below per the Shure proposed design.
c. Replace the existing installed Shure microphone system in ESS Audio Racks 1 and 2 with the new Shure designed wireless microphone system. The new system shall be installed in ESS Audio Rack 2. Return the existing installed Shure wireless microphone system equipment from ESS audio racks 1 and 2 to ESS. Purchase all required equipment, materials and permits. Reference the attached drawing, interconnect diagram and parts list below. Purchase the mounting stands for the UA834WB amplifiers.
Jim Brandon Equestrian Center - Proj. Req. Page 3 of 8
Project No. 19331
ITEM QTY PART NUMBER MANUFACTURER DESCRIPTION REF.DES.
1 AR LMR-400
TIMES MICROWAVE
SYSTEMS LOW LOSS COAXIAL CABLE RG-8 W1-W12
2 2 AD4Q-A SHURE QUAD Rx IN QUADVERSITY WIRELESS RECEIVER A1-A2
3 1 AD4D-A SHURE DUAL CHANNEL WIRELESS RECEIVER A3
4 5 AD2/SM58-G57 SHURE AD HANDHELD MICROPHONES WITH SM58 HEADS
5 2 UA845UWB SHURE ANTENNA DISTRIBUTION AMPLIFIER A4-A5
6 2 UABIAST SHURE POWER FOR MULTIPLE AMPS PS1-PS2
7 2 UA221 SHURE PASSIVE SPLITTER/COMBINER; MODIFIED PER FAQ#2990 CP1-CP2
8 8 UA834WB SHURE INLINE UHF ACTIVE LINE AMPLIFIER AR1-AR8
9 2 UA874US SHURE
DIRECTIONAL LOG PERIODIC WIDE BAND ANTENNA FOR
COVERED ARENA ANT A-1B, ANT B-1B
10 4 SHURE 1/2 WAVE DIPOLE ANTENNA COMES WITH RECEIVER
ANT A-1A, ANT B-1A,
ANT C, ANT D
PARTIAL PARTS LIST
d. Install the new equipment A1-A5 and PS1-PS2 into ESS Audio Rack 2. Provide all wiring needed to connect the system to digital signal processor and connect the distribution amplifiers to the three receivers. Label all devices with the reference designators.
e. Terminate all cabling shown below with appropriate manufacturer recommended connectors.
CABLE # FROM TO
CABLE I.D.
LABEL BOTH ENDS
W1 ESS AUDIO RACK 2 NEMA ENCLOSURE J1 ANT A
W2 ESS AUDIO RACK 3 NEMA ENCLOSURE J1 ANT B
W3 ESS AUDIO RACK 4 NEMA ENCLOSURE J1 ANT C
W4 ESS AUDIO RACK 5 NEMA ENCLOSURE J1 ANT D
W5 NEMA ENCLOSURE J1 NEMA ENCLOSURE J2 ANT A-1
W6 NEMA ENCLOSURE J1 NEMA ENCLOSURE J2 ANT B-1
W7 NEMA ENCLOSURE J1 NEMA ENCLOSURE J2 ANT C-1
W8 NEMA ENCLOSURE J1 NEMA ENCLOSURE J2 ANT D-1
W9 NEMA ENCLOSURE J2 NEMA ENCLOSURE J3 ANT A-1A
W10 NEMA ENCLOSURE J2 NEMA ENCLOSURE J4 ANT B-1A
W11 NEMA ENCLOSURE J2 NEMA ENCLOSURE J7 ANT A-1B
W12 NEMA ENCLOSURE J2 NEMA ENCLOSURE J8 ANT B-1B
CABLE IDENTIFICATION
f. Label four of the UA834WB active inline amplifiers AR1 – AR4. Assemble the mounting stands to the amplifiers and mount in NEMA enclosure J1. Attach cables W1-W4 as shown on the interconnect diagram. Attach W5-W8 on the outputs of the amplifiers in J1.
Jim Brandon Equestrian Center - Proj. Req. Page 4 of 8
Project No. 19331
g. Connect terminated cables W5 and W9 to a UA221 splitter and label the splitter CP1 or Antenna A. Connect terminated cables W6 and W10 to the second UA221 splitter and label the splitter CP2 or Antenna B.
h. Antennas C and D are to be located in or near enclosure J2. Label the amplifier for antenna C (AR7) and the amplifier for antenna D (AR8). Label each amplifier with the appropriate identity ANT C or ANT D.
i. Antenna A-1A is to be installed a minimum in or near enclosure J3. Label the amplifier for antenna A-1A (AR5).
j. Antenna B-1A is to be installed in or near enclosure J4. Label the amplifier for antenna B-1A (AR6).
k. Antenna A-1B is to be installed near enclosure J7. The antenna should be stood off from the metallic structure at least 18 inches. Do not use metallic strapping to secure the antenna.
l. Antenna B-1B is to be installed near enclosure J8. The antenna should be stood off from the metallic structure at least 18 inches. Do not use metallic strapping to secure the antenna.
m. Set all the amplifier gains and make any adjustments to the system required to accomplish wireless microphone coverage in the defined area. Set all the microphone and receiver frequencies.
n. Provide output cables from the receivers to the digital signal processing unit.
Identify, label and connect cables as listed below.
CABLE I.D. TO DESCRIPTION
WM1 RECEIVER A1 OUTPUT 1 DSP MIC/LINE INPUT 1 WIRELESS MICROPHONE 1
WM2 RECEIVER A1 OUTPUT 3 DSP MIC/LINE INPUT 2 WIRELESS MICROPHONE 2
WM3 RECEIVER A2 OUTPUT 1 DSP MIC/LINE INPUT 3 WIRELESS MICROPHONE 3
WM4 RECEIVER A2 OUTPUT 3 DSP MIC/LINE INPUT 4 WIRELESS MICROPHONE 4
WM5 RECEIVER A3 OUTPUT 1 DSP MIC/LINE INPUT 5 WIRELESS MICROPHONE 5
FROM
CABLE IDENTIFICATION
o. Perform a full functional test of all 5 microphones within the required area with an ESS representative.
LOT 2 QSC Q-SYS CORE AND TOUCHSCREEN
a. Installer must have experience programming QSC Core products and be able to supply references for similar work.
b. Purchase the parts listed in the table below.
Jim Brandon Equestrian Center - Proj. Req. Page 5 of 8
Project No. 19331
QTY PART NUMBER DESCRIPTION
1 Q-SYS CORE110F-NA 8 X 8 BALANCED AUDIO I/O CORE PROCESSOR
1 TSC-80TW-G2-BK TOUCH SCREEN CONTROLLER
1 TSC-80T-G2-BK TABLE TOP MOUNT
6 TSD-MIX31RL ATLAS 3 X 1 MIC/LINE MIXER
2 TSD-RMK ATLAS 19-INCH RACK MOUNT KIT FOR TSD UNITS
CUSTOM TOUCH SCREEN INTERFACE
c. Install two TSD-RMK 19” rack mount kits for TSD units in ESS Audio Rack 2.
d. Install six TSD-MIX31RL 3 x 1 Mic/Line mixers in the rack mount kits. Label the mixers MK1 – MK6.
e. Terminate the pre-installed hard wired microphone cables to the mixers in a balanced configuration as shown in the tables below.
CABLE # CABLE I.D. DESCRIPTION MIXER INPUT
W20 MK-2W WEST MIC SHOW RING 2 MK2 1
W21 MK-2E EAST MIC SHOW RING 2 MK2 2
W22 MK-3W WEST MIC SHOW RING 3 MK3 1
W23 MK-3E EAST MIC SHOW RING 3 MK3 2
W24 MK-6W WEST MIC TRAINING RING 3 MK6 1
W25 MK-6E EAST MIC TRAINING RING 3 MK6 2
W26 MK-5S SOUTH MIC TRAINING RING 2 MK5 1
W27 MK-5N NORTH MIC TRAINING RING 2 MK5 2
W28 MK-4S SOUTH MIC TRAINING RING 1 MK4 1
W29 MK-4N NORTH MIC TRAINING RING 1 MK4 2
W30 MK-1S SOUTH MIC COVERED ARENA MK1 1
W31 MK-1N NORTH MIC COVERED ARENA MK1 2
HARD WIRED MICROPHONE MIXER TERMINATION
f. XLR connectors shall be terminated to the mixers inputs as defined below.
PIN DESCRIPTION WIRE COLOR
1 SHIELD DRAIN WIRE
2 AUDIO + (HOT) RED
3 AUDIO - (RETURN) BLACK
XLR WIRING
g. Replace the mixer installed in the existing system with the Core 110.
h. The purpose of this replacement is to provide the customer with the ability, through a touchscreen interface, to assign any or all microphones to any or all speaker zone outputs (total 8). All microphones should work simultaneously across all assigned zones. Reference drawing for example of the graphical user interface.
Wireless microphones should be kept together on one page and the hard wired microphones should be kept together.
i. Connect Core inputs and outputs as defined below.
Jim Brandon Equestrian Center - Proj. Req. Page 6 of 8
Project No. 19331
FROM TO FROM TO
CORE 110
MIC/LINE INPUT
SHURE WIRELESS MICROPHONE
RECEIVER OUTPUT
CORE 110
LINE OUTPUTS
CROWN
AMPLIFIER INPUT
1 WIRELESS MICROPHONE #1 1 SPEAKER ZONE 1
2 WIRELESS MICROPHONE #2 2 SPEAKER ZONE 2
3 WIRELESS MICROPHONE #3 3 SPEAKER ZONE 3
4 WIRELESS MICROPHONE #4 4 SPEAKER ZONE 4
5 WIRELESS MICROPHONE #5 5 SPEAKER ZONE 5
6 SPEAKER ZONE 6
FROM TO 7 SPEAKER ZONE 7
CORE 110
FLEX CHANNEL
ATLAS
3 X 1 MIC/LINE MIXER OUTPUT 8 SPEAKER ZONE 8
1 MK1 (COVERED ARENA HARD WIRE)
2 MK2 (SHOW RING 2 HARD WIRE)
3 MK3 (SHOW RING 3 HARD WIRE)
4 MK4 (TRAINING RING 1 HARD WIRE)
5 MK5 (TRAINING RING 2 HARD WIRE)
6 MK6 (TRAINING RING 3 HARD WIRE)
j. Perform a full functional test of the system to ESS for acceptance.
3. SUBMITTALS
All submittals shall be sent to the Project Manager for approval. This includes, but is not limited to, products to be used, methods of installation and requests for information and/or clarification. All submittals must be made by the Contractor and must include all details necessary for the Project Manager and Palm Beach County to make any necessary determinations and stamped as reviewed by the Contractor. A transmittal form must be included which clearly requests data or information and deviations from the contract requirements for which approval is being requested. Failure to provide sufficient information will result in the rejection of the submittal. Where the specifications do not specify a brand name product or where a substitution of a product is not specifically prohibited, the Contractor shall submit their selected products for approval by the Project Manager. Such submittals shall include as much detail, and in a format, as required by the Project Manager, so as to allow the Project Manager to evaluate the proposed substitution.
4. MATERIALS
a. All material shall meet or exceed Florida Building Code and product submittals shall be reviewed and approved by the Owner’s Representative prior to ordering.
b. Materials shall be delivered in their original, unopened packages, and protected from exposure to the elements. Damaged or deteriorated materials shall not be used.
Jim Brandon Equestrian Center - Proj. Req. Page 7 of 8
Project No. 19331
5. TEMPORARY PROTECTION
The Contractor shall protect all workers, staff and the general public from injury. The Contractor shall coordinate and schedule all work with the Project Manager.
6. PROJECT CONDITIONS
Contractor is to coordinate all space and security requirements with the Project Manager. A construction schedule shall be submitted for review and approval prior to pre-construction meeting, including a start date, substantial completion date, and work plan defining which openings will be scheduled on what day. The Contractor shall conduct all work so as to cause the least interference possible with the normal activities of the operations of the facility and surrounding areas. Any damage caused by Contractor (including landscaping and irrigation) shall be the responsibility of the Contractor to repair and return to its original state.
7. PREPARATION
It shall be the responsibility of the Contractor to prep the site at the construction locations.
8. EXAMINATION
Report to the Project Manager, in writing, any imperfections, unacceptable conditions and/or corrections required to be made before commencing work. Any items not identified, documented and reported to PBC in writing, will become part of the contractors’ scope. All other items identified in writing, if approved, shall result in a change order.
9. INSTALLATION
All materials shall be installed in strict accordance with Manufacturer’s written instructions and recommendations. All work shall be done in conformance with applicable Federal, State and Local codes, and established standards.
10. WARRANTY
Contractor warrants all equipment, materials and labor furnished or performed against defects in design, materials and workmanship for a period of twelve (12) months from substantial completion.
11. CLEAN UP
Remove all waste materials, tools and equipment from job site daily. Thoroughly clean the entire job area prior to requesting final inspection.
Jim Brandon Equestrian Center - Proj. Req. Page 8 of 8
Project No. 19331
12. SECURITY
All bidders must have badged employees as identified below prior to beginning work.
This project is subject to: [X] Critical Facilities Background Check
[ ] CJI Facilities Background Check [ ] No Background Check
Exhibit 7
Confidential floor plan may be obtained by contacting FDO-CID-Bids@pbcgov.org or calling
(561) 233-0261.
mailto:FDO-CID-Bids@pbcgov.org
File details come from the government source that posted it. Updated .